ORDINANCE NO 8583
AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF
IMPROVEMENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A
PORTION OF EDERVILLE ROAD AND PORTIONS OF SUNDRY OTHER STREETS
AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH TEXAS FIX-
ING TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY
AND TO ALL OTHERS INTERESTED DIRECTING THE CITY SECRETARY TO
GIVE NOTICE OF SUCH HEARING AND DIRECTING THE CITY SECRETARY TO
ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME
IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILING THE COMPLETE
ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE CITY AND
PROVIDING AN EFFECTIVE DATE
WHEREAS the Ctiy Council of the City of Fort Worth Texas has here-
tofore ordered that each of the hereinafter described portions of streets
avenues and public places in the City of Fort Worth Texas be improved by
raising grading and filling same and by constructing thereon the follow-
ing to-wit
PROJECT NO 029-023174, UNIT I, EDERVILLE ROAD FROM WEST PROPERTY
LINE OF LOT 1-R, BLOCK 9, RYANWOOD NORTH ADDITION TO EAST PROPER-
TY LINE OF LOT 4-R, BLOCK 11, RYANWOOD NORTH ADDITION to be
improved by construction of seven-inch thick hot-mixed asphaltic
concrete pavement on a six-inch thick lime stabilized subgrade
with seven-inch high concrete curb and eighteen-inch wide con-
crete gutter on a forty-eight foot wide roadway
PROJECT NO 029-023174; UNIT II, EDERVILLE ROAD FROM EAST PROPER-
TY LINE OF LOT 17, BLOCK 3, HILL TOP ACRES ADDITION TO SANDY
LANE to be improved by construction of seven-inch thick hot-mix
asphaltic concrete pavement on a six-inch thick lime stabilized
subgrade with seven-inch high concrete curb and eighteen-inch
wide concrete gutter on a forty-eight foot wide roadway Six-inch
thick concrete driveways will be constructed where specified
PROJECT NO 029-023174, UNIT III, EDERVILLE ROAD FROM EAST.,. PRO-
PERTY LINE OF COURTNEY OAKS APARTMENTS ADDITION TO COOKS LANE to
be improved by construction of seven-inch thick hot-mixed
asphaltic concrete pavement on a six-inch thick lime stabilized
subgrade with seven-inch high concrete curb and eighteen-inch
wide concrete gutter on a forty-eight foot wide roadway
PROJECT NO 029-023174; UNIT IV-A, EDERVILLE ROAD FROM COOKS LANE
TO STAIR ROAD to be improved by construction of seven-inch thick
hot-mixed asphaltic concrete pavement on a six-inch thick lime
stabilized subgrade with seven-inch high concrete curb and
e ghteen-inch wide concrete gutter on a forty-eight foot wide
roadway
together with concrete curbs gutters driveways and incidentals to such
improvements on proper grade and line where same are not already so con-
structed together with storm sewers and drains and other necessary inci-
dentals and appurtenances all of said improvements to be constructed as
and where shown on the Plans and in strict accordance with the Plans and
Specifications therefor contract therefore has been made and entered into
with Austin Road Company and Brown & Blakney Inc and
W1iEREAS the City Council of the City of Fort Worth Texas has caused
the Public Works Director to prepare and file estimates of the cost of such
improvements and estimates of the amount per front foot proposed to be
assessed against abutting property and the owners thereof and such esti-
mates have been examined NOW THEREFORE
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH TEXAS
THAT
I
Such estimates be and they are hereby adopted and approved
II
It is hereby found and determined that the cost of improvements on each
portion of streets avenues and public places hereinafter described with
the amount or amounts per front foot proposed to be assessed for such
improvements against abutting property and the owners thereof are as
follows to-wit
Ederville Road Unit I From West property line of Lot 1-R
Block 9 Ryanwood North Addition to East property
line of Lot 4-R Block 11 Ryanwood North Addi-
tion
The estimated cost of improvements is $56 150.72.
Ederville Road Unit II From East property line of Lot 17
Block 3 Hill Top Acres Addition to Sandy Lane
The e timated cost of improvements is $161 796 70 the estimated amount per
front foot to be assessed against abutting property and the owners thereof
for concrete curb and gutter is $5 54 the estimated amount per front foot
to be assessed against abutting property and the owners thereof for pave-
ment is $23 21 the estimated amount per front foot to be assessed against
abutting property and the owners thereof for storm drain preparation of
right-of -way top soil seeding street lights and traffic markers is
$21 00 the total estimated amount per front foot to be assessed against
abutting property and owners thereof is $49 75 plus the cost incurred for
concrete driveway construction where specified
Ederville Road Unit III From East property line of Courtney Oaks
Apartments Addition to Cooks Lane
The estimated cost of improvements is $293 190 61 the estimated amount per
front foot to be assessed against abutting property and the owners thereof
for concrete curb and gutter is $5 54 the estimated amount per front foot
to be assessed against abutting property and the owners thereof for pave-
ment is $25 98 the estimated amount per front foot to be assessed against
abutting property and the owners thereof for storm drain preparation of
right-of-way top soil seeding street'lights and traffic markers is
$31 26 the total estimated amount per front foot to be assessed against
abutting property and owners thereof is $62 78
Ederville Road Unit IV-A, From Cooks Lane to Stair Road
The estimated cost of improvements is $1 036 100 26 the estimated amount
per front foot to be assessed against abutting property and the owners
thereof for concrete curb and gutter is $6 95 the estimated amount per
front foot to be assessed against abutting property and the owners thereof
for pavement is $24 91 the estimated amount per front foot to be assessed
against abutting property and the owners thereof for storm drain bridge
preparation of right-of-way top soil seeding street lights and traffic
markers is $51 95 the total estimated amount per front foot to be assessed
against abutting property and owners thereof is $83 80.
lIl
A hearing be given and held by and before the City Council of the City
of Fort Worth Texas to all owning or claiming any property abutting upon said
portions of highways streets avenues and public places as well as to all
owning or claiming any interest in any such property Such hearing shall be
given and held on the "29th. day of ,Line 19~~ at 10: a.m
in the Council Chamber in the City Hall in the City of Fort Worth Texas and
the City Secretary is hereby directed to give or cause t be given notice ,of the
time and place of such hearing and of other matters and facts in accordance with
the terms and provisions of an Act passed at the First Called Session of the
Fortieth Legislature of the State of Texas and known as Chapter 106 of the Acts
of said Session now being known as Article 1105b of Vernon s Texas Civil Statutes
as amended by Acts 1967 60th Legislature Fage 365 Chapter 176 Section 1
emergency effective May 12 1967 Such notice shall be by advertisement inserted
at least three (3) times in a newspaper published in the pity of Fort Worth
Texas the first publication to be made at least twenty one (21) days before
the date of said hearing Said notice shall comply with and be in accordance with
the terms and provisions of said Act as amended The City Secretary is further
directed to give or cause to be given personal notice of the time and place of
such hearing to all owning or claiming any property abutting on said portions of
highways streets avenues and public places as well as to all owning or claiming
any interest in any such property Such personal notice shall be in writing and
shall be given or caused to be given by the C ty Secretary by depositing such
written notice in the United States Mail at least fourteen (14) days before the
date of the hearing postage prepaid in envelopes addressed to all persons
owning or claiming any interest in the respective properties abutting the high
ways streets avenues and public places or portions thereof to be improved as
the names bf such persons are shown on the current rendered tax rolls of the City
of Fort Worth and at the addresses so shown or if the name of such respective
owners do not appear on such rendered tax rolls then address to sueFi owners as
their names are shown on the current unrendered tax rolls of the City of Fort Worth
at the addresses shown thereon In those cases in which an owner of property
abutting a highway street avenue or public place or portion or portions there
of which is to be improved is listed as 'unknown on the then current City of
Fort Worth tax rolls or the name of an owner is shown on the City of Fort Worth
tax rolls but no address for such owner is shown no notice need be mailed In
those cases where the owner is shown to be an estate the ma led not ce may be
addressed to such estate Zn this connection the City Secretary shall prepare
and file or cause to be prepared and filed with these proceedings a list of the
properties to be assessed the names of those persons ownidg or claiming any
interest in said properties to whom the notice was mailed together with the last
known addresses determined as aforesaid of the respective owners and those perms
sons owning or claiming any interest in said property
The City Secretary shall certify that each of the parties in said list whose
address is shown on the then current rendered or una:endered tax rolls of the City
of Fort Worth was mailed a copy of the notice of hearing and shall further certify
the date or dates on which said notice was mailed A copy of each notice shall be
attached to such certificate The certificate of the City Secretary will be con
clusive evidence of the facts therein recited
IV
The City Secretary is hereby directed to engross and enroll this ordinance
by copying the caption of sarne in the Minute Book of the City Council and by
filing the complete ordinance in the appropriate Ordinance Records of this City
V
This ordinance shall take effect and be in full force and effect from and
after the date of its passage
Passed and approved this- day of 19
APPROVED AS TO FORM AND LEGALITY
ity ttorney
~~
DATE GtE~ERENCE ~ SUgJi~GT Aw~rU, oL Contrac~~=assessment PAGE
r+uM®ESa Pav~.ng of Ederville Road F om S
6/1./82 **C-6339 Warren Lane to Stair Road for
City Council action is requested on Project No 029-023-174-.00 as described
below
Roadway R 0 W
Un t Street Limits Width-Feet Width-Feet
I Ederville W P/L Lot 1-R 48 68
Road Block 9 to E
P/L Lot 4-R
Block 11 Ryanwood
N Addita.on
II Ederville E P/L Lot 17 48 68
Road Black 3 Bill
Top Acres Addltlon
to Sand Lane
III Ederville E P/L Courtney 48 68
Road Oaks Apts Addn
to Cooks Lane
ILY°~ ~~derti ill Crooks Lane ~.8 68
Road to tair Road
IV-B Bri ge Ova: Grattonwood 48 N/A
Creek i.zx 1Jnit
IV-A
Origi n of Pro ee.t
~.~..__
On May~20 1980 (Ma~C G-4848 txe C ty Council. approved the 1980-81 Capital Im-
provezuent Program (CIP) f r s:ree.t and starz.z d~ n i.rnpxovements Included in
the prog um are Acres to 1.--30 P ojects t<rhich include this project
Ozx June 24 1980 (M&C C-S141~ an engineer zxg cunt act was awarded to Gordon
Swift Consul.tin.g Engineer and l~arrington and Assoc etas as a Joint Venture
to design the proje t and prepare plans and spec fications
Im rOV£;mP.k'0.tS
Eder~xil.le Road wiJ.l be xpro;red as a forty-eight foc,t wide major collector
roadway by construe ion of 6 in h th k concr k. pavement with concrete curb
In laded are left-t rn lanes at Sandy T.,azxe Cooks Lane and Bentley Village
Pa k;~a.y torm drainage im~.rovernent consist f 18 860 feet of concrete pipe
and apl~zartenances two c~nc ate box culverts and a bridge over Cottonwood
Creek
DATE REFERENCE ~~ U~3 :7 ir:iri of Cor+tract Assessment PAGE
NUMBER
6/1/82 L-6339 (Paving of Ederw lle Road From 2 of 5 _
Receipts of Bids
The project was advertised for bids on April 1 and 8 1982 with bids received
on April 29 1982 Alternates for both hot-mix asphaltic concrete and rein-
forced concrete pavement were bid as well as both lime and cement stabilized
subgrade The following bids were received
HMAC HMAC CONCRETE CONCRETE
BIDDER W/LINE W/CEMENT W/LIME W/CEMENT
UNIT I
Austin Road Co $52 972 38 $54 975 18 $73 633 30 $75 636 10
APAC Texas Inc $62 258 30 $64 244 50 No Bid No Bid
Walt Williams Inc No Bid No Bid $91 682 25 $94 436 25
d L Bert am Inc No Bid No Bid $67 898 39 No Bid
I. H Lacy Co No Bid No Bid *$54 776 34 No Bid
Stolaruk Inc $ 55 413 55 $ 58 444 55 No Bid No Bid
S R 0 Asphalt Inc $53 705 97 $56 068 17 $ 64 596 29 $ 66 958 49
i7NIT TI
~.aestin R ad Co $152 638 40 $.160 127 17 $198 310 28 $200 799 05
APAC Texa Inc $180 314 48 $185 192 44 No Bid No Bid
Walt IaTil i.ams Inc No Bid Igo Bid $7.52 584 60 $259 350 60
,I L i~ertram Inc No Bid No Bid 191 792 20 No Bid
L H Lacy Co No Bid No Bid *$165 278 78 No Bid
Stolaruk T.nc $166 568 50 $174 019 75 loo Bid No Bid
S R 0 Asphalt Inc $159 550 80 $165 354 85 $187 051 33 $192 855 38
UNIT III
Austin Road Co $267 160 95 $270 303 85 $325 012 75 $328 155 65
APAC Texas Inc $289 499 19 $293 129 65 No Bid No Bid
Walt Williams Inc Na Bid N Bid $409 029 44 $409 612 44
DATE RECEREPecE ~. ~ sCaR.i~:t`F aa~~d (:ontract-Assessment PAGE
6/1/82 Nu~sER
**C-6339 Paving of Eder°ville Road Froua 3 of 5
_.,. I en~r~P'Y~9 ~tai.r_ Road
J L Bertram Inc No B~.d Na B~.d $316 013 23 No Bid
L H Lacy Co No Bid No Bid *$276 689 35 No Bid
Stolaruk Inc $295 657 50 $300 206 55 No Bid No Bid
S R 0 Asphalt Inc $273 765 63 $276 746 03 $306 476 14 $309 456 54
UNIT IV-~A
Austin Road Co $623 883 62 $64'. 470 62 $709 334 77 $726 921 77
Walt Williams Inc No Bid No Bid. No Bid No Bid
J L Bertram, Inc No Bid No Bid $745 241 77 No Bid
L H Lacy Co No Bid No Bid *$682 251 40 No Bid
Stolaruk Inc $657 2I4 95 $684 719 95 No Bid No Bid
S R 0 Asphalt Inc $647 630 90 $668 210 90 $743 563 45 $764 143 95
UNIT IV-B
Austin Road Co $392 251 94
AFAC `~`nxas Inc. $381 045 74
Concho Const Inc $382 255 40
M A Vinson Const $408 832 O1
B own ~ Blakney Inc *$353 569 55
*Recomsuended best bid
Aiscussion of Bids Received
The thickness of the H M A C pavement bid is 7-inches while the concrete pave-
ment is 6-inches The two sec fans are not egsa]. as the 6-inch section of con-
cr t.e on lime stabilization is far tron.ger Moreover the service life of con-
crete pavement is generally regarded as much longer than that of H M A C with
far lower. maintenance costs in the interim
The area, in which this read will be constructed is known to contain a variety
of soil types including some highly plastic clay soils The price of the con-
~•ete pavement while slightly highe promises lower long-term costs The
premium. being paiaf for concrete paving of all four units is slightly under
seven percent This premium must be considered ag inst he increase in service
lie and laver maintenance costs as well as having a stranger pavement The
~. ~~,~.......,..,.•t.,~.~.,
DATE REFERENCE ~ B"..kd~.~S'e;T lw~ d Of CCnt aCt-Assessment PAGE
NlJMBER
~i/1/82 **C-6339 `~v~.ng fsdervill.e Ro :d From 4 5
!.y-~,.,a.,.. T .,,.., a,. ems..,.,,. n.. .., Of _
taff recommends that the concrete alternate on lime stabilization be selected
for all four raving units For information attached is a copy of an analysis
submitted by Mr Shuler Nelson President of Austin Road Company favoring the
asphalt alternative a copy of an analysis prepared by Mr Warren Burres
Portland Cement Association favoring the concrete alternative and a copy of a
comparative analysis prepared by City Staff which concludes that the selection
of the concrete alternative is preferred in this instance
ProjPCt Cost. and Financing
UNIT I
This unimproved segment of Ederville Road is approximately one block in length
with existing permanent pavement. and curb and gutter at each end The adjacent
property was developed in conjunction with Community Facilities Agreement No
4780 approved April 15 1963 (MSC C-54) Future assessments against the five
residential lots were satisfied by the developer in accordance with City policy
at that time No further assessments are proposed at this time
Deferred Payments (Units II, III & IV-A)
A~;,~. of the adjacent property except two parcels on both sides of the street
is~K~developer type property The owners have no immediate plans for development
at this time however they have dedicated the right-of-way and have agreed to
assessments on a deferred basis against the property based on normal
development policy (Sections IV V and VIYI) for an interior street The
deferred provision provides fo assessments to be payable in ten equal
installments ach eq a1 to om.e tenth of the total amount of the assessment
The first. insta.Ilment shall. be due and payable thirty days after completion and
ac eptance of a:he project by the City The remaining nine equal annual
installments each n he amours of one-tenth of the total assessment together
witl~a interest on the upaid balance calculated at 8~ per annum, with principal
and interes payable on the anniversary date of the initial payment
Ass sam.ents may be rrepai.d at any time without penalty The two parcels noted
above are zoned residential. small in size and are located on the south side
of the treat at the east end of the project and will be assessed the current
residential raze for pavement and curb
Based ors, the above it is pr ;posed that approximately $1 049 695 37 (includes
dev~:lopex coat of he bridge Unit IV-B) will be asseESed against property ad-
jacent to Ederville Road Units II III and IV-A Funding will be provided for
'by a bond fund, transfer from t~:e °Revolvi.ng Fund Unspec fled
Cost to Cif
Cast to the City far construction is approximat 1y $482 870 05 (includes City s
~, portion of cost of bridge Unit IV-B! plu $91 953 92 (6~) engineering Suf-
ficient fends are available in the project account for the City s construction
cost Howeve a bond fund transfer from the 'Engineering Unspecified Account
is required for the C ty s engineering cos
~_
TE ~..~.o. _-....,..,,.._~,.....~.,.~....-._.._.,~.,...~~,~...._._.._.._
REFERENCE J A~.9arc1 Of CQLYtrar.t Assessment
N MBE
~
AGE
6/1/82 *
C-339 Paving of Ederv lle Raa.d From 5 5
~~arren Lane to Stair Road --- ---
Recommendations
It i.s recommended that
1 The following bond fund transfers be approved
From To Amount Reason
~
~
'
029-023-901-00
029-021-101-00 $
740 000 00 To provide funds
Major Thoroughfares Contribution to for Revolving Fund
` Unspecified Revolving Fund
~
J
094-009-901.00 X094-023-174-00 $1 049 695 37 To provide funds
Revolving Fund Ederville Road for property owners
Unspecified cost of construction
,029-023 174-00 J 029°023-901-00 ~ $ 240 000 00 To reduce allocation
Ederville Road Majo Thoroughfares in project account
Unspecif. ed
~ 029-09~--901-00 029-023-174-00 ~$ 92 000 00 To provide funds
Engineez~ing Ederville Road for City s engineer-
Unspecified ing cost
2 An ordinance be adopted ADOPTED ORDINANCE NO g~~~
A Declaring the necessity for anc] ord ring the improvements
B Making provisions for levying ass ssments
C Directing the Transport atian/Public Works Department to prepare esti-
ma~:es of costs and amounts to be ass ssed
D Awarding a ont act to L H Lacy C:~mpany in the amount of
$1 178 995 87 based on their low bi.d for Un t I II III and IV-A
for concrete pavement with im.e stabili~;ed subgrade
E AFArarding a contract to Brown & Blakney Inc in the amount of
$?53 569 55 based on their low bid for Un t IV-B (Bridge) and
F Making appropriations to cover the indebtedness thereby incurred for
i=nprovemen.ts of the project named above
3 An ordinance be adopted ADOPTED ORDINANCE N®. ~s~~
A Anpr.oving the estimates of o is and amount proposed to be assessed
and
B Setting ,Tune 29 1982 as the date for the Benef ~~~~~ gY
G~ dk CITY_ COUNCIL
,I~UN ~. i992
1
sueMITTED Fa;~ T
CiTY 1d)ANAGER'S
OFi1CE BY a - .
P®SITIO BY C ~ eCi<0t81y ~£ Ch
~ R~4 _- ~ ~p ~ j~IOx ~~ ----- ~~-
3 PROCESSED
S~7Gttli
IGINATIP6G _ ^ DTIdER (DESCRIBE) L(/~
DEPIaRTMENT hIEAD` SantP_rre G~L~r ~
CI SECRETARY
FQR ADDITIFJNA!_ FORMATION ~J~~
~~°
CONTAC'i USdell chnidt Ext 7$0~ ~ a.. r ~~~-G ATE6 !-~"