Loading...
HomeMy WebLinkAboutContract 48283 CITY SECRETARYyJ b2�� CONTRACT NO. Developer and Project Information Cover Sheet: Developer Company Name: FG Aledo Development, LLC Address, State,Zip Code: 3045 Lackland Dr.,Fort Worth,TX 76116 Phone&Email: 817-731-7595, kg@sableholdings.com Authorized Signatory, Title: Kim Gill,President Project Name and Brief Morningstar Sec.6 Ph.2 Description: Project Location: FM 3325 Parker County Plat Case Number: FP-16-012 Plat Name: Morningstar Development Mapsco: 710-Z Council District: ETJ City Project Number: 100326 CFA Number: 2016-057 DOE Number: None To be completed b toff: G 4 Received b � Date: FOFFICIALECORD City of Fort Worth,Texas ETARY Standard Community Facilities Agreement He TX CFA Official Release Date: 10.07.2015 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, FG Aledo Development, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Morningstar Sec.6 Ph.2 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ('Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) .M!, Sewer (A-1) Paving (B) ��, Storm Drain (B-1) Street Lights & Signs (C) Iii. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent(100%) of the contract price of the infrastiucture for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the allemed ne-likence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the allezed nezl&ence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period)the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 7 of 11 Cost Summary Sheet Project Name: Morningstar Sec. 6 Ph.2 CFA No.: 2016-057 DOE No.: 100326 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 158,970.20 2.Sewer Construction $ 179,687.20 Water and Sewer Construction Total $ 338,657.40 B. TPW Construction 1.Street $ 347,462.50 2.Storm Drain $ 117,273.00 3.Street Lights Installed by Developer $ 58,870.00 4. Signals $ - TPW Construction Cost Total $ 523,605.50 Total Construction Cost(excluding the fees): $ 862,262.90 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 6,773.15 D. Water/Sewer Material Testing Fee(2%) $ 6,773.15 Sub-Total for Water Construction Fees $ 13,546.30 E. TPW Inspection Fee(4%) $ 18,589.42 F. TPW Material Testing(2%) $ 9,294.71 G. Street Light Inspsection Cost $ 2,354.80 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 30,238.93 Total Construction Fees: $ 43,785.23 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 862,262.90 Completion Agreement=100%/Holds Plat $ 862,262.90 x Cash Escrow Water/Sanitary Sewer=125% $ 423,321.75 Cash Escrow Paving/Storm Drain=125% $ 654,506.88 Letter of Credit=125%w/2yr expiration period $ 1,077,828.63 City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER FG Aledo Development,LLC Jesus J. Chapa Assistant City Manager Name: Kim Gill Title: President Date: Date: � �,5�� /(O X6 Recommended by: ATTEST: (Only if required by Developer) Wendy C abulal, EMBA,P.E. Development Engineering Manager Signature Water Department Name: LA� v. o DouglaoV. Wiersig, P.E. V is OR ®eon Director Transportation&Public Works DepartmentQO�o 4 9�0 Approved as to Form &Legality: ATTEST: � o$� a X Richard A. McCracken Mary J. er Assistant City Attorney City Secretary M&C No. fih+ Date: 16112..11 k o�t 17.5 5 : A 14. City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 CITY SECRETARY Page 9 of 11 FT,WORTH,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 - Changes to Standard Community Facilities Agreement Location Map a� Exhibit A: Water Improvments I Water Cost Estimate Exhibit A-1: Sewer Improvements QX Sewer Cost Estimate Exhibit B: Paving Improvements Paving Cost Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 10 of 11 ATTACHMENT"I" Changes to Standard Agreement Community Facilities Agreement City Project No. 100326 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 11 of 11 WHAT OAK S E -LO('�A ION SECTION 6 PHASE 1 MORNING MIST TR.- N.I T.S. \'- ./— DWE THERFORD----` A ERS?! OLD WEATHERFORD TT CHAPIN20 j 0 1187 3 30 8 MA YS R Underwood Iternet-ery— UNI,ON 20 `--NALE `ASA / UNION 4, < PACIFIC R —5 LOCATION MAP WATER NO. 59601-0600430-001580 SANITARY SEWER NO. 59607-0700430-001380 MORNINGSTAR STREET/STORM DRAIN NO. W-2390 SECTION 6, PHASE 2 CITY PROJECT NO. 100326 X-23552 WELCH Ewc-vrNEERn---zo, INC. CONSUL TING ENG/NEE-RS � SCALE: I"=200' Exis E,10�� , „ , t ,t i ROP NN 10 �9• 9 '� � O� �Vj`��� 'f "r'"%' iii" ��g� � •�+ t S�pR ' 'rte, , t ' , z , 1007. DEVELOPER'S COST _ 8" WATER LINES, FIRE HYDRANTS, GATE VALVES AND ASSOCIATED APPURTENANCES EXHIBIT "A" WATER NO. 59601-0600430-001580 WATER IMPROVEMENTS SANITARY SEWER NO. 59607-0700430-001380 MORNINGSTAR STREET/STORM DRAIN NO. W-2390 CITY PROJECT NO. 100326 SECTION 6, PHASE 2 X-23552 WELCH ENGINEERIl*-TG, INC. CONSUL TING ENGINEERS sip PNS' `; SCALE: 1"=200' ol V 007 ��, - : 100% DEVELOPER'S COST �- 8" AND 12" SANITARY SEWER LINES AND ASSOCIATED APPURTENANCES EXHIBIT "A-i " WATER NO. 59601-0600430-001580 SANITARY SEWER IMPROVEMENTS SANITARY SEWER NO. 59607-0700430-001380 MORNINGSTAR STREET/STORM DRAIN NO. W-2390 CITY PROJECT NO. 100326 SECTION 6, PHASE 2 X-23552 WELCH ENGINEERING, I NC. CONSUL TING ENGINEERS IA;'"` \ SCALE: 1"=200' tlt tx--Y - �- rl `� 1p Q � �1 B.8 +r V ��// /i/moi � • ��� , � • �//iii // f; '�.�,.�.r-"""�. •--- t 100% DEVELOPER'S COST 6" PAVEMENT W/2% CROSS SLOPE ON 6" LIME SUBGRADE 100% DEVELOPER'S COST 2" TYPE D SURFACE COURSE, 4" TYPE B BASE COURSE ON 6" LIME SUBGRADE EXHIBIT "B" WATER NO. 59601-0600430-001580 PAVING IMPROVEMENTS SANITARY SEWER NO. 59607-0700430-001380 MORNINGSTAR STREET/STORM DRAIN NO. W-2390 SECTION 6, PHASE 2 XIr23552JECT N0. 100326 WELCH ENGINEER -40, INC. CONSUL TING ENG/NEE-!`?S '24"RCP 1 36'RCp % "RCP 48"RCP 48"RCP \ SCALE: 1"=200' i X flt V -\20 36'R CP 26 'r T' F \ Y U / 10', 15, OR 20' INLET-, 100% DEVELOPER'S COST STORM SEWER AND INLET AND ASSOCIATED APPURTENANCES EXHIBIT "B-1 " WATER NO. 59601-0600430-001580 STORM DRAIN IMPROVEMENTS SANITARY SEWER NO. 59607-0700430-001380 MORNINGSTAR STREET/STORM DRAIN NO. W-2390 CITY PROJECT NO. 100326 SECTION 6, PHASE 2 X-23552 WELCH ENGINEERIl-TG, INC. CONSUL TING ENGINEERS i ?T SCALE: 1"=200' V 131A �N C\ ���'�/iii � J •, \ \ f * -- PROPOSED STREET LIGHT (100% DEVELOPER'S COST) D -- PROPOSED STREET SIGN (100% DEVELOPER'S COST) ■ -- PROPOSED GROUND BOX (100% DEVELOPER'S COST) EXHIBIT "C" STREET LIGHTS WATER NO. 59601-0600430-001580 SANITARY SEWER NO. 59607-0700430-001380 MORNINGSTAR STREET/STORM DRAIN NO. W-2390 SECTION 6, PHASE 2 CITY PROJECT NO. 100326 X-23552 WELCH NC. CONSUL TING ENGINEERS 00 42 43 DAP-BID PROPOSAL Page I of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM CONTRACT 5/23/2016 MORNINGSTAR-SECTION 6,PHASE 2 CPN: 100326 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Specification Unit of Bid Item Description Unit Price Bid Value No Section No. Measure Quantity UNIT I:WATER IMPROVEMENTS 1 3311.0161 6"Water Pipe 33 11 12 LF 15 $26.0 $390.0 2 331 1.0261 8"Water Pipe 33 11 12 LF 2;458 $29.5 $72,511.0 3 3312.3002 6"Gate Valve 33 1220 EA 3 $850.0 $2,550.0 4 3312.3003 8"Gate Valve 33 t2 20 EA 3 $950.0 $2,850.0 5 3312.0117 Connect.to Existing 4"-12"Water Main 33 1225 EA 3 $700.00 $2,100.0 6 3312.0001 Fire Hydrant 33 1240 EA 3 $3,400.00 $10,200.0( 7 3311.0001 Ductile Iron Water Fittings 33 11 11 TON 1.5 $5,400.00 $8,100.0 8 3305.0109 Trench Safety 3305 10 LF 2,473 $0.40 $989.2 9 3312.2003 1"Water Service 33 12 10 EA 76 $780.00 $59,280.0 TOTAL UNIT I:WATER IMPROVEMENT $158,970.20 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 00 42 43-CONTRACT BIDS DAP MORNINGSTAR-SECTION 6 PHASE 2-201336E2-05-23-16 00 42 43 DAP-BID PROPOSAL Page 2 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM CON'T'RACT 5/23/2016 MORNINGSTAR-SEC7I'ION 6,PHASE 2 CPN: 100326 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Specification Unit of Bid Item Description Unit Price Bid Value No. Section No. Measure Quantity UNIT II:SANITARY SEWER IMPROVEMENTS 1 3331.41 15 8"Sewer Pipe 33 31 20 LF 997 $34.0 $33,898.0 2 3331.4208 12"Sewer Pipe 33 31 20 LF 802 $64.00 $51,328.0 3 3331.4209 12"Sewer Pipe,CSB Backfill 33 11 10 LF 40 $104.0 $4,160.0 4 3305.0116 Concrete Encasement 3305 10 LF 52 $50.00 $2,600.0 5 3339.1001 4'Manhole 33 39 20 EA 5 $3,600.00 $18,000.0 6 3339.1002 4'Drop Manhole 33 29 20 EA 2 $6,000.0 $12,000.0 7 3339.1003 4'Extra Depth Manhole 33 39 20 VF 43 $150.0 $6,450.0 8 3331.3101 4"Sewer Service,Two-way cleanout 3331 50 EA 95 $385.0 $36,575.0 9 3301.0002 Post-CCTV Inspection 33 01 31 LF 1,891 $2.80 $5,294.8 10 3301.0101 Manhole Vacuum Testing 33 01 30 EA 7 $150.oc $1,050.0 11 3339.0001 Epoxy Manhole Liner 33 39 60 VF 27 $225.00 $6,075.0 12 3305.0109 Trench Safety 3305 10 LF 1,891 $0.40 $756.4 13 9999.0001 Connect to Existing Sanitary Sewer Main 33 11 10 EA 1 $500.00 $500.0 14 3305.0113 Trench Water Stops 330510 EA 4 $250.00 $1,000.0 TOTAL UNIT If:SANITARY SEWER IMPROVEMENT $179,687.20 CITY OF FORT NORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Fomi Version April 2.2014 00 42 43-CONTRACT BIDS DAP MORNINGSTAR-SECTION 6 PHASE 2-201336E2-05-23-16 00 42 43 DAP-BID PROPOSAL Page 3 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM CONTRACT 5/23/2016 MORNINGSTAR-SECTION 6,PHASE 2 CPN: 100326 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Specification Unit of Bid Item Description Unit Price Bid Value No. Section No. Measure Quantity UNIT III: DRAINAGE IMPROVEMENTS I 3305.0109 Trench Safety 3305 10 LF 558 $0.50 $279.0 2 3341.0409 48"RCP,Class 111 3341 10 LF 184 $135.0 $24,840.0 3 3341.0309 36"RCP,Class 1II 3341 10 LF 220 $90.00 $19,800.0 4 3341.0307 30"RCP,Class 111 3341 10 LF 98 $68.00 $6,664.0 5 3341.0205 24"RCP,Class III 3341 10 LF 56 $60.00 $3,360.0 6 3349.0001 4'Stonn Junction Box 3349 10 EA 1 $4,300.0 $4,300.0 7 3349.5002 15'Curb Inlet 33 49 20 EA 2 $6,000.0 $12,000.0 8 3349.5003 20'Curb Inlet 33 49 20 EA 4 $7,400.0 $29,600.0 9 36"TXDOT,2:1,30 Skew,CH-PW-S Headwall 33 49 40 EA 1 $4,200.0 $4,200.0 10 48"TXDOT,2:1,30 Skew,CH-PW-S Headwall 33 49 40 EA 1 $5,600.00 $5,600.0 11 3137.0104 Medium Stone,Riprap,dry 31 37 00 Sy 78 $85.00 $6,630,0 TOTAL UNIT III:DRAINAGE IMPROVEMENT $117,273.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Fom Version April 2,2014 00 42 43-CONTRACT BIDS DAP\40RNINGSTAR-SECTION 6 PHASE 2-201336E2-05-23-16 00 42 43 DAP-BID PROPOSAL Page 4 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM CONTRACT 5/23/2016 MORNINGSTAR-SECTION 6,PRASE 2 CPN: 100326 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. Measure Quantity UNIT IV: PAVING IMPROVEMENTS 1 3213.0101 6"Cone Pvmt 32 13 13 SY 8,133 $35.50 $288,721.5 2 3211.0501 6"Lime Treatment 32 1129 SY 8,662 $3.00 $25,986.0 3 3211.0400 Hydrate Lime 32 11 29 TN 130.00 $175.00 $22,750.0 4 3213.0301 4"Concrete Sidewalk 32 13 20 SF 300 $5.00 $1,500.0 5 3213.0501 Barrier Free Ramp-Type R-1 32 1320 EA 2 $1,000.00 $2,000.0 6 3441.4003 Furnish&Install Ground Mount Sign Post and Sign 3441 30 EA 8 $650.00 $5,200.0 7 3217.2103 REFL Raised Marker TY II A-A-4 32 1723 EA 116 $5.00 $580.0 8 9999.0002 Street Barricade(street deand ends) 31 36 00 LF 29 $25.00 $725.013 TOTAL UNIT IV: PAVING IMPROVEMENT $347,462.50 CITY OF FORT wORT'H STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 00 42 43-CONTRACT BIDS DAP MORNINGSTAR-SECTION 6 PHASE 2-201336112-05-23-16 00 42 43 DAP-BID PROPOSAL Page 5 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM CONTRACT 5/23/2016 MORNINGSTAR-SECTION 6,PHASE 2 CPN: 100326 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Specification Unit of Bid Item Description Section No. Measure Quantity Unit Price FBd Value No. UNIT V:STREET LIGHTING IMPROVEMENTS 1 9999.0000 IIolophane-Columbia Aluminum Pole, Washington- 34 41 20 EA 13 $3,250.00 $42,250.0 14.5'Luminaire WFL-l00W-4K-AS-B-L5-H-PCS 2 3441.3001 Furnish/Install Rdwy Ilium Foundation TY 7 34 41 20 EA 13 $750.00 $9,750.0 3 2605.3015 2 Inch Conduit PVC SCH 80(T) 26 05 33 LF 687 $8.00 $5,496.0 4 3441.3401 #6 Triplex Alum Electric Conductor 3441 10 LF 687 $2.00 $1,374.0 TOTAL UNIT V:STREET LIGHTING IMPROVEMENT $58,870.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 00 42 43-CONTRACT BIDS DAP MORNINGSTAR-SECTION 6 PHASE 2-201336E2-05-23-16 00 42 43 DAP-BID PROPOSAL Page 7 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM CONTRACT 5/23/2016 MORNINGST'AR-SECTION 6,PHASE 2 CYN: 100326 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Specification Unit of Bid Item Description Unit Price Bid Value No. Section No. Measure Quantity Bid Summary UNIT I:WATER IMPROVEMENTS _ $158,970.20 UNIT II:SANITARY SEWER IMPROVEMENTS TT $179,687.20 UNIT III:DRAINAGE IMPROVEMENTS $117,273.00 UNIT IV: PAVING IMPROVEMENTS $347,462.50 UNIT V:STREET LIGHTING IMPROVEMENTS $58,870.00 Total Construction Bid $862,262.90 Contractor agrees to complete\YORK for FINAL ACCEPTANCE within #days +calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 00 42 43-CONTRACT BIDS DAP MORNINGSTAR-SECTION 6 PHASE 2-201336E2-05-23-16 STATE OF TEXAS COUNTY OF PARKER Whereas FG Aledo Development, LLC and FWFW Holdings, Inc. are the sole owners of a tract of land out of the P.J. McClary Survey,Abstract No.907 and the J. Morris Survey,Abstract No. 927, and situated in Parker County,Texas, and surveyed by Miller Surveying, Inc. of Hurst,Texas in February of 2016,said tract being a portion of the same tract of land described in the deed to FG Aledo Development, LLC, recorded as Document No. 2014-10308 in the Deed Records of Parker County,Texas, and being a portion of the same tract of land described in the deed to FWFW Holdings, Inc., recorded as Document No. 2014-10303 in said Records and being more particularly described by metes and bounds as follows: Beginning at a 1/2 inch "MILLER 5665" capped steel rod found for the most northerly corner of Lot 63, Block 53, Morningstar, an addition to Parker County,Texas according to the plat thereof recorded as Document No. of the Plat Records of Parker County,Texas, said rod being in the southeasterly right-of-way line of Star Creek Drive; Thence North 64 degrees 39 minutes 14 seconds East with said right-of-way line a distance of 36.49 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence North 25 degrees 20 minutes 46 seconds West with the easterly boundary line of said addition a distance of 630.00 feet to the northerly right-of-way line Angel Trace Drive; Thence North 64 degrees 39 minutes 14 seconds East with said northerly right-of-way line a distance of 0.86 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence North 25 degrees 20 minutes 46 seconds West a distance of 120.00 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence North 64 degrees 39 minutes 14 seconds East a distance of 657.26 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence North 25 degrees 20 minutes 46 seconds West a distance of 2.98 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence North 64 degrees 39 minutes 14 seconds East a distance of 305.01 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence South 30 degrees 34 minutes 02 seconds East a distance of 592.23 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence South 18 degrees 05 minutes 19 seconds East a distance of 94.23 feet to a 1/2 inch "MILLER 5665" capped steel rod set in the northerly boundary line of Lot 1X, Block 38, Morningstar, an addition to Parker County,Texas according to the plat thereof recorded as Document No. of said Plat Records; Thence South 88 degrees 46 minutes 42 seconds West with said northerly boundary line a distance of 68.76 feet to a 1/2 inch "MILLER 5665" capped steel rod found; Thence South 64 degrees 39 minutes 14 seconds West continuing with said northerly boundary line a distance of 68.76 feet to a 1/2 inch "MILLER 5665" capped steel rod found; Thence South 25 degrees 20 minutes 46 seconds East continuing with said northerly boundary line a distance of 150.81 feet to a 1/2 inch "MILLER 5665" capped steel rod found; Thence South 34 degrees 56 minutes 34 seconds West continuing with said northerly boundary line a distance of 134.23 feet to a 1/2 inch "MILLER 5665"capped steel rod found; Thence South 64 degrees 39 minutes 14 seconds West continuing with said northerly boundary line a distance of 595.76 feet to a 1/2 inch "MILLER 5665" capped steel rod found for the most westerly corner of said Lot 63; Thence North 25 degrees 20 minutes 46 seconds West with the northeasterly boundary line of said Lot 63 a distance of 120.00 feet to the point of beginning and containing 18.294 acres of land, more or less; 005243-1 Developer Awarded Project Agreement Page l of 4 1 SECTION 00 52 43 2 AGREEMENT 3 4 THIS AGREEMENT, authorized on .!R i- 14 is made by and between 5 the Developer, FG ALEDO DEVELOPMENT, LLC, authorized to do business in Texas 6 ("Developer") and D.T. UTILITY CONTRACTORS,INC., authorized to do business in Texas, 7 acting by and through its duly authorized representative, ("Contractor"). 8 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 9 follows: 10 Article 1. WORK 11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 12 Project identified herein. 13 Article 2.PROJECT 14 The project for which the Work under the Contract Documents may be the whole or only a part is 15 generally described as follows: 16 MORNINGSTAR—SECTION 6,PHASE 2 17 18 CITY PROJECT NO.: 100326 19 20 Article 3. CONTRACT TIME 21 3.1 Time is of the essence. 22 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 23 Documents are of the essence to this Contract. 24 3.2 Final Acceptance. 25 The Work will be complete for Final Acceptance within 60 calendar days after the date 26 when the Contract Time commences to run as provided in Paragraph 2.04 of the Standard 27 City Conditions of the Construction Contract for Developer Awarded Projects. 28 3.3 Liquidated damages 29 Contractor recognizes that time is of the essence of this Agreement and that Developer 30 will suffer financial loss if the Work is not completed within the times specified in 31 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of 32 the Standard City Conditions of the Construction Contract for Developer Awarded 33 Projects. The Contractor also recognizes the delays, expense and difficulties involved in 34 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not 35 completed on time. Accordingly, instead of requiring any such proof, Contractor agrees 36 that as liquidated damages for delay (but not as a penalty), Contractor shall pay 37 Developer, ONE THOUSAND Dollars ($1,000.00) for each day that expires after the 38 time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter 39 of Acceptance. CITY OF FORT WORTH MORNINGSTAR—SECTION 6,PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 100326 Revised April 2,2014 005243-2 Developer Awarded Project Agreement Page 2 of 4 40 Article 4. CONTRACT PRICE 41 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 42 Documents an amount in current funds of. FOUR HUNDRED FIFTY FIVE THOUSAND 43 NINE HUNDRED THIRTY DOLLARS AND FORTY CENT, ($455,930.40). 44 Article 5. CONTRACT DOCUMENTS 45 5.1 CONTENTS: 46 A. The Contract Documents which comprise the entire agreement between Developer and 47 Contractor concerning the Work consist of the following: 48 1. This Agreement. 49 2. Attachments to this Agreement: 50 a. Bid Form(As provided by Developer) 51 1) Proposal Form(DAP Version) 52 2) Prequalification Statement 53 3) State and Federal documents(project specific) 54 b. Insurance ACORD Form(s) 55 c. Payment Bond(DAP Version) 56 d. Performance Bond(DAP Version) 57 e. Maintenance Bond(DAP Version) 58 f. Power of Attorney for the Bonds 59 g. Worker's Compensation Affidavit 60 h. MBE and/or SBE Commitment Form(If required) 61 3. Standard City General Conditions of the Construction Contract for Developer 62 Awarded Projects. 63 4. Supplementary Conditions. 64 5. Specifications specifically made a part of the Contract Documents by attachment 65 or, if not attached, as incorporated by reference and described in the Table of 66 Contents of the Project's Contract Documents. 67 6. Drawings. 68 7. Addenda. 69 8. Documentation submitted by Contractor prior to Notice of Award. 70 9. The following which may be delivered or issued after the Effective Date of the 71 Agreement and, if issued, become an incorporated part of the Contract Documents: 72 a. Notice to Proceed. 73 b. Field Orders. 74 c. Change Orders. 75 d. Letter of Final Acceptance. 76 77 CITY OF FORT WORTH MORNINGSTAR—SECTION 6,PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 100326 Revised April 2,2014 005243-3 Developer Awarded Project Agreement Page 3 of 4 78 Article 6. INDEMNIFICATION 79 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 80 expense, the city, its officers, servants and employees, from and against any and all 81 claims arising out of, or alleged to arise out of, the work and services to be performed 82 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 83 under this contract. This indemnification provision is specifically intended to operate 84 and be effective even if it is alleged or proven that all or some of the damages being 85 sought were caused,in whole or in part, by any act,omission or negligence of the city. 86 This indemnity provision is intended to include, without limitation, indemnity for 87 costs,expenses and legal fees incurred by the city in defending against such claims and 88 causes of actions. 89 90 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 91 the city,its officers,servants and employees,from and against any and all loss,damage 92 or destruction of property of the city,arising out of,or alleged to arise out of,the work 93 and services to be performed by the contractor, its officers, agents, employees, 94 subcontractors, licensees or invitees under this contract. This indemnification 95 provision is specifically intended to operate and be effective even if it is alleged or 96 proven that all or some of the damages being sought were caused, in whole or in part, 97 by any act,omission or negligence of the city. 98 99 Article 7.MISCELLANEOUS 100 7.1 Terms. 101 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of 102 the Construction Contract for Developer Awarded Projects. 103 7.2 Assignment of Contract. 104 This Agreement, including all of the Contract Documents may not be assigned by the 105 Contractor without the advanced express written consent of the Developer. 106 7.3 Successors and Assigns. 107 Developer and Contractor each binds itself, its partners, successors, assigns and legal 108 representatives to the other party hereto, in respect to all covenants, agreements and 109 obligations contained in the Contract Documents. 110 7.4 Severability. 111 Any provision or part of the Contract Documents held to be unconstitutional, void or 112 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 113 remaining provisions shall continue to be valid and binding upon DEVELOPER and 114 CONTRACTOR. 115 7.5 Governing Law and Venue. 116 This Agreement, including all of the Contract Documents is performable in the State of 117 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 118 Northern District of Texas,Fort Worth Division. CITY OF FORT WORTH MORNINGSTAR—SECTION 6,PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 100326 Revised April 2,2014 005243-4 Developer Awarded Project Agreement Page 4 of 4 119 120 7.6 Authority to Sign. 121 Contractor shall attach evidence of authority to sign Agreement, if other than duly 122 authorized signatory of the Contractor. 123 124 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple 125 counterparts. 126 127 This Agreement is effective as of the last date signed by the Parties("Effective Date"). 128 Contractor: Developer: D.T. UTILITY CONTRACTORS, FG ALEDO DEVELOPMENT,LLC INC. By: By: (Signature) (Signature) Co 40W 76-) (Printed Name) (Printed Name) Title: U L-e �rel!& . Title: Company Name: D.T.UTILITY Company name: FG ALEDO CONTRACTORS,INC. DEVELOPMENT,LLC. Address: 2619 CAUSBIE ROAD Address: 3045 LACKLAND BLVD. City/State/Zip: WEATHERFORD,TX City/State/Zip: FORT WORTH,TEXAS 76116 76087 Date Date 129 CITY OF FORT WORTH MORNINGSTAR—SECTION 6,PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 100326 Revised April 2,2014 00 52 43-1 Developer Awarded Project Agreement Page I or4 1 SECTION 00 52 43 2 AGREEMENT 3 k�.5'T ?0 4 THIS AGREEMENT, authorized on � is made by and between 5 the Developer, FG ALEDO DEVELOPMENT, LLC, authorized to do business in Texas 6 ("Developer") and CONATSER CONSTRUCTION TX, LP., authorized to do business in 7 Texas,acting by and through its duly authorized representative,("Contractor"). 8 Developer and Contractor,in consideration of the mutual covenants hereinafter set forth,agree as 9 follows: 10 Article 1.WORK 11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 12 Project identified herein. 13 Article 2.PROJECT 14 The project for which the Work under the Contract Documents may be the whole or only a part is 15 generally described as follows: 16 MORNINGSTAR—SECTION 6, PHASE2 17 18 CITY PROJECT NO.: 100326 19 20 Article 3. CONTRACT TIME 21 3.1 Time is of the essence. 22 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 23 Documents are of the essence to this Contract. 24 3.2 Final Acceptance. 25 The Work will be complete for Final Acceptance within 100 calendar days after the date 26 when the Contract Time commences to run as provided in Paragraph 2.04 of the Standard 27 City Conditions of the Construction Contract for Developer Awarded Projects. 28 3.3 Liquidated damages 29 Contractor recognizes that time is of the essence of this Agreement and that Developer 30 will suffer financial loss if the Work is not completed within the times specified in 31 Paragraph 3.2 above,plus any extension thereof allowed in accordance with Article 10 of 32 the Standard City Conditions of the Construction Contract for Developer Awarded 33 Projects. The Contractor also recognizes the delays, expense and difficulties involved in 34 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not 35 completed on time. Accordingly, instead of requiring any such proof, Contractor agrees 36 that as liquidated damages for delay (but not as a penalty), Contractor shall pay 37 Developer ONE THOUSAND Dollars ($1,000.00) for each day that expires after the 38 time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter 39 of Acceptance. CITY OF FORT WORTH MORNINGSTAR—SECTION 6,PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NOA00326 Revised April 2,2014 005243-2 Developer Awarded Prqiect Agreement Page 2 of 4 40 Article 4. CONTRACT PRICE 41 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 42 Documents an amount in current funds of THREE HUNDRED FORTY SEVEN THOUSAND, 43 FOUR HUNDRED SIXTY TWO DOLLARS AND FIFTY CENTS,($347,462.50). 44 Article 5. CONTRACT DOCUMENTS 45 5.1 CONTENTS: 46 A. The Contract Documents which comprise the entire agreement between Developer and 47 Contractor concerning the Work consist of the following: 48 1. This Agreement. 49 2. Attachments to this Agreement: 50 a. Bid Forn(As provided by Developer) 51 1) Proposal Form(DAP Version) 52 2) Prequalification Statement 53 3) State and Federal documents Qn-oject sI)ecUic) 54 b. Insurance ACORD Fornr(s) 55 c. Payment Bond(DAP Version) 56 d. Performance Bond(DAP Version) 57 e. Maintenance Bond(DAP Version) 58 £ Power of Attorney for the Bonds 59 g. Worker's Compensation Affidavit 60 h. MBE and/or SBE Commitment Form(If required) 61 3. Standard City General Conditions of the Construction Contract for Developer 62 Awarded Projects. 63 4. Supplementary Conditions. 64 5. Specifications specifically made a part of the Contract Documents by attachment 65 or, if not attached, as incorporated by reference and described in the Table of 66 Contents of the Project's Contract Documents. 67 6. Drawings. 68 7. Addenda. 69 8. Documentation submitted by Contractor prior to Notice of Award. 70 9. The following which may be delivered or issued after the Effective Date of the 71 Agreement and,if issued,become an incorporated part of the Contract Documents: 72 a. Notice to Proceed. 73 b. Field Orders. 74 c. Change Orders. 75 d. Letter of Final Acceptance. 76 77 CITY OF FORT WORTH MORNINGSTAR—SECTION 6,PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NO.:100326 Revised April 2,2014 005243-3 Developer Awarded Project Agreement Page 3 of 4 78 Article 6. INDEMNIFICATION 79 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 80 expense, the city, its officers, servants and employees, from and against any and all 81 claims arising out of, or alleged to arise out of, the work and services to be performed 82 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 83 under this contract. This indemnification provision is specifically intended to operate 84 and be effective even if it is alleged or proven that all or some of the damages being 85 sought were caused, in whole or in part, by any act, omission or negligence of the city. 86 This indemnity provision is intended to include, without limitation, indemnity for 87 costs, expenses and legal fees incurred by the city in defending against such claims and 88 causes of actions. 89 90 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 91 the city,its officers,servants and employees,from and against any and all loss,damage 92 or destruction of property of the city,arising out of,or alleged to arise out of,the work 93 and services to be performed by the contractor, its officers, agents, employees, 94 subcontractors, licensees or invitees under this contract. This indemnification 95 provision is specifically intended to operate and be effective even if it is alleged or 96 proven that all or some of the damages being sought were caused, in whole or in part, 97 by any act,omission or negligence of the city. 98 99 Article 7.MISCELLANEOUS 100 7.1 Terms. 101 Terns used in this Agreement are defined in Article 1 of the Standard City Conditions of 102 the Construction Contract for Developer Awarded Projects. 103 7.2 Assignment of Contract. 104 This Agreement, including all of the Contract Documents may not be assigned by the 105 Contractor without the advanced express written consent of the Developer. 106 7.3 Successors and Assigns. 107 Developer and Contractor each binds itself, its partners, successors, assigns and legal 108 representatives to the other party hereto, in respect to all covenants, agreements and 109 obligations contained in the Contract Documents. 110 7.4 Severability. 111 Any provision or part of the Contract Documents held to be unconstitutional, void or 112 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 113 remaining provisions shall continue to be valid and binding upon DEVELOPER and 114 CONTRACTOR. 115 7.5 Governing Law and Venue. 116 This Agreement, including all of the Contract Documents is performable in the State of 117 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 118 Northern District of Texas,Fort Worth Division. CITY OF FORT WORTH MORNINGSTAR—SECTION 6,PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NOA00326 Revised April 2,2014 00 52 43-4 Developer Awarded Project Agreement Page 4 of 4 119 120 7.6 Authority to Sign. 121 Contractor shall attach evidence of authority to sign Agreement, if other than duly 122 authorized signatory of the Contractor. 123 124 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple 125 counterparts. 126 127 This Agreement is effective as of the last date signed by the Parties ("Effective Date"). 128 Contractor: Developer: CONATSER CONSTRUCTION TX, FG ALEDO DEVELOPMENT,LLC L.P. By: `f By: (Sig re) (Signature) BROCK HUGGINS V e;�;/// (Printed Name) (Printed Name) Title: PRESIDENT Title: /�aD ef__��_ Company Name: CONATSER Company name: FG ALEDO CONSTRUCTION TX,L.P. DEVELOPMENT,LLC. Address: P.O. Box 15448 Address: 3045 LACKLAND BLVD. City/State/Zip: FORT WORTH,TX City/State/Zip: FORT WORTH,TEXAS 76116 76119 clue, /�/' A124 Date Date 129 CITY OF FORT WORTH MORNINGSTAR—SECTION 6,PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NOA00326 Revised April 2,2014 005243-1 Developer Awarded Project Agreement Page i of 4 1 SECTION 00 52 43 2 AGREEMENT 3 f'IG�Lr/r[�y 4 THIS AGREEMENT, authorized on G, is made by and between 5 the Developer, FG ALEDO DEVELOPMENT, LLC, authorized to do business in Texas 6 ("Developer") and BEAN ELECTRIC, INC., authorized to do business in Texas, acting by and 7 through its duly authorized representative, ("Contractor"). 8 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 9 follows: 10 Article 1.WORK 11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 12 Project identified herein. 13 Article 2.PROJECT 14 The project for which the Work under the Contract Documents may be the whole or only a part is 15 generally described as follows: 16 MORNINGSTAR—SECTION 6,PHASE 2 17 18 CITY PROJECT NO.: 100326 19 20 Article 3. CONTRACT TIME 21 3.1 Time is of the essence. 22 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 23 Documents are of the essence to this Contract. 24 3.2 Final Acceptance. 25 The Work will be complete for Final Acceptance within 90 calendar days after the date 26 when the Contract Time commences to run as provided in Paragraph 2.04 of the Standard 27 City Conditions of the Construction Contract for Developer Awarded Projects. 28 3.3 Liquidated damages 29 Contractor recognizes that time is of the essence of this Agreement and that Developer 30 will suffer financial loss if the Work is not completed within the times specified in 31 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of 32 the Standard City Conditions of the Construction Contract for Developer Awarded 33 Projects. The Contractor also recognizes the delays, expense and difficulties involved in 34 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not 35 completed on time. Accordingly, instead of requiring any such proof, Contractor agrees 36 that as liquidated damages for delay (but not as a penalty), Contractor shall pay 37 Developer, ONE THOUSAND Dollars ($1,000.00) for each day that expires after the 38 time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter 39 of Acceptance. CITY OF FORT WORTH MORNINGSTAR—SECTION 6,PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NO.:100326 Revised April 2,2014 005243-2 Developer Awarded Project Agreement Page 2 of 4 40 Article 4. CONTRACT PRICE 41 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 42 Documents an amount in current funds of. FIFTY EIGHT THOUSAND EIGHT HUNDRED 43 SEVENTY DOLLARS AND NO CENTS,($58,870.00). 44 Article 5. CONTRACT DOCUMENTS 45 5.1 CONTENTS: 46 A. The Contract Documents which comprise the entire agreement between Developer and 47 Contractor concerning the Work consist of the following: 48 1. This Agreement. 49 2. Attachments to this Agreement: 50 a. Bid Form(As provided by Developer) 51 1) Proposal Form(DAP Version) 52 2) Prequalification Statement 53 3) State and Federal documents(project specific) 54 b. Insurance ACORD Form(s) 55 c. Payment Bond(DAP Version) 56 d. Performance Bond(DAP Version) 57 e. Maintenance Bond(DAP Version) 58 f. Power of Attorney for the Bonds 59 g. Worker's Compensation Affidavit 60 h. MBE and/or SBE Commitment Form(If required) 61 3. Standard City General Conditions of the Construction Contract for Developer 62 Awarded Projects. 63 4. Supplementary Conditions. 64 5. Specifications specifically made a part of the Contract Documents by attachment 65 or, if not attached, as incorporated by reference and described in the Table of 66 Contents of the Project's Contract Documents. 67 6. Drawings. 68 7. Addenda. 69 8. Documentation submitted by Contractor prior to Notice of Award. 70 9. The following which may be delivered or issued after the Effective Date of the 71 Agreement and, if issued, become an incorporated part of the Contract Documents: 72 a. Notice to Proceed. 73 b. Field Orders. 74 c. Change Orders. 75 d. Letter of Final Acceptance. 76 77 CITY OF FORT WORTH MORNINGSTAR—SECTION 6,PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NO.:100326 Revised April 2,2014 005243-3 Developer Awarded Project Agreement Page 3 of 4 78 Article 6.INDEMNIFICATION 79 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 80 expense, the city, its officers, servants and employees, from and against any and all 81 claims arising out of, or alleged to arise out of,the work and services to be performed 82 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 83 under this contract. This indemnification provision is specifically intended to operate 84 and be effective even if it is alleged or proven that all or some of the damages beim 85 sought were caused, in whole or in part, by any act, omission or nel!liEence of the city. 86 This indemnity provision is intended to include, without limitation, indemnity for 87 costs,expenses and legal fees incurred by the city in defending against such claims and 88 causes of actions. 89 90 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 91 the city,its officers,servants and employees,from and against any and all loss,damage 92 or destruction of property of the city,arising out of,or alleged to arise out of,the work 93 and services to be performed by the contractor, its officers, agents, employees, 94 subcontractors, licensees or invitees under this contract. This indemnification 95 provision is specifically intended to operate and be effective even if it is alleLyed or 96 proven that all or some of the damaLes being soualit were caused, in whole or in part, 97 by any act,omission or negligence of the city, 98 99 Article 7.MISCELLANEOUS 100 7.1 Terms. 101 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of 102 the Construction Contract for Developer Awarded Projects. 103 7.2 Assignment of Contract. 104 This Agreement, including all of the Contract Documents may not be assigned by the 105 Contractor without the advanced express written consent of the Developer. 106 7.3 Successors and Assigns. 107 Developer and Contractor each binds itself, its partners, successors, assigns and legal 108 representatives to the other party hereto, in respect to all covenants, agreements and 109 obligations contained in the Contract Documents. 110 7.4 Severability. 111 Any provision or part of the Contract Documents held to be unconstitutional; void or 112 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 113 remaining provisions shall continue to be valid and binding upon DEVELOPER and 114 CONTRACTOR. 115 7.5 Governing Law and Venue. 116 This Agreement, including all of the Contract Documents is performable in the State of 117 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 118 Northern District of Texas,Fort Worth Division. CITY OF FORT WORTH MORNINGSTAR—SECTION 6,PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NO.:100326 Revised April 2,2014 005243-4 Developer Awarded Project Agreement Page 4 of 4 119 120 7.6 Authority to Sign. 121 Contractor shall attach evidence of authority to sign Agreement, if other than duly 122 authorized signatory of the Contractor. 123 124 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple 125 counterparts. 126 127 This Agreement is effective as of the last date signed by the Parties("Effective Date"). 128 Contractor: Developer: FG ALEDO DEVELOPMENT,LLC BEAN ELECT A C. By: By: ignature) (Signature) A, 40 1// (Printed Name) (Printed Name) Title: %ie President Title: Company Name: BEAN Company name: FG ALEDO ELECTRICAL,INC. DEVELOPMENT,LLC. Address: 821 E. Enon Address: 3045 LACKLAND BLVD. City/State/Zip: City/State/Zip: FORT WORTH,TX 76140 FORT WORTH,TEXAS 76116 .- 2_0 1,6 Date Date 129 CITY OF FORT WORTH MORNINGSTAR—SECTION 6,PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NO.:100326 Revised April 2,2014