HomeMy WebLinkAboutOrdinance 8696
ORDINANCE NO
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OP CALMONT AVENUE
AND PORTIONS OF SUNDRY OTHE~L STREETS, AVENUES AND PUBLIC PLACES
TN THE CITY OP FORT WORTH, TEXAS9 DECLARING Tl~ CONTRACT WITii
SRO As halt, Inc. FOR THE CONSTRUCTION OI'
SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMEDg DIRECTING THE
ISSUANCE, EXECUTION AND DE%.IVERY OF CERTIFICATES IN EVIDENCE OF
SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS
HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS;
DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE
BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY
COUNCIL 0~ FORT WORTHS TEXAS, AND BY FILING THE COMPLETE ORDINANCE
IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY9 AND PROVIDING AN
EF1°ECTIVE DATE
WHEREASy the City of Fort~Worth9 Texasa has heretofore entered into a contract
wrath SRO Asphalt. Inc. , for the malting and construction of
certain street improvements on the hereinafter described portions of streetsa avenues and
public places in said CityD tomwit
CALMONT AVENUE From Cherry Lane to Lackland Road, known and designated as
Project No 021-22161 a seven-inch thick hot-mix asphaltic
concrete pavement on a six-inch thick lime stabilized sub-~,~
grade with seven-inch high concrete c~a,rb.~and eighteen-inch
wide concrete gutter on a sixty-to forty=four foot roadway
Six-inch tFiick concrete driveways will be constructed where
-~ _ ~.
specified
ti^~HEREAS, by sundry proceedings heretofore passed by the City Council of the
City of I~'ort Worth, Texas, including Ordinance No $51 t, , a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public places and against
the real and true owners thereof; and,
wHER:r;AS, the City Council of the pity of Fort ~'~orth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No 8514 , and
k~HEfi~:AS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NUbd, THE1tH:F'URE,
BE IN ONDAIIVED T3Y THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TP:)Cr1:a, THAT
I
The improvement-s on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be, and it is hereby, found and declared fully completed and perfomned
II
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance Frith
the proceedings relating to such improvements and assessments The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed and9ha11 be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon The
numbers of the certificates, with the property descriptions to be shown on the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if arty, are hereby enumerated and itemized as follows
III
When each of the certificates has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price
IV
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worths Texasa
and by filing the complete ordinance in the appropriate Ordinance Records of said City
V
This ordinance shall take effect and be in full force and effect from and after
the date of its passage
PASSED AND APPROVED THIS day of ~ 19
APPROVED AS TO FORM AND LEGALITY
City Attarney
,~^
PROJECT NO 021-221.61, CALMONT AVENUE FROM ,CHERRY LANE TO LACKLAND ROAD, to be improved by
constructing a seven-inch thick hot-mix asphaltic concrete ,pavement on a six-inch thick lime
stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter
on a sixty to forty-four foot roadway Six-inch thick concrete driveway approaches will be
constructed where specified
OWNER
NORTH SIDE
Tesco
P 0 Box 8368
76112
Attn R E Flowers
Telco
P 0 Box 8368
76112
Kip A Souza
7404 Calmont
76116
G 0 Kahler Inv ,Inc
7301 W Freeway
76116
William Landis
1180 S Beverly Drive
Los Angeles, Ca
Highway 183 intersects
BLOCK
LOT ZONING FRONTAGE RATE
JACOB WILCOX SURVEY
Tract 1 1,406 5' Frontage
C F 352 5' Pavement adjusted to
302 5' Pavement $30 02
675 Curb & gutter 5 91
233 S F Driveway 2 92
HAYS COVINGTON SURVEY
Tract ZO-G-4 596 4 Pavement
C F 596 4' Curb & gutter
155 S F Driveway
Tract 10-G-9 110' Pavement
Comm 110' Curb & gutter
388 S F Driveway
1-A-1 1
Comm
1-A 1
Apt
LOFFLAND ADDITION
AMOUNT ASSESSMENT
(Drainage easement)
$9,081 05
3,989 25
680 36
$13 750 66
$30 02 $17,903 93
5 91 3 524 73
2 92 452 60
$21 881 26
$30 02 $3 302 20
5 91 650 10
2 92 1 132 96
$ 5,085 26
319 04' Existing facilities
240' Existing facilities
HAYS COVINGTOPl SURVEY
-0-
-0-
Railroad ROW 80' -0-
-1-
PROJECT NO 021-X2161, CALMONT AVENUE, cont
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE J D FARMER SURVEY
The Kohler Corp Tract 1-C 1,]16 9' Pavement $30 02 $33,529 34
Rochester, Mn 55901 Ind $33,529 34
Attn Jim Hinnichs
FARMER-COVING70N-PATE SURVEY
J M Leonard Estate Tract 8 435' adjusted to (Perma nent paving)
c/o John Maddux Comm 350' Pavement $30 02 $10,507 00
2120 Ridgmar Blvd $10,507 00
76116
Lackland Road intersects
SOUTH SIDE Z BOAZ PARK
Z Boaz Golf Course 1,400' -0-
Irene Drive intersects ALTA MERE ADDITION
Endicott's Ore House 6-A-R 5 145 78' Pavement $30 02 $4,376 32
7101 Calmont Comm 144 S F Driveway 2 92 420 48
76116 $ 4,796 80
Attn Tom Felson
Railroad ROW 80' -0-
R J Schumaker, Charles 1-R 5 144 43' Pavement $30 02 $4,335 79
Sharp & Willis E Rector Comm $ 4,335 79
2801 Alta Mere
76116
Alta Mere intersects
Highway 183 intersects
Norelco, Inc 1-A 4 120' Existing facilit ies -0-
.600 Sylvan Avenue Carton
Englewood Cl iffs, N J
Joyce Drive intersects
.David M, Ryan 4,5,6 & 3 210` Existing facilities
6620 Camp Bowie E~-3 Ind
76116
-0-
-2-
PROJECT NO 021-22161, CALMONT AVENUE, cont~~
BLOCK
OWNER LOT ZONING FRONTAGE
SOUTH SIDE
Robert A Anderson
& Robert Wright
3601 Hulen
76107
Gordon D Johnston
7401 Calmont
76116
Homer E Wardlow
2900 Cortez
76116
Western Hills Free
Will Baptist Church
7413 Calmont
76116
Hill Avenue intersects
Sam McCall Company
1612 Sunnit, Suite 316
76102
420' adjusted to
60' Pavement
40' Curb & gutter
ALTA MERE ADDITION
1-R 3 150' Existing facilities
Ind
5&6 2
Res
4 2
Res
1,2 & 3 2
Res
1-R 1
Ind
Bonnie Drive intersects
Booth Creek inv ,Inc 14 & 15 7
611 Ryan Plaza, Suite 1414 Apt
Arlington, Tx 76011
Coronado Drive intersects
W B Chapman 22 6
2805 Raton Drive Apt
76116
60' Pavement
60' Curb & gutter
85 S F Driveway
180' Pavement
180' Curb & gutter
140 S F Driveway
RATE AMOUNT ASSESSMENT
-0-
(permanent paving)
$9 59 $575 40
5 91 236 40
$ 811 80
$9 59 $575 40
5 91 354 60
2 92 248 20
$1 178 20
$9 59 $1,726 20
5 91 1,063 80
2 92 408 80
$ 3,198 80
280 5' Pavement $30 02 $8,420 61
280 5' Curb & gutter 5 91 1,657 76
$10,078 37
CORONADO HILLS ADDITION
214' Pavement $30 02 $6,424 28
214' Curb & gutter 5 91 1,264 74
$ 7,689 02
80' Drainage easement -0-
180' Existing facilities -0-
-3-
:PROJECT NO 021=2216T, CALMONT AVENUE, cont
BLOCK
OWNER ,LOT ZONING FRONTAGE RATE
SOUTH SIDE CORONADO HILLS ADDITION
Raton Drive intersects
Zoa Alene Schmidt 16 5 112 25' Existing facilities
2800 Ratan Drive Res
76116
Jimmie E Hammons 15
2801 Sierra Drive
76116
Sierra Drive intersects
Thomas J Honea 21
2800 Sierra Drive
76116
5 112 25' Existing facilities
Res
4 107' Existing facilities
Res
Clyde M Sloan 20
280.1 Rio Vista Drive
76116
Rio Vista Road intersects
Roberto L Guerrero 13
2800 Rio Vista Road
76116
Ryan Mortgage Co 1
bll Ryan Plaza ,.Suite 1140
Arlington, Tx 76011
4 107' Existing facilities
Res
3 107' Existing facilities
Res
3 160' Existing facilities
Total cost to property owners (assessments)
Total cost to City of Fort Worth
Tot~.1 =~-construction cost
AMOUNT ASSESSMENT
-0-
-0-
-0-
-0-
-0-
-0-
$116,842 30
$374,.30.7.81
-4-
~~AA' oi'ER FILE+P ~ J- ~2t~ ®~ ®/ t ~®~~/8~1 ~`s.IV~.4J
CITY. MANA6CR•11 J 1~Jil ~l.V x.16 ®~ ~~~ ~®~~IL~W `~/® Ii~~ "/l+l~~~uJ' U (L
ACCOUNTING•2
DATE REFERENCE SUBJECT FINAL PAYMENT PAGE
NUMBER
11/23/82 **FP--1731 Calmont Avenue lot 2
Final Council action is requested on the subject project
Proiect Description
Name
,~- Contractor
- 7 Contract Awarded
Work Order Dated
Work Order Effective On or Before
Work Began
Contract Time Began
Project Substantially Complete and Final
Inspection Made
Punch List Completed
Contractor Affidavit Received
Final Construction Approval
Working Time Provided
Working Time Used
Proiect Cost
Original Bid Price
R= Final Contract Price
Partial Payments Previously Made
Amount
Final Payment Due
Deviation from Bid Price
Calmont Avenue (Cherry to Lackland)
Project No 021-22161
Contract No 12213
SRO Asphalt Inc
December 29 1981 (M&C C-6067)
February 15 1982
March 1, 1982
March 4, 1982
March 1 1982
September 29 1982
October 18 1982
November 4 1982
November 4 1982
165 days
91 days
$497 290 OS
$450 596 43
7
$428 066 60
$22 529 83
Final measured quantities at contract unit prices yield an earned total price
for this contract of $450 596 43 which is $46 693 62 (9 39%) under the bid
price The underrun is the result of differences between quantities estimated
for the contract documents and quantities actually used to complete the work
Financing
Sufficient funds are available for the recommended final payment to be made
from the Project No 021-22161 account
Compliance with Specificata_ons
The project has been completed in accordance with the requirements of the
contract
n~
~;
~~
•+~
7
OATS REFERENCE
NUMBER SUBJECT FINAL PAYMENT PAGE
Calmont Avenue 2 2
11/23/82 **FP-1731 Che _ or___
Recommendation
It is recommended that the project described above be accepted by the adoption
of an ordinance and final payment of $22 529 83 be made to SRO Asphalt Inc
DAI j i
APPROVED BY
CBTY COUNCIL
NOV 23 1982
C1 ecXetary of the --°"'T"'
C o>g Rozt 6Focth. Yeah
SUBMITTED FOR THE n
/
A
CITY MANAGER'S
DISPOSITION BY COUNCIL:
PROCESSED BY
C
~
OFFICE BY ^ APPROVED
ORIGINATING ^ OTHER (DESCRIBE)
DEPARTMENT HEAD• Gary Santerre CITY SECRETARY
FOR ADDITIONAL INFORMATION y
CONTACT W Masse EXt
7
~ TED O RDINANCE NO ~ I ~
DATE