HomeMy WebLinkAboutOrdinance 8405ORDINANCE NO. ~ ~ ~ ._
AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE-
MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF
STAL,~IIP ROAD
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE
CITY OF FORT WORTH, TEXAS FIXING TIME AND PLACE FOR HEARING TO THE
OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING
THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE
CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE
CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILING
THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE
CITY AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the
hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im-
proved by raising grading and filling same and by constructing thereon the following to-wit
STALCUP ROAD From Turner to Fitzhugh and Cottey Street Storm
Drain known and designated as Project No 021-
25235, Units I & II, a two-inch thick hot-mix
asphaltic concrete surface course on a five-inch
thick hot-mix asphaltic base and by constructing
seven-inch high concrete curb and eighteen-inch
wide concrete gutter where none exists Six-inch
thick concrete driveways wi17 be constructed where
specified
together with concrete curbs, gutters driveways and incidentals to such improvements
on proper grade and line where same are not already so constructed together with storm
sewers and drains and other necessary incidentals and appurtenances all of said im-
provements to be constructed as and where shown on the Plans and in strict accordance
with the Plans and Specifications therefor contract therefore has been made and
entered into with __ SRS ASPHALT~,INC. ;
and
WHEREAS, the City Council of the City of Fort Worth Texas, has caused the Public
Works Director to prepare and file estimates of the cost of such improvements and
estimates of the amount per front foot proposed to be assessed against abutting property
and the owners thereof, and such estimates have been examined, NOW, THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT
I
Such estimates be and they are hereby adopted and approved
II
It is hereby found and determined that the cost of improvements on each portion of
streets avenues and public places hereinafter described with the amount or amounts
per front foot proposed to be assessed for sueh improvements against abutting pro-
perty and the owners thereof, are as follows to-wit
STALCUP ROAD From Turner to Fitzhugh and Cottey Street Storm
Drain known and designated as Project No 021-
25235, Unit I & II
The estimated cost of improvements is $`~, 499,380 72 the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ 7.09 the estimated amount per front foot to
be assessed against abutting property and the owners thereof for pavement is $ -0-
the estimated amount per front foot to be assessed against abutting property and the
owners thereof for 4 foot wide concrete sidewalk is $ -0- the estimated
amount per square foot to be assessed against abutting property and the owners thereof for
six-inch thick concrete driveway is $_ 3.55 per square foot the total
estimated amount per front foot to be assessed against abutting property and the owners
thereof is $ 7_~q , plus the cost incurred for concrete driveway construction
where specified
'S,
gII
A hearing be given and held by and before the City Council of the City
of Fort Worth Texas to all owning or claiming any property abutting upon said
portions of highways streets avenues and public places as well as to all
owning or claiming any interest in any such property Such hearing shall be
given and held on the ~~~h day of ~~Pp~jpr 19~, at y~~~ p1M
in the Council Chamber in the City Hall in the City of Fort Worth Texas and
the City Secretary is hereby directed to give or cause to be given notice ,of the
time and place of such hearing and of other matters and facts in accordance with
the terms and provisions of an Act passed at the First Called Session of the
Fortieth Legislature of the State of Texas and known as Chapter 106 of the Acts
of said Session now being known as Article 1105b of Vernon's Texas Civil Statutes
as amended by Acts 1967 60th Legislature Page 365 Chapter 176 Section 1
emergency effective May I2 1967 Such notice shall be by advertisement inserted
at least three (3) times in a newspaper published in the £ity of Fort Worth
Texas, the first publication to be made at least twenty-one (21) days before
the date of said hearing Said notice shall comply with and be in accordance with
the terms and provisions of said Act as amended The City Secretary is further
directed to give or cause to be given personal notice of the time and place of
such hearing to all owning or claiming any property abutting on' said portions of
highways- streets avenues and public places as well as to all owning or claiming
any interest in any such property Sueh personal notice shall be in writing and
shall be given or caused to be given by the City Secretary by depositing such
written notice in the United States Mail at least fourteen (14) days before the
date of the hearing postage prepaid in envelopes addressed to all persons
ow~aing or claiming any interest in the respective properties abutting the high
ways streets avenues and public places or portions thereof to be improved as
the names bf such persons aze shown on the current rendered tax rolls of the City
of Fort Worth and at the addresses so shown or if the name of such respective
owners do not appear on such rendered tax rolls then address to such owners as
their names are shown on the current unrendered tax rolls of the City of Fort Worth
at the addresses shown thereon In those cases in which an owner of property
abutting a highway street avenue or public place or portion or portions there-
of which is to be improved is listed as "unknown" on the then current City of
Fort Worth tax rolls or the name of an owner is shown on the City of Fort Worth
tax rolls but no address for such owner is shown no notice need be mailed In
those cases where the owner is shown to be an estate the mailed notice may be
addressed to such estate In this connection the City Secretary shall prepare
and file or cause to be prepared and filed with these proceedings a list of the
properties to be assessed the names of those persons owni~tg or claiming any
interest in said properties to whom the notice was mailed together with the last
known addresses determined as aforesaid of the respective owners and those perms
sons owning or claiming any interest in said property
The City Secretary shall certify that each of the parties in said list whose
address is shown on the then current rendered or unrendered tax rolls of the City
of Fort Worth was mailed a copy of the notice of hearing and shall further certify
the date or dates on which said notice was mailed A copy of each notice shall be
attached to such certificate The certificate of the City Secretary will be con
elusive evidence of the facts therein recited
ti
IV
The City Secretary is hereby directed to engross and enroll this ordinance
by copying the caption of sarne in the Minute Book of the City Council and by
filinci the complete ordinance in the appropriate Ordinance Records of this City
V
This ordinance shall take effect and be in full force and effect from and
after the date of its passage
Passed and approved thi s_~_day of 19 B'
APPROVED AS TO FORM AND LEGALITY
i~Tt Attorne
y y
.~ _ ~,~~,
~, -- ,~.
City of Fort Worth, `reacas
Mayor and Council Communz,cation
.:~
`DATE'
1. ~ .~l,.
~,~~ „
ENCE SUBJECT Award of Contract - Reconstructio SAGE
~ ~ R of Stalcup Road and Cottey Street Storm
C ~-5846____ Drain Improvements i of 3
City Council action is requested on Project No 0''1-025-235-00 (Stalcup Road
Reconstruction and Cottey Street Storm Drain) and No 021-n3r; 100-00~(Stalcup
Road Sidewalk) described below
P.oadway ROW
Unit Street Limits Width-Feet Width-Feet
I Stalcup Road Turner Street north to 40 60 to 66
(Reconstruction)ritzhugh Street
II Cottey Street Stalcup Road east to 277' 30 50
Storm Drain east of Farrell Lane
III Stalcup Road East Berry Street north East Side 10' Parkwa
Sidewalk to Turner Street only
Origin of Project
On June 6, 1978 (M&C G-3837) the City Council approved the 1978-81 Capital
Improvement Program (CIP) which included the resurfacing of Stalcup Road from
Pinson Street to Cottey Street CCTP Page ST-41 through ST-45) and $49,000 was
allocated for the construction thereof During the design of the project it
was determined that the street should be reconstructed and the limits extended
from Turner Street to Fitzhugh Street to provide for a continuous collector
street from East Berry to East. Rosedale In addition storm drain facilities
were required in the vicinity of Cottey Street and Stalcup Road Additional
funds in the amount of $597 000 were appropriated from the 1980 bonds to provide
for the additional improvements
On July 25 1978 (M&C TE-199) the City Council approved sidewalk construction
under the "Critical Need Provision" at 20 locations The first priority on the
list is Stalcup Road from Ramey Avenue to East Berry Street with sidewalk on
the east side of the street only This project will satisfy the need with the
exception of the Bunche Park frontage which will be constructed at such time
as the new school is completed
Im ovements
Unit I Stalcup Road will be improved by constructing collector grade pavement
with concrete curb and gutter and driveway approaches Sidewalk will be construe
ted on the east side of the street as approved by M&C TE-199 and on the west side
to tie in with existing walk at commercial establishments Storm drain improve-
ments are included in the vicinity of Turner Street and Cottey Street
Unit II, Cottey Street storm d,.ain will consist of constructing 21 to 42'
storm drain pipe and appurtenances from just west of Stalcup Raod to the outfall
channel east of Farrell Lane A new road surface will also be constructed from
Stalcup Road to Farrell Lane
Unit III Stalcup Road sidewalk will consist of constructing new 4' wide concrete
sidewalk from East Berry Street to Turner Street (east side only) with wheel char
ramps at both limits ,,r
:R-
.a
sa~ear~cs: Award of Contract - Re o®nstruct
f Stalcup Road and Cottey Street Storm
-ra~ir~ Imvr®vements
Recei~st of Bids
The. project was advertised for bids on July 23 and 30 1981 and the following
bids were received on August 13 1981 with 175 working days allotted to compl ete
the project
Bidder Unit I & II Unit III
SRO Asphalt Inc $443 097 15* $15 050 30*
Austin Road Company $446 322 55 $15 000 00
L Crimes & Co Inc $471 ,102 66 $16,136 30
APAC-Texas, Inc $459 748 20 $15 927 OS
Metroplex Paving Co $493 614 92 $15 980 80
Southwestern Contracting Co $522 296 70 $15 381 40
,~= $458,147 45
Pro_)ect Cost and Financing
Standard City policy states that under street reconstruction where the existing
street is the required width adjacent properties will only be assessed for curb
and gutter and driveway approaches where none now exist Consequently based on
the low bid unit prices approximately $17 060 34 is proposed to be assessed
against those properties where no curb and gutter and driveway approaches now
exist Funding for the property owner's share of construction cost will be
provided for by a bond fund transfer from the Revolving Fund Unspecified account
Cost to the City for street and storm drain construction is $426,063 81., plus
engineering and $15 050 30 for sidewalk construction Sufficient funds are
available in Project Account No 02T-025-235-00 for the City's street and storm
drain cost and Project Account No D21-038-100-00 for the sidewalk cost A
bond fund transfer in the amount of $37 200 is required from the Engineering
Unspecified account for the City's engineering cost
Recommendations
It is recommended that
1 The following bond fund transfers be approved
From To Amount Reason
094-009-901-00 094-025-235-00 $17 060 34 To provide funds for
Revolving Fund Unspecified Stalcup Road the property owner's
Reconstruction share of construction
cost
021-095-901-00 021-025-235-00 $37 200 00 To provide funds for
Engineering Unspecified Stalcup Road survey inspection
Reconstruction testing and admini-
strative salaries etc,
021-025-235-00 021-025-901-00 $175,000 00 To transfer excess
Stalcup Road Reconstruction Resurfacing and allocation to Unspeci-
Reconstruction Unspecified fled
~~
~f~
~ "~
DATE REFERENCE SUBJECT Award of Contract - Reconstructio PAGE
NUMBER of Stalcup Road and Cottey Street Storm
Drain Im r~ovements 3 of 3
a®7 /sty ~*C-5846 P
AQQPTE~ ~P~~~~~d ~~;~, ~`~~ .~~~
2 An ordinance be adopted
A Declaring the necessity for and ordering the improvements
B Making provisions for levying assessments
C Directing the Transportation/Public Works Department to prepare estimate
of costs and amounts to be assessed
D Awarding the contract to SRO Asphalt Inc in the amount of $458 147 45
based on its combined low bid
E Making appropriations to cover the indebtedness thereby incurred for
improvements of the protect named above and
8 An ordinance be adopted A~~N ~ ~u U~~~6~~a~~~t ~~® ~ ~~~°'
A Approving the estimates of costs and amounts proposed to be assessed
B Setting September 29 1981 as the date for the benefit hearing
00 plg
~~
~pppR~~`~~,
C1~I~ ~0~~~~~.
SUBMITTED FOR THE
CITY MANAGER'S