Loading...
HomeMy WebLinkAboutContract 43406-CO3 �.4 FORT WOR-Fi4 City of Fort Worth riff 4s GRRAW Change Order Request Project Namel Clear Fork Drainage Basin M-210 Sewer Improvements, Part 2 City Sec No. 43406 Project No.(s) 59607-0700430-CO1022-CO1787 DOE No. —68-07-7 City Proj. No. 1022 Project Description: Installation of 1,400 feet of 36-inch sanitary sewer line on Colonial Parkway and 2,110 feet of eight-inch water main in Country Club Circle. Contractor: North Texas Contracting, Inc. Change Order: 0 Date: 10/12/2016 City Project Mgr.1 Roberto C. Sauceda I City Inspector: Raymond Brice Phone Number:1 817-392-2387 Phone Number: 817-223-2269 Dept. Sewer Totals Contract Time (Calender days) Original Contract Amount $1,029,708.20 $1,029,708.20 180 Extras to Date $55,004.00 $55,004.00 110 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,084,712.20 $1,084,712.20 290 Amount of Proposed Change Order $194,205.00 $194,205.00 060 Revised Contract Amount $1,278,917.20 $1,278,917.20 350 Original Funds Available for Change Orders $31,000.00 $31,000.00 Remaining Funds Available for this CO Additional Funding(if necessary) $194,205.00 $194,205.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 24.20% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,287,135.25 JUSTIFICATION (REASONS) FOR CHANGE ORDER The change order will provide compensation to allow for the modifications as required by the Tarrant Regional Water District for a stoim drain outfall at the Clear Fork Trinity River for the construction of the segment of the project sewer main. f/-' Staff concurs with the contractors request for 60 additional calendar days for the chang r u ZI At AaadW,dyed 282016 OFFICIAL RECORD � CITY SECRETARYs , � FT. WORTHP TY &r J. Kity Seexetwy i a It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Contractor's Company Name Contractor Name Contractor Signature Date North Texas Contracting, Inc. Iek K4ckKVARdy Nord w /6 P�pector Date Project Manager Date lV Az istanf irector(Water Dept) Date donstructioupervisor(Water Dept) Date As ist Cit_y Attorney Date Assistant City Manager Date �v-?fir — —� l4' Council Action (If Required) M&C Number C-279M&C Date Approved 10/11/2016 zq� ld - 06 3 I F" WCC City of Fort Worth Change Order Additions Project Name Clear Fork Drainage Basin M-210 Sewer Improvements, Part 2 City Sec No. 43406 Project No.(s) 59607-0700430-CO1022-C01787 DOE No.= City Proj. No. 1022 Project Installation of 1,400 feet of 36-inch sanitary sewer line on Colonial Parkway and 2,110 feet of eight-inch water main in Description Country Club Circle. Contractor North Texas Contracting, Inc. Change Order: 0 Date: 10112/2016 City Project Mgr. Roberto C. Sauceda City Inspector Raymond Brice ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 52 Extention of 54 inch Special Storm drain Sewer 1.00 LS $194,205.00 $194,205.00 Sewer $194,205.00 Page 2 of 4 Additions Sub Total $194,205.00 FORT WORTH City of Fort Worth Change Order Deletions Project Name FClear Fork Drainage Basin M-210 Sewer Improvements, Part 2 City Sec No. 43406 Project No.(s) 59607-0700430-C01022-C01787 DOE No. 6807 City Proj. No. 1022 Project Description Installation of 1,400 feet of 36-inch sanitary sewer line on Colonial Parkway and 2,110 feet of eight-inch water main in Country Club Circle. Contractor North Texas Contracting, Inc. Change Order: [� Date 10/12/2016 City Project Mgr. Roberto C. Sauceda City Inspector Raymond Brice DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total Sewer Page 3 of 4 Deletions Sub Total M/WBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT' Total $0.00 Page 4 of 4 M&C Review Page 1 of 3 official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA Fo H COUNCIL ACTION: Approved on 10/11/2016 - Ordinance No. 22460-10-2016 & 22461-10-2016 DATE: 10/11/2016 REFERENCE **C-27958 LOG NAME: 60SSM21OP4P2CO3- NO.: CIRCLECNTC CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Change Order No. 3 in the Amount of$364,100.00 to City Secretary Contract No. 45817 with William J. Schultz, Inc. d/b/a Circle "C" Construction Company, for a Revised Contract Amount of$5,089,157.00 for Clear Fork Drainage Basin M-210 Water and Sanitary Sewer Improvements, Part 4 and Authorize Change Order No. 3 in the Amount of$194,205.00 to City Secretary Contract No. 43406 with North Texas Contracting, Inc., for a Revised Contract Amount of$1,278,917.20 for Clear Fork Drainage Basin M-210 Water and Sanitary Sewer Improvements, Part 2, Provide for Additional Project Management and Staff Costs for a Revised Clear Fork Drainage Basin M-210 Improvements Construction Phase Amount of$6,788,074.20 and Adopt Appropriation Ordinances (COUNCIL DISTRICT 3) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinances increasing estimated receipts and appropriations in the Water Capital Fund in the amount of$201,865.00 and the Sewer Capital Fund in the amount of $776,440.00 from available funds; and 2. Authorize execution of Change Order No. 3 in the amount of$364,100.00 to City Secretary Contract No. 45817 with William J. Schultz, Inc. d/b/a Circle "C" Construction Company, for a revised contract amount of $5,089,157.00 for Clear Fork Drainage Basin M-210 Water and/or Sanitary Sewer Improvements, Part 4; and 3. Authorize Change Order No. 3 in the amount of$194,205.00 to City Secretary Contract No. 43406 with North Texas Contracting, Inc., for a revised contract amount of$1,278,917.20 for Clear Fork Drainage Basin M-210 Water and Sanitary Sewer Improvements, Part 2. DISCUSSION: On July 15, 2014 (Mayor and Council Communication (M&C) C-26858), the City Council authorized a construction contract with William J. Schultz, Inc. d/b/a Circle "C" Construction Company, in the amount of $4,145,081.00 for Clear Fork Drainage Basin M-210 Water and/or Sanitary Sewer Improvements, Part 4. The contract was subsequently revised by two change orders totaling $579,976.00 as follows: Change Order No. 1 in the amount of$480,915.00 approved October 14, 2014 (M&C C-27034) and Change Order No. 2 in the amount of$99,061.00 administratively authorized September 22, 2015. This Change Order No. 3 will provide compensation on the Part 4, project for the following: tunneling under South University Drive to provide sewer service to Log Cabin Village, increased pay item quantities of extra depth manhole, temporary asphalt pavement repair, concrete pavement repair and curb and gutter replacement, which were necessary due to actual field conditions that were encountered during construction. Upon approval of this M&C, revised construction costs due to change orders for Part 4 will be $5,089,157.00. On June 12, 2012 (M&C C-25666), City Council authorized a construction contract with North Texas Contracting Inc., in the amount of$1,029,708.20, for Clear Fork Drainage Basin M-210 Water and Sanitary Sewer Improvements, Part 2. The contract was subsequently revised by two change orders totaling $55,004.00 as follows: Change order No. 1 in the amount of$8,724.00 administratively authorized November 2, 2012 and Change order No. 2 in the amount of$46,280.00 administratively authorized http://apps.cfwnet.org/council_packet/mc review.asp?ID=22834&councildate=10/11/2016 10/12/2016 M&C Review Page 2 of 3 September 23, 2015. This Change Order No.3 will provide compensation on the Part 2 project to allow for modifications as required by the Tarrant Regional Water District to a storm drain outfall at the Clear Fork Trinity River for the construction of a segment of the project sewer main. Upon approval of this M&C, revised construction costs due to change orders for Part 2 will be$1,278,917.20. In addition to the combined change order amounts, $420,000.00 (water: $190,000.00; sewer: $230,000.00) is required for project management, material testing, easement acquisition and inspection. M/WBE OFFICE: A waiver of the goal for MBE/SBE subcontracting requirements was requested by the department and approved by the M/WBE Office, in accordance with the BIDE Ordinance, because the purchase of goods or services from source(s)where subcontracting or supplier opportunities are negligible. Staff concurs with the contractors' requests for 150 additional calendar days on this change order (Part 4- 90 days, Part 2-60 days). This project is part of the Water Department's Sanitary Sewer Overflow Initiative Program. This project is located in COUNCIL DISTRICT 3, Mapsco 75V. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the current capital budget, as appropriated, of the Water Capital Fund and of the Sewer Capital Fund. The Fiscal Year 2016 Water and Sewer Operating Budget includes appropriations of$26,068,353.00 for the purpose of providing Pay-As-You-Go Funding for Water Capital Projects. After this transfer for Fiscal Year 2016, the balance will be $5,188,137.00. The Fiscal Year 2016 Water and Sewer Operating Budget includes appropriations of$26,300,046.00 for the purpose of providing Pay-As-You-Go Funding for Sewer Capital Projects. After this transfer for Fiscal Year 2016, the balance will be $3,981,230.00. Appropriations for the Clear Fork Drainage Basin M-210 Water and Sanitary Sewer Improvements, will consist of the following by fund: FUND Existing Additional project Total* Appropriations Appropriations Water Capital 59601 $ 3,550,974.00 $201,865.00 $ 3,752,839.00 Sewer Capital 59607 $ 8,537,541.00 $776,440.00 $ 9,313,981.00 Project Total $12,088,515.00 $978,305.00 $13,066,820.00 *Numbers rounded for presentation purposes. TO Fund Department Account Project Program Activity Budget ( Reference# Amount ID ID Year + (Chartfield 2) FROM Fund I Department Account Project Program Activity Budget Reference# I Amount ID I I ID I I Year (Chartfield 2) Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Bead: John Carman (8246) http://apps.cfwnet.org/council_packet/mc review.asp?ID=22834&councildate=10/11/2016 10/12/2016 M&C Review Page 3 of 3 Additional Information Contact: Robert Sauceda (2387) ATTACHMENTS 60SSM21OP4P2CO3 CIRCLECNTC MAP 01.pdf 60SSM21OP4P2CO3 CIRCLECNTC MAP 02.pdf 60SSM21OP4P2CO3-CIRCLECNTC sewerA016R2.docx 60SSM21OP4P2CO3-CIRCLECNTC water A016R2.docx Circle C form 1295.pdf North Texas Contract Form 1295.pdf http://apps.cfwnet.org/council_packet/mc_review.asp?ID=22834&councildate=10/11/2016 10/12/2016 FID Table for M&C Log Name: 60SSM21OP4P2CO3-CIRCLEC Fund identifiers (FIDs) TO Reference Department Account Project Budget # Amount Fund ID ID Program Activity Year-- (Chartfield - 1)59601 0600430 4956001 C01022 C017ZZ 2016 $201,865.00 1)59601 0600430 5740010 C01022 C01783 2016 $11,865.00 1)59601 0600430 5610102 C01022 C01781 2016 $8,000.00 1)59601 0600430 5110101 C01022 C01730 2016 $44,000.00 1)59601 0600430 5310350 C01022 C01752 2016 $29,200.00 1)59601 0600430 5330500 C01022 C01784 2016 $40,800.00 1)59601 0600430 5310350 C01022 C01794 2016 $2,500.00 1)59601 0600430 5110101 C01022 C01785 2016 $65,300.00 1)59601 0600430 5310352 C01022 C01710 2016 $200.00 1)59607 0700430 4956001 C01022 C017ZZ 2016 $776,440.00 1)59607 0700430 5330500 C01022 C01732 2016 $30,000.00 1)59607 0700430 5110101 C01022 C01730 2016 $42,000.00 1)59607 0700430 5710010 C01022 C01752 2016 $7,000.00 1)59607 0700430 5550101 C01022 C01781 2016 $2,000.00 1)59607 0700430 5740010 C01022 C01783 2016 $352,235.00 1)59607 0700430 5110101 C01022 C01780 2016 $80,000.00 1)59607 0700430 5330500 C01022 C01784 2016 $10,000.00 1)59607 0700430 5110101 C01022 C01785 2016 $59,000.00 1)59607 0700430 5740010 C01022 C01787 2016 $194,205.00 FROM Reference Department Account Proiect Budge # Amount Fund ID ID Program Activity Year (Chartfield 2)59601 0600430 5740010 C01022 C01783 2016 $11,865.00 2)59607 0700430 5740010 C01022 C01783 2016 $352,235.00 2)59607 0700430 5740010 C01022 C01787 2016 $194,205.00 C - 27958 C CERTIFICATE OF INTERESTED PARTIES FORM 3.295 lofl Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2016-106731 North Texas Contracting, Inc. Fort Worth,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 08/31/2016 being filed. City of Fort Worth Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. 01022 Extension of storm line into Clear Fork Nature of interest 4 Name of Interested Party City,State,Country(place of business) (check applicable) Controlling I Intermediary Fusilier,Zach Fort Worth,TX United States X Louy, Jay Fort Worth,TX United States X 5 Check only if there is NO Interested Party. 6 AFFIDAVIT— "^ I swear,or affirm,under penalty of perjury,that a above disclosure is true and correct. KATHRYN MARIE KING - Notary Public,Slate 0f Texas My Commission Expires 0 -2I-2017 -Sig,&aErof aulhorizgd agent o ontracting business entity AFFIX NOTARY STAMP/SEAL ABOVE Sworn to and subscribed before me,by the said za&6—Fkrvt U er this the day of IAS 20 jo to certify which,witness my hand and seal of office. 11a� triLVI PM Signature of Wicer ad istering oath Printed name of officer adm' stering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.2,