HomeMy WebLinkAboutContract 47144-FP3 Department of TP &W Const. Services
DOE# Ad Dat
Project anage":Canadv
Risk ManagementLD.O.E. g Brothern -a- ITWORTH. `;Y sE � 4
CFA Westerman/Scanned o X-i (.o
The Proceeding people have been Contacted
concerning the request for final payment& have ATION AND PUBLIC WORKS
released this project for such payment. ,r PROJECT COMPLETION
Clearance Conducted By Shameka Kennedy i r A Smvy, RN4 D.O.E. Ns: 7500
rr C o
Regarding contract 117500 for MORNINGSTAR SECTION 6 PHASE las required by the 4,9#
TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director
of the TRANSPORTATION& PUBLIC WORKS upon the recommendation of the Assistant Director of the
Transportation&Public Works Department has accepted the project as complete.
Original Contract Prices: $38,887.00
Amount of Approved Change Orders: J§
Revised Contract Amount:
Total Cost Work Completed: $38,887.00
Less Deductions:
Liquidated Damages: Days rr $210.00/Day
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed: $38,887.00
Less Previous Payments: $0.00
Final P lent Due $38,887.00
Recom e ded for Acceptance Date
Asst. Di tor, TPW - Infrastructure Design and Construction
Accepte Date
AN& Director, TRANSPORTATI N & PUBLIC WORKS �9��
Asst. City Manager Date
Comments: C205-541200-203760264183
Fr-C&A L EC0R1
/BUJ 9 2016 R
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name MORNINUSTAR SECTION 6 PHASE I
Contract Limits
Project Type STORM DRAIN
City Project Numbers 02641
DOL Number 7500
Estimate Number I Payment Number I For Period Ending 7/21/2016
CD
City Secretary Contract Number 117500 Contract Time 120'D
Contract Date Days Charged to Date 271
Contract is 100.00 Complete
Project Manager Buckley
Contractor DT UTILITY CONTRACTORS,INC.
2614 CAUSBIE RD
WEATHERFORD, TX 76087
Inspectors LAYER / HOUSTON
Thursday,July 21,2016 Page I of 4
City Project Numbers 02641 DOE Number 7500
Contract Name MORNINGSTAR SECTION 6 PHASE 1 Estimate Number I
Contract Limits Payment Number I
Project Type STORM DRAIN For Period Ending 7/21/2016
Project Funding
STORM DRAIN
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quauity Total Quanity Total
1 TRENCH SAFETY 184 LF $0.50 $92.00 184 $92.00
2 36"RCP CLASS III 165 LF $90.00 $14,850.00 165 $14,850.00
3 24"RCP CLASS III 19 LF $60.00 $1,140.00 19 $1,140.00
4 4'STORM JUNCTION BOX I EA $4,000.00 $4,000.00 1 $4,000.00
5 20'CURB INLET 2 EA $6,100.00 $12,200.00 2 $12,200.00
6 36"PARALLEL HEADWALL I EA $3,800.00 $3,800.00 1 $3,800.00
7 MEDIUM STONE RIPRAP DRY 33 SY $85.00 $2,805.00 33 $2,805.00
Sub-Total of Previous Unit $38,887.00 $38,887.00
Thursday,July 21,2016 Page 2 of 4
City Project Numbers 02641 DOE Number 7500
Contract Name MORNINGSTAR SECTION 6 PHASE 1 Estimate Number I
Contract Limits Payment Number I
Project Type STORM DRAIN For Period Ending 7/21/2016
Project Funding
Contract Information Summary
Original ContractAtnount $38,887.00
Change Orders
Total Contract Price $38,887.00
/ g 1 Ab Total Cost of Work Completed
Date $38,887.00
Contr r Less %Retained $0.00
n Z�! Net Earned $38,887.00
_ Date C {r Earned This Period $38,887.00
tspe tia t
Retainage This Period $0.00
Date Less Liquidated Damages
Proj n r
L� Days @ /Day $0.00
Date r LessPavement Deficiency $0.00
A t.DiNt r/fPW-Infrastructure Design and Construction Less Penalty $0.00
ate Less Previous Payment $0.00
Direct /Contracting Departm t Plus Material on Hand Less 15% $0.00
Balance Due This Payment $38,887.00
Thursday,July 21,2016 Page 3 of 4
City Project Numbers 02641 DOE Number 7500
Contract Name MORNINGSTAR SECTION 6 PHASE 1 Estimate Number I
Contract Limits Payment Number 1
Project Type STORM DRAIN For Period Ending 7/21/2016
Project Funding
i
Project Manager Buckley City Secretary Contract Number 117500
I
Inspectors LAYER / HOUSTON Contract Date
Contractor D T UTILITY CONTRACTORS,INC. Contract Time 120 CD
2614 CAUSBIE RD Days Charged to Date 271 CD
WEATHERFORD, TX 76087 Contract is .000000 Complete
i
i
CITY OF FORT WORTH
SUMMARY OF CHARGES
i
Line Fund Account Center AmountGross Retainage Net
Funded
i
i
I
1
I
II
Total Cost of Work Completed $38,887.00
Less %Retained $0.00
Net Earned $38,887.00
Earned This Period $38,887.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $38,887.00
Thursday,July 21,2016 Page 4 of 4
FORTWORTH rev 03/05/07
TRANSPORTATION&PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:I
NAME OF PROJECT: Morningstar Section 6 Phase 1
PROJECT NO.: 02641 CONTRACTOR: DT Utility Contractors
DOE NO.: 7500
PERIOD FROM.10/16/15 TO: 07/13/16 FINAL INSPECTION DATE: 20-Jul-16
WORK ORDER EFFECTIVE:10/16/2015 CONTRACT TIME: 120 O WO* CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS
THIS 0 0 0 0 271 271
PERIOD
PREVIOUS 0 0 0 0 0 0
PERIOD
TOTALS 0 0 0 0 271 271
TO DATE
*REMARKS:
CONTRAC OR DATE MSACTOR DATE
ENGINEERING DEPARTMENT
i The Cit},of Fort Worth•1000 Throclanorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845 ";= IVIA:
ITY sECRETARY
�-T. ORTHI TX
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Lori Tollett,Vice
President Of D.T. Utility Contractors, Inc.,known to me to be a credible
person,who being by me duly sworn,upon his oath deposed and said;
That all persons, firms, associations, corporations,or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Morningstar, Section 6, Phase 1,Tarrant County,Texas
BY �
Lori Tollett,Vice President
Subscribed and sworn before me on this date 26th of July, 2016.
^�a TANYA DAVIS
Notary Public
a. ,'� STATE OF TEXAS
Notar Public "��a,�;' ID#00576914-4
M Comm.Up.09-28-2017
Parker County,Texas
SURETEC INSURANCE
9737 Great Hills Trail, Suite 320, Austin, Tx 78759
OWNER ❑
CONSENT OF SURETY ARCHITECT ❑
CONTRACTOR ❑
TO FINAL PAYMENT SURETY ❑
❑
BOND NO.:4403273 OTHER
TO OBLIGEE:
(Name and Address)
CONTRACT FOR:
FG Aledo Development, LLC. Utilities
3045 Lackland Rd., Fort Worth
PROJECT: CONTRACT DATED:
(Name and Address) September 16, 2015
Morningstar Section 6, Phase 1
PRINCIPAL: D.T. Utility Contractors, Inc.
At the request of the Obligee and the Principal indicated above, (insert name and address of surety)
SureTec Insurance Company, 9737 Great Hills Trail, Suite 320, Austin, TX 78759
on bond of SURETY,
(Insert name and address of Contractor)
D.T. Utility Contractors, Inc.
2614 Causbie Rd., Weatherford, TX 76087
, CONTRACTOR,
and conditioned on the representation by Obligee that all Contract provisions relating to the payment
of final payment under the Contract have been satisfied by Principal as of the date of final payment,
and that no claims by Obligee or any third party are known or believed by Obligee or its
representatives to exist as of the date of final payment, representations as to the truth and accuracy
of the foregoing conditions being deemed to have been made by Obligee in connection with this
request for Consent of Surety, hereby approves of the final payment to the Principal in accordance
with the executed Letter of Directive(Copy attached)and agrees that final payment in accordance
with the terms hereof shall not relieve the Surety of its obligations to
(Insert name and address of Obligee)
FG Aledo Development, LLC.
3045 Lackland Rd., Fort Worth, TX 76116
,
as set forth in said Surety's bond. OBLIGEE,
IN WITNESS WHEREOF, the Surety has hereunto set its hand on this date: July 18, 2016
(Insert in writing the month followed by the numeric date and year.)
SureTec Insurance Company
(Surety)
_..
('Signature of authori ed representative)
Attest: Michelle Harris, Attorney-in-Fact
(Seal):: (Printed name and title)
FORTWORTHREV:02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
1) CONTRACTOR&PROJECT DATA
Name of Contraclor Project Name
DT Utility Contractors,Inc Morningstar Section 6 Phase 1
DOE Inspector DOE Number
Garey Houston 7500
DOE btspeclor Project Manager
❑Water ❑Waste Water 0 Storm Drainage ❑Pavement Pat Buckley
Initial Contract Amount Project Difficult),
$38,887.00 O Simple OO Routine O Complex
Final Contract Amount Dale
$38,887.00 7/15/2016
II)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 4 60 60
9 Daily Clean Up 5 Y 4 20 20
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 448
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 448
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating([TS/MS]* 100%) 448 / 448 = 100%
Performance Category Excellent
<20%=Inade9uale 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Facellenl
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Inspector
Signature Contractor
Signature DOE Ins p
Signature DOE Inspector's Supervisor ?2
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
� ¢ The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
FG ALEDO DEVELOPMENT, L.L.C.
3045 LACKLAND RD.
FORT WORTH, TEXAS 76116
July 18, 2016
Garey Houston
Freese and Nichols
4.055 International Plaza, Suite 200
Fort North, Texas 76109
Re: Morningstar Sections 6, Phase 1
DOE No. 7500, City Project No. 0264.1
Dear Mr. Houston,
There are no liquidated damages for Conatser Construction, DT Utilities or i
Bean Electrical, Inc. on the above referenced job.
Slncerel
Tim H. Fleet
Vice President
i
FORTWORTHREV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
l)PROJECT INFORMATION Date: 7/15/2016
Nance of Contraclor Project Name
DT Utility Contractors,Inc Morningstar Section 6 Phase 1
DOELispector Project Manager
Garey Houston Pat Buckley
DOENmnber Projecl Difficully T}pe of Contract
7500 O Simple O Routine O Complex ❑Water ❑Waste Water El Storm Drainage ❑Pavement
Initial Conhact Amount Final Contracl Amount
$38,887.00 $38,887.00
II)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) 1 (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
I Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 4 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities Y 3 Applicability of Specifications
4 Display Of Professionalism q 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution q PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution yl
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments 14 Resolution of Utility Conflicts `f
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor �iZ�C�-
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
, ` The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845