HomeMy WebLinkAboutContract 48320 C.IIt� SECRETARY
CONTRACT N0. M ()
DEVELOPER FUNDING AGREEMENT
OC7,)jg � FOR
NORTHSIDE IV 24-INCH WATER MAIN EXTENSION
BOWMAN-ROBERTS ROAD
THIS AGREEMENT is by and between CENTEX HOMES, a Nevada general
partnership, hereinafter referred to as "Developer", and the City of Fort Worth, hereinafter
referred to as "City".
WHEREAS, Developer, is the owner of land to be developed as a phase of a
residential community commonly known as LakePointe, an Addition To The City Of Fort
Worth, Tarrant County Texas, more fully described in Exhibit A attached hereto (the
"Property"); and
WHEREAS, in order to serve the Property, Developer is required to extend a 12-inch
water line to the Property; and
WHEREAS, City is planning to construct in phases the NS IV 24-inch water main from
Eagle Mountain Water Treatment Plant to serve points in the City's northern growth areas.
WHEREAS, in lieu of Developer constructing its 12-inch water main pursuant to a
Community Facilities Agreement with City participation, City will instead construct Phase 1 of
the Northside IV 24-inch Water Main Extension from the Eagle Mountain Water Treatment
Plant at Bowman Roberts Road and Santa Gertrudis to Bailey Boswell Road, including a
hydropneumatic tank, a pressure plane valve and related facilities and a stub out to provide
water service to the Property (the "Facility") as a CIP project, with Developer to contribute
funds equivalent to its proportionate share of the water main toward the City's construction of
the Facility; and
WHEREAS, as more fully set forth below, Developer will make a total contribution to
the City of $849,045 for its share of the Facility and to expedite service to Developer's
Property (the "Contribution") in the amounts of $110,745 for engineering costs (the .
"Engineering Cost Contribution") and $738,300 for construction costs (the "Construction
Cost Contribution"); and
WHEREAS, the estimated cost for the Facility is $400,000 for design and $5,240,000
for construction (See Opinion of Probable Construction Costs in Ex. B) inclusive of Facility
features which are not the Developer's responsibility;
NOW THEREFORE, in consideration of the above recitals, City and Developer, acting
herein by and through their duly authorized representatives, do hereby agree as follows:
1.
City, at City's cost (including Developer's Contribution), agrees to design and construct
the Facility. The scope of the Facility is shown on Exhibit "B" attached hereto and
incorporated herein.
OFFICIAL RECORD
CITY SECRETARY
Dev Funding Agreement NS IV 24-Inch Water Main FT.WORTH,TX' Page 1 of 9
2.
City shall design (or cause to be designed) the Facility upon receipt of Developer's
Engineering Cost Contribution. Developer shall deliver its Engineering Cost Contribution to
the City within 10 days after Developer receives from the City a fully-executed copy of this
Agreement. If the City Council for the City fails to authorize the award of a contract for design
of the Facility within 90 days after the effective date of this Agreement, City will immediately
return the Engineering Cost Contribution to Developer. Failure by Developer to remit the
Engineering Cost Contribution will delay award of the design contract.
3.
Developer will pay the Construction Cost Contribution to the City within 10 days after
the City notifies Developer in writing that the City has finalized and approved the construction
plans for the Facility and the City has advertised for bids from contractors for the construction
of the Facility. If within 180 days after receipt of Developer's Construction Cost Contribution
the City Council for the City has not authorized the award of a contract for the construction of
the Facility, the City will immediately return all of the Contribution to Developer. The City shall
construct the Facility as soon as is reasonably practical after the design is completed. Failure
by Developer to timely remit the Construction Cost Contribution will delay award of the
construction contract.
4.
City agrees to design and construct the Facility in accordance with the following
schedule. City will use its best reasonable efforts to comply with this schedule:
Completion Deadline
Task
Six months after execution
of the agreement.
Design Completion Estimated April 1, 2017
One month after design
completes.
Advertisement Estimated May 1, 2017
Three months after bid
Construction Award/Signing of General opening date. Estimated
Contract August 1, 2017
Dev Funding Agreement NS IV 24-Inch Water Main Page 2 of 9
One month after Council
Award for construction
Construction Commencement contract. Estimated
September 1, 2017
13 months
after construction
Facility Completion commencement. Estimated
October 2, 2018
It is acknowledged and agreed by the parties that time is of the essence in the performance
of this Agreement. From and after the execution of this Agreement and until completion of the
Facility, City shall provide Developer with monthly progress reports.
5.
Developer's Contribution to the City shall be the entire amount of Developer's
obligation for its costs related to the Facility, such Improvements being necessitated in part
by the additional water demands that the development of the Property will be placing upon on
the Northside IV pressure plane. The Contribution fairly represents the Developer's
proportional share of the cost of the Facility and shall not be refunded for any reason after
award of the construction contract by the City.
By accepting the Developer's Contribution pursuant to this Agreement, City agrees
that the Developer and any successor owner of all or part of the Property will have no
obligation whatsoever to pay any amounts in addition to the Developer's Contribution or take
any further action with regard to the design or construction of the Facility even if(a) the actual
costs to construct the Facility exceed the costs expected by the City as of the date of this
Agreement, (b) the specifications, composition, or other characteristics of the Facility
hereafter change for any reason, (c) a mistake has been made (mutual or unilateral) in
computing the costs of the Facility or otherwise, or (d) the costs or scope of the Facility
change for any reason.
6.
The City will timely proceed with processing a Community Facilities Agreement and
related engineering plan review for the development of the Property when submitted by
Developer ("Property CFA"). As part of the Property CFA, City will allow the on-site
subdivision paving, water, sewer and other public improvements ("Infrastructure") to proceed
to construction while the Facility is being constructed. The City will issue acceptance of
completed Infrastructure constructed, inspected and accepted in accordance with the
Property CFA even though the construction of the Facility may not then be complete. City will
issue building permits for subdivision lots within the Property with a finished floor elevation
below 830' even though construction of the Facility may not then be complete and Developer
Dev Funding Agreement NS IV 24-Inch Water Main Page 3 of 9
agrees it will not close the sale of any completed homes to a third party until the Facility is
complete and accepted per City and TCEQ rules and regulations.
7.
Developer shall be entitled to a refund of a portion of its Contribution pursuant to City Code
Chapter 35, Article III, Division 4 et seq.
8.
The City will use its best reasonable efforts to construct the Facility without undue
delay, but City's performance of construction will be subject to delays caused by events of
force majeure.
9.
This Agreement shall be binding upon and inure to the benefit of the City and
Developer and their respective successors and assigns. This Agreement, together with any
exhibits attached hereto, constitutes the entire agreement between the parties hereto, and
may not be amended except by a writing signed by all parties and dated subsequent to the
date hereof.
If Developer or any subsequent owner transfers the Property or any portion thereof
prior to the performance of all obligations of the Developer hereunder, Developer or such
transferring owner shall obtain an agreement from the transferee assuming the obligations of
the transferring owner under this Agreement performable from and after the date of transfer.
From and after the date of such transfer, the transferee shall be solely obligated under this
Agreement, and the transferring owner shall have no further obligations under this
Agreement, with respect to the Property or portion thereof transferred.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
Dev Funding Agreement NS IV 24-Inch Water Main Page 4 of 9
Executed by each party's duly designated and authorized representative, effective as
of the date subscribed by the City's designated signatory.
Developer:
CENTEX HOMES, a Nevada general CITY OF FORT WORTH
partnership, by Centex Real Estate
Corporation, its managing general partner
By:
By: Jesus J. Chapa
Name: r.1-INT VINCFNT Assistant City Manager
Title: N/2 QF I ANn nEVEI OPMFNT
Date: iv l}%�! Date: �p "l
Recommended By:
' e
Joh�/n arman
Director, Water Department
APPROVED AS TO FORM ATTEST:
QaL Ajo fi
Mir- l .Q
Douglas W Black jTary J. K y er
Sr. Assistant City Attorney City Secr tary
AVY
Dev Funding Agreement NS IV 24-Inch Water Main Page 5 of 9
STATE OF TEXAS §
COUNTY OF TARRANT §
BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas,
on this day personally appeared Jesus J. Chapa, Assistant City Manager for the City of Fort
Worth, known to me to be the person whose name is subscribed to the foregoing instrument,
and acknowledged to me that the same was the act of the City of Fort Worth and that he
executed the same as the act of said City of Fort Worth for the purposes and consideration
therein expressed and in the capacity therein stated.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this o2% day of
()CW IOA
Aotary Public, State of Texas
My Commission expires:
a-(a--I 18
""'"� LINDA M. HIRRLINGER
Y PV �i�
Notary Public,State of Texas
Comm.Expires 02-02-2018
„°; Notary ID 12414474-6
Dev Funding Agreement NS IV 24-Inch Water Main Page 6 of 9
STATE OF TEXAS §
COUNTY OF DALLAS §
BEFORE ME, the undersigned authority, a Notary Pu in and for the State of Texas,
on thisday personally appeared a1�}� 1/lL>ot'l�' ,
yO of Centex Real Estate Corporation, a Nevada corporation, on
behalf of said corporatio , in its capacity as managing general partner of Centex Homes, a
Nevada general partnership, on behalf of said general partnership, known to me to be the
person whose name is subscribed to the foregoing instrument, and acknowledged to that he/she
executed the same for the purposes and consideration therein expressed.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of
2016.
JESSICA HERNANDEZ No ry Pubic, Stat o�Te s
Notary Public,State of Texas
My Commission Expires
April 18, 2018 Commission expires:
Dev Funding Agreement NS IV 24-Inch Water Main Page 7 of 9
Exhibit A
The Property
[Description of Centex's Property to be served to be inserted]
Dev Funding Agreement NS IV 24-Inch Water Main Page 8 of 9
a ..�. �..�..�
q•`\ I I sD
I • \\\1W 1D3 1az .]D °s B 3 '• aaz 1 __
47
105
'• • I tun 1m•• SPO 1DD s2 ' �'OT O
4s G 30
0 _t♦•I to\��Q�P�� �
�• • `• ,�♦�.I �•1t[11OJ P �I ��. •■i•..�,� 91 � ••10
S�• 63 5•54'5s •``•` 43 o
]2
115 3 43
1E • ]D a
1■��♦f�■ '_..__ wweII
w
• ..�• ♦ •`y
' 111 r.�. ♦ • 74 • �'��• E2 E1 57
' ^♦'•• ♦ �- __
,♦. 117 1s 1i • P tl9 ], 4,9 S/�tc• 5P • __
1 f t P • 9N[ 60
•i
1�••'•♦ 15 4 1B• �']Qn°♦ tlE] 77
• 59 •• ♦
, 1] 2D �S 1% Pfi ]E
Z' zL • D •t.
I 1 �
T
, ea• 2a_zt�lzz` ' x' UERTO VISTA DRIVE
J.�7 ♦�. 1zs F�cZ B 26 P*% ♦J�i, / y� – —
1z4 Fp 31
\• a� ♦ 125 tl12fi F• ° 2P
r '� •� 12E
ILI
12,
• �' \'
♦
••1 LOT BLOCK ♦ / tej •�♦ /, O �' -
PUBLIC PARK i♦LL 1aa �, �• (CC\
�--1` •`• ;�•♦�., //�\ ,� •,moi / _ \ � r. i�;.><'
20D 300
I ♦ `•� `, \ GRAPHIC SCALE IN FEET
EoxOeLocKs / LAKE POINTE
LOT
PN NTIO PARK ��//,` Z PHASE 4
DETENTION POND
ME , ,(
ORAINgGE EASEMENT
' I 137 SINGLE FAMILY
RESIDENTIAL LOTS
iiIII PELOTON F
- - - i
Exhibit B
The Facility
[Description/diagram of Facility to be inserted, including showing plans and location for
service to Centex's Property]
Dev Funding Agreement NS IV 24-Inch Water Main Page 9 of 9
i
E
I
I
EXHIBIT B ,
OPINION OF PROBABLE CONSTRUCTION COST
Route Study
i
Northside 4 24-inch Water Main
CITY OF FORT WORTH,TEXAS
7ACCOUN-17NO • • : •.
FTW14497 OLK DGS I March 24,2016
ITEM DESCRIPTION QUANTITY UNIT UNITPRICE TOTAL
24-inch Water Main $ 3,838,860.00
1 24-in Waterline by Open Cut 10,820 LF $ 140.00 $ 1,514,800.00
2 24-in Waterline inside Casing 180 LF $ 180.00 $ 32,400.00
3 36-in Steel Casing by Other Than Open Cut 180 LF $ 720.00 $ 129,600.00
4 24-in Gate Valve and Vault 10 EA $ 30,000.00 $ 300,000.00
5 2-in Combination Air Valve Assembly 6 EA $ 20,000.00 $ 120,000.00
6 8-in Blow Off Assembly 6 EA $ 25,000.00 $ 150,000.00
7 Connection to Water Treatment Plant i EA $ 20,000.00 $ 20,000.00
8 Trench Safety 10,820 LF $ 2.00 $ 21,640.00
9 Hydromulch 60,120 SY $ 1.00 $ 60,120.00
10 Storm Water Pollution Prevention Plan 1 LS $ 25,000.00 $ 25,000.00
11 Cathodic Protection 1 LS $ 140,000.00 $ 140,000.00
12 Traffic Control 6 MO 3,000.00 $ 18,000.00
13 Ashalpt Pavement Repair 10,000 LF $ 65.00 $ 650,000.00
14 2"Surface Mill 26,700 SY $ 4.00 $ 106,800.00
15 2"Asphalt Pvmt Type D 26,700 SY $ 15.00 $ 400,500.00
16 Pavement Striping 10,000 LF $ 5.00 $ 50,000.00
17 Misc.Utlity Adjustments 1 LS $ 100,000.00 $ 100,000.00
Flow Meter at EMWTP $ 40,000.00
16 Flow Meter 1 EA $ 20,000.00 $ 20,000.00
17 Piping for flow meter i LS $ 10,000.00 $ 10,000:00
18 Electical Equpment for flow meter 1 LS $ 10,000.00 $ 10,000.00
Hydro-Pneumatic Tank $ 300,000.00
19 Hydro-Pneumatic Tank 1 LS $ 250,000.00 $ 250,000.00
20 jElectical Equpment for Hydro-Pneumatic Tank 1 LS $ 50,000.00 $ 50,000.00
Pressure Plan Flow Transfer Station $ 188,200.00
21 Flow control valve 1 EA $ 30,000.00 $ 30,000.00
22 Flow Meter 1 EA $ 8,000.00 $ 8,000.00
23 12"Gate Valve 2 EA $ 3,500.00 $ 71000.00
24 Connection to existing 36-inch NSIII Water Line 1 EA $ 25,000.00 $ 25,000.00
25 12"Ductile Iron Pipe 40 LF $ 80.00 $ 3,200,00
26 Valut 1 EA $ 20,000.00 $ 20,000.00
27 ElecticaI Power to site 1 LS $ 50,000.00 $ 50,000.00
28 Electical Equpment for Flow Transfer Station 1 LS $ 25,000.00 $ 25,000.00
29 SCADA Antenna 1 LS $ 20,000.00 $ 20,000.00
c • �� 00
CONTINGENCY 20% $ 873,500.00
• OPCC $ 5,241,000.00
Notes:
1.Easements may be required where Right-Of-Way for existing roads have not been dedicated.
Created By Freese and NSchols,Inc.
Job No:FTW14497
Location:KIPIPES_PUMPSMbrking\NS 4 Project b1 Machn,enl-E)-NS4 Rcute 6tudy(8.5x11)and
dated:Frida Be tember 16 201611:25:23 AIA
ATTACHMENT E
CITY OF FORT WORTH
Proposed NS4 to NS3 ,i NORTHSIDE 4
Tta " , ' 24-INCH WATER MAIN
Transfer Valve
(PROJECT 6N4)
-41
IAM 4X(" LEGEND
° °0 Proposed Proposed
(D Hydropneumatic Tank 24"Water Line
y o * Proposed Meter Water
Treatment Plant
Proposed Valve
FORT WORTH,
• FREESE
r-7=NICHOLS
Proposed Northside IV Z
24" Water Line
t
Y '
may/
. �P
.y �w—x1 q
L r�r'
Water
t
Treatment Plant Proposed
Hydropneumatic Tank s
Proposed Meter
'0 1,000 '+ 1tL_ j
Connection to
SCALE IN FEET ; Existing 30" Water Line ' ,''