Loading...
HomeMy WebLinkAboutContract 45044-CO1 'Clffy SECRET' FORT WORTH. City of Fort Worth "°'MT CT M0• �04-c.[.%1 Change Order Request Breakdown Project Namel Old Decatur Road-WJ Boaz to McLeroy City Sec# 1 45044 Client Project#(s)l 01749, DOE 6705 Change Order Submittal# Date 2/13/2015 Dept. T/PW Water Sewer Contract TimeTotals CD Original Contract Amount $3,377,522.65 $601,380.00 $3,978,902.65 329 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $3,377,522.65 $601,380.00 $3,978,902.65 329 Amount of Proposed Change Order $0.00 $238,528.00 $0.00 $238,528.00 28 Revised Contract Amount $3,377,522.65 $839,908.00 $4,217,430.65 357 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 $0.00 Additional Funding(if necessary) $238,528.00 $238,528.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 5.99% MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $4,973,628.31 JUSTIFICATION (REASONS)FOR CHANGE ORDER Change order is for 72"casing for future water line installation under McLeroy/Old Decatur Road intersection. Additional days are for casing installation only. coo Am"by: � Mary J. )Kaye, City 8 [0F:F1C1:ALR:ECORDRYX FOR_ T�� City of Fort Worth Change Order Additions Project Name Old Decatur Road-WJ Boaz to McLeroy City Sec# 45044 Client Project# 01749,DOE 6705 Change Order Submittal# 0 Date 2/13/2015 ADDITIONS Qty Unit Unit Cost Total x stee casing ater 38 Casing end seal&backfill Water 2.00 EA 2,875.00 39 Sawcut&Remove concrete paving Water 324.00 SY $14.50 40 Temporary pavement repair Water 324.00 SY 20.00 41 Concrete Traffic Barrier Water 240.00 LF 100.00 T/PW $0.00 Water $238,528.00 Sewer $0.00 Sub Total Additions $238,528.Uu Change Order Additions Page 2 of 4 FoK_ r �� City of Fort Worth Change Order Deletions Project Name Old Decatur Road-WJ Boaz to McLeroy City Sec# 45044 Client Project# 01749,DOE 6705 Change Order Submittal# 0 Date 2/13/2015 DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost I ota T/PW $0.00 Water $0.00 Sewer $0.00 Sub Total Deletions Change Order Deletions Page 3 of 4 M/SBE Breakdown for this Change Order M/SBE Sub Type of Service Amount for this CO N/A Total $0.00 Previous Change Orders CO# DATE AMOUNT' N/A Total $Q.00 CFW Change Order Approval Wa-COApp01 Page 1 of 3 Routlnq Assigned To: Due Date: Assigned By: Due Time: Links 2 fortworthgov/Infrastructure Projects/01749 - Old Decatur Road-Boaz to McLerov/Contractor/Change Orders/Change Order 1 Breakdown revised.xls fortworthgov/Infrastructure Proiects/01749 - Old Decatur Road-Boaz to McLerov/Contractor/Change Orders/01749 Old Decatur Rd. M anC C 27446.Final.Ddf Attachments(0) No Attachments have been added to this form. https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 11/5/2015 CFW Change Order Approval Wa-COApp01 Page 2 of 3 FORT WORTH. City of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) ............................................................... For Change Order Submittal No.: ............................................................... Change Order No.: Wa-COApp01 Date Started: 2015-07-13 City Sec. No.: 45044 Date Due: 2015-09-01 Project Name: 01749 - Old Decatur Road-Boaz to McLeroy Project Numbers: 01749 DOE Numbers: 6705 Project Expand Old Decatur Rd. from a 3-lane undivided roadway to a 4- Description: lane divided arterial from W. J. Boaz Rd. to McLeroy Blvd. Project Manager: Wilma Smith City Inspector: Thomas Miller Contractor: JLB Contracting, LLC COUNCIL ACTION (If Required): M&C Log Name: a0 o[_o De,�ATLA (Z_ 6oNS7zz, i3OAR rD MG z-&-ko-q C cs( M&C Number: C_ a —7y44 (o M&C Date: COST AND AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: 60 $ 238,528.00 P266-541200-607140174983 28 Total Cost: $ 238,528.00 Total Requested Days: 28 Approval Status: https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 11/5/2015 CFW Change Order Approval Wa-COApp01 Page 3 of 3 Approved: Yes Comments: User: Norma Sauceda Date: 2015-10-08 2:38 PM Approved: Yes Comments: User: Sam Davis Date: 2015-10-08 2:46 PM Approved: Yes Comments: User: Wilma Smith Date: 2015-10-08 3:16 PM Approved: Yes Comments: User: Tony Sholola Date: 2015-10-09 5:12 PM Approved: Yes Comments: User: Andy Cronberg Date: 2015-10-12 10:39 AM Approved: Yes Comments: User: David Townsend Date: 2015-10-13 3:23 PM Approved: Yes Comments: User: Doug Black Date: 2015-11-03 3:38 PM Approved: Yes Comments: User: ]ay Chapa Date: 2015-11-03 3:51 PM Action Required: https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?Siteld=51500&ProcessI... 11/5/2015 M&C Review Page 1 of 3 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FORT�WORTF_I COUNCIL ACTION: Approved on 9/15/2015 - Resolution No. 4510-09-2015 REFERENCE ** 20OLD DECATUR CONSTR RE DATE: 9/15/2015 RE C-27446 LOG NAME: BOAZ TO MCLEROY : CHANGE ORDER NO. 1 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Change Order No. 1, to City Secretary Contract No. 45044, a Construction Contract with JLB Contracting, LLC, in the Amount of$238,528.00, for the Installation of a Seventy-Two Inch Casing Pipe Under the Future Intersection of Old Decatur Road and McLeroy Boulevard as Part of the Old Decatur Road from W.J. Boaz Road to McLeroy Boulevard Project, Thereby Increasing the Total Contract to $4,217,430.65 and Adopt Reimbursement Resolution (COUNCIL DISTRICT 7) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the execution of Change Order No. 1, to the City Secretary Contract No. 45044, with JLB Contracting, LLC., in the amount of$238,528.00 for the installation of a seventy-two inch casing pipe under the future intersection of Old Decatur Road and McLeroy Boulevard as part of the Old Decatur Road from W.J. Boaz Road to McLeroy Boulevard project for a revised contract total of$4,217,430.65; and 2. Adopt the attached resolution expressing official Intent to Reimburse expenditures with proceeds of future debt for Change Order No. 1 to City Secretary No.45044 for Old Decatur Road from W.J. Boaz Road to McLeroy Boulevard. DISCUSSION: On October 22, 2013, the City Council authorized a contract with JLB Contracting, LLC., in the amount of $3,978,902.65 for the construction of Old Decatur Road from W.J. Boaz Road to McLeroy Boulevard. The project provides for the construction of the west two lanes of the roadway. Change Order No. 1 provides for the installation of a 72-inch casing pipe under the future intersection of Old Decatur Road and McLeroy Boulevard. The proposed casing will accommodate a planned 48-inch water main that will be installed as part of a separate project that is to begin next year. This 48-inch water main will be placed inside the proposed 72-inch casing thereby eliminating the need to cut new concrete pavement when the water main project begins next year. The 48-inch water main will increase the volume of water available to supply the Caylor Ground Storage Tank which services the Northside II Pressure Plane and customer cities such as Southlake, Keller, Westlake and Trophy Club. Funding for this Change Order will be provided from the Water Capital Projects Fund and will have no impact on the transportation fund budget. Subject to approval of this Mayor and Council Communication (M&C), appropriations for Change Order No. 1 will consist of the following: http://apps.cfwnet.org/council packet/mc review.asp?ID=213 16&councildate=9/1 5/2015 11/5/2015 M&C Review Page 2 of 3 Items Amount Project M&C No. Approved Description Original Contract $3,978,902.65 Construction of a C-26526 10/22/2013 four-lane divided roadway Change Order $ 238,528.00 Add 72-inch casing Pending Pending No. 1 for future water line installation Total Revised $4,217,430.65 - - - Contract Upon approval of this M&C, funding for the contract, Change Order No. 1 and other project costs will consist the following: FUND Existing Additional Revised Encumbrances Remaining Appropriations Appropriations Appropriations 11& Expenditures Balance Water Capital $ 715,180.00 $ 0.00 $ 715,180.00 $ 698,319.09 $ 16,860.91 Projects Fund (P253) 2017 Water and Sewer Revenue Bonds $ 0.00 $238,528.00 $ 238,528.00 $ 0.00 $238,528.00 Capital Project Fund (P266) (C204) $ 694,777.53 - $ 694,777.53 $ 694,777.53 - (C223) $4,603,825.35 - $4,603,825.35 $4,603,825.35 $558,240.05 Project $6,013,782.88 $238,528.00 1$6,252,310.88 $5,996,921.97 ][$255,388.91 Total This project is anticipated to be included in a future revenue bond issue for the Water and Sewer Fund. Available cash within the Water and Sewer portfolio and the City's portfolio along with the appropriation authority authorized under the Direct Purchase Note Program will be used to provide interim financing for this project until debt is issued. To the extent resources other than the Water and Sewer portfolio are used to provide interim financing, the Water and Sewer Fund will be charged interest that is equivalent to the overall rate of return being earned by the City's portfolio (currently approximately one-percent annually). Should the City's portfolio not support the liquidity needed to provide an interim short-term financing source another funding source will be required, which could mean issuance of securities under the Direct Purchase Note Program or earlier issuance of Water and Sewer revenue bonds than is currently planned. Once debt associated with this project is sold, bond proceeds will be used to reimburse the Water and Sewer portfolio and the City's portfolio in accordance with the attached Reimbursement Resolution. In accordance with the provisions of the Financial Management Policy Statements, Staff anticipates presenting revenue-supported debt issuances to the City Council for consideration within the next three years. The Financial Management Services Department is currently working with all departments to ensure that multi-year capital improvements plans are in place. Newly developed and already existing plans, such as the Water Department's current multi-year Capital Improvement Plan, will be presented to City Council for review and adoption. If the City Council-adopted plan does not include issuance of debt for this specific project, the project will be funded utilizing pay-as-you go financing sources. If the City Council-adopted plan calls for debt issuance, that debt must be issued within approximately three years http://apps.cfwnet.org/council_packet/mc review.asp?ID=21316&councildate=9/15/2015 11/5/2015 M&C Review Page 3 of 3 to provide reimbursement for these expenses. If that does not occur, the costs will no longer be reimbursable by issuing tax-exempt debt and the funding source will have to be made whole through other budgetary methods. Adoption of this resolution does not obligate the City to sell bonds, but preserves the ability to reimburse the City from tax-exempt bond proceeds. Construction is anticipated to commence in September 2015 and October 2015. Contract time for completion of this work is 28 calendar days. Upon completion of this capital project, there is no anticipated annual operating impact to the Transportation and Public Works Department/Street Division or the Water Department. M/WBE OFFICE -A waiver of the goal for MBE subcontracting requirements are requested by the Department and approved by the M/WBE Office, in accordance with the BDE Ordinance, because the purchase of goods or services from source(s)where subcontracting or supplier opportunities are negligible. This project is located in COUNCIL DISTRICT 7, Mapsco 33T and 33X. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the 2017 Water and Sewer Revenue Bonds Capital Project Fund for this contract. Currently, available revenue in the 2017 Water and Sewer revenue Bonds Capital Project Fund is $53,415,534.06. After appropriation of the $238,528.00.00 to the project, the amount of$53,177,006.66 in available revenue will remain in the 2017 Water and Sewer Revenue Bonds Capital Project Fund. This project will have no impact on Water Department operating budget. TO Fund/Account/Centers FROM Fund/Account/Centers P266 541200 601159990100 $238.528.00 P266 541200 607140174983 $238,528.00 Submitted for City Manager's Office by: Jesus J. Chapa (5804) Originating Department Head: Douglas W. Wiersig (7801) Additional Information Contact: Wilma Smith (8785) ATTACHMENTS 20OLD DECATUR CONSTRUCTION BOAZ TO MCLEROY pdf 20OLD DECATUR RD C01 REIMB RESOLUTION (Rev8 27 15) doc http://apps.cfwnet.org/council_packet/mc_review.asp?ID=21316&councildate=9/15/2015 11/5/2015