Loading...
HomeMy WebLinkAboutContract 45167-FP2 Depart m i��of,TP &W Co ri t. Services DOE#_'N�I 1 X Date Project an ger g' —(( CITY SECRETARY , Risk Managemen Ma - OO �° D.O.E. Brotherton — 1TWORTH. CFA Westerman/Scanned The Proceeding people have been Contacted concerning the request for final payment& have 'ATION AND PUBLIC WORKS released this project for such payment. F PROJECT COMPLETION Clearance Conducted By Shameka Kennedy �i ,/� Q� G( �QD.O.E. 2. 7112 Regarding contract 117112 for 7TH AVE &WEST TERRELL AVE as required by the TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through 1V1&C N/A the director of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the Transportation&Public Works Department leas accepted the project as complete. Original Contract Prices: $102,714.00 Amount of Approved Change Orders: $26,339.00 Ns 1 Revised Contract Amount: $129,053.00 Total Cost Worlc Completed: $129,053.00 Less Deductions: Liquidated Damages: Days a $210.00/Day Pavement Deficiencies: Total Deduction Amount: Total Cost Work Completed: $129,053.00 Less Previous Payments: $0.00 Final Paym ue $129,053.00 �0. 1�•/4 Recommend d fo Acceptance Date Asst`Directo TP - Infrastructure Design and Construction Accepted j Date -Director, TRANSPORTATION TPBLIC WORKS r Asst. City Manager Date Comments: C205-541200-209760217083 H1T .ZLED OFFICIAL RECORD OCT 2 0 2016 CITY SECRETARY FT.WORTHo T FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name 7TH AVENUE&WEST TERRELL AVE Contract Limits Project Type STORM DRAIN&PAVING City Project Numbers 02170 DOL Number 7112 Estimate Number 1 Payment Number I For Period Ending 8/4/2016 CD City Secretary Contract Number 117112 Contract Time 12(rD Contract Date Days Charged to Date 872 Project Manager hafad Contract is 100.00 Complete Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 Inspectors LAYER / DIESTEL Thursday,August 04,2016 Page I of 4 6 City Project Numbers 02170 DOE Number 7112 Contract Name 7TH AVENUE&WEST TERRELL AVE Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 8/4/2016 Project Funding STORM DRAIN Item Estimated Estimated Completed Completed Description of Items Unit Unit Cost No. Quanity Total Quanity Total --------------------------------------- 1 ----------------------- - - 1 REMOVE IO'CURB INLET I EA $1,500.00 $1,500.00 1 $1,500.00 2 10'CURB INLET 1 EA $3,500.00 $3,500.00 1 $3,500.00 3 12"STORM ABANDONMENT PLUG CO#2 3 EA $800.00 $2,400.00 3 $2,400.00 4 21"STORM ABANDONMENT PLUG CO#2 3 EA $1,000.00 $3,000.00 3 $3,000.00 5 24"STORM ABANDONMENT PLUG CO#2 1 EA $1,200.00 $1,200.00 1 $1,200.00 6 TRENCH SAFETY CO#2 173 LF $4.00 $692.00 173 $692.00 7 12"RCP CLASS III CO#2 83 LF $65.00 $5,395.00 83 $5,395.00 8 21"RCP CLASS III CO#2 95 LF $80.00 $7,600.00 95 $7,600.00 9 24"RCP CLASS III CO#2 47 LF $85.00 $3,995.00 47 $3,995.00 10 REMOVE 24"STORM LINE CO#2 10 LF $15.00 $150.00 10 $150.00 -------------------- -------------------- Sub-Total of Previous Unit $29,432.00 $29,432.00 PAVING Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 REMOVE SIDEWALK CO#2 2370 SF $2.00 $4,740.00 2370 $4,740.00 2 REMOVE CONCRETE DRIVE CO#1 586 SF $2.00 $1,17100 586 $1,172.00 3 REMOVE CONC PAVEMENT 16 SY $2,00 $32.00 16 $32.00 4 REMOVE CONC CURB&GUTTER CO#1,2 341 LF $1.00 $341.00 341 $341.00 5 10'WIDE ASPHALT PVMT REPAIR CO#2 899 LF $40.00 $35,960.00 899 $35,960.00 6 ASPHALT PVMT REPAIR BEYOND DEFINED 516 SY $40.00 $20,640.00 516 $20,640.00 WIDTH CO#1,3 7 4"CONC SIDEWALK CO#1,2 2272 SF $5.00 $11,360.00 2272 $11,360.00 8 7"CONC CURB&GUTTER CO#1,2 327 LF $28.00 $9,156.00 327 $9,156.00 9 4"SLD PVMT MARKING 14 LF $10.00 $140.00 14 $140.00 10 BLOCK SOD PLACEMENT 116 SY $5.00 $580.00 116 $580.00 11 TRAFFIC CONTROL 2 MO $7,500.00 $15,000.00 2 $15,000.00 12 REMOVE PARKING METER&POLE 1 EA $250.00 $250.00 1 $250.00 13 INSTALL PARKING METER&POLE I EA $250.00 $250.00 1 $250.00 ----------------------------------- - --- --- Sub-Total of Previous Unit - --$99,621.00---- $99,621.00 ---- i I Thursday,August 04,2016 Page 2 of 4 I i i i City Project Numbers 02170 DOE Number 7112 Conti-act Name 7TH AVENUE&WEST TERRELL AVE Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 8/4/2016 Project Funding Contract Information Summary Originnl Contract Amount $102,714.00 ChanIze Orders Change Order Number 1 $26,339.00 Total Contract Price $129,053.00 Date —10-I& Total Cost of Work Completed $129,053.00 Contra Less %Retained $0.00 4Net Earned $129,053.00 Date Inspection Sup o Earned This Period $129,053.00 Retainage This Period $0.00 JLV�04l 01.6L. Ph Date 10 Iz,��,L Less Liquidated Damages Project Man er Days tau /Day $0.00 ('X Date lo, li'I& LessPavement Deficiency $0.00 A st. 'r to TP/W-InfrJasttru�ctare Design and Construction Less Penalty $0.00 6Jl/`� Date �d Less Previous Payment $0.00 Director/ ontracting Department Plus Material on Hand Less 15% $0.00 Balance Due This Payment $129,053.00 Thursday,August 04,2016 Page 3 of 4 City Project Numbers 02170 DOE Number 7112 Contract Name 7TH AVENUE&WEST TERRELL AVE Estimate Number 1 Contract Limits Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 8/4/2016 Project Funding Project Manager Jaafari City Secretary Contract Number 117112 Inspectors LAYER / DIESTEL Contract Date Contractor CONATSER CONSTRUCTION T%LP Contract Time 120 CD 5327 WICHITA ST Days Charged to Date 872 CD FORT WORTH, TX 76119 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded -------------------------------------- Total Cost of Work Completed $129,053.00 Less %Retained $0.00 Net Earned $129,053.00 Earned This Period $129,053.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days a $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 i Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $129,053.00 Thursday,August 04,2016 Page 4 of 4 I k I CD "� m >O 0 m 0 "O z 'rt Cn 0 0 0 0 -O N a :!� 0 z � �CD 0 --p m � -DIOm �� Dz0 C- 0 � o 4 D (-m m m -u -DC- D7i o ~ 0O D ..o m m m ;O m mC- C- (7 DZ O0 OD O zm m m m m { m o -yi z 1 D s G) 0 1 M O O O Om z 'u N N N 3 � � U7 CJ7 N O W D fD fOD Ot 'B O J p p N N V o m m m O O CO CO ti, o A G A A p CO p (D N23 O O O O w co N O O O W (n O o 0 0 o O A- 41 01 - O 0',m Q y m p N " ( D a d1 P. b w °D ..m m e D m -o 0 m 3 Z 0 m :,4 o �`n O A A m iA N Z o o OZ D co 0 Z A° z --A G1 m o ', Z (WO --I O ,Z7 tz N co P --4W Z N 0 Q ro (D O (O A W 0 CD N H 9 o p N o o a oo A ;m o o D la iz, zm o m o o= 0 bf fn to fn <n eA "N 0 0 0 0 o a 0 0 0 0 0 0 o ro � m O O O O O O 6 D_6 O V A Q O O 'u CA D °) A m -0 I i i ((D O < � G N O w 2 (D Q 0 m DSD a Z z 'co olV mLItAWD COVW(nAN m O o G) G) mcn pco� m(Drncni>o � m 3 m m Q7 w m Q p m o m 0 0 J,, oww woo wWww o wwww WwWwWwCW w W N N 1 N N O N 0 w w W w �jijjWO O N N w w w O to(0 co ooW N A O O O O O A N O O000 000 woj 0EF 000 �N--�--iV -` W-i(o of (om O O O VN W W'w W W VN(VO W'O 3 rrrrrmmm r-V1Cnr-r-WCn mmGr mrrrrrr Z -n-n .-n-nDDD -n-n f-n'n-tm DD'n n Dm-n-n-n-nI z O r D N w 'p 0O A i N m m N tj V m m cnu,tn 13 w Dn o m m m(n m _ D A a< 3 .T7 a (U N Zi O< �'N W w m o m * x `2 O0 01.t=-i O m �1 0�7 m o o(p ^n m 3 A(p m 1-0 m < N C)oo �Q� C)� 0 9� C)� g' �b G)vl2o rn m O T1 0�w w w o < o o m w D w w w w w 0• w (nC�C�(�tnano 3 Cao ao m- - co � C) w a o o °t a a�I� o o (mn o <ro vv oQ1 w owmw wn � = mmm mm w (n d1 N m 2 't O' m to m W -.m (p 'Q N n w 3 3 3 w � m r Cl) <V m m m r=== �X,Qw fk0 s3m m - r O G7 wmw m S z CD m< 3 o m E C C d y (D N '�• S 2 _ m O_ 7 PI 159fA fR E9 T 69<t3 fA EA P NEA f9 N FA Efl EA f9 Z ww Q1�IJ O co N�AAfA fA ff1 O AN-� O m Ut ASN --1 w VtO C71�OOp m�00. NIV 00�a o p 00 Un�'N T 0 0 0 0 0 0 0' p O o O O O O O O O O O O O O 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 C,O O C,O O O O O 00 00 o m N ?�WJC�J1��W N -,WEflN W fA ffl km Np NN�enT(�1) O Aol cO Q)W(Oo[JOA (o pwj-N W No m O�AAN 6f OIJA W W A O O W (wJ i O[(011 N 0 0 0 X0.1 0 0 0 p 0 0 0 0 0 0 p 0 0 0 O p y O N O O O :, O O O C i O O O O Q o 0 o O O O r w O O O O 0 0 C. O O 4 O 6 O O O O O Cl O O O O O O O O O 0 0 0 m N N 1 a i z m rt lu on 1 1 i R l L a C J i S F i f I 1 } 0 o 3 1 i i iI 1 v � W 1 3 i S FORTWORTH rev 03/05/07 TRANSPORTATION&PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.1 NAME OF PROJECT: 7th Ave&West Tei7ell Ave PROJECT NO.: 02170 CONTRACTOR: Conatser Construction DOE NO. 7112 PERIOD FROM 02/03/14 TO: 04/23/16 FINAL INSPECTION DATE: 1-Jul-16 WORK ORDER EFFECTIVE 2/3/2014 CONTRACT TIME 120 O WD OO CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS THIS 0 0 0 0 872 872 PERIOD PREVIOUS 0 0 0 0 0 0 PERIOD TOTALS 0 0 0 0 872 872 TO DATE *REMARKS: CONTRACTOR DATE INSPECTOR DATE ENGINEERING DEPARTMENT The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845 FORTWORTHREV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY n PROJECT INFORMATION Date: 6/29/2016 Name of Contractor Project Name Conatser Construction 7th Ave and West Terrell Ave DOE Inspector Project Manager Galey Houston Khal Jaafari DOENumber Project D lCulty Type of Conh•act 7112 O Simple OO Routine O Complex ❑Water ❑Waste Water O Storm Drainage Pavement Initial ContractAmorait Final Contract Amount $102,714.00 $129,053.00 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS 1 Availability of Inspector V 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector y 2 Clarity&Sufficiency of Details y 3 Accuracy of Measured Quantities y 3 Applicability of Specifications 4 Display Of Professionalism M 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time &1 3 Communication 2 Timliness of Contractor Payments Jf 14 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timefiame If III)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 t' 1 (817)392-7941 •Fax:(817)392-7845 FORTWORTHREV:02/20/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR I) CONTRACTOR&PROJECT DATA Name of Contractor Project Name Conatser Construction 7th Ave and West Terrell Ave DOElnspector DOENumber Garey Houston 7112 DOE Inspector Project Manager ❑water ❑Waste water 9 Storm Drainage [A Pavement Khal Jaafari Initial Contract A,nount Project Difficulty $102,714.00 O Simple Op Routine O Complex Final Cwnh•act Amount Date $129,053.00 16/29/2016 H)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 4 20 20 10 Citizen's Complaint Resolution 5 Y 4 20 20 11 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 4 20 1 20 TOTAL ELEMENT SCORE(A) 448 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 448 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating(ITS/MS]*100%) 448 / 448 = 100% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=,Standard 60%to<80%=Good >80%=Excellent Inspector's Comments(INCLUDING EXPLANATION Of,BONUS POINTS AWARDED) Signature DOE Inspector Signature Contactor Signature DOE Inspector's Supervisor CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS �' The City of Fort Worth•1000 Tlirockmorton Street•Fort Wortli,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared Brock Huggins, Vice-President of Conatser Management Group, Inc., general partner of Conatser Construction TX,LP, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said: That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth, has been paid in full; and That there are no claims pending for personal injury and/or property damages; On Contract described as: Th AVENUE &WEST TERRELL AVE. WATER, STORM DRAIN, SANITARY SEWER, PAVING IMPROVEMENTS DOE#: N/A CFA- City Project#: 2013-080 CITY OF FORT WORTH STATE OF TEXAS CONAT CONSTRUCTION TX,LP Brock Huggins Subscribed and sworn to before me this I It" day of Au , ^%a% BERTHA GIANULIS Notary Public in Tarrant County, Texas Notary Public,state of Texas '`s•'•� +y My commission Expires September 18, 2019 Seto CONSENT OF OWNER ❑ SURETY COMPANY ARCHITECT ❑ CONTRACTOR ❑ TO FINAL PAYMENT SURETY ❑ Conforms with the American Institute of OTHER Architects,AIA Document G707 Bond No 0174424 PROJECT: (name, address)Water,Sewer, Paving&Drainage Imprvis. 7th Ave.and West Terrell Ave. TO (Owner) Fort Worth,TX COOK CHILDREN'S MEDICAL CENTER AND THE —1 ARCHITECT'S PROJECT NO: CFA No.2013-080 CITY OF FORT WORTH CONTRACT FOR: 71h Avenue and West Terrell Avenue Water,Sewer,Paving,&Drainge Improvements L— TX —J CONTRACT DATE: CONTRACTOR:CONATSER CONSTRUCTION TX, L.P. I In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (hare insert name and address of Surety Company) BERKLEY INSURANCE COMPANY 475 Steamboat Road Greenwich CT 06830 , SURETY COMPANY on bond of (here insert name and address of Contractor) CONATSER CONSTRUCTION TX, L.P. 5327 Wichita St. Forest Hill TX 76119-6035 , CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to (here insert name and address of Owner) COOK CHILDREN'S MEDICAL CENTER AND THE CITY OF FORT WORTH TX , OWNER, as set forth in the said Surety Company's bond. IN WITNESS,WHEREOF, the Surety Company has hereunto set its hand this 10th day of August,2016 BERKLEY INSURANCE COMPANY Surety �Company Attest: % t • t�� I' Seal : � t ) a Signature of Authorized Representative Robbi Morales Attorney-in-Fact Title NOTE: This form Is to be used as a companion document to AIA DOCUMENT 0706, CONTRACTOR's AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition i ONE PAGE No. BI-7280f POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON,DELAWARE NOTICE: The waming found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully. KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly C organized and existing under the laws of the State of Delaware,having its principal office in Greenwich,CT, has made,constituted v and appointed, and does by these presents make, constitute and appoint: Ricardo J Reyna; Don E. Cornell; Vena DeLene Marshall,Sophinie Hunter;Robbi Morales;or Kelly A. Westbrook of Aon Risk Services Southwest,Inc. of Dallas, TX its true v and lawful Attorney-in-Fact,to sign its name as surety only as delineated below and to execute,seal,acknowledge and deliver any v and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars(U.S.S50,000,000.00),to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. v s, This Power of Attorney shall be construed and enforced in accordance with, and governed by,the laws of the State of Delaware, .S without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010: > v E RESOLVED,that, with respect to the Surety business written by Berkley Surety Group, the Chairman of the Board, Chief Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein oto execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such 3 c attorney-in-fact and revoke any power of attorney previously granted;and further n 'F RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings,recognizances, s or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the F = manner and to the extent therein stated;and further RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and further o b, RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any a power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or — M other suretyship obligation of the Company;and such signature and seal when so used shall have the same force and effect as though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any L person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have E ceased to be such at the time when such instruments shall be issued. c IN WITNESS WHEREOF, the Company has causeV these presents to be signed and attested by its appropriate officers and its op corporate seal hereunto affixed this ay of 4t1_1� — Attest: Berkley Insurance Company � v c-- F (Seal)By ! By o Ira S. a erman Je after o y Senior Vice President&Secretary a Preside WARNING!THIS POWER INVALID IF NOT PRINTED ON BLUE"BERKLEY"SECURITY PAPER. P v STATE OF CONNECTICUT) 0 0 ) ss: HCOUNTY OF FAIRFIELD Sworn to before me, a Notary Public in the State of Connecticut, this 60 da of '�`�' ,2015, by Ira S. Lederman and Jeffrey M.Halter who are swom to me to be the Senior Vice President and Secre j an the Senior Vice Pre dent,respectively,of a Berkley Insurance Company. MARIA C.RUNDBAKEN f ' NOTARY PUBLIC' Q MY COMMISSION EXPIRES otary Public,State of Connecticut APRIL 30,2019 Z CERTIFICATE 1,the undersigned,Assistant Secretary of BERKLEY INSURANCE COMPANY,DO HEREBY CERTIFY that the foregoing is a true,correct and complete copy of the original Power of Attorney;that said Power of Attorney•has not been revoked or rescinded 3 = and that the authority of the Attorney-in-Fact set forth therein, who executed the bond or undertaking to which this Power of Attorney is attached, is in full force and effect as of this date. Given under my hand and seal of the Company,thislOth day of August A 2016 (Seal) _ A a