Loading...
HomeMy WebLinkAboutContract 47144-FP3 Department of TP &W Const. Services DOE# Ad Dat Project anage":Canadv Risk ManagementLD.O.E. g Brothern -a- ITWORTH. `;Y sE � 4 CFA Westerman/Scanned o X-i (.o The Proceeding people have been Contacted concerning the request for final payment& have ATION AND PUBLIC WORKS released this project for such payment. ,r PROJECT COMPLETION Clearance Conducted By Shameka Kennedy i r A Smvy, RN4 D.O.E. Ns: 7500 rr C o Regarding contract 117500 for MORNINGSTAR SECTION 6 PHASE las required by the 4,9# TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director of the TRANSPORTATION& PUBLIC WORKS upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Prices: $38,887.00 Amount of Approved Change Orders: J§ Revised Contract Amount: Total Cost Work Completed: $38,887.00 Less Deductions: Liquidated Damages: Days rr $210.00/Day Pavement Deficiencies: Total Deduction Amount: Total Cost Work Completed: $38,887.00 Less Previous Payments: $0.00 Final P lent Due $38,887.00 Recom e ded for Acceptance Date Asst. Di tor, TPW - Infrastructure Design and Construction Accepte Date AN& Director, TRANSPORTATI N & PUBLIC WORKS �9�� Asst. City Manager Date Comments: C205-541200-203760264183 Fr-C&A L EC0R1 /BUJ 9 2016 R FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name MORNINUSTAR SECTION 6 PHASE I Contract Limits Project Type STORM DRAIN City Project Numbers 02641 DOL Number 7500 Estimate Number I Payment Number I For Period Ending 7/21/2016 CD City Secretary Contract Number 117500 Contract Time 120'D Contract Date Days Charged to Date 271 Contract is 100.00 Complete Project Manager Buckley Contractor DT UTILITY CONTRACTORS,INC. 2614 CAUSBIE RD WEATHERFORD, TX 76087 Inspectors LAYER / HOUSTON Thursday,July 21,2016 Page I of 4 City Project Numbers 02641 DOE Number 7500 Contract Name MORNINGSTAR SECTION 6 PHASE 1 Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN For Period Ending 7/21/2016 Project Funding STORM DRAIN Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quauity Total Quanity Total 1 TRENCH SAFETY 184 LF $0.50 $92.00 184 $92.00 2 36"RCP CLASS III 165 LF $90.00 $14,850.00 165 $14,850.00 3 24"RCP CLASS III 19 LF $60.00 $1,140.00 19 $1,140.00 4 4'STORM JUNCTION BOX I EA $4,000.00 $4,000.00 1 $4,000.00 5 20'CURB INLET 2 EA $6,100.00 $12,200.00 2 $12,200.00 6 36"PARALLEL HEADWALL I EA $3,800.00 $3,800.00 1 $3,800.00 7 MEDIUM STONE RIPRAP DRY 33 SY $85.00 $2,805.00 33 $2,805.00 Sub-Total of Previous Unit $38,887.00 $38,887.00 Thursday,July 21,2016 Page 2 of 4 City Project Numbers 02641 DOE Number 7500 Contract Name MORNINGSTAR SECTION 6 PHASE 1 Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN For Period Ending 7/21/2016 Project Funding Contract Information Summary Original ContractAtnount $38,887.00 Change Orders Total Contract Price $38,887.00 / g 1 Ab Total Cost of Work Completed Date $38,887.00 Contr r Less %Retained $0.00 n Z�! Net Earned $38,887.00 _ Date C {r Earned This Period $38,887.00 tspe tia t Retainage This Period $0.00 Date Less Liquidated Damages Proj n r L� Days @ /Day $0.00 Date r LessPavement Deficiency $0.00 A t.DiNt r/fPW-Infrastructure Design and Construction Less Penalty $0.00 ate Less Previous Payment $0.00 Direct /Contracting Departm t Plus Material on Hand Less 15% $0.00 Balance Due This Payment $38,887.00 Thursday,July 21,2016 Page 3 of 4 City Project Numbers 02641 DOE Number 7500 Contract Name MORNINGSTAR SECTION 6 PHASE 1 Estimate Number I Contract Limits Payment Number 1 Project Type STORM DRAIN For Period Ending 7/21/2016 Project Funding i Project Manager Buckley City Secretary Contract Number 117500 I Inspectors LAYER / HOUSTON Contract Date Contractor D T UTILITY CONTRACTORS,INC. Contract Time 120 CD 2614 CAUSBIE RD Days Charged to Date 271 CD WEATHERFORD, TX 76087 Contract is .000000 Complete i i CITY OF FORT WORTH SUMMARY OF CHARGES i Line Fund Account Center AmountGross Retainage Net Funded i i I 1 I II Total Cost of Work Completed $38,887.00 Less %Retained $0.00 Net Earned $38,887.00 Earned This Period $38,887.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $38,887.00 Thursday,July 21,2016 Page 4 of 4 FORTWORTH rev 03/05/07 TRANSPORTATION&PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:I NAME OF PROJECT: Morningstar Section 6 Phase 1 PROJECT NO.: 02641 CONTRACTOR: DT Utility Contractors DOE NO.: 7500 PERIOD FROM.10/16/15 TO: 07/13/16 FINAL INSPECTION DATE: 20-Jul-16 WORK ORDER EFFECTIVE:10/16/2015 CONTRACT TIME: 120 O WO* CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS THIS 0 0 0 0 271 271 PERIOD PREVIOUS 0 0 0 0 0 0 PERIOD TOTALS 0 0 0 0 271 271 TO DATE *REMARKS: CONTRAC OR DATE MSACTOR DATE ENGINEERING DEPARTMENT i The Cit},of Fort Worth•1000 Throclanorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845 ";= IVIA: ITY sECRETARY �-T. ORTHI TX AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Lori Tollett,Vice President Of D.T. Utility Contractors, Inc.,known to me to be a credible person,who being by me duly sworn,upon his oath deposed and said; That all persons, firms, associations, corporations,or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Morningstar, Section 6, Phase 1,Tarrant County,Texas BY � Lori Tollett,Vice President Subscribed and sworn before me on this date 26th of July, 2016. ^�a TANYA DAVIS Notary Public a. ,'� STATE OF TEXAS Notar Public "��a,�;' ID#00576914-4 M Comm.Up.09-28-2017 Parker County,Texas SURETEC INSURANCE 9737 Great Hills Trail, Suite 320, Austin, Tx 78759 OWNER ❑ CONSENT OF SURETY ARCHITECT ❑ CONTRACTOR ❑ TO FINAL PAYMENT SURETY ❑ ❑ BOND NO.:4403273 OTHER TO OBLIGEE: (Name and Address) CONTRACT FOR: FG Aledo Development, LLC. Utilities 3045 Lackland Rd., Fort Worth PROJECT: CONTRACT DATED: (Name and Address) September 16, 2015 Morningstar Section 6, Phase 1 PRINCIPAL: D.T. Utility Contractors, Inc. At the request of the Obligee and the Principal indicated above, (insert name and address of surety) SureTec Insurance Company, 9737 Great Hills Trail, Suite 320, Austin, TX 78759 on bond of SURETY, (Insert name and address of Contractor) D.T. Utility Contractors, Inc. 2614 Causbie Rd., Weatherford, TX 76087 , CONTRACTOR, and conditioned on the representation by Obligee that all Contract provisions relating to the payment of final payment under the Contract have been satisfied by Principal as of the date of final payment, and that no claims by Obligee or any third party are known or believed by Obligee or its representatives to exist as of the date of final payment, representations as to the truth and accuracy of the foregoing conditions being deemed to have been made by Obligee in connection with this request for Consent of Surety, hereby approves of the final payment to the Principal in accordance with the executed Letter of Directive(Copy attached)and agrees that final payment in accordance with the terms hereof shall not relieve the Surety of its obligations to (Insert name and address of Obligee) FG Aledo Development, LLC. 3045 Lackland Rd., Fort Worth, TX 76116 , as set forth in said Surety's bond. OBLIGEE, IN WITNESS WHEREOF, the Surety has hereunto set its hand on this date: July 18, 2016 (Insert in writing the month followed by the numeric date and year.) SureTec Insurance Company (Surety) _.. ('Signature of authori ed representative) Attest: Michelle Harris, Attorney-in-Fact (Seal):: (Printed name and title) FORTWORTHREV:02/20/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR 1) CONTRACTOR&PROJECT DATA Name of Contraclor Project Name DT Utility Contractors,Inc Morningstar Section 6 Phase 1 DOE Inspector DOE Number Garey Houston 7500 DOE btspeclor Project Manager ❑Water ❑Waste Water 0 Storm Drainage ❑Pavement Pat Buckley Initial Contract Amount Project Difficult), $38,887.00 O Simple OO Routine O Complex Final Contract Amount Dale $38,887.00 7/15/2016 II)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 4 20 20 10 Citizen's Complaint Resolution 5 Y 4 20 20 11 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 448 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 448 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating([TS/MS]* 100%) 448 / 448 = 100% Performance Category Excellent <20%=Inade9uale 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Facellenl Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Inspector Signature Contractor Signature DOE Ins p Signature DOE Inspector's Supervisor ?2 CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS � ¢ The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845 FG ALEDO DEVELOPMENT, L.L.C. 3045 LACKLAND RD. FORT WORTH, TEXAS 76116 July 18, 2016 Garey Houston Freese and Nichols 4.055 International Plaza, Suite 200 Fort North, Texas 76109 Re: Morningstar Sections 6, Phase 1 DOE No. 7500, City Project No. 0264.1 Dear Mr. Houston, There are no liquidated damages for Conatser Construction, DT Utilities or i Bean Electrical, Inc. on the above referenced job. Slncerel Tim H. Fleet Vice President i FORTWORTHREV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY l)PROJECT INFORMATION Date: 7/15/2016 Nance of Contraclor Project Name DT Utility Contractors,Inc Morningstar Section 6 Phase 1 DOELispector Project Manager Garey Houston Pat Buckley DOENmnber Projecl Difficully T}pe of Contract 7500 O Simple O Routine O Complex ❑Water ❑Waste Water El Storm Drainage ❑Pavement Initial Conhact Amount Final Contracl Amount $38,887.00 $38,887.00 II)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) 1 (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS I Availability of Inspector 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector 4 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities Y 3 Applicability of Specifications 4 Display Of Professionalism q 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution q PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution yl ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time 3 Communication 2 Timliness of Contractor Payments 14 Resolution of Utility Conflicts `f 3 Bid Opening to Pre-Con Meeting Timeframe III)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervisor �iZ�C�- INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS , ` The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845 i