HomeMy WebLinkAboutContract 38511-A3 CITY SK TARY CONTRACT w. AMENDMENT No. 3 0� TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and James DeOtte Engineering, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 38511, (CONTRACT) which was authorized by M&C C-23420 on the 31st day of March, 2009 in the amount of $442 ,172 . 00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $19,475 . 00 which was administratively authorized on December 28, 2011 and Amendment No. 2 in the amount of $331, 662 . 00 . 00 which was authorized by M&C C-26561 on November 12, 2013 . WHEREAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Main 257 Upper and Middle Village Creek Parallel Relief Main, Part 1; and WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOW TIIEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated August 18, 2016, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $273,388 . 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $830,722 . 00 C�FI�Y6��, ir�f��C'R® Page -1- CITE':ECRE` AR l FT- WORTH, `�R� 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and E + +ECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of ort Wort James D e Engineering, J y Chapa Assistant City Manager �� James DeOtte, P.E. , R.P.L. S . President DATE: `�" DATE: APPROVAL RECOMMENDED: r,'(' Z/- �iz Christopher Harder, P.E. Acting Assistant Director, Water Department APPROVED AS TO FORM AND M&C: C-27957 LEG Y: 9K�6k Date: October 11, 2016 Douglas W. Black Senior Assistant City Attorney ATTEST: ® F% / - °"i'0- 00 0 - ®® City Secretary 00-0 0 Oo Opo 00000000 -011* XA� FOIFFICIAL RECORD CITY SECRETARV FT.vioRTH, P' Page -2- �.-.— ..James ................Civil Englnee. ring ..... ................................... ........ . ............ DeOtteLand Surveying ........................ ........... ..............I............. 4 4 1 d ...... ............C�T!!�rqa!�?Ragernenl ... ...... . .. ...........Inc. ydrologic and Hydraulic Modeling ENGINEERING H ............................... 18 August 2016 Mr. John Kasavich, P.E. Water Department City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas Ref: Sanitary Sewer Main 257 Upper and Middle Village Creek Parallel Relief Main, Part I Additional Services -Amendment No. 3 City Secretary No. 38511 City Project No. 1226 Fort Worth, Texas Mr. Kasavich, Due to additional services requested by the City as part of the referenced project, James DeOfte Engineering, Inc. will perform the work outlined in the following items: M-257 Extension Design Management & Conceptual Design Design Management - Team management, communications, and reporting. Prepare up to 12 monthly, invoices, progress reports, schedule updates, and MWBE reports over course of project. Design includes 3 flow control structures, 2 siphon structures, & I junction box, and 1,050 LF of pipe in the vicinity of Station -155+00 to Station -165+00 (M-257C). Also the update to the 2010 M- 257 Part I plans and resizing to 60" pipe. Prepare Existing M-257 extension parallel sewer line bypass plan and recommendation. Prepare design for a depressed sewer beneath an 84" and 108" raw water supply lines owned by the TRWD. $55,160.00 Preliminary Design Development of the Preliminary Design Drawings. Geotechnical Borings at 4 locations to a depth of 30'. Design for 3 flow control structures, 2 siphon structures, and I junction box. $ 81,160.00 fax 817.930.0445 2201 Dottie Lynn Parkway Ste.119 * Fort Worth TX,76120 phone 817.446.6877 ...................I................................................................................ i r'r*n-R"e'g". l'O'l'O'1'4"0'0' J13 TBFE Firm Reg.No.8917 18 August 2016 Sanitary Sewer Main 257 Upper and Middle Village Creek Parallel Relief Main, Part 1 Amendment No. 3 Final Design Final Design and Construction Documents. $ 24,535.00 Bid Phase Services Bid phasing services- Assist City with advertising and awarding the construction contract for the project. $ 10,188.00 Construction Phase Services Construction phasing services- Attend Preconstruction Conference, review RFI's, Change Orders, Shop Drawings, Site Visits, Final Walk Through, and Record Drawings. $ 17,680.00 R.O.W. / Easement Services Easement preparation - Prepare rights of entry, research property ownership, recover property corners, and prepare 5 permanent & 5 temporary construction easements. $ 28,960.00 Survey Services Topographic survey for 1,050 linear feet of pipeline and -400 linear feet for streambank stabilization. Research and locate utilities via Subsurface Utility Engineering investigation (Level B & A) within the alignment corridor of approximately 1,050 feet & 2 potholes. $ 40,135.00 Permitting Prepare SWPPP Erosion Protection Plan Sheets, City of Fort Worth Fill Permit, City of Fort Worth Floodplain Development Permit, Oncor permit, and Tarrant Regional Water District Permit. Routine Wetland Delineation & Nationwide Permit Application for NWP 13 application preparation including endangered & cultural resources review and Section 401 Water Quality Certification. $ 15,570.00 Sincerely 1• James E. DeOtte, P.E., R.P.L.S. President fax 817.930.0445 2201 Dottie Lynn Parkway Ste.119 • Fort Worth TX,76120 phone 817.446.6877 ........a.......................................................................... ............................................................................................. ...... T8PLS Firm Reg,No.10101400 WE Firm Reg.No.8917 EN(IINP.EHIHO 18 August 2016 Upper and Middle Village Creek Parallel Relief Main, Part 1 M-257C and M-503 Amendment No. 3 The Water and Sewer Services Breakdown for this amendment is as follows: Description Water Sewer Amend No. 3 Concept Phase $0 $55,160 $55,160 Preliminary Design $0 $81,160 $81,160 Final Design $0 $24,535 $24,535 Bid Phase Services $0 $10,188 $10,188 Construction $0 $17,680 $17,680 Phase Services ROW/Easement $0 $28,960 $28,960 Services Survey Services $0 $40,135 $40,135 Permitting $0 ! $15,570 $15,570 Total $0 $273,388 $273,388 The Work Phase Breakdown for this amendment is as follows: Amendment No. 3 Work Phase Water Fee Sewer Fee Total Fee 31 $0 $0 $0 32 $0 $0 $0 33 $0 $273,388 $273,388 51 $0 $0 $0 Total $0 $273,388 $273,388 fax 817.930.0445 2201 collie Lynn Parkway Me,119 Fort Worlh TX.76120 phone 817.446.6877 ......:............... :..........:.......:..:.....:.....:....:......:............:.................do..............................................:......:..............:.....:.............. LSFirm Reg.No.10101400 TBPE Rrm Reg.No.8917 CM0111®PM6 18 August 2016 Upper and Middle Village Creek Parallel Relief Main, Part 1 M-257C and M-503 Amendment No. 3 The Task Description Breakdown for the project including the amendment is as follows: Description Original Fee Amend No. 1 Amend No. 2 Amend No. 3 Revised Contract Concept Phase $138,562 $4,330 $55,160 $198,052 Preliminary Design $93,029 $46,050 $81,160 $220,239 Final Design $73,230 $15,030 $24,535 $112,795 Bid Phase Services $5,630 $2,452 $10,188 $18,270 Construction $14,540 $2,985 $17,680 $35,205 Phase Services ROW/Easement $38,123 $8,860 $28,960 $75,943 Services Survey Services $60,118 $19,475 $12,300 $40,135 $132,028 Permitting $18,940 $3,680 $15,570 $38,190 Total $442,172 $19,475 $95,687 $273,388 $830,722 The Work Phase Breakdown for the project including the amendment is as follows: Contract/ Water Sewer Survey Total Amendment Original Fee $0 $382,054 ! $60,118 $442,172 Amend No. 1 $0 $0 $19,475 $19,475 Amend No. 2 $0 $83,387 $12,300 $95,687 Amend No. 3 $0 $233,253 $40,135 $273,388 Total $0 $698,694 $132,028 $830,722 fox 817.930.0445 2201 Doifie Lynn Parkway Sle.119 • Fort Worlh TX,76120 phone 817.446.6877 ...I.......... ....................... .:................:.......................:..........................................................................................:.............. TBPLS Firm Reg.No.10101400- _ A Fi TBPE rm Recd.No:8917 viovau.Na 18 August 2016 Upper and Middle Village Creek Parallel Relief Main, Part 1 M-257C and M-503 Amendment No. 3 The M/WBE Percentage Breakdown for the amendment is as follows: Amendment No. 3 Sub-Consultant Fee AIA Engineers, LTD. $20,150 The Rios Group, Inc. $6,050 GM Enterprises, Inc. (CMJ 2nd Tier MWBE) $3,030 Total $29,230 M/WBE Percentage 10.69% The M/WBE Percentage Breakdown for the project including the amendment is as follows: Description Original Revised Contract Amount $442,172 $830,722 Total Contract M/WBE $128,208 $170,988 Total Contract M/WBE Percentage 29.00 20.58 fox 817.930.0445 2201 Dottie Lynn Parkway Ste.119 • Port Worth TX.76120 phone S - :.. ............... ....................:..........:.. - ............. ...... ..:. .............. 817..446..6877 .BS.F.r:m..R.'e.9.N..o:.1.0.1.0..1.4..0.0........ ...... .......... ........ ...... ........ BR..r.m..R.e:g. .N.o..8..9.1.7. 0 wei- N P �lp a° P. -I -i --1 N o m O N o 0 3 N 0<m0➢�1�0 n A 01davm`°°° 63�nO: m1p" mmm� da33c�3x3"n- - °" t�ti �'��°o N m�mm°10N-n_<ory o � o_ ao�o oNOwD�v!°�m��Gn �x=,�,�o-oao vd n 7 y � v�-' O-�3=o. u a. if 0 m<_u a -N 1, m C ° 3 v N o 0 3 s 3nma ° p j°.-' �5 O oN m '� N 'w� °msR 'c3' y 3 Dn�gFf� m ^ 03CD m_ =ac�3ns n� °< E �W m amd g�3A00 yDV3 Ei C ° m 3 3 si n a 3 3 3 0° _ " v Ey m Ci 51 .D 3 '3 l a 3 S o � Cl) c v n W 3 `z CD F CD Q P P 0 0 o N J C m ."I OJillill I J Id x r El DO D a 3 Q Q 0 3 m M m < w�� aw a a Nawa .�-. N N N N N N N NO N N N N N N N N N N N N O m W 2 (� O m o 0 A O N N A N m o A o 0 o m m N m CD n O N N Fixa N o� A A N Soo m m 8 N N O N J D1 A C � N N N N N N N N N N N 0 0 N N o p m� O D r A m o S S Sod NIJ IJn �g N g�iim O�� oSA ON m O � 0 0 0 0 O O o 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O a c N N O al �3 m �ry m v I o to� N N W -I t� H1ao «JV - rn NH V A.-m g m g om NS pAS o N� A P. �1 A m vt H A P w A °P W m m w m ny m 3 mN m _nm -+m<p�3 o-a"�8 v �r�Ax<_m�mm_m_mH� onxma'<'v>;vol-iamN2mmy� opvoo<pTTT=A d�DD� p QmamFm� CL n na.3cn�-o�E9 o,w "�oo W =a000 P_ oa -'_n =30 =om Go =N�=Oco w m N m o y c"a"-mm n nAC e3m o N Z n m 9 d C y N "� n n:➢ O" N y -n m 0=D m n m >KET T- 2vi sID fA 30 9E 3m Ofd» v='RR T 3 y 3 3 [ �. 3 5. o 3^D'n nER w n3 v3' 3 2,a N p-' 3 N °aD_np m w3 lo o p o avr o dSo d33z NOO n m ° n^ m q M moo tiR5. 3m >a o > m m _ - do � sT m co � o � 3 a m — T C c C m N P V Q P 0 0 0 o N C x b m x� rpo_ °l CD m m 'D +A N AA oAAooAm Q Q O� � N Z M CD G 1. K NN NN NNNNN NNNNN NNNNNNN NN000 No °RI 1 ID x (� O oAS Nm NA Si0 oAmmAA AomAoomN JwZdJ IvUll enNww w� an Hen m p � x x w (D o� -�D-n A A N O N A N N A o A A N W A (U �1 C N N N N N N N NN N N N O O O � Q O 0 D D r N m NA � UHi NAN�� aµ ANt«.�o N�e N O 00 O�J .Z7 000 o0 0o O 000000 000000 O0000O 000000000 Oo0 0000 V a Q c A �3 d 3G N h 'rt o R L O N'�O N 6 6 6 o 4 6 §\ !/§-�E ® 7! ° # # k § § § ■ _ ;■ ` ` °! \ � j } {! } « ; \ / \k£ /©E ± §» � \ ) > {<a f / J| 0 LO m ! ! lo \ K \ / / \ \ } \ _ \\ } \)\ \ \ \ \�\\� \ \{���)�)� \�\ et=do'd , /)$(//)�zi ))\ { f{ ©a!«f!§a§: 0 , , m 0 0 _ o , Sanitary Sewer Main 257 Upper and Middle Village Creek Parallel Relief Main,Part 1 Opinion of Probable Construction Costs Bidlist Item Specification Unit of No. Description Section No. Measure Price Quantity Amount 1 3331.4708 60"Fiberglass Sewer Pipe 3331 13 LF $420.00 12,284 $5,159,280.00 2 9999.0001 84"Casing By Other Than Open Cut 33 05 22 LF $1,200.00 1,829 $2,194,800.00 3 9999.0002 Manhole(to 6 Ft Depth) 3339 10, EA 33 39 20 $7,000.00 21 $147,000.00 4 9999.0003 Manhole(over 6 Ft Depth) 3339 10, VF 33 39 20 $350.00 273 $95,550.00 5 9999.0004 Junction Box 3339 10, EA 33 39 20 $175,000.00 4 $700,000.00 6 3301.0101 Manhole Vacuum Testing 33 01 30 EA $273.00 25 $6,825.00 7 3339.0001 Epoxy Manhole Liner 33 39 60 VF $70.00 399 $27,930.00 8 3305.0109 Trench Safety 3305 10 LF $4.20 10,455 $43,911.00 9 3301.0002 Post-CCTV Inspection 33 01 31 LF $4.20 14,113 $59,274.60 10 3292.0400 Seeding,Hydromulch(Bermuda) 32 92 13 SY $0.70 104,550 $73,185.00 11 3137.0105 Medium Stone Riprap,grouted(12"-18") 31 37 00 SY $98.00 605 $59,290.00 12 3231.0121 4'Chain Link,Aluminum 3231 13 LF $9.80 3,000 $29,400.00 13 3231.0141 4'Steel Tube Fence 3231 13 LF $9.80 100 $980.00 14 3231.0211 Barbed Wire Fence,Metal Posts 32 31 26 LF $9.80 220 $2,156.00 Sub-Total $8,599,581.60 10%Contingency $859,958.16 Total Bid $9,459,539.76 M&C Review Page 1 of 2 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FOR, 'VVo Rm COUNCIL ACTION: Approved on 10/11/2016 ' DATE: 10/11/2016 REFERENCE NO.: **C-27957 LOG NAME: 60M257P1A3- DEOTTE CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 3 in the Amount of$273,388.00 to City Secretary Contract No. 38511, an Engineering Agreement with James DeOtte Engineering, Inc., for a Revised Contract Amount of$830,722.00 for Sanitary Sewer Main 257 Upper and Middle Village Creek Parallel Relief Main, Part 1 Project and Provide for Project Management and Real Property Easement Acquisition Costs (COUNCIL DISTRICT 8) RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment No. 3 to City Secretary Contract No. 38511 with James DeOtte Engineering, Inc., in the amount of$273,388.00 for a revised contract amount of$830,722.00. DISCUSSION: On March 31, 2009 (Mayor and Council Communication (M&C) C-23420), the City Council authorized an Engineering Agreement with James DeOtte Engineering Inc., in the amount of$442,172.00 for the Sanitary Sewer Main 257 Upper and Middle Village Creek Parallel Relief Main, Part 1. The Agreement was subsequently revised by two amendments totaling $115,162.00 as follows: Amendment No. 1 in the amount of$19,475.00 administratively authorized on December 22, 2011 and Amendment No. 2 in the amount of$95,687.00 authorized November 12, 2013 (M&C C-26561). Amendment No. 3 will allow for additional engineering services for the design of a parallel relief main adjacent to existing Sanitary Sewer Main 503 to provide additional wastewater capacity to meet future demands from Southeast Fort Worth, Burleson and Crowley. The proposed main will begin south of Lon Stephenson Road and east of Anglin Drive and will end north of Everman - Kennedale- Burleson Road and east of Anglin Drive. The alignment generally follows Village Creek for approximately 1,050 linear feet. The proposed scope of services consists of: preparation of plans and specifications, survey services, geotechnical engineering, environmental assessment, permitting, bid phase and construction phase services and ROW/Easement services. In addition to the contract amount, $700,000.00 is required for project management and real property easement acquisition. This project will have no impact on the Water Department's operating budget when complete. MWBE OFFICE: James DeOtte Engineering Inc., is in compliance with the City's M/WBE Ordinance by committing to an additional 11 percent M/WBE participation on this Amendment No.3. The City's M/WBE goal on this Amendment is 10 percent. The project is located in COUNCIL DISTRICT 8, Mapsco 107B and F. http://apps.cfwnet.org/council_packet/Mc_review.asp?ID=22899&councildate=10/11/2016 10/12/2016 M&C Review Page 2 of 2 FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that the appropriation is available as directed by M&C G-18625 in the Water/Sewer Bond 2016 Fund for the Sanitary Sewer Main 257 Upper and Middle Village Creek Parallel Relief Main, Part 1 Project as depicted below by fund: FUND Existing Appropriations Additional Appropriations Project Total* Water/Sewer Bond 2016 Fund 56005 $1,168,700.00 $0.00 $1,168,700.00 Clean Water SRF Fund 59602 $ 442,172.00 F $0.00 $ 442,172.00 Sewer Capital Fund 59607 $1,621,687.00 $0.00 $11621,687.00 Project Total $3,232,559.00 $0.00 $3,232,559.00 'Numbers rounded for presentation purposes. TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year (Chartfield 2) FROM Fund Department Account Project Program Activity Budget Reference# Amount ID I ID I Year (Chartfield 2) Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: John Carman (8246) Additional Information Contact: John Kasavich (8480) ATTACHMENTS 60M257P1A3 DeOtte Form 1295.pdf 60M257P1A3 DEOTTE.pdf http://app s.cfwnet.org/council_packet/me_review.asp?ID=22 8 9 9&councildate=l 0/11/2016 10/12/2016 Ln I 0 0 U, . 0 V O A W O 1 In W - W Ln O O n 0 N N ' n 0 N _ V W W I N O N I I� f - I 1 9 N V W W 00 90 O I 1 I l ' I . I i 1 C CERTIFICATE OF INTERESTED PARTIES FORM 3.295 10f1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2016-111135 James DeOtte Engineering, Inc. Fort Worth,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 09/13/2016 being filed. City of Fort Worth Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. 1226 Engineering Services-Sanitary Sewer Main 257 Upper and Middle Village Creek Parallel Relief Main, Part 1 Nature of interest 4 Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary DeOtte,James Fort Worth,TX United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. PATRICK YORK Notary ID# 125087911 _ My Commission Expires .� ,, oy October 15. 2020 Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE 4 Sworn to and subscribed before me,by the said �/;Av► �0./�'� this the 1 7 '�� day of 51r444-(* 20 16 ,to certify which,witness my hand and seal of office. A 6 Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.277 M&C Review Page 1 of 2 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FoRTWoxm COUNCIL ACTION: Approved on 10/11/2016 DATE: 10/11/2016 REFERENCE NO.: **C-27957 LOG NAME: 60M257P1A3- DEOTTE CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 3 in the Amount of$273,388.00 to City Secretary Contract No. 38511, an Engineering Agreement with James DeOtte Engineering, Inc., for a Revised Contract Amount of$830,722.00 for Sanitary Sewer Main 257 Upper and Middle Village Creek Parallel Relief Main, Part 1 Project and Provide for Project Management and Real Property Easement Acquisition Costs (COUNCIL DISTRICT 8) RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment No. 3 to City Secretary Contract No. 38511 with James DeOtte Engineering, Inc., in the amount of$273,388.00 for a revised contract amount of$830,722.00. DISCUSSION: On March 31, 2009 (Mayor and Council Communication (M&C) C-23420), the City Council authorized an Engineering Agreement with James DeOtte Engineering Inc., in the amount of$442,172.00 for the Sanitary Sewer Main 257 Upper and Middle Village Creek Parallel Relief Main, Part 1. The Agreement was subsequently revised by two amendments totaling $115,162.00 as follows: Amendment No. 1 in the amount of$19,475.00 administratively authorized on December 22, 2011 and Amendment No. 2 in the amount of$95,687.00 authorized November 12, 2013 (M&C C-26561). Amendment No. 3 will allow for additional engineering services for the design of a parallel relief main adjacent to existing Sanitary Sewer Main 503 to provide additional wastewater capacity to meet future demands from Southeast Fort Worth, Burleson and Crowley. The proposed main will begin south of Lon Stephenson Road and east of Anglin Drive and will end north of Everman - Kennedale- Burleson Road and east of Anglin Drive. The alignment generally follows Village Creek for approximately 1,050 linear feet. The proposed scope of services consists of: preparation of plans and specifications, survey services, geotechnical engineering, environmental assessment, permitting, bid phase and construction phase services and ROW/Easement services. In addition to the contract amount, $700,000.00 is required for project management and real property easement acquisition. This project will have no impact on the Water Department's operating budget when complete. MWBE OFFICE: James DeOtte Engineering Inc., is in compliance with the City's M/WBE Ordinance by committing to an additional 11 percent M/WBE participation on this Amendment No.3. The City's M/WBE goal on this Amendment is 10 percent. http://apps.cfwnet.org/council_packet/mc_review.asp?ID=22899&councildate=l 0/11/2016 10/19/2016 M&C Review Page 2 of 2 The project is located in COUNCIL DISTRICT 8, Mapsco 107B and F. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that the appropriation is available as directed by M&C G-18625 in the Water/Sewer Bond 2016 Fund for the Sanitary Sewer Main 257 Upper and Middle Village Creek Parallel Relief Main, Part 1 Project as depicted below by fund: FUND Existing A ro riations Additional A ro riations Project Total* Water/Sewer Bond 2016 Fund 56005 11 $1,168,760.00 $0.00 $1,168,700.00—] Clean Water SRF Fund 59602 $ 442,172.00 $0.00 $ 442,172.00 Sewer Ca ital Fund 59607 $1,621,687.001 $0.00 11 $1,621,687.00 Project Total $3,232,559.00 $0.00 $3,232,559.00 *Numbers rounded for presentation purposes. TO Fund Department Account Project Program Activity ff_ud_g_e_tF Reference# TAmount ID ID Year Chartfield 2 FROM Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year Chartfield 2 Submitted for City Manager's Office bv: Jay Chapa (5804) Originating Department Head: John Carman (8246) Additional Information Contact: John Kasavich (8480) ATTACHMENTS 60M257P1A3 DeOtte Form 1295.pdf 60M257P1A3 DEOTTE.pdf http://apps.cfwnet.org/council_packet/mc review.asp?ID=22899&councildate=10/11/2016 10/19/2016