CITY OF FORT WORTH
ALERT NOTIFICATION SYSTEM
AT
NORTH HOLLY AND SOUTH. HOLLY
WATER TREATMENT PLANTS
PROJECT NO. PW164-060164050001
05A03 : 19 RCVD
SPECIFICATIONS
AND
CONTRACT DOCUMENTS
OF
.. S�c...• '''••. Boa
*::.......... .
.......... ..
DENNEY R. HOWARD
................................�
,r, ; 60234 s
�t��FI/CENS
�O'v����
Prepared by: ;
Chiang.,C Nyj, Y�
Patel & Yerb Inc.
CP&Y Project No. CFW0332
July 2004 ORIGINAL
TABLE OF CONTENTS
NOTICE TO BIDDERS PART A
SPECIAL INSTRUCTIONS TO BIDDERS PART A
PROPOSAL PART B
MINORITY AND WOMEN BUSINESS ENTERPRISE SPECIFICATIONS PART B
GENERAL CONDITIONS PART C
SUPPLEMENTARY CONDITIONS PART CS
SPECIAL CONDITIONS PART D
TECHNICAL SPECIFICATIONS PART E
DIVISION 1 GENERAL REQUIREMENTS
01010 Summary of Work
01200 Project Meetings
01300 Submittals
01310 Construction Schedule
01370 Schedule of Values
01430 Operation and Maintenance Data
01500 Construction Temporary Facilities and Controls
01600 General Material and Equipment Stipulations
01640 Manufacturer's Services
01650 Testing, Adjusting, Balancing, Demonstration and Startup of Systems
01700 Contract Closeout
01710 Cleaning
01720 Project Record Documents
01740 Warranties and Bonds
DIVISION 2 SITE WORK
02225 Flowable Fill
DIVISION 16 ELECTRICAL
16010 Electrical General Provisions
16012 Identifications
16110 Raceways
16120 Conductors—600 V and Below
16130 Boxes
16170 Metal Framing
16723 Alert Notification System
CERTIFICATE OF INSURANCE/ BONDS/ CONTRACTOR'S
COMPLIANCE WITH WORKER'S COMPENSATION LAWS PART F
CONTRACT PART G
CONSTRUCTION DETAILS PART H
CFW0332 i ISSUE:0
CITY OF FORT WORTH ALERT NOTIFICATION SYSTEM 07/02/04
DRH TABLE OF CONTENTS
PART A
_J
1
NOTICE TO BIDDERS
Sealed Proposals for the North and South Holly Water Treatment Plants (WTP) Alert
Notification System, Water Department Project Number PW164-060164050001,
addressed to Mr. Gray Jackson, City Manager, will be received until 01:30 p.m. on the-
date
hedate of the bid opening, at the Office of the Purchasing Division, located on the lower
level of the Municipal Building, 1000 Throckmorton Street, Fort Worth, Texas 76102.
The bids will be publicly opened and read aloud in the City Council Chambers at:
02:00 p.m.,August 05, 2004
Special Contract Documents, including plans and detailed specifications, have been
prepared for this project and may be obtained from Chiang, Patel and Yerby. Inc. located
at 15100 Trinity Blvd. Suite 200, Fort Worth, Texas 76155 (PH: 817-354-0189). The
documents will be available for a non-refundable fee of$150 per set.
Prequalification according,to the Fort Worth Water Department Contract Specifications
(as listed in Special Instructions to Bidders) is required. All bidders must submit
prequalification documentation with the city of Fort Worth Water Department a
minimum of seven(7) days prior to the bid opening.
A pre-bid conference will be held at 10:00 A.M., Thursday, July 22, 2004, at the Fort
Worth North Holly Training Room, 921 Fournier St., Fort Worth, TX. Attendance is not
mandatory for prospective bidders. Representatives of the Owner and Engineer will be
present to discuss the project. Engineer will transmit to all prospective bidders of record
such Addenda as Engineer considers necessary in response to questions arising at the
conference. A site visit will be held after the per-bid conference. Contact Engineer no
later than close of business on Tuesday, July 20, 2004, and provide list of attendees for
the purpose of access to the Pre-bid Conference.
The City reserves the right to reject any or all bids and waive any or all irregularities. No
Bid may be withdrawn until the expiration of ninety (90) days from the date the Bids are
opened.
Gary Jackson
City Manager
Gloria Pearson
City Secretary
Publication Dates: July 08, 2004
July 15, 2004
i
i
SPECIAL INSTRUCTIONS TO BIDDERS
(August 4,2003)
1. pREQUALIFICATION REQUIREMENTS. All contractors submitting bids, are
required to be pre-qualified by the Fort Worth Water Department prior to submitting
bids. This pre-qualification process will establish a bid limit based on technical
evaluation and financial analysis of the contractor. It is the bidder's responsibility to
submit the following documentation: a current financial statement, an acceptable
equipment schedule, names and addresses of each individual or business entity
owning 10% or more of the bidding entity, and any other documents the Department
may deem necessary, to the Director of the. Water Department or his designated
representative, at least seven(7) calendar days prior to the date of the opening of bids.
a) COVER LETTER. The cover letter provided by the prospective bidder
with the pre-qualification information must include the following
information:
• Contact person (for additional information) if other than individual
who signed the cover letter
• If the bidder intends to submit a bid within thirty (30) days from the
date` that the pre-qualification request is submitted to the City, a
statement as to the project to be bid and the date that the bids are
scheduled to be opened.
b) FINANCIAL STATEMENT. The financial statement required shall have
been prepared by an independent certified public accountant or
independent public accountant holding a valid permit issued by an
appropriate State licensing agency and shall have been so prepared as to
reflect the financial status of the submitting company. This statement must
be current and not more than one (1) year old. In the case that a bidding
date falls within the time a new statement is being prepared, the previous
statement shall be updated by proper verification.
G) EXPERIENCE RECORD. For an experience record to be considered to be
acceptable for a given project, it must reflect the experience of the firm
seeking qualification in the work of both the same nature and technical
level as that of the project for which bids are to be received. Experience
must be on projects that were completed no more than 5 years prior to the
date on which bids will be received. A minimum of three references must
be included. References must include a contact person name, telephone
number, project name and total cost, and type of work done (Utility
contractor shall list pipe size and pipe linear footage).
d) EQUIPMENT SCHEDULE. The prospective bidder shall list the
equipment that the Contractor has available for the project and list the
equipment that Contractor will rent as may be required to complete the
project on which the Contractor submits a bid.
A-1
The Water Department will review each pre-qualification submittal. From the financial
statement, the maximum bid limit swill be based on amount of liquid assets times 10. The
expiration date for pre-qualification will be established as 15 months after the date of the -
financial statement. The experience record will be reviewed and verified at the same time.
The following conditions will apply:
a) The Director of the Water Department shall be the sole judge as to the
acceptability for financial and experience qualification to bid on any Fort
Worth Water Department project.
b) Bids received in excess of the bid limit shall be considered non-responsive
and will be rejected as such.
c) The City, in its sole discretion, may reject a bid for failure to demonstrate
experience and/or expertise.
d) Any proposals submitted by a non pre-qualified bidder shall be returned
unopened, and if inadvertently opened, shall not be considered.
e) The City will attempt to notify prospective bidders whose qualifications
(financial or experience) are not deemed to be appropriate to the nature
and/or magnitude of the project on which bids are to be received. Failure
to notify shall not be a wavier of any necessary pre-qualification.
For additional information contact John Kasavich, Fort Worth Water Department at(817)
871- 8480 (FAX 817-871-8195). Pre-qualification submittal should be sent to:
John Kasavich
Fort Worth Water Department
1000 Throckmorton
Fort Worth, TX 76102-6212
q� 2. BID SECURITY. A cashier's check, or an acceptable bidder's bond, payable to the
City of Fort Worth, in the amount of not less than five (5%) percent of the largest
possible total of the bid submitted must accompany the bid, and is subject to
forfeiture in the event the successful bidder fails to execute the Contract Documents
within ten (10) days after the contract has been awarded. To be an acceptable surety
on the bid bond, the surety must be licensed to do business in the State of Texas. In
addition, the surety must (1) hold a certificate of authority from the United States
Secretary of the Treasury to qualify as a surety on obligations permitted or required
under federal law; or (2) have obtained reinsurance for any liability in excess of
$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the State of
Texas and is the holder of a certificate of authority from the Untied States Secretary
of the Treasury to qualify as a surety on obligations permitted or required under
federal law. Satisfactory proof of any such reinsurance shall be provided to the City
upon request. The City, in its sole discretion, will determine the adequacy of the proof
required herein.
A-2
3. BONDS. A performance bond, a payment bond, and a maintenance bond each for one
hundred(100%)percent of the,contract price will be required. Reference C3-3.7.
4. WAGE RATES. Not less that the prevailing wage rates established by the City of Fort
Worth, Texas, and as set forth in the Contract Documents. must be paid on this
proj ect.
5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the
Proposal, the City reserves the right to adopt the most advantageous construction
thereof to the City or to reject the Proposal.
6. BIDDER LICENSE: Prior to the award of contract to an out-of-state bidder, the
bidder shall be licensed to do business in the State of Texas. For licensing procedures,
contact the Texas Secretary of State Offices (Telephone Number 1-512-463-5555 or
1-900-263-0060)
7. NONRESIDENT BIDDERS: Pursuant to Article 601g, Texas Revised Civil Statues,
the City of Fort Worth will not award this contract to a nonresident bidder unless the
nonresident's bid is lower that the lowest bid submitted by a Texas resident bidder by
the same amount that a Texas resident would be required to underbid a nonresident
bidder to obtain a comparable contract in the state in which the .nonresident `s
principal place of business is located.
"Nonresident bidder" means a bidder whose principal place of business is not in this
state, but excludes a contractor whose ultimate parent company or majority owner has
a place of business in the State of Texas.
This provision does not apply if this contract involves federal funds.
The appropriate blanks of the Proposal must be filled out by all nonresident bidders in
order for the bid to meet specifications. The failure of a nonresident contractor to do
so will automatically disqualify that bidder.
8. PAYMENT: If the contract amount is $25,000 or less, the contract amount shall be
paid within forty-five (45) days after the completion and acceptance by the City.
9. AGE: In accordance with the policy("Policy") of the Executive Branch of the Federal
Government, Contractor covenants that neither it nor any of its officers, members,
agents, employees, program participants or subcontractors, while engaged in
performing this contract, shall, in connection with the employment, advancement or
discharge of employees or in connection with the terms, conditions or privileges of
their employment, discriminate against persons because of their age except on the
basis of a bona fide occupational qualification, retirement plan or statutory
requirement.
Contractor further covenants that neither it nor its officers, members, agents,
employees, subcontractors, program participants, or persons acting on their behalf,
shall specify, in solicitations or advertisements for employees to work on this
A-3
contract, a maximum age limit for such employment unless the specified maximum
age limit is based upon a bona fide occupational qualification, retirement plan or
statutory requirements.
Contractor warrants it will fully comply with the policy and will defend, indemnify
and hold City harmless against any claims or allegations asserted by third parties or
subcontractors against the City arising out of the Contractor's and/or its
subcontractors' alleged failure to comply with the above referenced Policy concerning
age discrimination in the performance of the contract.
10. DISABILITY: In accordance with provisions of the Americans with Disabilities Act
of 1990 ("ADA"), Contractor warrants that it and any and all of its subcontractors will
not unlawfully discriminate on; the basis of disability in the provision of services to
the general public, nor in the availability, terms and/or conditions of employment for
applicants for employment with, or employees of the Contractor or any of its
subcontractors. Contract warrants it will fully comply with ADA's provision and any
other applicable Federal, State, and local laws concerning disability and will defend, _
indemnify and hold harmless against any claims or allegations asserted by third
parties or subcontractors against the City arising out of the Contractor's and/or its
subcontractors' alleged failure to comply with the above referenced Policy concerning
disability discrimination in the performance of this contract.
11. MINORITY AND`WOMEN BUSINESS ENTERPRISES: In a accord with City of
Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the
participation of minority business enterprises and women business enterprises in City
contracts. A copy of the Ordinance can be obtained from the Office of the City
Secretary. The bidder shall submit the MBE/WBE SUBCONTRACTOR/SUPPLIER
UTILIZATION, FORM, PRIME CONTRACTOR WAIVER FORM, and/or the
GOOD FAITH EFFORT FORM ("with Documentation") and/or the JOINT
VENTURE FORM as appropriate. The Documentation must be received by the
managing department no later than 5:00 p.m, five (5) City business days after the bid
opening date. The bidder shall obtain a receipt from the appropriate employee of the
managing department to whom delivery was made. Such receipt shall be evidence
that the documentation was received by the City. Failure to comply shall render the
bid non-responsive.
Upon request, Contractor agrees to provide the Owner complete and accurate
information regarding actual work performed by a minority business enterprise
(MBE) and/or women business enterprise (WBE) on the contract and payment
thereof. Contractor further agrees to permit any audit and/or examination of any
books, records or files in its possession that will substantiate the actual work
performed by an MBE and/or WBE. The misrepresentation of facts (other than a
negligent misrepresentation) and/or commission of fraud by the Contractor will be
grounds for termination of the contract and/or initiating action under appropriate
Federal, State or local laws or ordinances relating to false statements. Further, any
such misrepresentation facts (other than a negligent misrepresentation) and/or
commission of fraud will result in the Contractor being determined to be irresponsible
A-4
and barred from participating in City work for a period of time of not less that three
(3)years.
12. ADDENDA: Bidders wanting further information, interpretation or clarification of
the contract documents must make their request in writing to the Fort Worth Water
Department Engineering Services, at least 96 hours prior to bid opening. Answers to
all such requests will be bound and made a part of the Contract Documents. No other
explanation or interpretation will be considered official or binding. Should a bidder
find discrepancies in, or omissions from, the Contract Documents, or should the
bidder be in doubt as to their meaning, the bidder should at once notify the Fort
Worth Water Department Engineering Services, in order that a written.addendum may
be sent to all bidders. Any addenda issued will be mailed or be delivered to each
prospective bidder. The bid proposal as submitted by the bidder must be so
constructed as to include any addenda issued by the Fort Worth Water Department,
prior to 24 hours of the opening of bids with appropriate recognition of addenda so
noted in the bid proposal.
A-S
PART B
I . 0 i
ATTACHMENT 1A
FORT WORTH Pagel of4
City of Fort Worth
5
Subcontractors/Suppliers_Utilization Form
PRIME COMPANY NAME: Check applicable block to describe prime
\ t 'f`1 5 _T
MIWIDBE NON-MIW/DBE 1-f
f)r)A
PROJECT NAME-
BID DATE
9
C_ _0q
City's M/WBE Project Goal: Prime's MIWBE Project Utilization: PROJECT NUMBER
Identify all subcontractors/suppliers you will use on this project
Failure to complete this form, in its entirety with requested documentation, and received by the Managing
Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date,
will result in the bid being considered non-responsive to bid specifications.
The undersigned Offeror agrees to enter into a formal agreement with the M/WBE firm(s) listed in this
utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional
and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the
bid being considered non-responsive to bid specifications
MIWBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or
currently doing business in the marketplace at the time of bid.I Marketplace is the geographic area of Tarrant,
Parker, Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall counties
Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct
payment from the prime contractor to a subcontractor is considered 1St-tier, a payment by a subcontractor to
its supplier is,considered 2nd tier
ALL M[WBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD.
Certification means those firms, located or doing business at the time of bid opening within the Marketplace that have
been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification
Agency (NCTRCA), or the Texas Department of Transportation (TX DOT), highway division. Disadvantaged Business
Enterprise(DBE) is synonymous with Minority/Women Business Enterprise (M/WBE).
If hauling services are utilized, the prime will be given credit as. long as the M/WBE listed owns and
operates at least one fully licensed and operational truck to be used on the contract. The M/WBE may lease
trucks from another M/WBE firm, including M/WBE owner-operators, and receive full M/WBE credit. The
M/WBE may lease trucks from non-MIWBEs, including owner-operators, but will only receive credit for the
fees and commissions earned by the M/WBE as outlined in the leas,e agreement.
Ild Rev.5/30/03
ATTACHMENT 1A
F_ORT WORTH Page 2 of 4
Primes are required to identify ALL subcontractors/suppliers,regardless of status; i.e., Minority,Women and non-M/WBEs.
Please list M/WBE firms first,use additional sheets if necessary.
Certification N
SUBCONTRACTOR/SUPPLIER T (check one) n
N T Detail Detail
Company Name i C X M Subcontracting Work Supplies Purchased Dollar Amount
Address e M W T D W
Telephone/Fax r BB E E R O B
C T E
A
�CtrN ��c�fLt C-
kc) `
�C. cI
( r)Ct�v
fit'?,6s`4. I Lo
���I✓ � �A���� QAC��
P�\
MA8A1vCcM
Iia- A\,
FL,34-
-711
(W. ;4c). 05
�A
Rev.5/30/0;
i
FORT WORTH
MinoPrimes are required to identify ALLesl'subcontractors/sup
firmspPrst use additional sheets if necessaless of status; i.e
ry Women and non-M/1NBEs.
Pleas
Certification N
o
(check one) n Detail
N T Supplies Purchased Dollar Amount
SUBCONTRACTORISUPPLIER T Detail
Company Name I C X M Subcontracting Work
Address e M W T D
Telephone/Fax r E E R o B
C T E
A
Rev.5/30103
i
ATTACHMENT 1)
FORT WORTH. Page 4 of
Total Dollar Amount of M/WBE Subcontractors/Suppliers $ f ,f
r a ,
Total Dollar Amount of Non-M/WBE Subcontractors/Suppliers -------------
$
l TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $
i ? 32)
The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval
of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a
I Request for Approval of Change/Addition. Any unjustified change or deletion shall be a material breach of
I contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor
shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed
M/WBE goal. If the detail explanation is not submitted, it will affect the final compliance determination.
v By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request,
complete and accurate information regarding actual work performed by all subcontractors, including
M/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or
examination of any books, records and files held by their company. The bidder agrees to allow the
transmission of interviews with owners, principals, officers, employees and applicable
subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work
performed by the M/W/DBE(s) on this contract, by an authorized officer or employee of the City. Any
intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment
from City work for a period of not less than three (3) years and for initiating action under Federal, State or
Local laws concerning false statements. Any failure to comply with this ordinance and create a material
breach of contract may result in a determination of an irresponsible Offeror and barred from participating in
City work for a period of time not less than one (1) year.
Authorized Signature Printed Signature
i
Tale Contact Name/Title(if different)
COVIL f
Company NarAe Telephone and/or Fax
ci
AddressE-mail Addr s
City/State/Zip Date
Rev.5/30/03
AT,,TACHMENT 1
TABLE OF CONTENTS
Subject Page No.
1. DEFINITIONS
....................................................................... 1
11. PURPOSE .............................................. 4
I11. CERTIFICATION
................................................................... 4
IV. PROGRAM GOAL SETTING ................................................... 4
V. APPLICABLE CONTRACTS
1. CONSTRUCTION .............................................................. 5
M/WBE UTILIZATION REQUIREMENTS
COUNTING PARTICIPATION
PAYMENTS
RETAINAGE
2. PROFESSIONAL-SERVICES ................................................. 8
M/WBE UTILIZATION REQUIREMENTS
COUNTING PARTICIPATION
PAYMENTS
3. PURCHASES 10
M/WBE UTILIZATION REQUIREMENTS
COUNTING PARTICIPATION
PAYMENTS
BEST VALUE CRITERIA
VI. POST AWARD COMPLIANCE .................................................... 13
VII. CONTRACT MONITORING AND REPORTING .............................. 15
Vill. EXCEPTIONS AND WAIVERS .................................................... 16
IX. PROGRAM ADMINISTRATION ................................................... 16
X. SANCTIONS ............................................................................ 18
XI. SEVERABILITY
........................................................................ 19
Minority and Women Business Enterprise Ordinance Attachment 1
ATTACHMENT
1. DEFINITIONS:
1. Applicable Contract means any contract of $25,000 or more for construction projects and professional
services and $25,000 or more for purchase agreements,as well as any other contracts that the City Council or
City Manager deem appropriate.
2. Certified means those firms, located or doing business at the time of bid/proposal opening within the
Marketplace, that have been determined to be a bonafide minority or women business enterprise by either the
North Central Texas Regional Certification Agency (NCTRCA), or the Texas Department of Transportation
(TxDOT), highway division.
3. City means the City of Fort Worth, Texas.
4. City business day means Monday through Friday, inclusive, excluding legal holidays. Legal holidays shall be
observed as prescribed by the City Council for observance as follows:
New Year's Day January 1
M. L. King, Jr. Birthday Third Monday in January
Memorial Day Last Monday in May
Independence Day July 4
Labor Day First Monday in September
Thanksgiving Day Fourth Thursday in November
Thanksgiving Friday Fourth Friday in November
Christmas Day December 25
When one of the above named holidays falls on a Saturday, the holiday shall be observed on the preceding
Friday. When one of the above named holidays falls on a Sunday, the holiday shall be observed on the
following Monday.
5. Combined Projects means a -construction contract, which includes paving and/or drainage elements of
construction and water and/or sanitary sewer construction elements, but does not include a standard water
and/or sanitary sewer contract where the pavement is temporarily or permanently repaired and that repair is not
a separate unit.
6. Construction means the erection, rehabilitation, alteration, conversion, extension, demolition, improvement,
remodeling or repair to any real property, including streets, storm drains and facilities providing utility service
owned by the City.
7. Contract means a binding agreement whereby the City either grants a privilege or is committed to expend or
does expend its funds or other resources for or in connection with a) construction of any public improvement,
and b) purchase of any services (including professional services). The term includes "purchase order".
8. Contract Officer means the person employed by the City to oversee the performance of the contract.
9. Contracting Department means the department responsible for payment of contract obligations.
10. Contractor means the business entity with whom the City has entered into an agreement. Includes the terms
"Vendor", "Prime Contractor" and "Prime Consultant".
11. Goal means the percentage of minority business enterprise and/or women business enterprise participation on
an applicable project as determined by the City, based on the availability of such businesses in the marketplace
and the subcontracting/supplier opportunities of the project.
1
i
Minority and Women Business Enterprise Ordinance Attachment 1
12. Good Faith Effort means an honest and conscientious effort by the Offeror to meet the City's goal for M/WBE
participation. Compliance with each of the following steps shall satisfy the Good Faith Effort requirement
absent proof of fraud, misrepresentation, or intentional discrimination by the Offeror:
12.1. List each and every subcontracting and/or supplier opportunity for the completion of this project. On
combined projects list each subcontracting and/or supplying opportunity through the 2nd tier.
12.2. Obtain a current (not more than three (3) months old from the bid open date) list of M/WBE
subcontractors and/or suppliers from the City's M/WBE Office.
12.3. Solicit bids from M/WBEs, within the subcontracting and/or supplier areas previously listed, at least
ten calendar days prior to bid opening by mail, exclusive of the day the bids are opened.
12.4. Solicit bids from M/WBEs, within the subcontracting and/or supplier areas previously listed, at least
ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened.
Note: A facsimile may be used to comply with either 12.3 or 12.4, but may not be used for both.
Note: If the list of M/WBEs for a particular subcontracting/supplier opportunity is ten or less, the Contractor must contact the
entire list within such area of opportunity to be in compliance with 12.3 and 12.4. If the list of M/WBEs for a particular
subcontracting/supplier opportunity is ten or more,the Contractor must contact at least two-thirds of the list within such
area of opportunity, but not less than ten,to be in compliance with 12.3 and 12.4.
12.5. Provide plans and specifications or information regarding the location of plans and specification to _
M/WBEs.
12.6. Submit documentatiop if M/WBE quotes were rejected. The documentation submitted should be in
the form of an affidavit, include a detailed explanation of why the M/WBE was rejected and any
supporting documentation the Offeror wishes to be considered by the City In the event of a bona
fide dispute concerning quotes, the Offeror will provide for confidential in-camera access to and
inspection of any relevant documentation by City personnel.
13. Horizontal Construction means construction of highways, roads, streets, bridges, utilities, water supply
projects, water plans, wastewater plants, water and wastewater distribution or conveyance facilities, wharves,
docks, airport runways and taxiways, drainage projects, or related types of projects associated with civil
engineering construction as referenced in this ordinance. -
14. Joint Venture means an association of two or more businesses, one of which must be a certified M/WBE firm.
The M/WBE firm must be responsible for a clearly defined portion of the work to be performed, equal to a share
in the ownership, control, knowledge, management, responsibility, risks, and profits of the joint venture.
15. Lease Agreement means a written agreement to transfer control and use of truck(s) from one business entity
to another, which outlines fees and/or commissions.
16. Lease Trucks means trucks that are leased from another M/WBE firm, including M/WBE owner-operators.
Trucks leased from non-M/WBE firms will only receive credit for the fees and commissions earned by the
M/WBE as outlined in the lease agreement.
17. Manager means the administrator of the M/WBE Office of the City of Fort Worth.
18. Managing Department means the department responsible for overseeing the day-to-day completion of the
contract.
19. Manufacturer means one that manufactures a product by hand or machinery suitable for uses; the process of
making wares.
20. Marketplace means the geographic market area as defined in the Availability and Disparity Study represented
by the counties of Tarrant, Parker, Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall.
2
Minority and Women Business Enterprise Ordinance Attachment 1
21. Minority means a citizen of the United States or lawfully admitted permanent resident that is Asian American,
American Indian, Black or Hispanic.
22. Minority Business Enterprise is defined as a qualified business concern located in the Marketplace or
providing proof of doing business in the Marketplace at the time of bid opening or the opening of responses to
requests for proposals, meeting the following criteria:
a. is at least 51 percent owned by one or more minority persons, or, in the case of any publicly owned
business, at least 51 percent of the stock is owned by one or more minority persons; and
b. management and daily business operations are controlled by one or more minority persons who own it.
23. MWBEAC means the Minority and Women Business Enterprise Advisory Committee appointed by the City
Council to review the findings of Availability and Disparity Studies conducted for the City and present
recommendations, in concurrence with the City Manager, on any amendments to the M/WBE Ordinance.
24. Mediation means an alternate dispute resolution method as authorized by the state law
25. Nepotism means the state or fact of showing favoritism to a relative on the basis of a relationship.
26. Non-compliance means failure,of a prime contractor to comply with the Ordinance's requirements during the
contract and/or at completion of the contract.
27. Non-responsive means failure of an Offeror to respond to the Ordinance's requirements upon submission of a
bid or proposal; herein specifically defined by either 1) meet or exceed the stated project goal, or 2) make a
good and honest faith effort to meet the project goal or 3) submit the prime contractor waiver or 4) submit the
joint venture form.
28. Offeror means any person, firm, corporation, or partnership that submits a bid or proposal to provide labor,
goods or services to the City where funds are expended. The term includes bidder and proposer.
29. Payment Dispute means a bonafide disagreement of payment.
30. Procurement means the buying, renting, leasing or otherwise obtaining or acquiring any supplies, materials,
equipment or services.
31. Professional Services means services, which require predominantly mental or intellectual labor and skills,
includes, but is not necessarily limited to, architects, engineers, surveyors, doctors, attorneys, and accountants.
32. Project Manager see Contract Officer.
33. Purchasing means the buying, renting, leasing or otherwise obtaining or acquiring any supplies, materials,
equipment or services excluding construction and professional services previously defined.
34. Qualified means an individual or business entity having previously performed or received training in the work,
industry or profession required.
35. Regular Dealer is defined as a firm that owns, operates, or maintains a store, a warehouse, or other
establishments in which the materials or supplies required for the contract are bought, kept in stock, and are
regularly sold retail or wholesale.
36. Subcontract means an agreement between the contractor and another business entity for the performance of
work.
37. Subcontract/Supplier Opportunity means an area where there is more than one_ _M/WBE,_ _
subcontractor/subconsultant/supplier in the market place.
3
Minority and Women Business Enterprise Ordinance Attachment 1
38. Tier means the level of subcontracting below the prime contractor/consultant, i.e., a direct payment from the
prime contractor to a subcontractor is considered 1St tier, a payment by a subcontractor to its supplier is
considered 2"d tier.
39. Vertical Construction means construction of a facility. Facility means buildings the design and construction of
which are governed by accepted building codes. The term does not include: (A) highways, roads, streets,
bridges, utilities, water supply projects, water plans, wastewater plants, water and wastewater distribution or
conveyance facilities, wharves, docks, airport runways and taxiways, drainage projects, or related types of
projects associated with civil engineering construction or (B) builds or structures that are incidental to projects
that are primarily civil engineering construction projects.
40. Women Business Enterprise is defined as a qualified business concern located in the Marketplace or provide
proof of doing business in the Marketplace at the time of bid opening or the opening of responses to requests
for proposals, meeting the following criteria:
a, is at least 51 percent owned by one or more women, or, in the case of any publicly owned business,
at least 51 percent of the stock is owned by one or more women; and
b. management and daily business operations are controlled by one or more women who own it.
I1. PURPOSE:
The ultimate goal of this ordinance is to remedy the effects of past underutilization in the Marketplace by increasing
the utilization of minority and women business enterprises above the present low level to one more comparable to
their availability in the Fort Worth M@rketplace.
Specific goals shall be established in the areas of construction, professional services, and purchases of other
goods and services. A goal may be set on individual projects based on the type of work or services to be
performed, or goods to be acquired and the availability of minority and women businesses in the City's
Marketplace.
The City Manager shall recommend an annual goal for M/WBE participation in City procurement activities, based
upon the availability within the Marketplace.
The provisions of this ordinance shall apply to all contracts awarded by the City, except as may be hereafter
specifically exempted. Where contracts involve the expenditure of federal or state funds, the state or federal policy
related to M/WBE or DBE participation may take precedence over this ordinance.
Award of a contract shall be recommended when the Offeror has complied with the requirements of this ordinance
via meeting the goal, demonstrating a Good Faith Effort to meet the goal or meeting the requirements for a Prime
Contractor Waiver. Failure to comply with the Ordinance by any of the required methods shall result in an Offeror
being deemed non-responsive.
111. CERTIFICATION:
The City will recognize M/WBE firms that are certified by the North Central Texas Regional Certification Agency
(NCTRCA) or Texas Department of Transportation (TX DOT), highway division. The firms shall be located in or
doing business in the Marketplace at the time of bid/proposal opening.
IV. PROGRAM GOAL:
A. A Citywide goal for the utilization of minority business enterprises (MBE) and women business enterprises
(WBE) shall be reviewed and approved annually by the City Council.
1. The City Manager shall conduct an analysis of the availability of M/WBEs and present to the City Council
an annual report on M/WBE availability and utilization by the end of the first quarter of the new fiscal year.
4
Minority and Women Business Enterprise Ordinance Attachment 1
2. Based on the availability of M/WBEs in the Marketplace and the City's most recent goal attainment and with
the advice and counsel of the, the City Manager shall recommend to the City Council a reasonable goal for
the remainder of the current fiscal year.
3. The goal shall .be expressed in terms of a percentage of the total dollar value of all applicable contracts
awarded by the City. Goals shall be established separately for categories of construction, professional
services, and purchasing, as well as, any other categories that the City Council or City Manager deems
appropriate.
B. An individual project goal shall be set by the M/WBE Office in collaboration with the Contract Officer and Risk
Management (where appropriate) prior to solicitation. The project goal shall be reasonable and shall be based
upon:
1. Specific subcontracting and/or materials opportunities required to complete the project, and
2. The availability of M/WBE in the identified subcontracting and/or materials opportunities in the Marketplace.
V. APPLICABLE CONTRACTS:
A. CONSTRUCTION PROJECTS
1. MM/BE UTILIZATION REQUIREMENTS
a. In addition to the requirements set forth elsewhere, bid conditions shall include a statement of the
M/WBE goal established for the project. The requirements below also apply to circumstances where
change orders or extra work gives rise to new trade or vendor opportunities outside the original scope
of work.
b. Bid conditions and all other specifications for applicable contracts to be awarded by the City shall
require that Offerors make a good faith effort (GFE) to subcontract with or purchase supplies from
M/WBE firms. Such specifications shall require the Offeror to meet or exceed the stated goal or
submit documentation of GFE for all applicable contracts to permit a determination of compliance with
the specifications.
C. Construction contracts (estimated cost of $25,000 or more) shall be awarded and administered in
accordance with the following standards and procedures:
01. Competitive bids for applicable contracts shall include the M/WBE requirements and
documentation in the bid specifications. M/WBE documentation consists of the SPECIAL
INSTRUCTIONS TO BIDDERS, the SUBCONTRACTOR UTILIZATION FORM, the PRIME
CONTRACTOR WAIVER FORM, the GOOD FAITH EFFORT FORM, and the JOINT VENTURE
FORM.
a) Competitive bids where the Offeror equals or exceeds the project goal must submit the
SUBCONTRACTOR UTILIZATION FORM or the JOINT VENTURE FORM.
b) Competitive bids where the Offeror does not have subcontracting and/or supplier opportunities
must submit the PRIME CONTRACTOR WAIVER FORM.
c) Competitive bids where the Offeror has subcontracting and/or supplier opportunities but does
not include M/WBE participation in an amount, which equals or exceeds the project goal, must
submit the SUBCONTRACTOR UTILIZATION FORM and the GOOD FAITH EFFORT FORM
(GFE) and documentation.
d) Competitive bids where the Offeror has subcontracting and/or supplier opportunities but do not
include any M/WBE participation must submit the SUBCONTRACTOR UTILIZATION FORM
i
and the GOOD FAITH EFFORT FORM and documentation.
5
_ i
Minority and Women Business Enterprise Ordinance Attachment 1
02. The Offeror shall submit the,, SUBCONTRACTOR UTILIZATION FORM and/or the GOOD
FAITH EFFORT FORM or the PRIME CONTRACTOR WAIVER FORM, or the JOINT
VENTURE FORM ("and documentation") as appropriate. The Managing Department must
receive the documentation no later than 5:00 p.m., five (5) City business days after the bid
opening date, exclusive of the bid opening date. The Offeror shall obtain a receipt from the
appropriate employee of the managing department to whom delivery was made. Such receipt
shall be evidence that the City received the documentation. The submission of the applicable
completed form(s) within the allotted time will be considered when determining the
responsiveness of the bid. Failure to comply with the bid specifications, inclusive of the M/WBE
requirements and documentation, shall render the Offeror non-responsive.
03. The GFE documentation shall demonstrate the Offeror's commitment and honest efforts to utilize
M/WBE(s). The burden of preparing and submitting the GFE information is on the Offeror and
will be evaluated as part of the responsiveness to the bid/proposal. An Offeror who intentionally _
and/or knowingly misrepresents facts on the documentation submitted will constitute a basis for
classification as non-responsive and possible debarment.
04. The contracting department may request the M/WBE Office to waive the goal requirements of
this subsection, or to reduce the amount of the goal, in accordance with the provisions of the
Exceptions and Waivers section.
2. COUNTING M/WBE PARTICIPATION
M/WBE participation shall be counted toward meeting the goal in accordance with the following provisions:
a. For the purpose of determining compliance with the goal requirements established in this ordinance,
businesses will be cbunted as M/WBE only when they have been certified as such prior to a
recommendation for award being made to the City Council.
01. Any business listed by an Offeror that is not certified at the time of bid opening must file an
application for certification to a city authorized certification agency within a reasonable time for
the City to consider the business and dollar amount towards meeting the goal.
02. If a business described in the subparagraph immediately above fails to submit an application for
certification within a reasonable time, or if the business is denied certification, the Offeror shall
be afforded five (5) City business days to secure additional certified/certifiable M/WBE
participation, starting the next City business day following the day the written notification was
received from the Managing Department.
03. Evidence of the additional certified/certifiable M/WBE participation shall be delivered to and
received by the Managing Department within five (5) City business days after the notification was
received by the Offeror, exclusive of the date that the notification was received.
b. Except as provided for in paragraph C below, if the Offeror is ruled non-responsive to for failure to
comply with the requirements of this ordinance, the Managing Department will provide written
notification to the Offeror stating the specific basis for the ruling. The Offeror may then submit
documentation that it will either meet or exceed the stated goal and if the documentation satisfies this
ordinance, the Offeror may then be considered for an award of contract.
C. If the Offeror is ruled non-responsive solely for its failure to identify a subcontract/supplier opportunity
and that opportunity is less than three (3%) percent of the total bid, the Offeror may submit
documentation that an M/WBE will be utilized for that subcontract/supplier opportunity, and may be
considered for an award of contract.
d. Documentation required under either paragraph 2 or 3 above must be received by the Managing
Department within five (5) City business days, exclusive of the date that the Offeror was notified that it
was non-responsive. If the documentation is not received within the stated time, the Offeror shall be
deemed to have withdrawn its bid. The City will not communicate with another Offeror regarding
award of the contract until five (5) City business days after the original Offeror has been notified that it
is non-responsive.
6
Minority and Women Business Enterprise Ordinance Attachment 1
e. The Offeror may count toward the goal any tier of M/WBE subcontractors and/or suppliers
f. The Offeror will be given credit toward the goal only when the M/WBE subcontractor performs a
commercially useful function. A M/WBE subcontractor is considered to have performed a
commercially useful function when.
01. It is responsible for the execution of a distinct element of the work by actually performing,
managing and supervising the work involved in accordance with normal business practice; and
02. When the firm receives due compensation as agreed upon.for the work performed.
g. The Offeror will be given credit toward the M/WBE goal only when the MM/BE supplier performs a
commercially useful function. A M/WBE supplier is considered to have performed a commercially
useful function when the M/WBE supplier is a manufacturer or a regular dealer.
h. The Offeror will be given credit for utilizing a M/WBE hauling firm as long as the M/WBE owns and
operates at least one fully licensed and operational truck used on the contract. The M/WBE may
lease trucks from another M/WBE firm, including M/WBE owner-operators and receive full M/WBE
credit. The M/WBE may lease trucks from non-M/WBEs, including owner-operators, but will only
receive credit for the fees and commissions earned by the M/WBE as outlined in the lease
agreement.
i. Regardless of whether an arrangement between the contractor and the M/WBE represents standard
industry practice, if the arrangement erodes the ownership, control or independence of the M/WBE or
does not _meet the .commercially useful function requirement, the Offeror shall receive no credit
toward the goal.
j. An Offeror may count toward its goal a portion of the total dollar value of a contract with a joint
venture equal to the percentage of M/WBE participation in the joint venture.
01. The Managing Department must receive the documentation no later than 5:00 p.m., five (5) City
business days after the bid opening date, exclusive of the bid opening date. The Offeror shall
obtain a receipt from the appropriate employee of the managing department to whom delivery
was made. Such receipt shall be evidence that the City received the documentation. The
submission of the applicable completed form(s) within the allotted time will be considered when
determining the responsiveness of the bid. Failure to comply with the bid specifications, inclusive
of the M/WBE requirements and documentation, shall render the Offeror non-responsive.
02. The M/WBE involved in the joint venture must be responsible for a clearly defined portion of the
work to be performed, equal to a share in the ownership, control, knowledge, management,
responsibility, risks, and profits of the joint venture.
k. Except for joint ventures, the prime contractor (regardless of their M/WBE status) and any work
performed by the prime contractor is not counted toward meeting the M/WBE contract goal and is not
considered when determining compliance with this ordinance.
I. An Offeror may not count toward its goal any arrangement with an M/WBE that is nepotism or where
a M/WBE has been a recent employee (less than one year) of the Offeror.
m. The Offeror may not count toward the goal any agreement with a M/WBE that does not meet the
requirements of this ordinance.
3. PAYMENTS
The City Manager shall implement procedures to comply with the following:
7
}
Minority and Women Business Enterprise Ordinance Attachment 1
a. For vertical construction contracts, procedures will be established to ensure that the prime shall
submit an invoice at least monthly and the City will pay the invoice as required by the Texas Prompt
Payment Act (Tex. Gov't. Code, chap. 2251) or any successor statute. The prime shall pay
subcontractors as required by the Texas Prompt Payment Act or any successor statute. The prime
contractor's failure to make payments as provided by state law shall, in addition to any other
remedies provided by law, authorize the City to withhold future payments and/or reject future bids
from the contractor until compliance with this ordinance is attained.
b. For horizontal construction contracts, procedures will be established to ensure that all progress
payments are made twice a month and that subcontractors are paid in accordance with the provisions
of the Texas Prompt Payment Act or any successor statute. A contractor's failure to make payments
as required by state law shall, in addition to any other remedies provided by state law, authorize the
City to withhold future payments and/or reject future bids from the contractor until compliance with
this ordinance is attained.
C. Whenever there is a dispute over payment due between the prime and subcontractor and/or supplier,
the City shall strongly encourage the parties to seek mediation before the City takes any action under
this ordinance.
4. RETAINAGE
a. If the prime withholds additional monies or a fee in excess of the retainage amount required by the
City, and if there is nq dispute about payment to the subcontractor, the prime shall release the
additional monies after the completion of the subcontractor's scope of work, or as otherwise required
by law, but may retain the required retainage monies until project completion, acceptance and final ti
payment by the City.
41
b. Where contracts involve the expenditure of federal or state funds, the state or federal policy related to
M/WBE or DBE retainage may take precedence over this ordinance.
B. PROFESSIONAL SERVICES
1. M/WBE UTILIZATION REQUIREMENTS
a. In addition to the requirements set forth elsewhere, requests for proposals shall include a statement
of the M/WBE goal established for the project. The requirements below shall also apply to =
circumstances where amendments or extra work gives rise to new subconsulting/supplier
opportunities.
b. Requests for proposals and all'other specifications for applicable contracts to be awarded by the City -
shall require that Offeror make a good faith effort(GFE) to sub-consult with or purchase supplies from
MNVBE firms. Such specifications shall require the Offeror to meet or exceed the stated goal or
submit documentation of GFE for all applicable contracts to permit a determination of compliance with
the specifications.
C. Professional Services contracts and such other contracts which may be competed for under sealed
proposal procedures (estimated cost of $25,000 or more) shall be awarded and administered in
accordance with the following standards and procedures:
01. Other than responses to Requests for Proposals for those professional services defined in
Chapter 2254 of the Texas Government Code, responses to Request for Proposals shall be
submitted by the proposal deadline date and include a section, which identifies the particular
M/WBE utilization plan in performing the contract.
a) The proposal shall specify the estimated percentage. of the M/WBE participation, the type of
work to be performed by the MNVBE, and such other information as may reasonably be
required to determine the responsiveness to the Request for Proposal.
8
Minority and Women Business Enterprise Ordinance Attachment 1
b) Proposals that do not meet or exceed the utilization goal, as required by the Request for
Proposal, must submit a GFE explanation. Failure to include such GFE explanation shall
render the proposal non-responsive.
02. Initial responses to requests for proposals for those professional services defined in Chapter
2254 of the Texas Government Code shall not include a response to the requirements of this
ordinance. The City shall comply with the requirements of said Chapter and rank the
professional on the basis of demonstrated competence and qualifications. During negotiations,
the proposer shall respond to this ordinance in the manner specified in paragraph 01(a) above.
03. The GFE documentation shall demonstrate the Offeror's commitment and honest efforts to utilize
M/WBEs. The burden of preparing and submitting the GFE information is on the Offeror and will
be evaluated as part of the responsiveness to the proposal. An Offeror who intentionally and/or
knowingly misrepresents facts on the documentation submitted may be classified as non-
responsive and be subject to possible debarment.
04. The contracting department may request the M/WBE Office to waive the goal requirements of
this subsection, or to reduce the amount of the goal, in accordance with the provisions of the
Exceptions and Waivers section.
2. COUNTING M/WBE PARTICIPATION
M/WBE participation shall be counted toward meeting the goal in accordance with the following provisions:
a. For the purpose of determining compliance with the goal requirements established in this ordinance,
businesses will be Founted as M/WBEs only when they have been certified as such prior to a
recommendation for award being made to the City Council.
01. Any business listed by an Offeror that is not certified at the time of response opening must file an
application for certification to a city authorized certification agency within a reasonable time for
the City to consider the business and dollar amount towards meeting the goal.
02. If a business described in the subparagraph immediately above fails to submit an application for
certification within a reasonable time, or if the business is denied certification, the Offeror shall
be afforded five (5) City business days to secure additional certified/certifiable M/WBE
participation, starting the next City business day following the day the written notification was
received from the Managing Department.
03. Evidence of the additional certified/certifiable M/WBE participation shall be delivered to and
received by the Managing Department within five (5) City business days after the notification was
received by the Offeror, exclusive of the date that the notification was received.
b. The Offeror may count toward the goal any tier of M/WBE sub-consultants and/or suppliers.
C. The Offeror will be given credit toward the goal only when the M/WBE sub-consultant performs a
commercially useful function. A M/WBE sub-consultant is considered to have performed a
commercially useful function when:
01. It is responsible for the execution of a distinct element of the work by actually performing,
managing and supervising the work involved in accordance with normal business practice; and
02. When the firm receives due compensation as agreed upon for the work performed.
d. The Offeror will be given credit toward the M/WBE contract goal only when the M/WBE supplier
performs a commercially useful function. A M/WBE supplier is considered to have performed a
commercially useful function when the M/WBE supplier is a manufacturer or a regular dealer.
e. Regardless of whether an arrangement between the consultant and the M/WBE represents.standard
industry practice, if the arrangement erodes the ownership, control or independe ce of the M/WBE or
9
Minority and Women Business Enterprise Ordinance Attachment 1
does not meet the commercially useful function requirement, the Offeror shall receive no credit
toward the goal.
f. An Offeror may count toward its goal a portion of the total dollar value of a contract with a joint
venture equal to the percentage of MNVBE participation in the joint venture.
01. The Joint Venture Form must be submitted to the Managing Department with the proposal when
determining the responsiveness of the proposal by the MNVBE Office. Failure to comply with the
proposal scope of services, inclusive of the M/WBE requirements, shall render the Offeror non-
responsive.
02. The MNVBE involved in the joint venture must be responsible for a clearly defined portion of the
work to be performed, equal to a share in the ownership, control, knowledge, management,
responsibility, risks, and profits of the joint venture.
g. Except for joint ventures, the prime consultant (regardless of their MNVBE status) and any work
performed by the prime consultant is not counted toward meeting the MNVBE contract goal and is not
considered when determining compliance with this ordinance.
h. An Offeror may not count toward its goal any arrangement with an MNVBE that is nepotism or where
an MNVBE has been a recent employee (less than one year) of the Offeror.
L The Offeror may not count toward the goal any agreement with a MNVBE that does not meet the
requirements of this ordinance.
i
3. PAYMENTS 4
The City Manager shall implement procedures to comply with the following:
a. The prime shall submit an invoice at least monthly or as designated by the contract documents and
the City will pay the invoice as required by the Texas Prompt Payment Act or any successor statute.
The prime shall pay sub-consultants as required by the Texas Prompt Payment Act or any successor
statute. A consultant's failure to make payments in accordance with state law shall, in addition to any
other remedies provided by law, authorize the City to withhold future payments and/or reject future
proposals from the consultant until compliance with this ordinance is attained.
b. Whenever there is a dispute over payment due between the prirrte and sub-consultant and/or
supplier, the City shall strongly encourage the parties to seek mediation before the City initiates a
stop payment order.
C. PURCHASES
1. M/WBE UTILIZATION REQUIREMENTS
a. In addition to the requirements set forth elsewhere, bid conditions shall include a statement of the
MNVBE goal established for the project. The requirements below also apply to circumstances where
purchase orders or extra work cause new subcontracting/supplier opportunities.
b. Bid conditions and all other specifications for applicable contracts to be awarded by the City shall
require that Offeror make a good faith effort (GFE) to subcontract with or purchase supplies from
MNVBE firms. Such specifications shall require the Offeror to meet or exceed the stated goal or
submit documentation of GFE for all applicable contracts to permit a determination of compliance with
the specifications.
C. Purchase contracts and such other contracts which may be competed for under sealed proposal
procedures (estimated cost of $25,000 or more) shall be awarded and administered in accordance
with the following standards and procedures:
10
Minority and Women Business Enterprise Ordinance Attachment 1
01. Competitive bids for applicable contracts shall include the M/WBE requirements and
documentation in the bid specifications. M/WBE documentation consists of the SPECIAL
INSTRUCTIONS TO BIDDERS, the SUBCONTRACTOR UTILIZATION FORM, the PRIME
CONTRACTOR WAIVER FORM, the GOOD FAITH EFFORT FORM, and, the JOINT
VENTURE FORM.
a) Competitive bids where the Offeror equals or exceeds the project goal must submit the
SUBCONTRACTOR UTILIZATION FORM.
b) Competitive bids where the Offeror does not have subcontracting and/or supplier opportunities
must submit the PRIME CONTRACTOR WAIVER FORM.
c) Competitive bids where the Offeror has subcontracting and/or supplier opportunities but does
not include M/WBE participation in an amount, which equals or exceeds the project goal, must
submit the SUBCONTRACTOR UTILIZATION FORM.and the GOOD FAITH EFFORT FORM
and documentation.
d) Competitive bids where the Offeror has subcontracting and/or supplier opportunities but do not
include any M/WBE participation must submit the GOOD FAITH EFFORT FORM and
documentation.
02. The Offeror shall submit the SUBCONTRACTOR UTILIZATION FORM and/or the GOOD
FAITH EFFORT`FORM or the PRIME CONTRACTOR WAIVER FORM, or the JOINT
VENTURE FORM ("and documentation") as appropriate. The Managing Department must
receive the documentation no later than 5:00 p.m., five (5) City business days after the bid
opening date, exclusive of the bid opening date. The Offeror shall obtain a receipt from the
appropriate employee of the managing department to whom delivery was made. Such receipt
shall be evidence that the City received the documentation. The submission of the applicable
completed form(s) within the allotted time will be considered when determining the
responsiveness of the bid. Failure to comply with the bid specifications, inclusive of the MN1/BE
requirements and documentation, shall render the Offeror non-responsive.
03. The GFE documentation shall demonstrate the Offeror's commitment and honest efforts to utilize
M/WBE(s). The burden of preparing and submitting the GFE information is on the Offeror and
will be evaluated as part of the responsiveness to the bid/proposal. An Offeror who intentionally
and/or knowingly misrepresents facts on the documentation submitted will constitute a basis for
classification as non-responsive and possible debarment.
04. The contracting department may request the M/WBE Office to waive the goal requirements of
this subsection, or to reduce the amount of the goal, in accordance with the provisions of the
Exceptions and Waivers section.
2. COUNTING MANBE PARTICIPATION
M/WBE participation shall be counted toward meeting Goal in accordance with the following provisions:
a. For the purpose of determining compliance with the goal requirements established in this ordinance,
businesses will be counted as M/WBEs only when they have been certified as such prior to a
recommendation for award being made to the City Council.
01. Any business listed by an Offeror that is not certified at the time of bid/response opening must
file an application for certification within a reasonable time for the City to consider the business
towards meeting the goal.
02. If a business described in the subparagraph immediately above fails to submit an application for
certification within a reasonable time, or if the business is denied certification, the Offeror shall
be afforded five (5) City business days to secure additional certified/certifiable M/WBE
participation, starting the next City business day following the day the written notification was
i
received from the Managing Department
11
Minority and Women Business Enterprise Ordinance Attachment 1
03. Evidence of the additional certified/certifiable M/WBE participation shall be delivered to and
received by the Managing Department within five (5) City business days after the notification was
received by the Offeror, exclusive of the date that the notification was received.
b. Except as provided for in paragraph c below, if the Offeror is ruled non-responsive for failure to
comply with the requirements of this ordinance, the Managing Department will provide written
notification to the Offeror stating the specific basis for the ruling. The Offeror may submit
documentation that it will either meet or exceed the stated goal, and if the documentation satisfies this
ordinance, the Offeror may then be considered for an award of contract.
C. If the Offeror is ruled non-responsive solely for its failure to identify a subcontract/supplier opportunity
and that opportunity is less than three (3%) percent of the total bid, the Offeror may submit
documentation that an M/WBE will be utilized for that subcontract/supplier opportunity, and may be
considered for an award of contract.
d. Documentation required under either paragraph b or c above must be received by the Managing
Department within five(5) City business days, exclusive of the date that the Offeror was notified that it
was non-responsive. If the documentation is not received within the stated time, the Offeror shall be
deemed to have withdrawn its bid. The City will not communicate with another Offeror regarding
award of the contract until five (5) City business days after the original Offeror has been notified that it
is non-responsive.
e. The Offeror may count',toward the goal any tier of M/WBE subcontractors and/or suppliers. It is the
sole responsibility of the Offeror to report and document all subcontracting and/or supplier
participation dollars counted towards the goal, irrespective of tier level. Failure to submit
documentation as required in this subparagraph, shall entitle the City to withhold payments and/or
reject future purchasing orders until compliance is attained.
f. The Offeror will be given credit toward the goal only when the M/WBE subcontractor performs a
commercially useful function. A M/WBE subcontractor is considered to have performed a
commercially useful function when:
01. It is responsible for the execution of a distinct element of the work by actually performing,
managing and supervising the work involved in accordance with normal business practice; and
02. When the firm receives due compensation as agreed upon for the work performed.
g. The Offeror will be given credit toward the M/WBE contract goal only when the M/WBE supplier
performs a commercially useful function. A M/WBE supplier is considered to have performed a
commercially useful function when the M/WBE supplier is a manufacturer or a regular dealer.
h. The Offeror will be given credit for utilizing a M/WBE hauling firm as long as the M/WBE own and
operate at least one fully licensed, insured and operational truck used on the contract. The M/WBE
may lease trucks from another M/WBE firm, including M/WBE owner-operators and receive 100% _
M/WBE credit. The M/WBE may lease trucks from non-M/WBEs, including owner-operators, but will
only receive credit for the fees and commissions earned by the M/WBE as outlined in the lease
agreement.
L Regardless of whether an arrangement between the contractor and the M/WBE represents standard
industry practice, if the arrangement erodes the ownership, control or independence of the M/WBE or
does not meet the commercially useful function requirement, the Offeror shall receive no credit
toward the goal.
j. An Offeror may count toward its goal a portion of the total dollar value of a contract with a joint
venture equal to the percentage of M/WBE participation in the joint venture.
01. The Managing Department must receive the Joint Venture form from the Offeror within five (5)
City business days after the date of bid opening, exclusive of the day of the bid opening, for
certification by the M/WBE Office.
12
Minority and Women Business Enterprise Ordinance Attachment 1
02. The M/WBE involved in the joint venture must be responsible for a clearly defined portion of the
work to be performed, equal to a share in the ownership, control, knowledge, management,
responsibility, risks, and profits of the joint venture.
k. Except for joint ventures, the prime contractor (regardless of their M/WBE status) and any work
performed by the prime contractor is not counted toward meeting the MNVBE contract goal and is not
considered when determining compliance with this ordinance.
I. An Offeror may not count toward its goal any arrangement with an MNVBE that is nepotism or where
an MNVBE has been a recent employee (less than one year) of the Offeror.
m. The Offeror may not count toward the goal any agreement with an MNVBE that does not meet the
requirements of this ordinance.
3. PAYMENTS
The City Manager shall implement procedures to comply with the following: -
a. Establish procedures to ensure that purchase orders for all vendors' invoices be paid as required by
the Texas Prompt Payment Act or any successor statute and that subcontractors are paid as required
by state law. A vendor's failure to make payments as required by law shall, in addition to any other
remedies provided by law, authorize the City to withhold future payments from the vendor until
compliance with this ordinance is attained.
b. Whenever there is a dispute concerning payment due between the prime and subcontractor and/or
supplier, the City shall strongly encourage the parties to seek mediation before the City initiates a
stop payment order.
4. BEST VALUE CRITERIA
a. In order to increase MNVBE primes in direct purchases, the City will apply the best value criteria
codified in State law(Tex. Local Gov't Code, sec. 252.043 or any successor statute) to all purchasing
activities as outlined in the state legislation.
b. The City Manager, with the advice and counsel of the MWBEAC in accord with City of Fort Worth
Resolution No. 1148, shall implement procedures the purchase of goods and services under the
formal bid amount to emphasize the inclusion of MNVBEs.
VL POST-AWARD COMPLIANCE:
A. In addition to such other requirements as may be set forth elsewhere, the following shall apply to
applicable contracts awarded by the City:
1. Contracts shall incorporate this ordinance by reference, and shall provide that the contractor's violation of
this ordinance shall constitute a breach of such contract and may result in debarment in accord with the
procedures outlined in this ordinance.
2. Following the date and time of bid/proposal opening, any proposed change or deletion in MNVBE
participation identified in the bid, proposal or contract shall be reviewed by the MNVBE Office to determine
whether such change or deletion is justified in accord with paragraphs 3 and 4 immediately below. Any
unjustified change or deletion shall'be a material breach of contract and may result in debarment in accord
with the procedures outlined in this ordinance.
3. Following the date and time of bid/proposal opening, the contractor shall:
a. Make no unjustified changes or deletions in its MNVBE participation commitments submitted with the
bid, proposal or during negotiation, without prior submission of the proper documentation for review
and approval by the MNVBE Office.
13
7
{
Minority and Women Business Enterprise Ordinance Attachment 1
b. Shall submit a detailed explanation o`f how the requested change or deletion will affect the committed
M/WBE goal. If the detail explanation is not submitted, it will affect the final compliance determination.
c. If substantial subcontracting and/or supplier opportunities arise during the term of any contract when
the contractor represented in its bid to the City that it alone would perform the subcontracting/supplier
opportunity work, the contractor shall notify the City before subcontracts for work and/or supplies are
awarded and shall be required to comply with subsections 12.3 and 12.4 of this Attachment 1,
exclusive of the time requirements stated in such subsections;
d. Maintain records reasonably necessary for monitoring their compliance with the provisions of this
ordinance;
e. After the first payment and beginning with the second application for payment, submit the required
M/WBE Periodic Payment Reports, including copies of M/WBE subcontractor's /subconsultant's
/supplier applications for payment /invoices (as appropriate), and proof of payment documentation, to
the M/WBE Office. Additionally, upon request of the M/WBE Office, the contractor shall submit such
other documentation as may be reasonably required to verify proof of payments. Failure to submit
these reports and other requested information, if any, as required shall authorize the City to withhold
payment and/or reject future bids from the contractor until compliance with this ordinance is attained.
4. The contractor shall submit to the M/WBE Office for approval a M/WBE REQUEST FOR APPROVAL OF
CHANGE FORM if, during the term of any contract, a contractor wishes to change or delete one or more
M/WBE subcontractor(s), subconsultant(s) or supplier(s).
a. Within three(3) City business days after receipt by the M/WBE Office, exclusive of the date of receipt,
the Request shall be reviewed. The Request shall be approved if the change or deletion is justified.
The following shall constitute justification for the requested change or deletion:
01. A M/WBE's failure to provide workers' compensation insurance evidence as required by state
law; or
t'
02. A M/WBE's failure to provide evidence of general liability or other insurance under the same or
similar terms as contained in the contract documents with limits of coverage no greater than the
lower of 1) the limits required of the contractor by the City; or 2) the limits contained in the i
contractor's standard subcontract or supply agreements used on other projects of similar size
and scope and within the contractor's normal business practice with non-M/WBE
subcontractor's/subconsultant's or suppliers; or
03. A M/WBE's failure to execute the contractor's standard subcontract form, if entering a
subcontract is required by the contractor in its normal course of business, unless such failure is
due to:
a) A change in the amount of the previously agreed to bid or scope of work; or
i
b) The contract presented provides for payment once a month or longer and the contractor is
receiving payment from the City twice a month; or
c) Any limitation being placed on the ability of the M/WBE to report violations of this Ordinance
or any other ordinance or violations of any state or federal law or other improprieties to the
City or to provide notice of any claim to the contractor's surety company or insurance
company.
d) Mediation shall be a consideration before the request for change is approved.
04. A M/WBE defaults in the performance of the executed subcontract. In this event, the contractor
shall:
a) Request bids from all M/WBE subcontractors previously submitting bids for the work,
14
Minority and Women Business Enterprise Ordinance Attachment 1
b) If reasonably practicable,request bids from previously non-bidding M/WBEs, and
c) Provide to the M/WBE office documentation of compliance with (a) and (b) above.
05. Any other reason found to be acceptable by the M/WBE Office in its sole discretion.
NOTE: The contractor shall submit such documentation as may reasonably be requested by the
M/WBE Office to support the contractor's request. The time between the request by the
M/WBE Office for additional documentation and the delivery of such documentation shall
not be included within the time period that the M/WBE Office is required to respond as
stated in subparagraph (a) above.
b. If the M/WBE Office approves the deletion of a M/WBE and replacement by a non-M/WBE, such
approval shall constitute a post award waiver to the extent of the value of the deleted subcontract.
c. If the M/WBE Office denies the request for change or deletion, the contractor may appeal the denial to
the City Manager whose decision will be final.
5. Whenever contract amendments, change orders, purchase orders or extra work orders are made
individually or in the aggregate, the contractor shall comply with the provisions of this ordinance with
respect to the alternates, amendments, change orders, or extra work orders.
a. If the amendment, change order, purchase order or extra work affects the subcontract of a M/WBE,
such M/WBE shall be given the opportunity to perform such amendment, change order, purchase order
or extra work.
b. If the amendment, change order, purchase order or extra work is or is not covered by any
subcontractor performing like or similar work, and the amount of such amendment, change order,
purchase order or extra work is $50,000.00 or more, of the original contract amount, the contractor
shall comply with Article 1, subsections 12.3 and 12.4 of this Attachment 1 (exclusive of the time
requirements stated therein) with respect to such amendment, change order purchase order or extra
work.
6. If the contractor/consultant in its bid/proposal included any second or lower tier
subcontractor/subconsultant/supplier towards meeting the goal, it is the sole responsibility of the Offeror to
report and document all subcontracting/subconsulting and/or supplier participation dollars counted towards
the goal, irrespective of tier level. Failure to comply with the City's request to provide the required
documentation shall entitle the City to withhold payments and/or to reject future bids/proposals from the
Offeror until compliance with this ordinance is attained.
7. Upon completion of the contract and within ten (10) City business days after receipt of final payment from
the City, exclusive of the date the contractor receives payment, the contractor shall provide the M/WBE
Office with the M/WBE FINAL SUMMARY PAYMENT REPORT FORM to reflect the final participation of
each subcontractor/subconsultant and/or supplier (including non-M/WBEs) used on the project. Failure to
comply with the City's request to provide the required documentation shall entitle the City to reject future
bids from the contractor until compliance with this ordinance is attained.
8. In the event, a contractor is in non-compliance and is a subcontractor/subconsultant on a new quote; the
contractor will be required to comply with this ordinance prior to a recommendation for award being made
to the City Council.
VII. CONTRACT MONITORING, AND REPORTING:
A. The M/WBE Office shall monitor compliance with these requirements during the term of the contract. If it is
determined that there is cause to believe that a contractor or subcontractor has failed to comply with any of the
requirements of this ordinance, or the contract provisions pertaining to M/WBE utilization, the M/WBE Office
15
i
Minority and Women Business Enterprise Ordinance Attachment 1
shall notify the contracting department and the contractor. The M/WBE Office shall attempt to resolve the non-
compliance through conciliation. If the non-compliance cannot be resolved, the Manager and the contracting
department shall submit written recommendations to the City Manager or designee, and if the City Manager
concurs with the findings, sanctions shall be imposed as stated in ordinance.
B. Whenever the M/WBE Office finds, after investigation, that a contracting department has failed to comply with
the provisions of this ordinance, a.written finding specifying the nature of the non-compliance shall be
transmitted to the contracting department, and the M/WBE Office shall attempt to resolve any non-compliance
through conference and conciliation. Should such attempt fail to resolve the non-compliance, the Manager
shall transmit a copy of the findings of non-compliance, with a statement that conciliation was attempted and
failed, to the City Manager who shall take appropriate action to secure compliance. .
C. The M/WBE Office may require such reports, information, and documentation from contractors, Offerors,
contracting agencies, and the head of any department, division, or office of the City of Fort Worth, as are
reasonably necessary to determine compliance with the requirements of this ordinance.
D. Contracting departments shall maintain accurate records for each contract awarded, including the names of
contractors providing quotes, dollar value, the nature of the goods or services to be provided, the name of the
contractor awarded the contract, the efforts it employed to solicit quotes from M/WBEs, identifying for each its
dollar value, the nature of the goods or services provided, and the name of the subcontractors/suppliers.
E. The City Manager, with the advice and counsel of the MWBEAC in accord with City of Fort Worth Resolution
No. 1148, shall submit an annucli report to the City Council on the progress of the City toward the utilization
goal established by this ordinance, together with an identification of problems and specific recommendations for
improving the City's performance.
- a
VIII. EXCEPTIONS AND WAIVERS:
A. If an Offeror is unable to comply with the M/WBE goal requirements established in the Program Goal section of
this ordinance, such Offeror shall submit one of the two forms listed below within the allotted time.
1. A Prime Contractor Waiver Form (Attachment 113) is submitted if the Offeror will perform the entire contract
without subcontractors or suppliers.
2. A Good Faith Effort Form (Attachment 1C) is submitted if the Offeror has a subcontracting and/or supplier
opportunity but was unable to meet or exceed the project goal. The Offeror will submit requested
documentation that demonstrates a good faith effort to comply with the goal requirements as described in
the Program Goal section above.
B. A contracting department may request the M/WBE Office to waive or modify the goal requirements for M/WBEs
by submitting a Departmental Waiver Form, in writing, prior to solicitation of bids or proposals. The M/WBE
Office may grant such a waiver or reduction upon determination that:
1. The reasonable and necessary requirements of the contract render subcontracting or other participation of
business other than the Offeror infeasible; or
2. A public or administrative emergency exists which requires the goods or services to be provided with
unusual immediacy; or
3. Lack of sufficient M/WBE subcontracting/subconsulting/suppliers providing the services required by the
contract are unavailable in the marketplace of the project, despite attempts to locate them; or
4. The application of the provisions of this ordinance will impose an unwarranted risk on the City or unduly
delay acquisition of the goods or services.
C. Whenever the M/WBE Office denies a request to waive a goal; the contracting department may appeal that
denial to the City Manager whose decision on the request shall be final.
16
Minority and Women Business Enterprise Ordinance Attachment 1
IX. PROGRAM ADMINISTRATION:
A. The City Manager, with the advice and counsel of the MWBEAC in accord with City of Fort Worth Resolution
No. 1148, is authorized to establish and implement the regulations set forth in this ordinance. The M/WBE
Office shall be responsible for the overall administration of the City's M/WBE Program, and its duties and
responsibilities shall include:
1. Recommending rules and regulations to effectuate this ordinance;
2. Maintaining a current listing of certified M/WBE firms for distribution internally and externally on contracts;
3. Providing information, outreach (to include workshops, seminars, etc.) and needed assistance to M/WBEs
to increase their ability to compete effectively for the award of City contracts;
4. Investigating alleged violations of this ordinance and making written recommendations to appropriate City
authorities for remedial action when appropriate;
5. Developing and distributing all necessary forms, applications, and documents necessary to comply with this
ordinance;
6. Reviewing, on a regular basis, the progress of departments toward achieving the category goals for the
utilization of minority and women business enterprises;
7. Making recommendations to appropriate City staff regarding methods to further the policies and goals of
this ordinance;
8. Determining M/WBE compliance on bids and proposals before they are submitted to the City Council for
award;
9. Maintaining an accurate contract performance reporting system; and
10. Compiling a report reflecting the progress in attaining the City's annual goal, quarterly and annually.
B. It shall be the responsibility of the contracting department to ensure that bids or proposals for the department's
projects adhere to the procedures and provisions set forth in this ordinance.
1. The department director or designee shall assume primary responsibility for achieving the goals of this
program and shall review, on a continuing basis, all aspects of the program's operations to assure that the
purpose is being attained.
2. The contracting department shall take the following action to ensure that M/WBEs have the maximum
opportunity to participate on City contracts:
a. A written notification shall be sent to minority and women trade associations, contractor's associations,
and minority and women chambers of commerce about the availability of formally advertised
contracting opportunities no less than 28 days before bids are due;
b. All applicable contract solicitations shall include the requirements contained in this ordinance;
c. All contracting opportunities shall be evaluated in an effort to divide the total requirements of a contract
to provide reasonable opportunities for M/WBE;
d. Establish procedures to ensure that all contractors' invoices are paid on construction, professional
services and purchases as follows:
01. Vertical and horizontal construction shall be paid twice monthly,
02. Professional Services shall be paid within ten City business days after receipt of and approved
invoice and
03. Purchases shall be paid within ten City business days after receipt of an approved invoice.
17
Minority and Women Business Enterprise Ordinance Attachment 1
04. Subcontractors shall be paid Within five (5) City business days after receipt of payment of the
prime contractor by one of the methods stated above.
e. Establish guidelines to ensure that a notice to proceed is not issued until signed letters of intent
evidencing receipt by the M/WBE or executed agreements with the M/WBE have been submitted along
with the project work schedule, if applicable;
f. Ensure that all required statistics and documentation are submitted to the M/WBE Office as requested;
and
g. If circumstances prevent the contracting department from meeting the 28-day advertising and
notification requirements, the contracting department shall perform extensive outreach to M/WBE
associations or other relevant organizations to inform them of the contracting opportunity.
X. SANCTIONS:
A. The GFE documentation shall demonstrate the Offeror's commitment and honest efforts to utilize M/WBE.
The burden of preparing and submitting the GFE information is on the Offeror and will be evaluated as part
of the responsiveness to the bid/proposal. An Offeror who intentionally and/or knowingly misrepresents
facts in the documentation submitted will be classified as non-responsive and be. subject to possible
debarment.
B. A contractor's failure to make payments within five (5) City business days shall authorize the City to
withhold payment from the contractor until compliance with this ordinance is attained.
C. Debarment: '
1. An Offeror who intentionally and/or knowingly misrepresents material facts shall be determined to be an
irresponsible Offeror and barred from participating in City work for a period of not less than three (3)
years.
2. The failure of an Offeror to comply with this ordinance where such non-compliance constitutes a material
breach of contract as stated herein, may result in the Offeror being determined to be an irresponsible
Offeror and barred from participating in City work for a period of time of not less than one(1) year.
3. The M/WBE Office will send a written statement of facts and a recommendation for debarment to the City
Manager. The City Manager, after consultation with the Department of Law, will make the decision
regarding debarment and send a certified notice to the Offeror.
4. An Offeror that receives notification of debarment may appeal to an Appeal Board, hereinafter created,
by giving written notice within ten (10) days from the date of receipt of the debarment notice, to the City x
Manager of its request for appeal.
5. An Appeal Board, consisting of not less than three members appointed by the City Manager with the
approval of the City Council, will meet within thirty (30) days from the date of receipt of the request for
appeal of debarment, unless Offeror requests an extension of time. The Offeror will be notified of the
meeting time and location.
6. The Offeror will be afforded an opportunity to appear with Counsel if they so desire, submit documentary
evidence, and confront any witness that the City presents.
7. The Appeal Board will render its decision not more than thirty (30) days of the hearing and send a
certified notice to the Offeror.
8. If the Appeal Board upholds the original debarment, the Offeror may appeal to the City Council within ten
(10) days from the date of receipt of the Appeal Board's decision by giving written notice to the City
Manager.
18
Minority and Women Business Enterprise Ordinance Attachment 1
9. The appeal will be placed on the City_Pouncil agenda within thirty(30) days from receipt of written notice,
unless Offeror requests an extension in writing.
10. From the date of notification of debarment and during the pendency of any appeal, the City will not
consider offers from, award contracts to, renew or otherwise extend contracts with, or contract directly or
indirectly through subcontracts with the Offeror pending the Appeal Board's decision.
11. Any M/WBE subcontractor or supplier who intentionally and/or knowingly.misrepresents facts or
otherwise violates the provisions of this ordinance may be determined to be irresponsible for a period not
to exceed one(1) year, and if deemed irresponsible, such M/WBE shall not be included in calculating an
Offeror's responsiveness and barred from bidding on City work.
XI. SEVERABILITY:
If any provision of this attachment or ordinance, the application thereof to any person or circumstance is held invalid
for any reason in a court of competent jurisdiction, such invalidity shall not affect the other provisions of any other
application of this attachment or ordinance which can be given effect without the invalid provision or application,
and to this end, all the provisions of this attachment or ordinance are hereby declared to be severable.
a
i
i
19
i
I
1
. l
I
4 '
l
PART C
1
I
l
l
:i 4 re,
City of Fort Worth
Holly Water Plants
Alert Notification System
Pre-Bid Conference
July 22, 2004
10:00 AM
r
AGENDA
INTRODUCTIONS
Owner-City of Fort Worth.Water Department
Engineer-Chiang, Patel&Yerby,Inc.
SIGN-UP SHEET
PROJECT DESCRIPTION
BIDDING/CONTRACT REQUIREMENTS
Bids Due. �.
Bid Proposal Form.
Base Bid,Alternate and Unit Price Items.
Completion of Work.
Addenda—Including notes from Pre-bid Conference.
Bid Bond.
MBE/WBE—12%Requirement.
INSTRUCTIONS TO BIDDERS
Use of the Premises
SUMMARY OF WORK/DRAWINGS:
Review of Project Plans and Specifications.
Question and Answer Session.
Review-Project Site.
Additional Site Visits
�sa w'&t4u,
Aef a4>4. OvA
ncc
PART C - GENERAL CONDITIONS
TABLE OF CONTENTS
NOVEMBER 1, 1987
TABLE OF CONTENTS
C1-1 DEFINITIONS C1-1 (1)
C1-1.1 Definition of Terms C1-1 (1)
C1-1.2 Contract Documents Cl-l-(2)
C1-1.3 Notice to Bidders C1-1 (2)
C1-1.4 Proposal C1-1 (2)
C1-1.5 Bidder C1-1 (2)
Cl-1.6 General Conditions CI-1 (2)
C1-1.7 Special Conditions C1-1 (2)
C1-1.8 Specifications C1-1 (2)
C1-1.9 Bonds Cl-1 (2)
C1-1.10 Contract Cl-1 (3)
C1-1.11 Plans C1-1 (3)
I C1-1.12 City C1-1 (3)
C1-1.13 City Council C1-1 (3)
C1-1.14 Mayor , Cl-1 (3)
Cl-1.15 City Manager C1-1 (3)
C1-1.16 City Attorney C1-1 (3)
C1-1.17 Director of Public Works C1-1 (3)
C1-1.18 Director, City Water Department C1-1 (3)
C1-1.19 Engineer C1-1 (3)
C1-1.20 Contractor C1-1 (3)
CI-1.21 Sureties C1-1 (4)
C1-1.22 The Work or Project C1-1 (4)
CI-1.23 Working Day C1-1 (4)
C1-1.24 Calendar Days C1-1 (4)
C1-1.25 Legal Holidays C1-1 (4)
C1-1.26 Abbreviations C1-1 (4)
C1-1.27 Change Order CI-1 (5)
C1-1.28 Paved Streets and Alleys C1-1 (5)
C1-1.29 Unpaved Streets or Alleys CI-1 (6)
C1-1.30 City Street C1-1 (6)
C1-1.31 Roadway CI-1 (6)
C1-1.32 Gravel Street C1-1 (6)
IC2-2 INTERPRETATION AND PREPARATION
OF PROPOSAL
C2-2.1 Proposal Form C2-2 (1)
1 C2-2.2 Interpretation of Quantities C2-2 (1)
C2-2.3 Examination of Contract Documents and Site of Project C2-2 (2)
C2-2.4 Submitting of Proposal C2-2 (2)
of Jv�>1�'
C2-2.5 Rejection of Proposals C2-2 (3)
C2-2.6 Bid Security C2-2 (3) .
C2-2.7 Delivery of Proposal C2-2 (3)
C2-2.8 Withdrawing Proposals C2-2 (3)
C2-2.9 Telegraphic Modifications of Proposals C2-2 (3)
C2-2.10 Public Opening of Proposal C2-2 (4)
C2-2.11 Irregular Proposals C2-2 (4)
C2-2.12 Disqualification of Bidders C2-2 (4)
C3-3 AWARD AND EXECUTION OF DOCUMENTS:
C3-3.1 Consideration of Proposals C3-3 (1)
C3-3.2 Minority Business Enterprise/Women Business C3-3 (1)
Enterprise Compliance
C3-3.3 Equal Employment Provisions C3-3 (1)
C3-3.4 Withdrawal of Proposals C3-3 (1)
C3-3.5 Award of Contract C3-3 (2)
C3-3.6 Return of Proposal Securities C3-3 (2)
C3-3.7 Bonds C3-3 (2)
C3-3.8 Execution of Contract C3-3 (3)
C3-3.9 Failure to Bxecute Contract C3-3 (3)
C-3-3.10 Beginning Work C3-3 (4)
C3-3.11 Insurance C3-3 (4)
C3-3.12 Contractor's Obligations C3-3 (6)
C3-3.13 Weekly Payrolls C3-3 (6)
C3-3.14 Contractor's Contract Administration C3-3 (6)
C3-3.15 Venue C3-3 (7)
C4=4 SCOPE OF WORK
C4-4.1 Intent of Contract Documents C4-4 (1)
C4-4.2 Special Provisions C4-4 (1)
C4-4.3 Increased or Decreased Quantities C4-4 (1)
C4-4.4 Alteration of Contract Documents C4-4 (2)
C4-4.5 Extra Work C4-4 (2)
C4-4.6 Schedule of Operation C4-4 (3)
C4-4.7 Progress Schedules for Water and Sewer Plant Facilities C4-4 (4)
C5-5 CONTROL OF WORK AND MATERIALS
C5-5.1 Authority of Engineer C5-5 (1)
C5-5.2 Conformity with Plans C5-5 (1)
C5-5.3 Coordination of Contract Documents C5-5 (1)
C5-5.4 Cooperation of Contractor C5-5 (2)
C5-5.5 Emergency and/or Rectification Work C5-5 (2)
C5-5.6 Field Office C5-5 (3)
C5-5.7 Construction Stakes C5-5 (3)
(2)
C5-5.8 Authority and Duties of City Inspector C5-5 (3)
C5-5.9 Inspection C5-5 (4)
C5-5.10 Removal of Defective-and Unauthorized Work C5-5 (4)
C5-5.11 Substitute Materials or Equipment C5-5 (4)
C5-5.12 Samples and Tests of Materials C5-5 (5)
C5-5.13 Storage of Materials C5-5 (5)
C5-5.14 Existing Structures and Utilities C5-5 (5)
C5-5.15 Interruption of Service C5-5 (6)
C5-5.16 Mutual Responsibility of Contractors C5-5 (7)
C5-5.17 Clean-Up C5-5 (7)
C5-5.18 Final Inspection C5-5 (8)
C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY
C6-6.1 Laws to be Observed C6-6 (1)
C6-6.2 Permits and Licenses C6-6 (1)
C6-6.3 Patented Devices, Materials, and Processes C6-6 (1)
C6-6.4 Sanitary Provisions C6-6 (1)
C6-6.5 Public Safety and Convenience C6-6 (2)
C6-6.6 Privileges f Contractor in Streets, Alleys, C6-6 (3)
and Right-tof--Way
C6-6.7 Railway Crossings C6-6 (3)
C6-6.8 Barricades, Warnings and Flagmen C6-6 (3)
C6-6.9 Use of Explosives, Drop Weight, Etc. C6-6 (4)
5
C6-6.10 Work Within Easements C6-6 ( )
C6.6.1 i Independent Contractor C6-6 (6)
C6-6.12 Contractor's Responsibility for Damage Claims C6-6 (6)
C6-6.13 Contractor's Claim for Damages C6-6 (8)
C6-6.14 Adjustment or Relocation of Public Utilities, Etc. C6-6 (8)
C6-6.15 Temporary Sewer and Drain Connections C6-6 (8)
C6-6.16 Arrangement and Charges for Water Furnished by the City C6-6 (9)
C6-6.17 Use of a Section or Portion of the Work C6-6 (9)
C6-6.18 Contractor's Responsibility for the Work C6-6 (9)
C6-6.19 No Waiver of Legal Rights C6-6 (9)
C6-6.20 Personal Liability of Public Officials C6-6 (10)
C6-6.21 State Sales Tax C6-6 (10)
C7-7 PROSECUTION AND PROGRESS
C7-7.1 Subletting C7-7 (1)
C7-7.2 Assignment of Contract C7-7 (1)
C7-7.3 Prosecution of The Work C7-7 (1)
C7-7.4 Limitation of Operations C7-7 (2)
C7-7.5 Character of Workmen and Equipment C7-7 (2)
C7-7.6 Work Schedule C7-7 (3)
C7-7.7 Time of Commencement and Completion C7-7 (3)
C7-7.8 Extension of Time Completion C7-7 (3)
(3)
C7-7.9 Delays ' C7-7 (4)
C7-7.10 Time of Completion C7-7 (4)
C7-7.11 Suspension by Court Order C7-7 (5)
C7-7.12 Temporary Suspension C7-7 (5)
C7-7.13 Termination of Contract due to National Emergency C7-7 (6)
C7-7.14 Suspension or Abandonment of the Work C7-7 (6)
and Annulment of the Contract:
C7-7.15 Fulfillment of Contract C7-7 (8)
C7-7.16 Termination for Convenience of the Owner C7-7 (8)
C7-7.17 Safety Methods and Practices C7-7 (11)
C8-8 MEASUREMENT AND PAYMENT
C8-8.1 Measurement Of Quantities C8-8 (1)
C8-8.2 Unit Prices C8-8 (1)
C8-8.3 Lump Sum _ C8-8 (1)
C8-8.4 Scope of Payment C8-8 (1)
C8-8.5 Partial Estimates and Retainage C8-8 (2)
C8-8.6 Withholding Payment C8-8 (3)
C8-8.7 Final Accelitance C8-8 (3)
C8-8.8 Final Payment C8-8 (3)
C8-8.9 Adequacy of Design C8-8 (4) _
C8-8.10 General Guaranty C8-8 (4)
C8-8.11 Subsidiary Work C8-8 (4)
C8-8.12 Miscellaneous Placement of Material C8-8 (4) y
C8-8.13 Record Documents C8-8 (4)
(4)
PART C - GENERAL CONDITIONS
Cl-1 DEFINITIONS
SECTION Cl-1 DEFINITIONS
C1-1.1 DEFINITIONS OF TERMS: Whenever in these Contract Documents the
following terms or pronouns in place of them are used, the intent and meaning shall be
understood and interpreted as follows:
C1-1.2 CONTRACT DOCUMENTS: The Contract Documents are in all of the written
and drawn documents, such as specifications, bonds, addenda, plans, etc., which govern
the terms and performance of the contract. These are contained on the General Contract
Documents and the Special Contract Documents.
a. GENERAL CONTRACT DOCUMENTS: The General Contract
Documents govern all Water Department Projects and Include the
following Items
PART A-NOTICE TO BIDDERS (Sample) White
PART B PROPOSAL (Sample) White
PART C - GENERAL CONDITIONS (CITY) Canary Yellow
(Developer) Brown
PART D - SPECIAL CONDITIONS Green
PART E- SPECIFICATIONS El-White
E2-Golden Rod
E2A-White
PERMITS/EASEMENTS Blue
PART F - BONDS (Sample) White
PART G - CONTRACT (Sample) White
b. SPECIAL CONTRACT DOCUMENTS: The Special Contract
Documents are prepared for each specific project as a supplement to the
General Contract Documents and include the following items:
PART A -NOTICE TO BIDDERS (Advertisement) same as above
PART B - PROPOSAL (Bid)
PART C - GENERAL CONDITIONS
PART D - SPECIAL CONDITIONS
PART E - SPECIFICATIONS
PERMITS/EASEMENTS
PARTF - BONDS
PART G - CONTRACT
PART H - PLANS (Usually bound separately)
FOT..n.L'1 IU w'�10
C1-1.3 NOTICE TO BIDDERS: All of the legal publications either actually published
in public advertising mediums or furnished direct to interested parties pertaining to the
work contemplated under the Contract Documents constitutes the notice to bidders.
C1-1.4 PROPOSAL: The completed written and signed offer or tender of a bidder to
perform the work which the Owner desires to have done, together with the bid security,
constitutes the Proposal, which becomes_binding upon the Bidder when it is officially
received by the Owner,has been publicly opened and read and not rejected by the Owner.
L
C1-1.5 BIDDER: Any person, persons, firm, partnership, company, association,
corporation, acting directly or through a.duly authorized representative, submitting a
proposal for performing the work contemplated under the Contract Documents, -
constitutes a bidder.
C1-1.6 GENERAL CONDITIONS: The General Conditions are the usual construction
and contract requirements which govern the performance of the work so that it will be
carried on in accordance, with the customary procedure, the local statutes, and
requirements of the City of Fort Worth's charter and promulgated ordinances.
Whenever there may be+a conflict between the General Conditions and the Special
Conditions, the latter shall take precedence. .
C1-1.7 SPECIAL CONDITIONS: Special conditions are the specific requirements
which are necessary for the particular project covered by the Contract Documents and not
specifically covered in the General Conditions. When considered with the General
Conditions and other elements of the Contract Documents they provide the information
which the Contractor and Owner should have in order to gain a thorough knowledge of
the project.
C1-1.8 SPECIFICATIONS: The Specifications is that section or part of the Contract
Documents which set forth in detail the requirements which must be met by all materials,
construction, workmanship, equipment and services in order to render a completed an
useful project. Whenever reference is made to standard specifications, regulations,
requirements, statutes, etc., such referred to documents shall become a part of the
Contract Documents just as though they were embodied therein.
C1-1.9 BONDS: The bond or bonds are the written guarantee or security furnished by
the Contractor for prompt and faithful performance of the contract and include the
following:
a. Performance Bond(see paragraph C3-3.7)
b. Payment Bond(see paragraph C3-3.7)
C. Maintenance Bond(see paragraph C3-3.7)
d. Proposal or Bid Security(see Special Instructions to Bidders, Part A and
C2-2.6)
Cl-1 (2)
f
C1-1.10 CONTRACT: The Contract is a formal signed agreement between the owner
and the Contractor covering the mutual understanding of the two contracting parties about
the project to be completed under the Contract Documents.
C1-1.11 PLANS: The plans are the drawings or reproductions therefrom made by the
Owner's representative showing in detail the location, dimension and position of the
various elements of the project, including such profiles, typical cross-sections, layout
diagrams, working drawings, preliminary drawings and such supplemental drawings as
the Owner may issue to clarify other drawings or for the purpose of showing-changes in
the work hereinafter authorized by the Owner. The plans are usually bound separately
from the other parts of the Contract Documents, but they are part of the Contract
Documents just as though they were bound therein.
C1-1.12 CITY: The City of Fort Worth, Texas, a municipal corporation, authorized and
chartered under the Texas State Statutes, acting by and through its governing body or its
City Manager, each of which .is required by charter to perform specific duties.
Responsibility for final enforcement of the Contracts involving the City of Fort Worth is
by Charter vested in the City Manager. The terms City and Owner are synonymous.
C1-1.13 CITY-COUNCAL: The duly elected and qualified governing body of the City of
Fort Worth, Texas.
C1-1.14 MAYOR: The officially elected Mayor, or in his absence, the Mayor Pro tem
of the City of Fort Worth, Texas.
C1-1.15 CITY MANAGER: The officially appointed and authorized City Manager of
the City of Fort Worth, Texas, or his duly authorized representative.
C1-1.16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort
Worth, Texas, or his duly authorized representative.
C1-1.17 DIRECTOR OF PUBLIC WORKS: The officially appointed official of the City
of Fort Worth, Texas, referred to in the charter as the City Engineer, or his duly
authorized representative.
C1-1.18 DIRECTOR CITY WATER DEPARTMENT: The officially appointed
Director of the City Water Department of the City of Fort Worth, Texas, or his duly
authorized representative, assistant, or agents.
C1-1.19 ENGINEER: The Director of Public Works, the Director of the Fort Worth
City Water Department, or their duly authorized assistants, agents, engineers, inspectors,
or superintendents, acting within the scope of the particular duties entrusted to them.
C1-1.20 CONTRACTOR: The person, person's, partnership, company, firm, association,
or corporation, entering into a contract with the Owner for the execution of work, acting
Cl-1 (3)
directly or through a duly authorized representative. A sub-contractor is a person, firm,
corporation, supplying labor and materials or only labor, for the work at the site of the
project.
C1-1.21 SURETIES: The Corporate bodies which are bound by such bonds as are
required with and for the Contractor. The sureties engaged are to be fully responsible for
the entire and satisfactory fulfillment of the Contract and for any and all requirements as
set forth in the Contract Documents and approved changes therein.
Cl-1.22 THE WORK OR PROJECT: The completed work contemplated in and
covered by the Contract Documents, including but not limited to the furnishing of all
labor, materials, tools, equipment, and incidentals necessary to produce a completed and
serviceable project.
Cl-1.23 WORKING DAY: A working day is defined as a calendar day, not including
Saturdays, Sundays, and legal holidays, in which weather or other conditions not under
the control of the Contractor permit the performance of the principal unit of work for a
period of not less than seven (7) hours between 7:00 a.m. and 6:00 p.m., with exceptions
as permitted in paragraph C7-7.6 -
C1-1.24 CALENDAR DAYS: A calendar day is any day of the week or month, no days
being excepted.
C1-1.25: LEGAL HOLIDAYS: Legal holidays shall be observed as prescribed by the
City Council of the City of Fort Worth for observance by City employees as follows:
1. New Year's day January 1
2. M.L. King, Jr. Birthday Third Monday in January
3. Memorial Day Last Monday in May
4. Independence Day July 4
5. Labor Day First Monday in September
6. Thanksgiving Day Fourth Thursday in November
7. Thanksgiving Friday Forth Friday in November
8. Christmas Day December 25
9. Such other days in lieu of holidays as
the City Council may determine
When one of the above named holidays or a special holiday is declared by the City
Council, falls on a Saturday, the holiday shall be observed on the preceding Friday, or if it
falls on Sunday, it shall be observed on the following Monday, by those employees
working on working day operations. Employees working calendar day operations will
consider the calendar as the holiday.
C1-1.26 ABBREVIATIONS: Whenever the abbreviations defined herein appear in the
Contract Documents, the intent and meaning shall be as follows:
Cl-1 (4)
AASHTO - American Association of State MGD - Million Gallons
Highway Transportation Officials per Day
ASCE - American Society of Civil CFS - Cubic Foot per
Engineers Second
IAW - In Accordance With Min. - Minimum
ASTM - American Society of Testing Mono. - Monolithic
Materials % - Percentum
AWWA - American Water Works R - Radius
Association I.D. - Inside Diameter
ASA - American Standards Association O.D. - Outside Diameter
HI - Hydraulic Institute Elev. - Elevation
Asph. - Asphalt F - Fahrenheit
Ave. - Avenue C - Centigrade
Blvd. - Boulevard In. - Inch
CI - Cast Iron Ft. - Foot
CL - Center Line St. - Street
GI - Galvanized Iron CY - Cubic Yard
Lin. - Linear or Lineal Yd. - Yard
lb. - Pound SY - Square yard
MH - Manhole L.F. - Linear Foot
Max. - Maximum D.I. - Ductile Iron
C1-1.27 CHANGE ORDER: A "Change Order" is a written supplemental agreement
between the Owner and the Contractor covering some added or deducted item or feature
which may be found necessary and which was not specifically included in the scope of
the project on which bids were submitted. Increase in unit quantities stated in the
proposal are not the subject matter of a Change Order unless the increase or decrease is
more than 25% of the amount of the particular item or items in the original proposal.
All "Change Orders" shall be prepared by the City from information as necessary
furnished by the Contractor.
C1-1.28 PAVED STREETS AND ALLEYS: A paved street or alley shall be defined as
a street or alley-having one of the following types of wearing surfaces applied over the
natural unimproved surface:
1. Any type of asphaltic concrete with or without separate base material.
2. Any type of asphalt surface treatment, not including an oiled surface, with
or without separate base material.
3. Brick, with or without separate base material.
4. Concrete, with or without separate base material.
5. Any combination of the above.
Cl-1 (5)
' 4
C1-1.29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley,roadway or
other surface is any area except those.defined for"Paved Streets and Alleys."
C1-1.30 CITY STREET: A city street is defined as that area between the right-of-way
lines as the street is dedicated.
C1-1.31 ROADWAY: The roadway is defined as the area between parallel lines two
(2') back of the curb lines or four (`4) feet back of the average edge of pavement where
no curb exists.
C1-1.32 GRAVEL STREET: A gravel street is an unimproved street to which has been
added one or more applications of gravel or similar material other than the natural
material found on the street surface before any improvement was made.
C1-1 (6)
SECTION C - GENERAL CONDITIONS
C2-2 INTERPRETATION AND
PREPARATION OF PROPOSAL
SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL
C2-2.1 PROPOSAL FORM: The Owner will furnish bidders with Proposal form,which
will contain an itemized list of the items of work to be done or materials to be furnished
and upon which bid prices are requested. The Proposal form will state the Bidder's
general understanding of the project to be completed, provide a space for furnishing the
amount of bid security, and state the basis for entering into a formal contract. The Owner
will furnish forms for the Bidder's "Experience Record," "Equipment Schedule," and
".`Financial Statement," all of which must be properly executed and filed with the Director
of the City Water Department one week prior to the hour for opening of bids.
The financial statement rgquired shall have been prepared by an independent certified
4 public accountant or an independent public accountant holding a valid permit issued by
an appropriate state licensing agency, and shall have been so prepared as to reflect the
current financial status. 'phis statement must be current and no more than one (1) year old.
In the case that bidding date falls within the time a new statement is being prepared, the
previous statement shall be updated by proper verification. Liquid assets in the amount of
ten(10)percent of the estimated project cost will be required.
For an experience record to be considered to be acceptable for a given project, it must
reflect the experience of the firm seeking qualification in work of both the same nature
and magnitude as that of the project for which bids are to be received, and such
experience must have been completed not more than five (5) years prior to the date on
which Bids are to be received. The Director of the Water Department shall be sole judge
as to the acceptability of experience for qualification to bid on any Fort Worth Water
Department proj ect.
The prospective bidder shall schedule the equipment he has available for the project and
state that he will rent such additional equipment as may be required to complete the
project on which he submits a bid.
C2-2.2 INTERPRETATION OF QUANTITIES: The quantities of work and materials
to be furnished as may be listed in the proposal forms or other parts of the Contract
Documents will be considered as approximate only and will be used for the purpose of
comparing bids on a uniform basis. Payment will be made to the Contractor for only the
actual quantities of work performed or materials furnished in strict accordance with the
Contract Documents and Plans. The quantities of work to be performed and materials to
be furnished may be increased or decreased as hereinafter provided, without in any way
invalidating the unit prices bid or any other requirements of the Contract Documents
C2-2(1)
C2-2.3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT:
Bidders are advised that the Contract Documents on file with the Owner shall constitute
all of the information which the Owner will furnish. All additional information and data
which the Owner will supply after promulgation of the formal contract documents shall
be issued in the form of written addenda and shall become part of the Contract
Documents just as though such addenda were actually written into the original Contract
Documents.
Bidders are required, prior to filing of proposal, to read and become familiar with the
Contract Documents, to visit the site of the project and examine carefully all local
conditions, to inform themselves by their own independent research and investigations,
tests, boring, and by such other.means as may be necessary to gain a complete knowledge
of the conditions which will be encountered during construction of the project. They must
judge for themselves the difficulties of the work and all attending circumstances affecting
the cost of doing the work or the time required for its completion, and obtain all
information required to make an intelligent proposal. No information given by the Owner
or any representative of tha.Owner other than that contained in the Contract Documents
and officially promulgated addenda thereto, shall be binding upon the Owner. Bidders
shall rely exclusively and solely upon their own estimates, investigation, research, tests, -
explorations, and other data which are necessary for full and complete information upon
which the.proposal is to be based. It is mutually agreed that the submission of a proposal
is prima-facie evidence that the bidder has made the investigation, examinations and tests
herein required. Claims for additional compensation due to variations between conditions -
actually encountered in construction and as indicated in the Contract Documents will not
be allowed.
The logs of Soil Borings, if any, on the plans are for general information only and may
not be correct. Neither the Owner nor the Engineer guarantee that the data shown is
representative of conditions which actually exist.
C2-2.4 SUBMITTING OF PROPOSAL: The Bidder shall submit his Proposal on the
form furnished by the Owner. All blank spaces applicable to the project contained in the
form shall be correctly filled in and the Bidder shall state the prices, written in ink in both
words and numerals, for which he proposes to do work contemplated or furnish the
materials required. All such prices shall be written legibly. In case of discrepancy .
between price written in words and the price written in numerals, the price most s
advantageous to the City shall govern.
If a proposal is submitted by an individual, his or her name must be signed by him (her) y
or his (her) duly authorized agent. If a proposal is submitted by a firm, association, or
partnership, the name and address of each member of the firm, association, or partnership,
or by person duly authorized. If a proposal is submitted by a company or corporation, the
company or corporation name and business address must.be given, and the proposal
signed by an official or duly authorized agent. The corporate seal must be affixed. Power
C2-2(2)
J
of Attorney authorizing agents or others to sign proposal must be properly certified and
must be in writing and submitted with the proposal.
C2-2.5 REJECTION OF PROPOSALS: Proposals may be rejected if they show any
alteration of words or figures, additions not called for, conditional or uncalled for
alternate bids, erasures, or irregularities of any kind, or contain unbalanced value of any
items. Proposal tendered or delivered after the official time designated for receipt of
proposal shall be returned to the Bidder unopened.
C2-2.6 BID SECURITY: No proposal will be considered unless it is accompanied by a
"Proposal Security" of the character and the amount indicated in the "Notice to Bidders
and the "Proposal." The Bid Security is required by the Owner as evidence of good faith
on the part of the Bidder, and by way of a guaranty that if awarded the contract, the
Bidder will within the required time execute a formal contract and furnish the required
performance and other bonds. The bid security of the three lowest bidders will be retained
until the contract is awarded or other disposition is made thereof. The bid security of all
other bidders may be returned promptly after the canvass of bids.
C2-2.7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is
delivered, accompanied,by its proper Bid Security, to the City Manager or his
representative in the official place of business as set forth in the "Notice to Bidders." It is
the Bidder's sole responsibility to deliver the proposal at the proper time to the proper
place. The mere fact that a proposal was dispatched will not be considered. The Bidder
must have the proposal actually delivered. Each proposal shall be in a sealed envelope
plainly marker with the word "PROPOSAL," and the name or description of the project
as designated in the "Notice to Bidders." The envelope shall be addressed to the City
Manager, City Hall, Fort Worth, Texas.
C2-2.8 WITHDRAWING PROPOSALS: Proposals actually filed with the City
Manager cannot be withdrawn prior to the time set for opening proposals. A request for
non-consideration must be made in writing, addressed to the City Manager, and filed with
him prior to the time set for opening of proposals. After all proposals not requested for
non-consideration are opened and publicly read aloud, the proposals for which non-
consideration requests have been properly filed may, at the option of the Owner, be
returned unopened.
C2-2.9 TELEGRAHIC MODIFICATIONS OF PROPOSALS: Any Bidder may modify
his proposal by telegraphic communication at any time prior to the time set for opening
proposals, provided such telegraphic communication is received by the City Manager
prior to the said proposal.opening time, and provided further, that the City Manager is
satisfied that a written and duly authenticated confirmation of such telegraphic
communication over the signature of the bidder was mailed prior to the proposal opening
time. If such confirmation is not received within forty-eight (48) hours after the proposal
opening time, no further consideration will be given to the proposal.
C2-2(3)
C2-2.10 PUBLIC OPENING OF PROPOSAL: Proposals which have been properly
filed and for which no "Non-consideration Request" has been received will be publicly
opened and read aloud by the City Manager or his authorized representative at the time
and place indicated in the "Notice to Bidders." All proposals which have been opened and
read will remain on file with the Owner until the contract has been awarded. Bidders or
their authorized representatives are invited to be present for the opening of bids.
C2-2.11 IRREGULAR PROPOSALS: Proposals shall be considered as "Irregular" if .
they show any omissions, alterations of form, additions, or conditions not called for,
unauthorized alternate bids, or irregularities of any kind. However, the Owner reserves
the right to waive any all irregularities and to make the award of the contract to the best
interest of the City. Tendering a proposal after the closing hour is an irregularity which
can not be waived.
C2-2.12 DISQUALIFICATION OF BIDDERS: Bidders may be disqualified and their
proposals not considered for any of, but not limited to, the following reasons:
a) Reasons for believing that collusion exists among bidders.
b) Reasonable grounds for believing that any bidder is interested in more than
one proposal for work contemplated.
C) The bidderkbeing interested in any litigation against the Owner or where
the Owner may have a claim against or be engaged in litigation against the
bidder.
d) The bidder being in arrears on any existing contract or having defaulted on
a previous contract.
e) The bidder having performed a prior contract in an unsatisfactory manner.
f) Lack of competency as revealed' by financial statement, experience
statement, equipment schedule, and such inquiries as the Owner may see
fit to make.
g) Uncompleted work which, in the judgment of the Owner, will prevent or
hinder the prompt completion of additional work if awarded.
h) The bidder not filing with the Owner, one week in advance of the hour of
the opening of proposals the following:
1. Financial Statement showing the financial condition of the bidder
as specified in Part"A" - Special Instructions
2. A current experience record showing especially the projects of a
nature similar to the one under consideration, which have been
successfully completed by the Bidder.
3. An equipment schedule showing the equipment the bidder has
available for use on the project.
The Bid Proposal of the bidder who, in the judgment of the Engineer, is disqualified
under the requirements stated herein, shall be set aside and not opened.
C2-2(4)
PART C - GENERAL CONDITIONS
C3-3 AWARD AND EXECUTION OF
DOCUMENTS
SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS:
C3-3.1 CONSIDERATION OF PROPOSALS: After proposals have been opened and
read aloud, the proposals will be tabulated on the basis of the quoted prices, the quantities
shown in the proposal, and the application of such formulas or other methods of bringing
items to a common basis as may be established in the Contract Documents.
The total obtained by taking the sum of the products of the unit prices quoted and the
estimated quantities plus any lump sum items and such other quoted amounts as may
enter into the cost of the completed project will be considered as the"amount of the bid.
Until the ward of the contzact is made by the Owner, the right will be reserved to reject
any or all proposals and waive technicalities, to re-advertise for new proposals, or to
proceed with the work in any manner as may be considered for the best interest of the
Owner. +
C3-3.2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS
ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner, upon request,
complete and accurate information regarding actual work performed by a Minority
Business Enterprise (MBE) and/or a Woman-owned Business Enterprise (),VBE) on the
contract and the payment therefor. Contractor further agrees, upon request by the Owner,
to allow and audit and/or an examination of any books, records, or files in the possession
of the Contractor that will substantiate the actual work performed by an MWE or WBE.
Any material misrepresentation of any nature will be grounds for termination of the
contract and for initiating any action under appropriate federal, state or local laws and
ordinances relating to false statements; further, any such misrepresentation may be
grounds for disqualification of Contractor at Owner's discretion for bidding on future
Contracts with the Owner for a period of time of not less than six (6) months.
C3-3.3 EQUAL EMPLOYMENT PROVISIONS: The Contractor shall comply with
Current City Ordinances prohibiting discrimination in employment practices. The
Contractor shall post the required notice to that effect on the project site, and at his
request, will be provided assistance by the City of Fort Worth's Equal Employment
Officer who will refer any qualified applicant he may have on file in his office to the
Contractor. Appropriate notices may be acquired from the Equal Employment Officer.
C3-3.4 WITHDRAWAL OF PROPOSALS: After a proposal has been read by the
Owner, it cannot be withdrawn by the Bidder within forty-five (45) days after the date on
which the the proposals were opened.
C3-3 (1)
C 3-3.5 AWARD OF CONTRACT: The Owner reserves the right to withhold final
action on the proposals for a reasonable time, not to exceed forty-five (45) days after the
date of opening proposals, and in no event will an award be made until after
investigations have been made as to the responsibility of the proposed awardee.
The award of the contract, if award is made, will be to the lowest and best responsive ;-
bidder.
The award of the contract shall not become effective until the Owner has notified the
Contractor in writing of such award.
C3-3.6 RETURN OF PROPOSAL SECURITIES: As soon as proposed price totals
have been determined for comparison of bids, the Owner may, at its discretion, return the
proposal security which accompanied the proposals which, in its judgment, would not be
considered for the award. All other proposal securities, usually those of the three lowest
bidders, will be retained by the Owner until the required contract has been executed and
bond furnished or the Owner has otherwise disposed of the bids, after which they will be
returned by the City Secretary.
C3-3.7 BONDS: With the execution and delivery of the Contract Documents, the
Contractor shall furnish to, and file with the owner in the amounts herein required, the
following bonds: -
a. PERFORMANCE BOND: A good and sufficient performance bond in
the amount.of not less than 100 percent of the amount of the contract, as
evidenced by the proposal tabulation or otherwise, guaranteeing the full
and faithful execution of the work and performance of the contract, and for
the protection of the Owner and all other persons against damage by
reason of negligence of the Contractor, or improper execution of the work
or use of inferior materials. This performance bond shall guarantee the
payment for all labor, materials, equipment, supplies, and services used in
the construction of the work, and shall remain in full force and effect until
provisions as above stipulated are accomplished and final payment is made _z
on the project by the City.
b. MAINTENANCE BOND: A good and sufficient maintenance bond, in
the amount of not less than 100 percent of the amount of the contract, as
evidenced by the proposal tabulation or otherwise, guaranteeing the
prompt, full and faithful performance of the general guaranty which is set -
forth in paragraph C8-8.10.
C. PAYMENT BOND: A good and sufficient payment bond, in the
amount of not less than 100 percent of the amount- of the contract, as
evidenced by the proposal tabulation or otherwise, guaranteeing the
prompt, full and faithful payment of all claimants as defined in Article
C3-3 (2)
J.
5160, Revised Civil Statutes of Texas, 1925, as amended by House Bill
344, Acts 56t1i Legislature, Regular Session, 1959, effective April 27,
1959, and/or the latest version thereof, supplying labor and materials in the
prosecution of the work provided for in thecontract contract being constructed
under these specifications. Payment Bond shall remain in force until all
payments as above stipulated are made.
d. OTHER BONDS: Such other bonds as may be required by these
Contract Documents shall be furnished by the Contractor.-
No
ontractor:No sureties will be accepted by the Owner which are at the time in default or delinquent
on any bonds or which are interested in any litigation against the Owner. All bonds shall
be made on the forms furnished by the Owner and shall be executed.by an approved
surety company doing business in the City of Fort Worth, Texas, and which is acceptable
to the Owner. In order to be acceptable, the name of the surety shall be included on the
current U.S. Treasury list of acceptable sureties, and the amount of bond written by any
one acceptable company shall not exceed the amount shown on the Treasury list.for that
company. Each bond shall be properly executed by both the Contractor and Surety
Company.
{ Should any surety on the contract be determined unsatisfactory at any time by the Owner,
f
notice will be given the Contractor to that effect and the Contractor shall immediately
provide a new surety satisfactory to the Owner. No payment will be made under the
contract until the new surety or sureties, as required, have qualified and have been
accepted by the Owner. The contract shall not be operative nor will any payments be due
or paid until approval of the bonds by the Owner.
C3-3.8 EXECUTION OF CONTRACT: Within ten (10) days after the Owner has
appropriate resolution, or otherwise, awarded the contract, the Contractor shall execute
and file with the Owner, the Contract and such bonds as may be required in the Contract
Documents.
No Contract shall be binding upon the Owner until it has been attested by the City
Secretary, approved as to form_and legality by the City Attorney, and executed for the
4 Owner by either the Mayor or City Manager.
C3-3.9 FAILURE TO EXECUTE CONTRACT: The failure of the Awardee to
execute the required bond or bonds or to sign the required contract within ten (10) days
after the contract is awarded shall be considered by the owner as an abandonment of his
�. proposal, and the owner may annual the Award. By reason of the uncertainty of the
market prices of material and labor, and.it being impracticable and difficult to accurately
determine the amount of damages occurring to the owner by reason of said awardee's
failure to execute said bonds and contract within ten (10) days, the proposal security
accompanying the proposal shall be the agreed amount of damages which the Owner will
C3-3 (3)
a "'
suffer by reason of such failure on the part of the Awardee and shall thereupon
immediately by forfeited to the Owner.
The.filing of a proposal will be considered as acceptance of this provision by the Bidder.
C-3-3.10 BEGINNING WORK: The Contractor shall not commence work until
authorized in writing to do so by the Owner. Should the Contractor fail to commence
work at the site of the project within the time stipulated in the written authorization
usually termed "Work Order" or "Proceed Order", it is agreed that the Surety Company
will, within ten (10) days after the commencement date set forth in such written
authorization, commence the physical execution of the contract.
C3-3.11 INSURANCE: The Contractor shall not commence work under this
contract until he has obtained all insurance required under the Contract Documents, and
such insurance has been approved by the Owner. The prime Contractor shall be
responsible for delivering to the Owner the sub-contractor's certificate of insurance for —
approval. The prime Contractor shall indicate on the certificate of insurance included in
the documents for execution whether or not his insurance covers sub-contractors. It is the
intention of the Owner that the insurance coverage required herein shall include the
coverage of all sub-contractors.
a. COMPENSATION INSURANCE: The Contractor shall maintain,
during the life of this contract, Worker's Compensation Insurance on all of
his employees to be engaged in work on the project under this contract,
and for all sub-contractors. In case any class of employees engaged in
hazardous work on the project under this contract is not protected under
the Worker's Compensation Statute, the Contractor shall provide adequate
employer's general liability insurance for the protection of such of his
employees not so protected.
b. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The
Contractor Shall procure and shall maintain during the life of this contract,
Comprehensive General Liability Insurance (Public Liability and Property -
Damage Insurance) in the amount not less than $500,000 covering each
occurrence on account of bodily injury, including death, and in an amount
not less than $500,000 covering each occurrence on account of property
damage with$2,000,000 umbrella policy coverage.
C. ADDITIONAL LIABILITY: The Contractor shall furnish
insurance as a separate policies or by additional endorsement to one of the
above-mentioned policies, and in the amount as set forth for public
liability and property damage, the following insurance:
1. Contingent Liability (covers General Contractor's Liability for acts
of sub-contractors).
C3-3 (4)
2. Blasting, prior.to any blasting being done.
3. Collapse of buildings or structures adjacent to excavation Lif
excavation are performed adjacent to same).
4. Damage to underground utilities for$500,000.
5. Builder's risk(where above-ground structures are involved).
6. Contractual Liability (covers all indemnification requirements of
Contract).
d. AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY
DAMAGE: The Contractor shall procure and maintain during the life of
this Contract, Comprehensive Automobile Liability Insurance in an
amount not,less than $250,000 for injuries including accidental death to
any one person and subject to the same limit for each person an amount
not less than $500,000 on account of one accident, and automobile
property damage insurance in an amount not less than$100,000.
e. SCOPE OF INSURANCE AND SPECIAL HAZARD: The insurance
required under the above paragraphs shall provide adequate protection for
the Contractor and .his sub-contractors, respectively, against damage
claims which may arise from operations under this contract, whether such
operations be by the insured or by anyone directly or indirectly employed
by him, and also against any of the following special hazards which may
be encountered in the performance of the Contract.
f. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall f irnish
the owner with satisfactory proof of coverage by insurance required in
these Contract Documents in the amounts and by carriers satisfactory to
the Owner. (Sample attached.) All insurance requirements made upon the
Contractor shall apply to the sub-contractors, should the Prime
Contractor's insurance not cover the sub-contractor's work operations.
g. LOCAL AGENT FOR INSURANCE AND BONDING: The insurance
and bonding companies with whom the Contractor's insurance and
C3-3 (5)
performance, payment, maintenance and all such other bonds are written,
shall be represented by an agent or agents having an office located within
the city limits of the City of Fort Worth. Tarrant County, Texas. Each such
agent shall be a duly qualified, one upon whom authority and power to act
on behalf of the insurance and/or bonding company to negotiate and settle
with the City of Fort Worth, or any other claimant, and claims that the City
of Fort Worth or other claimant or.any property owner who has been
damaged, may have against the Contractor, insurance, and/or bonding
company. If the local insurance representative is not so empowered by the
insurance or bonding companies, then such authority must be vested in a
local agent or claims officer residing in the Metroplex, the Fort Worth-
Dallas area. The name of the agent, or agents shall be set forth on all such
bonds and certificates of insurance.
C3-3.12 CONTRACTOR'S OBLIGATIONS: Under the Contract, the Contractor
shall pay for all materials, labor and services when due.
C3-3.13 WEEKLY PAYROLLS: A certified copy of each payroll covering payment
of wages to all persons engaged in work on the project at the site of the project shall be 3
furnished to the Owner's{representative within seven (7) days after the close of each
payroll period. A copy or copies of the applicable minimum wage rates as set forth in the
Contract Documents shall be kept posted in a conspicuous place at the site of the project
at all times during the course of the Contract. Copies of the wage rates will be furnished
the Contractor, by the Owner; however, posting and protection of the wage rates shall be
the responsibility of the Contractor.
C3-3.14 CONTRACTOR'S CONTRACT ADMINISTRATION: Any Contractor,
whether a person, persons, partnership, company, firm, association, corporation or other
who is approved to do business with and enters into a contract with the City for
construction of water and/or sanitary sewer facilities, will have or shall establish a fully
operational business office within the Fort Worth-Dallas metropolitan area. The
Contractor shall charge, delegate, or assign this office (or he may delegate his Project
Superintendent) with full authority to transact all business actions required in the
performance of the Contract. This local authority shall be made responsible to act for the
Contractor in all matters made responsible to act for the Contractor in all matters
pertaining to the work governed by the Contract whether it be administrative or other
wise and as such shall be empowered, thus delegated and directed, to settle all material,
labor or other expenditure, all claims against work or any other mater associated such as
maintaining adequate and appropriate insurance or security coverage for the project. Such
local authority for the administration of the work under the Contract shall be maintained
until all business transactions executed as part of the Contract are complete.
Should the Contractor's principal base of operations be other than in the Fort Worth-
Dallas metropolitan area, notification of the Contractor's assignment of local authority
shall be made in writing to the Engineer in advance of any work on the project, all
C3-3 (6)
appropriately signed and sealed, as applicable, by the Contractor's responsible offices
with the understanding that this written assignment of authority to the local representative
shall become part of the project Contract as though bound directly into the project
documents. The intent of these requirements is that all matters associated with the
Contractor's administration, whether it be oriented in furthering the work, or other, be
governed direct by local authority. This same requirement is imposed on insurance and
surety coverage. Should the Contractor's local representative fail to perform to the
satisfaction of the Engineer, the Engineer, at his sole discretion, may demand that such
local representative be replaced and the Engineer may, at his sole discretion, stop all work
until a new local authority satisfactory to the Engineer is assigned. No credit of working
time will be allowed for periods in which work stoppages are in effect for this reason.
C3-3.15 VENUE: Venue of any action hereinunder shall be exclusively in Tarrant
County, Texas.
C3-3 (7)
PART C - GENERAL CONDITIONS
C4-4 SCOPE OF WORK
SECTION C4-4 SCOPE OF WORK
C4-4.1 INTENT OF CONTRACT DOCUMENTS: It is the definite intention of these
Contract Documents to provide for a complete, useful project which the Contractor
undertakes to construct or furnish, all in full compliance with the requirements and intent
of the Contract Documents. It is definitely understood that the Contractor shall do all
work as provided for in the Contract Documents, shall do all extra or special work as may
be considered by the Owner as necessary to complete the project in a satisfactory and
acceptable manner. The Contractor shall, unless otherwise specifically stated in these
Contract Documents, furnish all labor, tools, materials, machinery, equipment, special
services, and incidentals necessary to the prosecution and completion of the project.
C4-4.2 SPECIAL PROVISIONS: Should any work or conditions which are not
thoroughly and satisfactorily stipulated or covered by General or Special Conditions of
these Contract Documents be anticipated, or should there be any additional proposed
work which is not covered by these Contract Documents, the "Special Provisions"
covering all such work will be prepared by the Owner previous to the time of receiving
bids or proposals for any such work and furnished to the Bidder in the form of Addenda.
All such "Special Provisions" shall be considered to be part of the Contract Documents
just as though they were originally written therein.
C443 INCREASED OR DECREASED QUANTITIES: The Owner reserves the right
to alter the quantities of the work to be performed or to extend or shorten the
improvements at any time when and as found to be necessary, and the Contractor shall
perform the work as altered, increased or decreased at the unit prices. Such increased or
decreased quantity shall not be more than twenty-five (25) percent of the contemplated
quantity of-such item. or items. When such changes increase or decrease the original
quantity of any item or items of work to be done or materials to be furnished by the 25
percent or more, then either party to the contract shall upon written request to the other
parry be entitled to a revised consideration upon that portion of the work above or below
the 25 percent of the original quantity stated in the proposal; such revised consideration to
be determined by special agreement or as hereinafter provided for "Extra Work." No
allowance will be made for any changes in anticipated profits not shall such changes be
considered as waiving or invalidating any conditions or provisions of the Contract
Documents.
Variations in quantities of sanitary sewer pipes in depth categories, shall be interpreted
herein as applying to overall quantities of sanitary sewer pipe in each pipe size, but not to
the various depth categories.
C4-4 (1)
C4-4.4 ALTERATION OF CONTRACT DOCUMENTS: By Change order, the
owner reserves the right to make such changes in the Contract Documents and in the
character or quantities of the work as may be necessary or desirable to insure completion
in the most satisfactory manner,provided such changes do not materially alter the original
Contract Documents or change the general nature of the project as a whole. Such changes
shall not be considered as waiving or invalidating any condition or provision of the
Contract Documents.
C4-4.5 EXTRA WORK: Additional work made necessary by changes and alterations
of the Contract Documents or of quantities or for other reasons for which no prices are
provided in the Contract Documents, shall be defined as "Extra Work" and shall be
performed by the Contractor in accordance with these Contract Documents or approved
additions thereto; provided however, that before any extra work is begun a "Change
order" shall be executed or written order issued by the Owner to do the work for
payments or credits as shall be determined by one or more combination of the following
methods:
a. Unit bid price previously approved.
b. An agreed lump sum.
C. The actual reasonable cost of(1) labor, (2) rental of equipment used on the
extra work for the time so used at Associated General Contractors of
America current equipment rental rates, (3) materials entering permanently
into the project, and (4) actual cost of insurance,bonds, and social security
as determined by the Owner, plus a fixed fee to be agreed upon but not to
exceed 10 percent of the actual cost of such extra work. The fixed fee is
not to include any additional profit to the Contractor for rental of
equipment owner by him and used for extra work. The fee shall be full and
complete compensation to cover the cost.of superintendence, overhead,
other profit, general and all other expense not included in (1), (2), (3), and
(4) above. The Contractor shall keep accurate cost records on the form and
in the method suggested by the Owner and shall give the Owner access to
all accounts,bills, vouchers, and records relating to the Extra Work.
No "Change Order" shall become effective until it has been approved and signed by each
of the Contracting Parties.
No claim for Extra Work of any kind will be allowed unless ordered in writing by the
Owner. In case any orders or instructions, either oral or written, appear to the Contractor
to involve Extra Work for which he should receive compensation, he shall make written
request to the Engineer for written orders authorizing such Extra Work,prior to beginning
such work.
C4-4 (2)
Should a difference arise as to what does or dose not constitute Extra Work, or as to the
payment thereof, and the Engineer-insists upon its performance, the Contractor shall
proceed with the work after .making written request for written orders and shall keep
accurate account of the actual reasonable cost thereof as provided under method (Item Q.
Claims for extra work will not be paid unless the Contractor shall file his claim with the
Owner within five(5) days before the time for making the first estimate after such work is
done and unless the claim is supported by satisfactory vouchers and certified payrolls
covering all labor and materials expended upon said Extra Work.
The Contractor shall furnish the Owner such installation records of all deviations from
the original Contract Documents as may be necessary to enable the Owner to prepare for
permanent record a corrected set of plans showing the actual installation.
The compensation agreed upon for "Extra Work" whether or not initiated by a "Change
Order" shall be a full, complete and final payment for all costs Contractor incurs as a
result or relating to the change or extra work, whether said costs are.known, unknown,
foreseen or unforeseen at,that time, including without limitation, any costs for delay,
extended overhead, ripple or impact cost, or any other effect on changed or unchanged
work as a result of the change or extra work.
C4-4.6 SCHEDULE OF OPERATION: Before commencing any work under this
contract, the Contractor shall submit to the Owner and receive the Owner's approval
thereof, a "Schedule of Operations," showing by a straight line method the date of
commencing and finishing each of the major elements of the Contract. There shall be also
shown the estimated monthly cost of work for which estimates are to be expected. There
shall be presented also a composite graph showing the anticipated progress of
construction with the time being plotted horizontally and percentage of completion
plotted vertically. The progress charts shall be prepared on 8-1/2" x 11" sheets and at
least five black or blue line prints shall be furnished to the Owner.
C44.7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT FACILITIES:
Within ten (10) days prior to submission of the first monthly progress payment, the
Contractor shall prepare and submit to the owner for approval six copies of the schedule
in which the Contractor proposes to carry on activities (including procurement of
materials, plans, and equipment) and the contemplated dates for completing the same.
The schedule shall be in the form of a time schedule Critical Path Method (CPM)
network diagram. As the work progresses, the Contractor shall enter on the diagram the
actual progress at the end of each partial payment period or at such intervals as directed
by the Engineer. The Contractor shall also revise the schedule to reflect any adjustments
in contract time approved by the Engineer. Three copies of the updated schedule shall be
delivered at such intervals as directed by the Engineer.
As a minimum, the construction schedule shall incorporate all work elements and
activities indicated in the proposal and in the technical specifications.
C4-4 (3)
Prior to the final drafting of the detailed construction schedule, the Contractor shall
review the draft schedule with the Engineer to ensure the Contractor's understanding of
the contract requirements.
The following guidelines shall be adhered to in preparing the construction schedule:
a. Milestone dates and final project completion dates shall be developed to
conform to the time constraints, sequencing requirements and completion
time.
b. The construction progress shall be divided into activities with time
durations of approximately fourteen days (14) days and construction
values not to exceed$50,000. Fabrication, delivery and submittal activities
are exceptions to this guideline.
C. Durations shall be in calendar days and normal holidays and weather
conditions over the duration of the contract shall be accounted for within
the duration of each activity.
d. One critical path shall be shown on the construction schedule. _
e. Float time is defined as the amount of time between the earliest start date
and the latest start date of a chain of activities of the CPM construction
schedule. Float time is not for the exclusive use or benefit of either the
Contractor or the Owner.
f. Thirty days shall be used for submittal review unless otherwise specified.
The construction schedule shall as a minimum, be divided into general categories as
indicated in the Proposal and Technical Specifications and each general category shall be
broken down into activities in enough detail to achieve activities of approximately
fourteen(14) days duration.
For each general category, the construction schedule shall identify all trades or
subcontracts whose work is represented by activities that follow the guidelines of this
Section.
For each of the trades or subcontracts, the construction schedule shall indicate the
following procurements, construction and preacceptance activities and events in their
logical sequence for equipment and materials.
1. Preparation and transmittal of submittals r
2. Submittal review periods.
C4-4 (4)
3. Shop fabrication and delivery.
4. Erection or installation.
5. Transmittal of manufacturer's operation and maintenance instructions.
6. Installed equipment and materials testing.
7. Owner's operator instruction(if applicable).
8. Final inspection.
9. Operational testing.
If, in the opinion of the Owner, work accomplished falls behind that scheduled, the
Contractor shall take such action as necessary to improve his progress. In addition, the
Owner may require the -Contractor to submit a revised schedule demonstrating his
program and proposed plan to make up lag in scheduled progress and to insure
completion of the work within the contract time. If the owner finds the proposed plan not
acceptable, he -may require the Contractor to increase the work force, the construction
plant and equipment, the number of work shifts or overtime operations without additional
cost to the Owner.
Failure of the Contractor to comply with these requirements shall be considered grounds
for determination by the Owner that the Contractor is failing to prosecute the work with
diligence as will insure its completion within the time specified.
C4-4 (5)
f
PART C- GENERAL CONDITIONS
C5-5 CONTROL OF WORK AND
MATERIALS
SECTION C5-5 CONTROL OF WORK AND MATERIALS
C5-5.1 AUTHORITY OF ENGINEER: The work shall be performed to the
satisfaction of the Engineer and in strict compliance with the Contract Documents. The
Engineer shall decide all questions which arise as to the quality and acceptability of the
materials furnished, work performed, rate of progress of the work, overall sequence of the
construction, interpretation of the Contract Documents, acceptable fulfillment of the
Contract, compensation, mutual rights between Contractor and Owner under these
Contract Documents, supervision of the work, resumption of operations, and all other
questions or disputes which may arise. Engineer will not be responsible for Contractor's
means, methods, techniques, sequence or procedures of construction, or the safety
precaution and programs incident thereto, and he will not be responsible for Contractor's
failure to perform the work in accordance with the contract documents.
The Engineer shall determine the amount and quality of the work completed and
materials furnished, and his decisions and estimates shall be final. His estimates in such
event shall be a condition to the right of the Contractor to receive money due him under
the Contract. The Owner shall have executive authority to enforce and make effective
such necessary decisions and orders as the Contractor fails to carry out promptly.
In the event of any dispute between the Engineer and Contractor over the decision of the
Engineer on any such matters, the Engineer must, within a reasonable time, upon written
and deliver to both the owner and Contractor, a written
request of the Contractor, render
decision on the matter in controversy.
C5-5.2 CONFORMITY WITH PLANS: The finished project in all cases shall
conform with lines, grades, cross-sections, finish, and dimensions shown on the plans or
any other requirements other wise described in the Contract Documents. Any deviation
from the approved Contract Documents required by the Engineer during construction will
in all cases be determined by the Engineer and authorized by the Owner by Change Order.
C5-5.3 COORDINATION OF CONTRACT DOCUMENTS: The Contract
Documents are made up of several sections, which, taken together, are intended to
describe and provide for a complete and useful project, and any requirements appearing in
one of the sections is as binding as though it occurred in all sections. In case of
discrepancies, figured dimension shall govern over scaled dimensions, plans shall govern
over specifications, special conditions shall govern over general conditions and standard
ies shown on the plans shall govern over.those shown in the
specification, and quantit
proposal. The Contractor shall not take advantage of any apparent error or omission in the
C5-5 (1)
Contract Documents, and the owner shall be permitted to make such corrections or
interpretations as may be deemed necessary for fulfillment of the intent of the Contract
Documents. In the event the Contractor discovers an apparent error or discrepancy, he
shall immediately call this condition to the attention of the Engineer. In the event of a
conflict in drawings, specifications, or other portions of the Contract Documents which
were not reported prior to the award of Contract, the Contractor.shall be deemed to have -
quoted the most expensive resolution of the conflict.
C5-5.4 COOPERATION OF CONTRACTOR: The Contractor will be furnished
with three sets of Contract Documents and shall have available on the site of the project
at all times, one set of such Contract Documents.
The Contractor shall give to the work the constant attention necessary-to facilitate the
progress thereof and shall cooperate with the Engineer, his inspector, and other
Contractors in every possible way.
The Contractor shall at all tines have competent personnel available to the project site for
proper performance of the work. The Contractor shall provide and maintain at all times at
the site of the project a competent, English-speaking superintendent and an assistant who
are fully authorized to act gas the Contractor's agent on the work. Such superintendent and
his assistant shall be capable of reading and understanding the Contract Documents and
shall receive and fulfill instructions from the Owner, the Engineer, or his authorized `-
representatives. Pursuant to this responsibility of the Contractor, the Contractor shall
designate in writing to the project superintendent, to act as the Contractor's agent on the
work. Such assistant project superintendent shall be a resident of Tarrant County, Texas,
and shall be subject to call, as is the project superintendent, at any time of the day or night
on any day of the week on which the Engineer determines that circumstances require the
presence on the project site of a representative of the Contractor to adequately provide for
the safety or convenience of the traveling public or the owners of property across.which
the project extends or the safety of the property contiguous to the project routing.
The Contractor shall provide all facilities to enable the Engineer and his inspector to
examine and inspect the workmanship and materials entering into the work. -
C5-5.5 EMERGENCY AND/OR RECTIFICATION WORK: When, in the opinion
of the Owner or Engineer, a condition of emergency exists related to any part of the work,
the Contractor, or the Contractor through his designated representative, shall respond
with dispatch to a verbal request made by the Owner or Engineer to alleviate the
emergency condition. Such a response shall occur day or night, whether the project is }
scheduled on a calendar-day or a working-day basis.
Should the Contractor fail to respond to a request from the Engineer to rectify any
discrepancies, omissions, or correction necessary to conform with the requirements of the
project specifications or plans, the Engineer shall give the Contractor written notice that
such work or changes are to be performed. The written notice shall direct attention to the
C5-5 (2)
discrepant condition and request the Contractor to take remedial action to correct the
condition. In the event the Contractor does not take positive steps to fulfill this written
request, or does not shoe just cause for not taking the proper action, within 24 hours, the
City may take such remedial action with City forces or by contract. The City shall deduct
an amount equal to the entire costs for such remedial action, plus 25%, from any funds
due the Contractor on the project.
C5-5.6 FIELD OFFICE: The Contractor shall provide, at no extra compensation, an
adequate field office for use of the Engineer, if specifically called for. The field office
shall be not less than 10 x 14 feet in floor area, substantially constructed, well heated, air
conditioned, lighted, and weather proof, so that documents will not be damaged by the
elements.
C5-5.7 CONTRUCTION STAKES: The City, through its Engineer, will furnish
the Contractor with all lines, grades, and measurements necessary to the proper
prosecution and control of the work contracted under these Contract Documents, and
lines, grades and measurements will be established by means of stakes or other customary
method of marking as may be found consistent with good practice.
These stakes or markings shall be set sufficiently in advance of construction operations to
avoid delay. Such stakes or markings as may be established for Contractor's use or
guidance shall be preserved by the Contractor until he is authorized by the Engineer to
remove them. Whenever, in the opinion of the Engineer, any stakes or.markings have
been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of
his employees, the full cost of replacing such stakes or marks plus 25% will be charged
against the Contractor, and the full amount will be deducted from payment due the
Contractor.
C5-5.8 AUTHORITY AND DUTIES OF CITY INSPECTOR: City Inspectors will
be authorized to inspect all work done and to be done and all materials furnished. Such
inspection may extend to all or any part of the work, and the preparation or manufacturing
of the materials to be used or equipment to be installed. A City Inspector may be
stationed on the work to report to the Engineer as to the progress of the work and the
manner in which it is being performed, to report any evidence that the materials being
furnished or the work being performed by the Contractor fails to fulfill the requirements
of the Contract Documents, and to call the attention of the Contractor to any such failure
or other infringements. Such inspection or lack of inspection will not relieve the
Contractor from any obligation to perform the work in accordance with the requirements
of the Contract Documents. In case of any dispute arising between the Contractor and the
City Inspector as to the materials or equipment furnished or the manner of performing the
work, the City Inspector will have the authority to reject materials or equipment, and/or to
suspend work until the question at issue can be referred to and decided by the Engineer.
The City Inspector will not, however, be authorized to revoke, alter, enlarge, or release
any requirement of these Contract Documents, nor to approve or accept any portion or
section of the work, nor to issue any instructions contrary tot he requirement s of the
C5-5 (3)
Contract Documents. The City Inspector will in no case act as superintendent or foreman i
or perform-any other duties for the Contractor, or interfere with the management or
operation of the work. He will not accept from the Contractor any compensation in any x
form for performing any duties. The Contractor shall regard and obey the directions and
instructions of the City Inspector or Engineer when the same are consistent with the
obligations of the Contract Documents of the Contract Documents, provided, however,
should the Contractor object to any orders or instructions or the City Inspector, the
Contractor may within six days make written appeal to the Engineer, for his decision on
the matter in Controversy.
C5-5.9 INSPECTION: The Contractor shall famish the Engineer with every
reasonable facility for ascertaining whether or not the work as performed is in accordance
with the requirements of the Contract Documents. If the Engineer so requests, the
Contractor shall, at any time before acceptance of the work, remove or uncover such
portion of the fmished work as may be directed. After examination, the Contractor shall
restore said portions of the work to the standard required by the Contract Documents.
Should the work exposed or examined prove acceptable, the uncovering or removing and
replacing of the covering or making good of the parts removed shall be paid for as extra
work,but should Work so'exposed or examined prove to be unacceptable, the uncovering
or removing and replacing of all adjacent defective or damaged parts shall be at the
Contractor's expense. No work shall be done or materials used without suitable
supervision or inspection.
C5-5.10 REMOVAL OF EDEFCTIVE AND UNAUTHORIZED WORK:All work,
materials, or equipment which has been rejected shall be remedied or removed and
replaced in an acceptable manner by the Contractor at this expense. Work done beyond
the lines and grades given or as shown on the plans, except as herein specially provided,
or any Extra Work done without written authority, will be considered as unauthorized and
done at the expense of the Contractor and will not be paid for by the Owner. Work so
done may be ordered removed at the Contractor's expense. Upon the failure on the part of
the Contractor to comply with any order of the Engineer made under the provisions of
this paragraph, the Engineer will have the authority to cause defective work to be
remedied or removed and replaced and unauthorized work to be removed, and the cost _
thereof may be deducted from any money due or to become due tot he Contractor. Failure
to require the removal of any defective or unauthorized work shall not constitute
acceptance of such work.
C5-5.11 SUBSTITUTE MATERIALS OR EQUIPMENT: If the Specifications,
law, ordinance, codes or regulations permit Contractor to furnish or use a substitute that is
equal to any material or equipment specified, and if Contractor wishes to furnish or use a
proposed substitute, he shall, prior to the preconstruction conference, make written
application to ENGINEER for approval of such substitute certifying in writing that the
proposed substitute will perform adequately the function called for by the general design,
be similar and of equal substance to that specified and be suited to the same use and
C5-5 (4)
g capable of performing the same function as that specified ; and identifying all variations
of the proposed substitute from that -specified and indicating available maintenance
service. No substitute shall be ordered or installed without written approval of Engineer
who will be the judge of the equality and may require Contractor to furnish such .other
data about the proposed substitute as he considers pertinent. No substitute shall be
ordered or installed without such performance guarantee and bonds as Owner may require
which shall be furnished at Contractor's expense. Contractor shall indemnify and hold
harmless Owner and Engineer and anyone directly or indirectly employees by either of
them from and against the claims, damages, losses and expenses (including attorneys
fees) arising out of the use of substituted materials or equipment.
C5-5.12 SAMPLES AND TESTS OF MATERIALS: Where, in the opinion of the
Engineer, or as called for in the Contract Documents, tests of materials or equipment are
necessary, such tests will be made at the expense of and paid for direct to the testing
f agency by the Owner unless other wise specifically provided. The failure of the Owner to
i
make any tests of materials shall in no way relieve the contractor of his responsibility of
furnishing materials and equipment fully conforming to the requirements of the Contract
Documents. Tests and sampling of materials, unless otherwise specified, will be made in
accordance with the latest methods prescribed by the American Society for Testing
Materials or specific requirements of the Owner. The Contractor shall provide such
facilities as the Engineer may require for collecting and forwarding samples and shall not,
without specific written permission of the Engineer, use materials represented by the
samples until tests have been made and the materials approved for use. The Contractor
will furnish adequate samples without charge to the Owner.
In case of concrete, the aggregates, design minimum, and the mixing and transporting
equipment shall be approved by the Engineer before any concrete is placed, and the
Contractor shall be responsible for replacing any concrete which does not meet the
requirements of the Contract Documents. Tests shall be made at least 9 days prior to the
placing of concrete, using samples from the same aggregate, cement, and mortar which
are to be used later in the concrete. Should the source of supply change, new tests shall be
made prior to the use of new materials.
C5-5.13 STORAGE OF MATERIALS: All materials which are to be used in the
construction contract shall be stored so as to insure the preservation of quality and fitness
of the work. When directed by the Engineer, they shall be placed on wooden platforms or
other hard, clean durable surfaces and not on.the ground, and shall be placed under cover
when directed. Stored materials shall be placed and located so as to facilitate prompt
a inspection.
C5-5.14 EXISTING STRUCTURES AND UTILITIES: The location and dimensions
shown on the plans relative to the existing utilities are based on the best information
4 available. Omission from, the inclusion of utility locations on the Plans is not to be
considered as nonexistence of, or a definite location of, existing underground utilities.
The location of many gas mains, water mains, conduits, sewer lines and service lines for
C5-5 (5)
f
3
7
i
all utilities, etc., is unknown to the Owner, and the Owner assumes no responsibility for
failure to show any or all such structures and utilities on the plans or to show them in
their exact location. It is .mutually agreed that such failure will not be considered
sufficient basis for claims for additional compensation for Extra Work or for increasing
the pay quantities in any manner whatsoever,unless an obstruction encountered is such as
to necessitate changes in the lines and grades of considerable magnitude or requires the
building of special works, provision of which is not made in these Contract Documents,
in which case the provision in these Contract Documents for Extra Work shall apply.
It shall be the Contractor's responsibility to verify locations of the adjacent and/or L
conflicting utilities sufficiently in advance of construction in order that he may negotiate
such local adjustments as necessary in the construction process to provide adequate
clearances. The Contractor shall take all necessary precautions in order to protect all
existing utilities,structures, and service lines. Verification of existing utilities, structures,
and service lines shall include notification of all utility companies at least forty-eight(48)
hours in advance of construction including exploratory excavation if necessary. All -
verification of utilities and their adjustment shall be considered subsidiary work.
C5-5.15 INTERRUPTION OF SERVICE:
a
a. Normal Prosecution: In the normal prosecution of work where the
interruption of service is necessary, the Contractor, at least 24 hours in
advance, shall be required to:
1. Notify the Water Department's Distribution Division as to
location,time, and schedule of service interruption.
2. Notify each customer personally through responsible personnel as
to the time and schedule of the interruption of their service, or
3. In the event that personal notification of a customer cannot be
made, a prepared tag form shall be attached to the customer's door
knob. The tag shall be durable in composition, and in large bold
letters shall say:
C5-5 (6)