Loading...
HomeMy WebLinkAboutContract 31381 SPECIFICATIONS AND CONTRACT DOCUMENTS RECONSTRUCTION OF CAMP BOWIE BOULEVARD FROM I-30 TO ELDRIDGE STREET PROJECT NO. C200-531200207230000980 IN THE CITY OF FORT WORTH, TEXAS FILE No. K-1857 2004 MIKE MONCRIEF CHARLES BOSWELL MAYOR CITY MANAGER ROBERT D. GOODE, PE - DIRECTOR DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS A. DOUGLAS RADEMAKER, PE - DIRECTOR DEPARTMENT OF ENGINEERING ° E , osi a Div • . a • . �� •- ..�p .. ,4 • �LSd ` h, r CITY OF FORT WORTH DEPARTMENT OF ENGINEERING O c q ENGINEERING SERVICES DIVISION ADDENDUM NO. I RECONSTRUCTION OF CAMP BOWIE BOULEVARD FROM I-30 TO ELDRIDGE DOE NO. 4528 RELEASE DATE: November 24, 2004 INFORMATION TO BIDDERS: The Specifications and Contract Documents for the above mentioned project are revised and amended as follows: X. In the"NOTICE TO BIDDERS"revise the bid opening date to December 9, 2004. 2. In the Proposal, revise Pay Item No. 36 to read: 314 36. 1,470 LF 1-FOOT REINFORCED CONCRETE HEADED PER PLAN DETAILS Dollars and Cents per LF. 3. All concrete shall be a minimum of five (5) sacks of cement per cubic yard of concrete in place, All hand poured concrete shall be a minimum of six (6) sacks of cement per cubic yard of concrete in place. The preceding shall supersede any and all concrete referenced on plans and In specifications. 4. This project is to be bid by the calendar day. As such should the Contractor not complete the contract in the calendar days specified, a time charge shall be made for each calendar day thereafter, not as a penalty but as liquidate damages. The preceding shall supersede any and all references made in the specifications and/or the standard street specifications to liquidated damages. 5. Given the time schedule for this contract the contractor will not be restricted to working from 9:00 am to 4:00 pm (, but will be allowed to work normal work hours (from 7:00 am to 6:00 pm). The contractor will also be allowed to work on phase I and phase 4 concurrently. Please acknowledge receipt of the Addendum in the bid proposal and on the outside of the sealed envelope. RECEIPT ACKNOWLEDGED: _r A. DOUGLAS RADEMAKER, P.E. DIRECTOR, D NT O INEERING By; cyw__� — &76ryan Beck, P.E. Manager, Design Services ! SII ,.•,,� �nlU� h�\o - z0 'd LZSEHL I B 'ON XVJ S101ANIS N0I Sia 304 Md0 Wd CO21 1 01h`MO`f�-�A�OI� G+ CITY OF FORT WORTH opO Ztq DEPARTMENT OF ENGINEERING ENGINEERING SERVICES DIVISION ADDENDUM NO. 2 RECONSTRUCTION OF CAMP BOWIE BOULEVARD FROM 1-30 TO ELDRIDGE DOE NO. 4528 RELEASE DATE: December 2, 2004 INFORMATION TO BIDDERS: The Specifications and Contract Documents for the above mentioned project are revised and amended as follows: 1. As a point of clarification, the concrete paving in the Intersection of Camp Bowie and Prevost shall be ✓ paid from bid item No. 34"7-INCH TAPERED REINFORCED CONCRETE PAVEMENT". 2. In the Proposal, revise Pay Item No. 12 to read: S.P. 12. 2,000 CY, UNCLASSIFIED STREET EXCAVATION ✓ 106 Dollars & Cents Per CY. $ $ 3. Expansion joints on this project shall not be sealed with silicone joint sealant as shown in Detail No. 1. Any reference to silicone joint sealant in expansion joints shall be considered superseded by this addendum. Please acknowledge receipt of the Addendum In the bid proposal and on the outside of the sealed envelope. RECEIPT ACKNOWLEDGED: A. DOUGLAS RADEMAKER, P.E. DIRECTOR _DF�T ENT OF FIWINEERING By: L'tlo;,, �j Bfian Beck, P.E. i Manager, Design Services �OleO 'd TP wi ul-l.l (ZT TA1MQ h1r)TC'.1n ion min im rn.en T\IA tnn� rn n,n TABLE OF CONTENTS TABLE OF CONTENTS 1. Notice to Bidders 2. Special Instructions to Bidders 3. Proposal 4. Vendor Compliance to State Law 5. Minority and Women Business Enterprises Specifications 6. Special Provisions 7. Certificate of Insurance 8. Contractor Compliance With Worker's Compensation Law 9. Equipment Schedule 10. Experience Record 11. Performance Bond 12. Payment Bond 13. Contract NOTICE TO BIDDERS Sealed proposals for the following: FOR: RECONSTRUCTION OF CAMP BOWIE BOULEVARD FROM I-30 TO ELDRIDGE STREET PROJECT NO. C200-531200207230000980 FILE NO. K-1857 DOE #: 4528 Addressed to Mr. Charles Boswell, City Manager of the City of Fort Worth,Texas will be received at the Purchasing Office until 1:30 PM, Thursday, December 2, 2004 and then publicly opened and read aloud at 2:00 PM in the Council Chambers. Plans, Specifications and Contract Documents for this project may be obtained at the Office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth,Texas. Sets of documents may be purchased for a non- refundable price of$30.00. These documents contain additional information for prospective bidders. Bid security is required in accordance with the Special Instruction to Bidders. The City reserves the right to reject any and/or all bids and waive any and/or all irregularities. No bid may be withdrawn until the expiration of ninety (90) days from the date the M/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("Documentation'� as appropriate is received by the City. The award of contract, if made, will be within ninety(90) days after this documentation is received, but in no case will the award be made until the responsibility of the bidder to whom it is proposed to award the contract has been verified. A mandatory pre-bid conference will be held on Friday November 19, 2004 at 10:00 am in DOE Conference Room 255A. Failure to attend the conference will result in the rejection of the bid. Note: Bidders will be required to submit experience records showing the successful completion of at least 3 other jobs involving brick paving of similar scope with their bid. If it is the intention of the contractor to sub-contract the brick paving,the contractor shall submit the experience record of the sub-contractor. Bidders are responsible for obtaining all Addenda to the contract documents and acknowledging receipt of the Addenda by initialing the appropriate spaces on the PROPOSAL form. Bids that do not acknowledge receipt of all Addenda may be rejected as being nonresponsive. Information regarding the status of Addenda may be obtained by contacting the Department of Engineering at 817-871- 7910. In accord with City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contract. A copy of the Ordinance can be obtained from the Office of the City Secretary. In addition, the bidder shall submit the MBE/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("Documentation's as appropriate. The documentation must be received no later than 5:00 PM, five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid nonresponsive. For additional information, contact Jim Deeter at(817) 392-7803. CHARLES BOSWELL MARTHA HENDRIX CITY MANAGER CITY SECRETARY A. Douglas aker, P.E. Directo , artm eering By k/ /Bryn Beck, P.E. � Manager, Design Services Advertising Dates: November 4, 2004 November 10, 2004 SPECIAL INSTRUCTION TO BIDDERS (TRANSPORTATION AND PUBLIC WORKS) 1. BID SECURITY: Cashier's check or an acceptable bidder's bond payable to the City of Fort Worth, in an amount of not less than five (5%) per cent of the total of the bid submitted must accompany the bid, and is subject to forfeit in the event the successful bidder fails to execute the contract documents within ten (10) days after the contract has been awarded. To be an acceptable surety on the bid bond, the surety must be authorized to do business in the state of Texas. In addition, the surety must (1) hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess of $100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. 2. PAYMENT, PERFORMANCE AND MAINTENANCE BONDS: The successful bidder entering into a contract for the work will be required to give the City surety in a sum equal to the amount of the contract awarded. In this connection, the successful bidder shall be required to furnish a performance bond and a payment bond, both in a sum equal to the amount of the contract awarded. The form of the bond shall be as herein provided and the surety shall be acceptable to the City. All bonds furnished hereunder shall meet the requirements of Chapter 2253,Texas Government Code. In order for a surety to be acceptable to the City, the surety must (1) hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess of $100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. The City will accept no sureties who are in default or delinquent on any bonds or who have an interest in any litigation against the City. Should any surety on the contract be determined unsatisfactory at any time by the City, notice will be given to the contractor to that effect and the contractor shall immediately provide a new surety satisfactory to the City. If the contract amount is in excess of $25,000, a Payment Bond shall be executed, in the amount of the contract, solely for the protection of all claimants supplying labor and materials in the prosecution of the work. If the contract amount is in excess of $100,000, a Performance Bond shall be executed, in the amount of the contract conditioned on the faithful performance of the work in accordance with the plans, specifications, and contract documents. Said bond shall solely be for the protection of the City of Fort Worth. All contracts shall require a maintenance bond in the amount of one hundred percent (100%) of the original contract amount to guarantee the work for a period of two (2) years after the date of acceptance of the project from defects in workmanship and/or material. -- L 10/27/04 1 � , '. 6FL� 3. LIQUIDATED DAMAGES: The Contractor's attention is called to Part 1, Item 8, paragraph 8.6, of the"General Provisions"of the Standard Specifications for Construction of the City of Fort Worth,Texas, concerning liquidated damages for late completion of projects. 4. AMBIGUITY: In case of ambiguity or lack of clearness in stating prices in the proposal, the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the proposal. 5. EMPLOYMENT: All bidders will be required to comply with City Ordinance No. 7278 as amended by City Ordinance No. 7400 (Fort Worth City Code Section 13-A-21 through 13-a- 29) prohibiting discrimination in employment practices. 6. WAGE RATES: Section 8.8 of the Standard Specifications for Street and Storm Drain Construction is deleted and replaced with the following: (a) The contractor shall comply with all requirements of Chapter 2258,Texas Government Code, including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258,Texas Government Code. Such prevailing wage rates are included in these contract documents. (b) The contractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract; and (ii) the actual per diem wages paid to each worker. These records shall be open at all reasonable hours for inspection by the City. The provisions of the special provision titled "Right to Audit"pertain to this inspection. (c) The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs (a) and (b) above. (d) With each partial payment estimate or payroll period, whichever is less, an affidavit stating that the contractor has complied with the requirements of Chapter 2258,Texas Government Code. (e) The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. Section 8.9 of the Standard Specifications for Street and Storm Drain Construction is hereby deleted. 7. FINANCIAL STATEMENT: A current certified financial statement may be required by the Department of Engineering if required for use by the CITY OF FORT WORTH in determining the successful bidder. This statement, if required, is to be prepared by an independent Public Accountant holding a valid permit issued by an appropriate State Licensing Agency. 8. INSURANCE: Within ten (10) days of receipt of notice of award of contract, the Contractor must provide, along with executed contract documents and appropriate bonds, proof of insurance for Worker's Compensation and Comprehensive General Liability (Bodily Injury- $500,000 each person, $1,000,000 each occurrence ($2,000,000 aggregate limit); Property Damage - $250,000 each occurrence). The City reserves the right to request any other insurance coverages as may be required by each individual project. 10/27/04 2 9. ADDITIONAL INSURANCE REQUIREMENTS: a. The City, its officers, employees and servants shall be endorsed as an additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's workers' compensation insurance policy. b. Certificates of insurance shall be delivered to the City of Fort Worth, contract administrator in the respective department as specified in the bid documents, 1000 Throckmorton Street, Fort Worth,TX 76102, prior to commencement of work on the contracted project. c. Any failure on part of the City to request required insurance documentation shall not constitute a waiver of the insurance requirements specified herein. d. Each insurance policy shall be endorsed to provide the City a minimum thirty days notice of cancellation, non-renewal, and/or material change in policy terms or coverage. A ten days notice shall be acceptable in the event of non-payment of premium. e. Insurers must be authorized to do business in the State of Texas and have a current A.M. Best rating of A: VII or equivalent measure of financial strength and solvency. f. Deductible limits, or self-funded retention,limits, on each policy must not exceed $10,000.00 per occurrence unless otherwise approved by the City. g. Other than worker's compensation insurance, in lieu of traditional insurance, City may consider alternative coverage or risk treatment measures through insurance pools or risk retention groups. The City must approve in writing any alternative coverage. h. Workers' compensation insurance policy(s) covering employees employed on the project shall be endorsed with a waiver of subrogation providing rights of recovery in favor of the City. L City shall not be responsible for the direct payment of insurance premium costs for contractor's insurance. j. Contractor's insurance policies shall each be endorsed to provide that such insurance is primary protection and any self-funded or commercial coverage maintained by City shall not be called upon to contribute to loss recovery. k. In the course of the project, Contractor shall report, in a timely manner, to City's officially designated contract administrator any known loss occurrence which could give rise to a liability claim or lawsuit or which could result in a property loss. Contractor's liability shall not be limited to the specified amounts of insurance required herein. - m. Upon the request of City, Contractor shall provide complete copies of all insurance policies required by these contract documents. 10. NONRESIDENT BIDDERS: Pursuant to Article 601g, Texas Revised Civil Statutes, the City of Fort Worth will not award this contract to a non resident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident 10/27/04 3 bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. "Nonresident bidder"means a bidder whose principal place of business is not in this state, but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. "Texas resident bidder"means a bidder whose principal place of business is in this state, and includes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. This provision does not apply if this contract involves federal funds. The appropriate blanks of the Proposal must be filled out by all non resident bidders in order for its bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In a accord with City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM SUBCONTRACTOR/SUPPLIER UTILIZATION FORM , PRIME CONTRACTOR WAIVER FORM, and/or the GOOD FAITH EFFORT FORM ("with Documentation's and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m., five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non-responsive. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a minority business enterprise (MBE) and/or women business enterprise (WBE) on the contract and payment thereof. Contractor further agrees to permit any audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate Federal, State or local laws or ordinances relating to false statements. Further, any such misrepresentation facts (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less that three (3) years. 12. AWARD OF CONTRACT: Contract will be awarded to the lowest responsive bidder. The City reserves the right to reject any and/or all bids and waive any and/or all irregularities. No bid may be withdrawn until the expiration of ninety (90) days from the date the M/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, GOOD FAITH EFFORT FORM, and/or the JOINT VENTURE FORM ("Documentation's as appropriate is received by the City. The award of contract, if made, will be within ninety (90) days after this documentation is received, but in no case will the award be made until all the responsibility of the bidder to whom it is proposed to award the contract has been verified. 10/27/04 4 13. PAYMENT: The Contractor will receive full payment(minus retainage) from the City for all work for each pay period. Payment of the remaining amount shall be made with the final payment, and upon acceptance of the project. 14. ADDENDA: Bidders are responsible for obtaining all addenda to the contract documents prior to the bid receipt time and acknowledging them at the time of bid receipt. Information regarding the status of addenda may be obtained by contacting the plans desk of the Department of Engineering Construction Division at(817) 871-7910. Bids that so not acknowledge all applicable addenda may be rejected as non-responsive. 15. CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW: A. Workers Compensation Insurance Coverage a. Definitions: Certain of coverage ("certificate's. A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement(TWCC- 81, TWCC-82, TWCC-83, or TWCC-84), showing statutory worker's compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project. Duration of the project-includes the time from the beginning of the work on the project until the contractor's/person's work on the project has been completed and accepted by the governmental entity. Persons providing services on the project("subcontractor"in §406.096)-includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services"include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or toner services related to a project. "Services"does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. b. The contractor shall provided coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011 (44) or all employees of the contractor providing services on the project, for the duration of the project. c. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. d. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. 10/27/04 5 e. The contractor shall obtain from each person providing services on a project, and provide to the governmental entity: (1) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (2) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. f. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter g. The contractor shall notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project. h. The contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Worker's Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. I. The contractor shall contractually require each person with whom it contracts to provide services on a project, to: (1) provide coverage, based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas labor Code, Section 401.011 (44) for all of its employees providing services on the project, for the duration of the project; (2) provide to the contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; (3) provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (4) obtain from each other person with whom it contracts, and provide to the contractor: (a) a certificate of coverage, prior to the other person beginning work on the project; and (b) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; 10/27/04 6 (5) retain all required certificates of coverage on file for the duration of the project and for one year thereafter. (6) notify the governmental entity in wiring by certified mail or personal delivery, within ten (10) days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (7) contractually require each person with whom it contracts, to perform as required by paragraphs (1) - (7), with the certificates of coverage to be provided to the person for whom they are providing services. j. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project will be covered by worker's compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the contractor to administrative, criminal, civil penalties or other civil actions. k. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. B. The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other Texas Worker's Compensation Commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text, without any additional words or changes: "REQUIRED WORKER'S COMPENSATION COVERAGE" The law requires that each person working on this site or providing services related to this construction project must be covered by worker"compensation insurance.This includes persons providing, hauling or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee". Call the Texas Worker's Compensation Commission at 512-440-3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage". 16. NON DISCRIMINATION: The contractor shall not discriminate against any person or persons because of sex, race, religion, color, or national origin and shall comply with the provisions of City Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City Code Sections 13A-21 through 13A-29), prohibiting discrimination in employment practices. d -' 10/27/04 7 17. AGE DISCRIMINATION: In accordance with the policy("Policy") of the Executive Branch of the federal government, contractor covenants that neither it nor any of its officers, members, agents, or employees, will engage in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment, discriminate against person because of their age except on the basis of a bona fide occupational qualification, retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers, members, agents, or employees, or person acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this Contract, a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirement. Contractor warrants it will fully comply with the Policy and will defend, indemnify and hold City harmless against any and all claims or allegations asserted by third parties against City arising out of Contractor's alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of this Contract. 18. DISCRIMINATION DUE TO DISABILITY: In accordance with the provisions of the Americans with Disabilities Act of 1990 ("ADA' , Contractor warrants that it will not unlawfully discriminate on the basis of disability in the provision of services to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with, or current employees of Contractor. Contractor warrants it will fully comply with ADA's provisions and any other applicable federal state and local laws concerning disability and will defend indemnify and hold City harmless against any claims or allegations asserted by third parties against City arising out of Contractor's alleged failure to comply with the above- referenced laws concerning disability discrimination in the performance of this Contract. 19. PROGRESS PAYMENTS FINAL PAYMENT PROJECT ACCEPTANCE AND WARRANTY: a. The contractor will receive full payment(less retainage) from the city for each pay period. b. Payment of the retainage will be included with the final payment after acceptance of the project as being complete. c. The project shall be deemed complete and accepted by the City as of the date the final punch list has been completed, as evidenced by a written statement signed by the contractor and the City. d. The warranty period shall begin as of the date that the final punch list has been completed. e. Bills Paid Affidavit and Consent of Surety shall be required prior to final payment becoming due and payable. f. In the event that the Bills Paid Affidavit and Consent of Surety have been delivered to the city and there is a dispute regarding (i) final quantities, or(ii) liquidated damages, city shall make a progress payment in the amount that city deems due and payable. g. In the event of a dispute regarding either final quantities or liquidated damages, the parties shall attempt to resolve the differences within 30 calendar days. 10/27/04 8 PROPOSAL TO: Mr. Charles Boswell City Manager Fort Worth, Texas FOR: RECONSTRUCTION OF CAMP BOWIE BOULEVARD FROM I-30 TO ELDRIDGE STREET PROJECT NO. C200-531200207230000980 FILE NO. K-1857 DOE #: 4528 Pursuant to the foregoing"Notice to Bidders", the undersigned has thoroughly examined the plans, specifications and the site, understands the amount of work to be done, and hereby proposes to do all the work and furnish all labor, equipment, and materials necessary to complete all the work as provided in the plans and specifications, and subject to the inspection and approval of the Department of Engineering Director of the City of Fort Worth. Upon acceptance of this proposal by the City Council, the bidder is bound to execute a contract and furnish Performance and Payment Bond approved by the City of Fort Worth for performing and completing said work within the time stated and for the following sums, to-wit: UNIT I STREET RECONSTRUCTION SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE AMOUNT BID S.P. 1. 1 LS. UTILITY ADJUSTMENT Ten Thousand Dollars & No Cents Per LS. $10,000.00 $10,000.00 2. 1 LS. TRAFFIC CONTROL F°.fy F:e 7-Ao so.+d Dollars & °O ., ztao Cents Per LS. $ 'yam $ #S,000. S.P. 3. 2 EA. PROJECT DESIGNATION SIGNS Three Hundred Dollars & No Cents Per EA. $300.00 $600.00 S.P. 4. 1 LS. MEDIAN CROSSOVER -1;0e"+!1 Tliorta,►d Dollars & z koCents Per LS. $ X04 000.00 $ zoo S.P. 5. 1 LS. TEMPORARY ACCESS ROAD PHASE 3A 60 AAmsa,.d A.c flyer?J Dollars & zc(zo Cents Per LS. $ Oo,°" $ /, SOO. 1O S.P. 6. 1 LS. TEMPORARY/� �lACCESS ROAD PHASE 5 ONl '�i orl�t� rt-r vmJ td Dollars & Z r2o Cents Per LS. $ f,Soo.00 $ S00 °D S.P. 7. 9,854 LF. REMOVE EXIST. CURB &GUTTER 104 Fo,,r-- Dollars & so F;-P♦v Cents Per LF. $ $ y�{ 3�3..� 104 8. 4,314 SF. REMOVE EXIST. CONCRETE SIDEWALK, LEADWALK AND/OR WHEELCHAIR RAMPS z-e2o Dollars & /✓%Ne-'y Cents Per SF. $ • 9 $ 3�882..6,0 104 9. 4,591 SF. REMOVE EXIST. CONCRETE DRIVEWAY (SAWCUT SUBSIDIARY Zego Dollars & AlilVe Cents Per SF. $ q0 $ 3f', 90 104 10. 21,949 SY. REMOVE EXIST. CONCRETE BASE S'tx Dollars & -Tew Cents Per SY. 104 11. 195 SY. REMOVE EXIST. CONCRETE PAVEMENT (SAWCUT SUBSIDIARY) Fa"F_ Dollars & So 87 So F 4 Cents Per SY. S.P. 12. _SR90'CY. UNCLASSIFIED STREET EXCAVATION 106 Z/0oo —Te.J Dollars & „ 00 ZeJZo Cents Per CY. $ )0, $ 20 °oO' S.P. 13. 147,280 SF. REMOVE, EXIST. BRICK PAVERS 2 e RG Dollars & F•.F+v o,Jc Cents Per SF. $ , s 1 $ 7� z 8° S.P. 14. 82,011 SF. SALVAGE, CLEAN, AND PALLETIZE EXIST. BRICK PAVERS )+ 014 G Dollars & F;-F+e e n Cents Per SF. $ 5 $ 9 s 452 15. 4 EA. REMOVE EXIST. 5'INLET Fi"12 gu.j ted Dollars & 00 zeQ,o Cents Per EA. $ SOO,°c $ Z 00. 452 16. 2 EA. REMOVE EXIST. 10'INLET S Hu AA red Dollars & / Z epo Cents Per EA. $ 600.06 $ 452 17. 42 LF. REMOVE 18"R.C.P. TY ri Dollars & Z e 20 Cents Per LF. $ 10.00 $ i 120 w 7 452 18. 4 LF. REMOVE 21"R.C.P. _Tr Ili Dollars & z e R-o Cents Per LF. 440 19. 42 LF. 18"CL. III R.C.P. C-,4*fN Two Dollars & zein Cents Per LF. $ 82.00 $ 300 440 20. 4 LF. 21"CL. III R.C.P. eNc. }dundced Dollars & z,e 9-0 Cents Per LF. o0 $ 444 21. 6 EA. STD. 10'INLET. Two 71,,,,}..d 71we AwIftbollars & z eR. Cents Per EA. $ 21 300 00 $ 800 +o S.P. 22. 46 LF. TRENCH SAFETY 525 T64 Dollars & Z e a o Cents Per LF. $ j O oo $ Y100o. 402 23. 55 CY. TRENCH EXCAVATION & BACKFILL 0 A d Dollars & Z-et-v Cents Per CY. $� �O $ SS de S.P. 24. 3,887 LF. 2-INCH CURB AND 12-INCH GUTTER 502 t re. Dollars & i~i dry Cents Per LF. $ 3. So $ 64 .se S.P. 25. 5,339 LF. 7-INCH CURB AND 18-INCH GUTTER 502 S t X Dollars & / S v Cents Per LF. $ L 6o $ 337. 502 26. 628 LF. 6-INCH ATTACHED CURB Orl C Dollars & z t Xo Cents Per LF. 504 27. 12,513 SF. 10 3/8-INCH CONCRETE VALLEY GUTTER PER PLAN DETAILS Dollars & 2c S Ob _60 Twn.t y Cents Per SF. $ 5. $ 504 28. 4,478 SF. STD. 4"REINFORCED CONCRETE SIDEWALK, LEADWALK AND/OR WHEELCHAIR RAMPS 00 Fu')x Dollars & $ 7. $ 11t e z P 0-0 Cents Per SF. 504 29. 5,296 SF. VARIABLE THICKNESS CONCRETE DRIVEWAY PER PLAN DETAILS R J e Dollars & $ s 50 $ ZcIT g o0 F:-FYv Cents Per SF. 210 30. 23,653 SY. 6"LIME STABILIZED SUBGRADE T'w a Dollars & ZC oo Cents Per SY. $ 2 ,ba $ 210 31. 354 Ton LIME /✓iNe+y FbJK- Dollars & 33 L7(, 00 Z t'1Zn Cents Per Ton $ $ , S.P. 32 130,252 SF. NEW BRICK PAVERS F';-4e_ Dollars & E"4ec,ti Cents Per SF. $ �.� s $ a X 97. 80 S.P. 33. 10,334 SF. INSTALL SALVAGED BRICK PAVERS --rw o Dollars & F►f'�•� Cents Per SF. $ z.50 $ 314 34. 2,749 SY. 7-INCH TAPERED REINFORCED CONCRETE PAVEMENT PER PLAN DETAILS rtiii IN Th Dollars & $ ?.J 3 00 $ z e ito Cents Per SY. 314 35. 14,473 SY. 7-INCH REINFORCED CONCRETE BASE ?wen-61 S;X Dollars & Od o0 zei6 Cents Per SY. $ Z�. $ 376 278, C tA.04 314 36. 1,470 1-FOOT REINFORCED CONCRETE HEADER C f PER PLAN DETAILS SY v c v, Dollars & $ � oo $ 10�e0 zego Cents Per SY. S.P. 37. 60 Ton 6-INCH H.M.A.C. TRANSITION 312 6i k*y Dollars & $ $ 'Ie z Poo Cents Per Ton 7 S.P. 38. 1 LS. TRAFFIC BUTTONS 1N'o -Av a.4and Dollars & zPito Cents Per LS. $?,000." $ DOO• °° S.P. 39. 2,443 LF. 2-INCH PVC CONDUIT 522 Dollars & $ yo $ 1�r�4-y y Cents Per LF. S.P. 40. 458 LF. 3-INCH PVC CONDUIT 522 S;l.A Dollars & S,;,< v Cents Per LF. $ (O."o $ 3 D O 41. 16 EA PVC GROUND BOX PER PLAN DETAIL f✓A -1I",deod Fv Dollars & z c R.o Ce is Per EA. $ VSO °D $ 7, Zoo.°O S.P. 42. 535 CY. TOP SOIL 116 NINE Dollars & NO Cents Per CY. $ 9.00 $4,815.00 S.P. 43. 14 EA. ADJUST WATER VALVE BOX TWO HUNDRED Dollars & NO Cents Per EA. $ 200.00 $ 2,800.00 S.P. 44. 8 EA. MANHOLE ADJUSTMENT THREE HUNDRED FIFTY Dollars & NO Cents Per EA. $ 350.00 $ 2,800.00 S.P. 45. 5 EA. ADJUST WATER METER BOX THIRTY FIVE Dollars & NO Cents Per EA. $ 35.00 175.00. �,�1 S.P. 46. 11 EA. CERAMIC TILE STREET NAMES S"x yw."deed Dollars & Z{to Cents Per EA. $ 6,00,on $ 600.8c, 112 47. 500 CY BORROW orale Dollars & z CAo Cents Per CY. 48. 1 LS BUSINESS SIGN PLAN S►'x ??Iousand Dollars & Z el-0 Cents Per LS $ lo_ 000.0" $ �a_ 0 49. 1 EA ADDITIONAL BUSINESS SIGNS F,�e_ Hund fed Dollars & Z t fto Cents Per EA. $ 600•" $ Sco.00 TOTAL BID UNIT I STREET RECONSTRUCTION $ = , OS2• '�` UNIT II PARKWAY PAVEMENT REMOVAL SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES UNIT TOTAL ITEM ITEM QUANTITY WRITTEN IN WORDS PRICE AMOUNT BID S.P. 1. 1,213 SY REMOVE EXISTING ASPHALT IN PARKWAY (SAWCUT SUBSIDIARY) Fovrt. Dollars & $ $ S� 7b F' Cents Per SY. S.P. 2. 950 SY. REMOVE XISTING CONCRETE IN 116 PARKWAY (SAWCUT SUBSIDIARY) 0000 F;,ee Dollars & $ 5• $ SO• rego Cents Per SY. S.P. 3. 360 CY. TOP SOIL NINE Dollars & NO Cents Per CY. $ 9.00 $3,240.00 TOTAL BID UNIT II PARKWAY PAVEMENT REMOVAL $ 13 q q 8. So TOTAL BID UNIT I $ iQ TOTAL BID UNIT II $ GRAND TOTAL BID UNIT I & UNIT II $ (Contractor to bid both Unit I and Unit II—See Special Provisions) J'i This contract is issued by an organization which qualifies for exemption pursuant to the provision of Article 20.04 (F) of the Texas Limited Sales, Excise and Use Tax Act, Taxes. All equipment and materials not consumed by or incorporated into the project construction, are subject to State sales taxes under House Bill 11, enacted August 15, 1991. The Contractor shall comply with City Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. The undersigned agrees to complete all work covered by these contract documents within Two Hundred Eighty (280) Calendar Days from and after the date for commencing work as set forth in the written Work Order to be issued by the Owner and to pay not less than the"Prevailing Wage Rates for Street, Drainage and Utility Construction"as established by the City of Fort Worth,Texas. Within ten (10) days of receipt of notice of acceptance of this bid, the undersigned will execute the formal contract and will deliver an approved Surety Bond for the faithful performance of this contract. The attached deposit check in the sum of 5% ::Zr A B Dollars ($ S% &A& ) is to be forfeited in the event the contract and bond are not executed within the time set forth, as liquidated damages for delay and additional work caused thereby. (I/we), acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration in preparation of the foregoing bid: //.;k Y-�Y Addendum No. 1 (Initials) �- Addendum No. 3 (Initials) �2-1-oy C Addendum No. 2 (Initials) — Addendum No. 4 (Initials) Respectfully submitted: Address /O- /1-7C 15-305,6- 7" TfX---Jr Telephone(977-) ZCy (SEAL) Date VENDOR COMPLIANCE TO STATE LAW The 1985 Session of the Texas Legislature passed House Bill 620 relative to the award of contracts to nonresident bidders. This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-State contractors whose corporate offices or principal place of business are outside of the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required too underbid a nonresident bidder in order to obtain a comparable contract in the State in which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all out-of-State or nonresident bidders in order for your bid to meet specifications. The failure of out-of-State or nonresident contractors to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Nonresident vendors in (give State), our principal place of business, are required to be percent lower than resident bidders by State law. A copy of the Statute is attached. Nonresident vendors in (give State), our principal place of business, are not required to underbid resident bidders. B. Our principal place of business or corporate offices are in the State of Texas. BIDDER: McMAHON CONTRACM0,LR 0 9 6 By: cSf��l wN 'W C' JA A✓ (Please print) Signature: 30J6 Title: ��✓ E city State Zip (Please int) THIS FORM MUST BE RETURNED WITH YOUR QUOTATION FORT WORTH City of Fort Worth Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is$25,000 or more,the M/WBE goal is applicable. If the total dollar value of the contract is less than $25,000, the M/WBE goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority and Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. All requirements and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid. MIME PROJECT GOAL (UNIT I ONLY) . The City's MBE/WBE goal on this project is 29 %of the base bid value of the contract. COMPLIANCE TO BID SPECIFICATIONS On City contracts of$25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of the following: 1. Meet or exceed the above stated M/WBE goal, or 2. Good Faith Effort documentation, or; 3. Waiver documentation, or; 4. Joint Venture. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. 1. Subcontractor Utilization Form, if goal is received by 5:00 p.m., five (5) City business days after the bid met or exceeded: opening date, exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if participation is less than opening date, exclusive of the bid opening date. stated goal: 3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if no M/WBE participation: opening date, exclusive of the bid opening date. 4. Prime Contractor Waiver Form, if you will received by 5:00 p.m., five (5) City business days after the bid perform all subcontracting/supplier work: opening date, exclusive of the bid opening date. 5. Joint Venture Form, if utilize a joint venture received by 5:00 p.m., five (5) City business days after the bid to met or exceed goal. opening date, exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S M/WBE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS Any questions, please contact the M/WBE Office at(817)392-6104. Rev.5/30/03 ATTACHMENT 1A Page 1 of 4 FORT WORTH City of Fort Worth Subcontractors/Suppliers Utilization Form PRIME COMPANY NAME: Check applicable block to describe prime McMAHON CONTRACTING,LR PROJECT NAME: MM/DBE I Vf NON-MM/DBE �gyYt pow t tGO,r�5�'f�G'� Iovt BID DATE Decem)oe r % Zoo LI City's MfWBE Project Goal: Prime's M/WBE Project Utilization: PROJECT NUMBER 2 % / O % CZoo —S3�2Do rV7 Z 3 ocoo?So Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, I will result in the bid being considered non-responsive to bid specifications. R The undersigned Offeror agrees to enter into a formal agreement with the M/WBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to bid specifications ,MIWBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant, Parker, Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall counties. Identify each .Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered 1 rt tier, a payment by a subcontractor to its supplier is considered 2M tier ALL MIWBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located or doing business at the time of bid opening within the Marketplace, that have been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency (NCTRCA), or the Texas Department of Transportation (TX DOT), highway division. Disadvantaged Business Enterprise (DBE) is synonymous with Minority/Women Business Enterprise(M/1NBE). If hauling services are utilized, the prime will be given credit as long as the MANGE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The MANBE may lease trucks from another M/WBE firm, including M/WBE owner-operators, and receive full M/WBE credit. The M/WBE may lease trucks from non-M/WBEs, including owner-operators, but will only receive credit for the fees and commissions earned by the M/WBE as outlined in the lease agreement. Rev.5/30/03 i ATTACHMENT IA FORT WORTH Page 2 of 4 Primes are required to identify ALL subcontractors/suppliers, regardless of status;i.e., Minority,Women and non-M/WBEs. Please list M/WBE firms first, use additional sheets if necessary. Certification N SUBCONTRACTOR/SUPPLIER T (check one) n Company Name i N T Detail Detail Address e M w C X M Subcontracting Work Supplies Purchased Dollar Amount Telephone/Fax r B B T D W E E R O B C T E A A A e-o✓!Orvc}i o✓L 1`ntrrlocKin� Pa./e.5 / ✓ 1rter�oc��~�` v P,,jers ��82, 1aS Dlm/wV,E f/nlD 1320300 (010 4t rndnS Ty0CKIw� DFF "'A't 00 � a L'(-�'^�.. 000. I � ,..c7R<A Cf� 8aa 10a„\ o gm nRZ33 531'0-705 s✓rri.ftt Swwii� #/0/ 000 . °b fie Rev. 5/30/03 ATTACHMENT IA FORT WORTH Page 3 of 4 Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority,Women and non-M/WBEs. Please list M/WBE firms first, use additional sheets if necessary. Certification � SUBCONTRACTOR/SUPPLIER T (check one) r Company Namei N T Detail Detail Address e M W C X i Subcontracting Work Supplies Purchased Dollar Amount Tele hone/Fax T D E P r E E R O E C T E A Rev.5/30/03 i ATTACHMENT 1A FORT WORTH Page 4 of 4 00 Total Dollar Amount of M/VVBE Subcontractors/Suppliers $ Total Dollar Amount of Non-M/WBE Subcontractors/Suppliers $ S ° S S / � 3. TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ I ( ?J Z S / -1 3 g' GO The Contractor will not make additions, deletions, or substitutions to--th s certified list without the prior approval of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a Request for Approval of Change/Addition. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed M/WBE goal. If the detail explanation is not submitted, it will affect the final compliance determination. By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work performed by the M/W/DBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one (1) year. r i uthorized • nature CfqGds Printed Signature A&14�.0 Cott- � e� Y\ Ca-PK0 -- Title I Contact Name/Title(if different) FPx:972-26N•aoo$ McMMON CON PAC M(3o LE 9-7Z - 2-6S- 690-7 CompanyName Q ) [ Telephone and/or Fax ry. goy- 1 J 0 PV w�0.�lonCor�}r tic Tins , cor+� Address E-mail Address O r'JInc1 I X . 750js— 30 � � bPcew�ber- 09, 2ov '-{ City/State/Zip Date Rev.5/30/03 ATTACHMENT 1 B FORT WORTH Page 1 of 1 City of Fort Worth Prime Contractor Waiver Form PRIME COMPANY NAME: Check applicable block to describe rime PROJECT NAME: MAW/DBE I I NON-M/W/DBE BID DATE City's MANBE Project Goal: PROJECT NUMBER If both answers to this form are YES, do not complete ATTACHMENT 1C(Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 11C. This form is only applicable if both answers are yes. Failure to complete this form in its entirety and be received by the Manacling Department on or before 5:00 p.m..five(5)City business days after bid opening,exclusive of the bid opening date,will result in the bid being considered non-responsive to bid specifications. Will you perform this entire contract without subcontractors? YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, NO this is your normal business practice and provide an operational profile of your business. Will you perform this entire contract without suppliers? YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business. NO The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/WBE(s)on this contract, the payment therefore and any proposed changes to the original M/WBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the M/WBEs on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3)years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1)year. Authorized Signature Printed Signature Title Contact Name(if different) P Company Name Phone Number Fax Number Address Email Address City/State/Zip Date Rev.5130103 SPECIAL PROVISIONS FOR STREET AND STORM DRAIN IMPROVEMENTS y FOR: RECONSTRUCTION OF CAMP BOWIE BOULEVARD FROM ELDRIDGE STREET TO HULEN STREET PR03ECT NO. C115-020115095116 p; FILE NO. K-1692 ; L DOE #: 2999 1. SCOPE OF WORK: The work covered by these plans and specifications consist of brick pavers over 7"reinforced concrete base over 6"lime stabilized subgrade and all other miscellaneous items of construction to be performed as outlined in the plans and specifications which are necessary to satisfactorily complete the work. 2. AWARD OF CONTRACT: Submission of Bids: Unit I and Unit II constitute a package. The Contractor must submit a bid on both Unit I and Unit II. After bids are received, the Engineer will evaluate the total amount bid for Unit II. If the total bid for Unit II is not within the City's budgeted amount then it will be dropped from the contract and the contract will be awarded for Unit I only. No allowance will be made for any changes in anticipated profits nor shall removing Unit II be considered as waiving or invalidating any conditions or provisions of the Contract Documents. Bidders are hereby informed that the Director of the Department of Engineering reserves the right to evaluate and recommend to the City Council the best bid that is considered to be in the best interest of the City. i 3. PRECONSTRUCTION CONFERENCE: The successful Contractor, Engineer, and City- City shall meet at the call of the City for a preconstruction conference before any of its work begins on this 1 project. At this time, details of sequencing of the work, contact individuals for each party, request for survey, and pay requests will be covered. Prior to the meeting, the Contractor shall prepare schedules showing the sequencing and progress of their work and its effect on others. A final composite schedule will be prepared during this conference to allow an orderly sequence of project construction. As used herein, the term"Engineer"shall mean the design engineer who prepared and sealed the plans, specifications and contract documents for this project. 4. EXAMINATION OF SITE: It shall be the responsibility of the prospective bidder to visit the project site and make such examinations and explorations as may be necessary to determine all conditions that may affect construction of this project. Particular attention should be given to methods of providing ingress and egress to adjacent private and public properties, procedures for protecting existing improvements and disposition of all materials to be removed. Proper -� consideration should be given to these details during preparation of the Proposal and all unusual conditions that may give rise to later contingencies should be brought to the attention of the City prior to the submission of the Proposal. During the construction of this project, it is required that all parkways be excavated and shaped including bar ditches at the same time the roadway is excavated. Excess excavation will be disposed of at locations approved by the Engineer. ` 1 During construction of this project, the Contractor shall comply with present zoning requirements of the City of Fort Worth in the use of vacant property for storage purposes. 10/27/04 SPA i � 5. BID SUBMITTAL: Bidders shall not separate, detach or remove any portion, segment or sheets from the contract documents at any time. Failure to bid or fully execute contract without retaining .contract documents intact may be grounds for designating bids as"non-responsive"and rejecting bids as appropriate and as determined by the Director of the Department of Engineering. 6. WATER FOR CONSTRUCTION: Water for construction will be furnished by the Contractor at his own expense. 7. SANITARY FACILITIES FOR WORKERS: The Contractor shall provide all necessary conveniences for the use of workers at the project site. Specific attention is directed to this equipment. 8. PAYMENT: The Contractor shall receive full payment from the City for all the work based on unit prices bid on the proposal and specified in the plans and specifications and approved by the Engineer per actual field measurement. 9. SUBSIDIARY WORK: Any and all work specifically governed by documentary requirement for the projects, such as conditions imposed by the Plans, the General Contract Documents or these special Contract Documents, in which no specific item for bid has been provided for in the Proposal, shall be considered as a subsidiary item or work, the cost of which shall be included in the price bid in the Proposal for each bid item, including but not limited to surface restoration cleanup and relocation of mailboxes. All objectionable matter required to be removed from within the right-of-way and not particularly described under these specifications shall be covered by Item No. 102"Clearing and Grubbing" and shall be subsidiary to the other items of the contract. 10. LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC: The Contractor's particular attention is directed to the requirements of Item 7,"Legal Relations and Responsibilities to the Public"of the"Standard Specifications for Street and Storm Drain Construction". 11. WAGE RATES: The labor classifications and minimum wage rates set forth herein have been predetermined by the City Council of the City of Fort Worth,Texas, in accordance with statutory requirements, as being the prevailing classifications and rates that shall govern on all work performed by the Contractor or any subcontractor on the site of the project covered by these Contract Documents. In no event shall less than the following rates be paid. (Attached at the end of this section.) I 12. EXISTING UTILITIES: The locations and dimensions shown on the plans relative to existing utilities are based on the best information available. It shall be the Contractor's responsibility to verify location of adjacent and/or conflicting utilities sufficiently in advance of construction in order that he may negotiate such local adjustments as are necessary in the construction process in order to provide adequate clearance. The Contractor shall take all necessary precautions in order to protect all services encountered. I Any damage to utilities and any losses to the utility City due to disruption of service resulting from the Contractor's operations shall be at the Contractor's expense. 13. PARKWAY CONSTRUCTION: During the construction of this project, it will be required that all parkways be excavated and shaped at the same time the roadway is excavated. Excess excavation will be disposed of at locations approved by the Director of the Department of Engineering. 14. MATERIAL STORAGE: Material shall not be stored on private property unless the Contractor has obtained written permission from the property owner and provided such to the City. 10/27/04 SP-2 I I CC � L ' ' 15. PROTECTION OF EXISTING UTILITIES AND IMPROVEMENTS: The Contractor shall take adequate ae gate measures to protect all existing structures, improvements and utilities, which may be encountered. ' The utility lines and conduits shown on the plans are for information only and are not guaranteed 1 by the City or the Engineer to be accurate as to extent, location and depth, they are shown on the plans as the best information available at the time of design,from the Owners of the utilities 1 involved and from evidences found on the ground. 16. INCREASE OR DECREASE IN QUANTITIES: The quantities shown in the Proposal are i approximate. It is the Contractor's sole responsibility to verify pay item quantities prior to submitting a bid. No additional compensation shall be paid to Contractor for errors in the quantities. Final payment will be based upon field measurements, except as provided in specification items allowing for plan quantity payment. The City reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices as established in the contract documents. No allowance will be made for any changes in anticipated profits or shall such changes be considered as waiving or invalidating any conditions or provisions of the Contract Documents. 17. CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contractor Covenants and agrees to n indemnify City's Engineer and Architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees,from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such injury, damage or death is caused,in whole or in part,by the negligence or alleged negligence of City,its officers,servants, oremployees Contractor likewise covenants and agrees to indemnify and hold harmless the City from and against any and all injuries to City's officers, servants and employees and any damage, loss or destruction to property of the City arising from the performance of any of the terms and conditions of this Contract, whether or not any such injury or damage is caused in whole or in part by the negligence or alleged negligence of City,its ofcers,servants or employees In the event City receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either(a) submits to City satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides City with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if deemed appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. 18. EQUAL EMPLOYMENT PROVISIONS: Contractor shall comply with City Ordinance Number 7278 as amended by City Ordinance Number 7400 (Fort Worth City Code Sections 13-A-21 through 12-A- 29) prohibiting discrimination in employments practices. The Contractor shall post the required notice to that effect on the project site, and at his request, will be provided by assistance by the City of Fort Worth's Equal Employment Officer who will refer any qualified applicant he may have on file in his office to the Contractor.. Appropriate notices may be acquired from the Equal Employment Officer. 10/27/04 SP-3 � l I 19. MINORITY AND WOMEN BUSINESS ENTERPRISE (M/WBE) COMPLIANCE: In accordance with City of Fort Worth Ordinance No. 15530, the City has goals for the participation of minority business enterprises and women business enterprises in City contracts. The Ordinance is incorporated in these specifications by reference. A copy of the Ordinance may be obtained from the Office of the City Secretary. Failure to comply with the ordinance shall be a material breach of contract. M/WBE UTILIZATION FORM, M/WBE GOALS WAIVER FORM AND GOOD FAITH EFFORT FORM, as 1 applicable, must be submitted within fine (5) city business days after bid opening. Failure to comply shall render the bid non-responsive. Upon request, Contractor agrees to provide the City complete and accurate information regarding actual work performed by a Minority or Women Business Enterprise (M/WBE) on the contract and payment thereof. Contractor further agrees to permit an audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of acts (other than a negligent misrepresentation) and/or the commission fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state, or local laws or ordinances relating to false statement. Further, any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time not less than three years. The City will consider the Contractor's performance regarding its M/WBE program in the evaluation of bids. Failure to comply with the City's M/WBE Ordinance, or to demonstrate"good faith effort", shall result in a bid being rendered non-responsive to specifications. Contractor shall provide copies of subcontracts or co-signed letters of intent with approved M/WBE subcontractors prior to issuance of the Notice to Proceed. Contractor shall also provide monthly reports on utilization of the subcontractors to the City's M/WBE office. The Contractor may count first and second tier subcontractors and/or suppliers toward meeting the goals. The Contractor may count toward its goal a portion of the total dollar amount of the contract with a joint venture equal to the percentage of the M/WBE participation in the joint venture for a clearly defined portion of the work to be performed. All M/WBE Contractors used in meeting the goals must be certified prior to the award of the Contract. The M/WBE Contractor(s) must be certified by either the North Central Texas Regional Certification Agency(NCTRCA) or Texas Department of Transportation TxDOT Highway Division and must be located in t p p ( ), g y he nine (9) county marketplace or currently doing business in the marketplace at time of bid. The Contractor shall contact all such M/WBE subcontractors or suppliers prior to listing them on the M/WBE utilization or good faith effort forms as applicable. Failure to contact the listed M/WBE subcontractor or supplier prior to bid opening may result in the rejection of bid as non-responsive. Whenever a change order affects the work of an M/WBE subcontractor or supplier, the M/WBE shall be given an opportunity to perform the work. Whenever a change order exceeds 10% of the original contract, the M/WBE coordinator shall determine the goals applicable to the work to be performed under the change order During the term of the contract the contract shall: 1. Make no unjustified changes or deletions in its M/WBE participation commitments submitted with or subsequent to the bid, and, 2. If substantial subcontracting and/or substantial supplier opportunities arise during the term of the contract which the Contractor had represented he would perform with his forces, the Contractor shall notify the City before subcontracts or purchase orders are 10/27/04 SP-4 i h GG let, and shall be required to comply with modifications to goals as determined by the City, and, i! 3. Submit a REQUEST FOR APPROVAL OF CHANGE FORM, if the Contractor desires to change or delete any of the M/WBE subcontractors or suppliers. Justification for change may be granted for the following: a. Failure of Subcontractor to provide evidence of coverage by Worker's Compensation Insurance. b. Failure of Subcontractor to provide required general liability of other insurance. C. Failure of Subcontractor to execute a standard subcontract form in the amount of the proposal used by the Contractor in preparing his M/WBE Participation r plan. d. Default by the M/WBE subcontractor or supplier in the performance of the subcontractor. Within ten (10) days after final payment from the City, the Contractor shall provide the M/WBE Office with documentation to reflect final participation of each subcontractor and supplier used on the project, inclusive of M/WBEs. l 20. FINAL CLEAN-UP: Final cleanup work shall be done for this project as soon as the paving and curb and gutter has been completed. No more than seven days shall elapse after completion of construction before the roadway and R.OW. is cleaned up to the satisfaction of the Engineer. The f Contractor shall make a final cleanup of all parts of the work before acceptance by the City or its representative. This cleanup shall include removal of all objectionable rocks, pieces of asphalt or concrete and other construction materials, and in general preparing the site of the work in an orderly manner and appearance. 21. CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW: A. Workers Compensation Insurance Coverage a. DEFINITIONS: i � b. Certification of coverage ("Certificate"). A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement(TWCC-81,TWCC- 82,TWCC-83, OR TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project. Duration of the project-includes the time from the beginning of the work on the project 4F until the Contractor's/person's work on the project has been completed and accepted by the € governmental entity. l Persons providing services on the project("subcontractor" in §406.096)-includes all persons or jf entities performing all or part of the services the Contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the Contractor and regardless of whether that person has employees. This includes, without limitation, independent Contractors, subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other services related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office.supply deliveries, and delivery of portable toilets. i 10/27/04 SP-5 i i The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) or all employees of the Contractor providing services on the project,for the duration of the project. c. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. d. If the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the project, the Contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. e. The Contractor shall obtain from each person providing services on a project, and provide to the governmental entity: (1) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (2) no later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. f. The Contractor shall retain all required certificates of coverage for the duration of the project and for one year*thereafter. g. The Contractor shall notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the Contractor knew or should have known, or any change that materially affects the provision of coverage of any person providing services on the project. h. The Contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Worker's Compensation, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. i. The Contractor shall contractually require each person with whom it contracts to provide services on a project, to: (1) provide coverage, based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44)for all of its employees providing services on the project, for the duration of the project; (2) provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; (3) provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; i 10/27/04 SP-6 i • b ' i (4) obtain form each other person with whom it contracts, and provide to the Contractor: (a) a certificate of coverage, prior to the other person beginning work on the project; and y (b) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the j project; (c) retain all required certificates of coverage on file for the duration of I ? the project and for one year thereafter. (d) notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (e) contractually require each person with whom it contracts, to perform as required by paragraphs (1)-(7), with the certificates of coverage to be provided to the person for whom they are providing services. By signing this contract or providing or causing to be provided a certificate of coverage, the Contractor is representing to the governmental entity that all employees of the Contractor who will provide services on the project will be covered by worker's compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the Contractor to administrative, criminal, civil penalties or other civil actions. i k. The Contractor's failure to comply with any of these provisions is a breach of contract by the Contractor which entitles the governmental entity to declare the contract void if the Contractor does not remedy the breach within ten day after receipt of notice of breach from the governmental entity. B. The Contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation ` Act or other Texas Worker's Commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the Worker population. The text for the notices shall be the following text, without any additional words or changes: "REQUIRED WORKER'S COMPENSATION COVERAGE The law requires that each person working on this site or providing services related to this construction project must be covered by worker's compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing ve 10/27/04 SP-7 1 labor or transportation or other service related to the project, regardless of the identify of their employer or status as an employee." Call the Texas Worker's Compensation Commission at 512-440-3789 to receive information on the legal requirement"for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage". 22. SUBSTITUTIONS: The specifications for materials set out the minimum standard of quality that the City believes necessary to procure a satisfactory project. No substitutions will be permitted until the Contractor has received written permission of the Engineer to make a substitution for the material that has been specified. Where the term"or equal", or"or approved equal"is used, it is understood that if a material, product, or piece of equipment bearing the name so used is j furnished, it will be approvable, as the particular trade name was used for the purpose of establishing a standard of quality acceptable to the City. If a product of any other name is proposed substitutes is procured by the Contractor. Where the term"or equal", or"approved equal"is not used in the specifications, this does not necessarily exclude alternative items or material or equipment which may accomplish the intended purpose. However, the Contractor shall have the full responsibility of providing that the proposed substitution is, in fact, equal, and the Engineer, as the representative of the City, shall be the sole judge of the acceptability of substitutions. The provisions of the sub-section as related to"substitutions"shall be applicable to all sections of these specifications. 23. MECHANICS AND MATERIALMEN'S LIEN: The Contractor shall be required to execute a release of mechanics and materialmen's liens upon receipt of payment. I 24. WORK ORDER DELAY: All utilities and right-of-way are expected to be clear and easements and/or , permits obtained on this project within sixty (60) days of advertisement of this project. The work order for subject project will not be issued until all utilities, right-of-ways, easements and/or permits are cleared or obtained.The Contractor shall not hold the City of Fort Worth responsible for any delay in issuing the work order for this Contract. 25. CALENDAR DAYS: The Contractor agrees to complete the Contract within the allotted number of calendar days. 26. RIGHT TO ABANDON: The City reserves the right to abandon, without obligation to the Contractor, any part of the project or the entire project at any time before the Contractor begins any construction work authorized by the City. I 27. CONSTRUCTION SPECIFICATIONS: This contract and project are governed by the two following published specifications, except as modified by these Special Provisions: STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION CITY OF FORT WORTH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION NORTH CENTRAL TEXAS A copy of either of these specifications may be purchased at the Office of the Department of ! Engineering, 1000 Throckmorton Street, 2nd Floor, Municipal Building, Fort Worth, Texas 76102. The specifications applicable to each pay item are indicated in the call-out for the pay item by the Engineer. If not shown, then applicable published specifications in either of these documents may 10/27/04 SP-8 I � be followed at the discretion of the Contractor. General Provisions shall be those of the Fort Worth document rather than Division 1 of the North Central Texas document. 28. MAINTENANCE STATEMENT: The Contractor shall be responsible for defects in this project due to faulty materials and workmanship, or both,for a period of two (2) years from date of final acceptance of this project and will be required to replace at his expense any part or the entire project which becomes defective due to these causes. 29. DELAYS: The Contractor shall receive no compensation for delays or hindrances to the work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any, which is to be furnished by the City. When such extra compensation is claimed a written statement thereof shall be presented by the Contractor to j the Director of the Department of Engineering and if by him found correct shall be approved and referred by him to the Council for final approval or disapproval; and the action thereon by the a Council shall be final and binding. If delay is caused by specific orders given by the Engineers to Cstop work or by the performance of extra work or by the failure of the City to provide material or necessary instructions for carrying on the work, then such delay will entitle the Contractor to an equivalent extension of time, his application for which shall, however, be subject to the approval of the City Council; and no such extension of time shall release the Contractor or the surety on his performance bond form all his obligations hereunder which shall remain in full force until the discharge of the contract. 30. DETOURS AND BARRICADES: The Contractor shall prosecute his work in such a manner as to create a minimum of interruption to traffic and pedestrian facilities and to the flow of vehicular r and pedestrian traffic within the project area. Contractor shall protect construction as required by i Engineer by providing barricades. Barricades, warning and detour signs shall conform to the Standard Specifications"Barriers and Warning and/or Detour Signs,"Item 524 and/or as shown on the plans. Construction signing and barricades shall conform with "1980 Texas Manual on Uniform Traffic Control Devices, Vol. No. 1." 31. DISPOSAL OF SPOIL FILL MATERIAL . Prior to the disposing of any spoil/fill material, the Contractor shall advise the Director of the Department of Engineering acting as the City of Fort Worth's Flood Plain Administrator("Administrator"), of the location of all sites where the Contractor intends to dispose of such material. Contractor shall not dispose of such material until the proposed sites have been determined by the Administrator to meet the requirements of the Flood Plain Ordinance of the City of Fort Worth (Ordinance No. 10056). All disposal sites must be approved by the Administrator to ensure the filling is not occurring within a flood plain without a permit. A flood plain permit can be issued upon approval of necessary engineering studies. No fill P permit is required if disposal sites are not in a flood plain. Approval of the Contractor's disposal sites shall be evidenced by a letter signed by the Administrator stating that the site is not in a known flood plain or by a Flood Plain fill Permit authorizing fill within the flood plain. Any expenses associated with obtaining the fill permit, including any necessary engineering studies, shall be at the Contractor's expense. In the event that the Contractor disposes of spoil/fill materials at a site without a fill permit or a letter from the administrator approving the disposal site, upon notification by the Director of Engineering, Contractor shall remove the spoil/fill material at its expense and dispose of such materials in accordance with the Ordinance of the City and this section. 32. QUALITY CONTROL TESTING: ' 10/27/04 SP-9 I i 1 (a) The Contractor shall furnish, at its own expense, certifications by a private laboratory for all materials proposed to be used on the project, including a mix design for any asphaltic and/or Portland cement concrete to be used and gradation analysis for sand and crushed stone to be j used along with the name of the pit from which the material was taken. The Contractor shall provide manufacturer's certifications for all manufactured items to be used in the project and will bear any expense related thereto. (b) Tests of the design concrete mix shall be made by the Contractor's laboratory at least nine days prior to the placing of concrete using the same aggregate, cement and mortar which are to be used later in the concrete. The Contractor shall provide a certified copy of the test results to the City. (c) Quality control testing of on site material on this project will be performed by the City at its own expense. Any retesting required as a result of failure of the material to meet project specifications will be at the expense of the Contractor and will be billed at commercial rates as determined by the City.The failure of the City to make any tests of materials shall in no way relieve the Contractor of its responsibility to furnish materials and equipment conforming to the requirements of the contract. (d) Not less than 24 hours notice shall be provided to the City by the Contractor for operations requiring testing. The Contractor shall provide access and trench safety system (if required) for the site to be tested and any work effort involved is deemed to be included in the unit price for the item being tested. (e) The Contractor shall provide a copy of the trip ticket for each load of fill material delivered to the job site. The ticket shall specify the name of the pit supplying the fill material. 33. PROPERTY ACCESS: Access to adjacent property shall be maintained at all times unless otherwise directed by the Engineer. i ti 34. SAFETY RESTRICTIONS - WORK NEAR HIGH VOLTAGE LINES: The following procedures will be followed regarding the subject item on this contract: (a) A warning sign not less than five inches by seven inches, painted yellow with black letters that are legible at twelve feet shall-be placed inside and outside vehicles such as cranes, derricks, power shovels, drilling rigs, pile drivers, hoisting equipment or similar apparatus. The warning sign shall read as follows: "WARNING—UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF HIGH j VOLTAGE LINES." (b) Equipment that may be operated within ten feet of high voltage lines shall have an insulating cage-type of guard about the boom or arm, except back hoes or dippers and insulator links on the lift hood connections. (c) When necessary to work within six feet of high voltage electric lines, notification shall be given the power company (TU Electric Service Company) which will erect temporary mechanical barriers, de-energize the line or raise or lower the line. The work done by the power company shall not be at the expense of the City of Fort Worth. The notifying department shall maintain an accurate log of all such calls to TU Electric Service Company and shall record action taken in each case. 10/27/04 SP-10 1 1 I 4r I 1 (d) The Contractor is required to make arrangements with the TU Electric Service Company for the temporary relocation or raising of high voltage lines at the Contractor's sole cost and expense. ; 1 (e) No person shall work within six feet of a high voltage line without protection having been taken as outlined in Paragraph (c). J 35. WATER DEPARTMENT PRE-QUALIFICATIONS: Any Contractor performing any work on Fort Worth water or sanitary sewer facilities must be pre-qualified with the Water Department to perform such work in accordance with procedures described in the current Fort Worth Water Department General Specifications which general specifications shall govern performance of all such work. 36. RIGHT TO AUDIT: (a) Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this contract have access to and the right to examine and photocopy any directly Gpertinent books, documents, papers and records of the Contractor involving transactions relating to this contract. Contractor agrees that the City shall have access during normal working hours to all necessary Contractor facilities and shall be provided adequate and a appropriate workspace in order to conduct audits in compliance with the provisions of this section. The City shall give Contractor reasonable advance notice of intended audits. (b) Contractor further agrees to include in all its subcontracts hereunder a provision to the effect C that the subcontractor agrees that the City shall, under the expiration of three (3) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subcontractor involving transactions to the subcontract and further, that City shall have access during normal working hours to all subcontractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this article together with subsection (c ) hereof. City shall give subcontractor reasonable advance notice of intended audits. (c) Contractor and subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. . 37. CONSTRUCTION STAKES; The City, through its Surveyor or agent, will provide to the Contractor construction stakes or other customary methods of markings as may be found consistent with professional practice to establish line and grade for roadway and utility construction and centerlines and benchmarks for bridgework. These stakes shall be set sufficiently in advance to avoid delay whenever practical. One set of stakes shall be set for all utility construction (water, sanitary sewer, drainage, etc.), one set of excavation/or stabilization stakes, and one set of stakes for curb and gutter and/or paving. It shall be the sole responsibility of the Contractor to preserve, maintain,transfer, etc., all stakes furnished until completion of the construction phase of the project for which they were furnished. If, in the opinion of the Engineer, a sufficient number of stakes or markings provided by the City have been lost, destroyed, or disturbed, that the proper prosecution and control of the work contracted for in the Contract Documents cannot take place, then the Contractor shall replace such stakes or markings as required. An individual registered by the Texas Board of Professional Land Surveying as a Registered Professional Land Surveyor shall replace these stakes, at the Contactor's expense. No claims for delay due to a lack of replacement of construction stakes will be accepted, and time will continue to be charged in accordance with the Contract Documents. 10/27/04 SP-11 I i 38. LOCATION OF NEW WALKS AND DRIVEWAYS; The Contractor will make every effort to protect existing trees within the parkway, with the approval of the engineer the Contractor may re-locate proposed new driveways and walks around existing trees to minimize damage to trees. 39. EARLY WARNING SYSTEM FOR CONSTRUCTION: Time is of the essence in the completion of this 1 contract. In order to insure that the Contractor is responsive when notified of unsatisfactory performance and/or of failure to maintain the contract schedule, the following process shall be applicable: The work progress on all construction projects will be closely monitored. On a bi-monthly basis the percentage of work completed will be compared to the percentage of time charged to the contract. If the amount of work performed by the Contractor is less than the percentage of time allowed by 20% or more (example: 10% of the work completed in 30% of the stated contract time as may be amended by change order), the following proactive measures will be taken: I� 1. A letter will be mailed to the Contractor by certified mail, return receipt requested demanding that, within 10 days from the date that the letter is received, it provide sufficient equipment, materials and labor to ensure completion of the work within the contract time. In the event the Contractor receives such a letter, the Contractor shall provide to the City an updated schedule showing how the project will be completed within the contract time. I I 2. The Project Manager and the Directors of the Department of Engineering, Water Department, and Department of Transportation and Public Works will be made aware of the situation. If necessary, the City Manager's Office and the appropriate city council members may also be informed. 3. Any notice that may, in the City's sole discretion, be required to be provided to interested individuals will distributed by the Engineering Department's Public Information Officer. 4. Upon receipt of the Contractor's response, the appropriate City departments and directors will be notified. The Engineering Department's Public Information Officer will, If necessary, then forward updated notices to the interested individuals. 5. If the Contractor fails to provide an acceptable schedule or fails to perform satisfactorily a second time prior to the completion of the contract, the bonding company will be notified appropriately. 40. AIR POLLUTION WATCH DAYS: The Contractor shall be required to observe the following guidelines relating to working on City construction sites on days designated as "AIR POLLUTION WATCH DAYS". Typically, the OZONE SEASON, within the Metroplex area, runs from May 1, through OCTOBER 31, with 6:00 a.m. - 10:00 a.m. being critical BECAUSE EMISSIONS FROM THIS TIME PERIOD HAVE ENOUGH TIME TO BAKE IN THE HOT ATMOSPHERE THAT LEADS TO EARLY AFTERNOON OZONE FORMATION. ,I The Texas Commission on Environmental Quality (TCEQ), in coordination with the National Weather Service, will issue the Air Pollution Watch by 3:00 p.m. on the afternoon prior to the WATCH day. On designated Air Pollution Watch Days, the Contractor shall bear the responsibility of being aware that such days have been designated Air Pollution Watch Days and as such shall not begin work until 10:00 a.m. whenever construction phasing requires the use of motorized 10/27/04 SP-12 4 A equipment for periods in excess of 1 hour. However, the Contractor may begin work prior to 10:00 a.m. if use of motorized equipment is less than 1 hour, or if equipment is new and certified tby EPA as "Low Emitting", or equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or alternative fuels such as CNG. If the Contractor is unable to perform continuous work for a period of at least seven hours between the hours of 7:00 a.m. -6:00 p.m., on a designated Air Pollution Watch Day, that day will be considered as a weather day and added onto the allowable weather days of a given month. ' p CONSTRUCTION 41 NON-PAY ITEM - CLEARING AND GRUBBING: All objectionable items within the limits of this project and not otherwise provided for shall be removed under this item in accordance with Standard Specification Item 102, "Clearing and Grubbing." r However, no direct payment will be made for this item and it shall be considered incidental to this I� contract. 42. NON-PAY ITEM - SPRINKLING FOR DUST CONTROL: All applicable provisions of Standard Specifications Item 200, "Sprinkling for Dust Control"shall apply. However, no direct payment will be made for this item and it shall be considered incidental to this contract. p 43. NON-PAY ITEM - PROTECTION OF TREES, PLANTS AND SOIL: All property along and adjacent to the Contractor's operations including lawns, yards, shrubs, trees, etc. shall be preserved or restored after completion of the work to a condition equal or better than existed prior to start of work. By ordinance, the Contractor must obtain a permit from the City Forester before any work (trimming, removal or root pruning) can be done on trees or shrubs growing on public property including street rights-of-way and designated alleys. This permit can be obtained by calling the Forestry Office at 871- 5738. All tree work shall be in compliance with pruning standards for Class II Pruning as described by the National Arborist Association. A copy of these standards can be provided by calling the above number. Any damage to public trees due to negligence by the Contractor shall be assessed using the current formula for Shade Tree Evaluation as defined by the International Society of Arboriculture. Payment for negligent damage to public trees shall be made to the City of Fort Worth and may be withheld from funds due to the Contractor by the City. To prevent the spread of the Oak Wilt fungus, all wounds on Live Oak and Red Oak trees shall be immediately sealed using a commercial pruning paint. This is the only instance when pruning paint is ' recommended. 44. NON-PAY ITEM - CONCRETE COLORED SURFACE: Concrete wheelchair ramp surfaces, excluding the side slopes and curb, shall be colored with LITHOCHROME color hardener or equal. A brick red color, a dry-shake hardener manufactured by L.M. Scofield Company or equal, shall be used in accordance with manufacturers instructions. Contractor shall provide a sample concrete panel of one foot by one foot by three inches dimension, or other dimension approved by the Engineer, meeting the aforementioned specifications. The sample, upon approval of the Engineer, shall be the acceptable standard to be applied for all construction I covered in the scope of this Non-Pay Item. No direct payment will be made for this item and it shall be considered incidental to this contract. The method of application shall be by screen, sifter, sieve, or other means in order to provide for a f uniform color distribution. 6 10/27/04 SP-13 45. NON-PAY ITEM - PROJECT CLEAN-UP: The Contractor shall be aware that keeping the project site in a neat and orderly condition is considered an integral part of the contracted work and as such shall be considered subsidiary to the appropriate bid items. Clean up work shall be done as directed by the Engineer as the work progresses or as needed. If, in the opinion of the Engineer it is necessary, clean up shall be done on a daily basis. Clean up work shall include, but not be limited to: • Sweeping the street clean of dirt or debris • Storing excess material in appropriate and organized manner • Keeping trash of any kind off of residents' property If the Engineer does not feel that the jobsite has been kept in an orderly condition, on the next estimate payment(and all subsequent payments until completed) of the appropriate bid item(s)will be reduced by 25%. Final cleanup work shall be done for this project as soon as the paving and curb and gutter has been constructed. No more than seven days shall elapse after completion of construction before the roadway and right-of-way is cleaned up to the satisfaction of the Engineer. 46. NON-PAY ITEM - PROJECT SCHEDULE: Contractor shall be responsible for producing a project schedule at the pre-construction conference. This schedule shall detail all phases of construction, including project clean up, and allow the Contractor to complete the work in the allotted time. Contractor will not move on to the jobsite nor will work begin until said schedule has been received and approval secured from the Construction Engineer. However, contract time will start even if the project schedule has not been turned in. Project schedule will be updated and resubmitted at the end of every estimating period. All costs involved with producing and maintaining the project schedule shall be considered subsidiary to this contract. 47. NON-PAY ITEM - NOTIFICATION OF RESIDENTS: In order to cut down on the number of complaints from residents due to the dust generated when saw-cutting joints in concrete pavement, the Contractor shall notify residents, in writing, at least 48 hours in advance of saw-cutting joints during the construction of paving projects. i All costs involved with providing such written notice shall be considered subsidiary to this contract. 48. NON-PAY ITEM - PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION: Prior to beginning construction on any block in the project, the Contractor shall, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction.The notice shall be prepared as follows: i The notification notice or flyer shall be posted seven (7) days prior to beginning any construction activity on each block in the project area. The flyer shall be prepared on the Contractor's letterhead and shall include the following information: Name of Project, DOE No., Scope of Project (i.e. type of construction activity), actual construction duration within the block, the name of the Contractor's foreman and his phone number, the name of the City's inspector and his phone number and the City's after-hours phone number. A sample of the`pre-construction notification'flyer is attached. The Contractor shall submit a schedule showing the construction start and finish time for each block of the project to the inspector. In addition, a copy of the flyer shall be delivered to the City Inspector for his review prior to being distributed. The Contractor will not be allowed to begin construction on any block until the flyer is delivered to all residents of the block. An electronic version of the sample flyer can be obtained from the construction office at 871-8306. 10/27/04 SP-14 i w II All work involved with the pre-construction notification flyer shall be considered subsidiary to the contract price and no additional compensation shall be made. 49. NON-PAY ITEM — PRE-CONSTRUCTION NEIGHBORHOOD MEETING: After the pre-construction conference has been held but before construction is allowed to begin on this project a public meeting will be held at a location to be determined by the Engineer. The Contractor, V inspector, and project manager shall meet with all affected residents and present the projected schedule, including construction start date, and answer any construction related questions. Every effort will be made to schedule the neighborhood meeting within the two weeks following the pre- construction conference but in no case will construction be allowed to begin until this a meeting is held. Note: The Contractor will be required to attend several public meetings in addition to the initial � meeting noted above. These will be on a monthly basis while construction is ongoing. it 50. NON-PAY ITEM - WASHED ROCK: All washed rock used for embedment or backfill or as otherwise directed by the Engineer shall washed, i' crushed stone and shall meet the following gradation and abrasion: (Actual washing not required if gradation is met) Sieve Size % Retained !' 1" 0-10 1/2" 40-75 > 3/8" 55-90 h #4 90-100 #8 95-100 Los Angeles Abrasion Test: 50% Maximum wear per A.S.T.M. Designation C-131. 51. NON-PAY ITEM —SAWCUT OF EXISTING CONCRETE: When existing concrete or H.M.A.C. is cut, such cuts shall be made with a concrete saw. The y Contractor may break out curb and gutter to the nearest joint if he chooses. All sawing shall be subsidiary to the unit cost of the respective item. 6 52. NON PAY ITEM—TIE IN INTO STORM DRAIN STRUCTURE: The cost for making lateral tie-ins to the storm drain structure shall be subsidiary to the bid price for the respective lines. 53. NON PAY ITEM —SPRINKLER HEAD ADJUSTMENT: The adjustment and/or relocation of sprinkler heads encountered shall be paid for under utility adjustment in the proposal section. No other compensation will be provided. 54. NON PAY ITEM - FEE FOR STREET USE PERMITS AND RE-INSPECTIONS: A fee for street use permits is in effect. In addition, a separate fee for re-inspections for parkway construction, such as driveways, sidewalks, etc., will be required. The fees are as follows: The street permit fee is $50.00 per permit with payment due at the time of permit application. Payment by the Contractor for all street use permits and re-inspections shall be considered subsidiary to the contract cost and no additional compensation shall be made. '1 55. NON PAY ITEM -TEMPORARY EROSION. SEDIMENT AND WATER POLLUTION CONTROL(FOR DISTURBED AREAS LESS THAN 1 ACRE): A. DESCRIPTION: This item shall consist of temporary soil erosion sediment and water pollution control measures deemed necessary by the Engineer for the duration of the contract. These control 10/27/04 SP-15 4 measures shall at no time be used as a substitute for the permanent control measure unless otherwise directed by the engineer and they shall not include measures taken by the CONTRACTOR to control conditions created by his construction operations. The temporary measures shall include dikes, dames, berms,sediment basins, fiber mats,jute netting, temporary seeding, straw mulch, asphalt mulch, plastic liners, rubble liners, baled-hay retards, dikes, slope drains and other devices. B. CONSTRUCTION REQUIRMENTS: The Engineer has the authority to define erodible earth and the authority to limit the surface are of erodible-earth material exposed by preparing right-of-way, clearing and grubbing, the surface area of erodible-earth material exposed by excavation, borrow and to direct the CONTRACTOR to provide temporary pollution-control measures to prevent contamination of adjacent streams, other water course, lakes, ponds or other areas of water impoundment. Such work may involve the construction of temporary berms, dikes, dams, sediment basins, slope drains and use of temporary mulches, mats, seeding or other control devices or methods directed by the Engineer as necessary to control soil erosion. Temporary pollution-control measures shall be used to prevent or correct erosion that may develop during construction prior to installation of permanent pollution control features, but are not associated with permanent control features on the project. The Engineer will limit the area of preparing right-of-way, clearing and grubbing, excavation and borrow to j be proportional to the CONTRACTOR'S capability and progress in keeping the finish grading, mulching, seeding, and other such permanent pollution-control measures current in accordance with the accepted schedule. Should seasonal conditions make such limitations unrealistic, temporary soil- erosion-control measures shall be performed as directed by the Engineer. 1. Waste or disposal areas and construction roads shall be located and constructed in a manner that will minimize the amount of sediment entering streams. 2. Frequent fording of live streams will not be permitted; therefore, temporary bridges or other structures shall be used wherever an appreciable number of j stream crossing are necessary. Unless otherwise approved in writing by the Engineer, mechanized equipment shall not be operated in live streams. ! 3. When work areas or material sources are located in or adjacent to live streams, I such areas shall be separated from the stream by a dike or other barrier to keep sediment from entering a flowing stream. Care shall be taken during the construction and removal of such barriers to minimize the muddying of a stream. 4. All waterways shall be cleared as soon as practicable of false work, piling, debris or other obstructions placed during construction operations that are not part of the finished work. 5. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes and reservoirs with fuels, oils, bitumens, calcium chloride or other harmful materials. He shall conduct and schedule his operations so as to avoid or minimize siltation of streams, lakes and reservoirs and to avoid interference with movement of migratory fish. E. SUBMITTAL: Prior to the start of the applicable construction, the Contractor shall submit for approval his schedules for accomplishment of soil-erosion-control work and his plan to keep the area of erodible-earth material to a minimum. He shall also submit for acceptance his proposed method of 1 soil-erosion control on construction and haul roads and material sources and his plan for disposal of waste materials. No work shall be started until the soil-erosion control schedules and methods of operations have been reviewed and approved by the Engineer. 10/27/04 SP-16 f F. MEASUREMENT AND PAYMENT: All work, materials and equipment necessary to provide temporary erosion control shall be considered subsidiary to the contract and no extra pay will be given j for this work. 56. NON PAY ITEM — CONTRACT TIME; Camp Bowie from I-30 to Eldridge is in a commercial area with businesses on both sides of the street. For this reason it is important that the street reconstruction be complete by the 15th of November. The days for this contract have been calculated to allow the Contractor to start work on February 7th after the Stock Show and be completed on November 14th. When calculating the contract time for this project it was anticipate that work on Saturdays might be necessary. The contractor will allocate manpower and equipment as required to meet the contract schedule. 57. NON PAY ITEM — LIMITS OF CONSTRUCTION: It is the intention of this contract to limit the contractor's operations to two feet behind the existing curb unless otherwise shown on the plans. In order to accomplish this, the contractor shall sawcut two feet behind the curb. 58. NON PAY ITEM - SILICONE JOINT SEALING FOR CONCRETE PAVEMENT: n; CITY OF FORT WORTH,TEXAS TRANSPORTATION AND PUBLIC WORKS DEPARTMENT SPECIFICATION for SILICONE JOINT SEALING (Revision 1, October 18, 1989) (Revision 2, May 12, 1994) ' 1. SCOPE This specification for silicone joint sealing Portland Cement Concrete pavement and curbs shall supersede Item 314.2. (11)"Joint Sealing Materials"of STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION - CITY OF FORT WORTH, and Item 2.210"Joint Sealing"of STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - NORTH TEXAS COUNCIL OF GOVERNMENTS. 2. MATERIALS -y 2.1 The silicone joint sealant shall meet Federal Specification TT-S-001543A for Class A sealant except as modified by the test requirements of this specification. ' Before the installation of the joint sealant, the Contractor shall furnish the Engineer certification by an independent testing laboratory that the silicone joint sealant meet these requirements. 2.2 The manufacturer of the silicone joint sealant shall have a minimum two-year demonstrated, documented successful field performance with Portland Cement Concrete pavement silicone joint sealant systems. Verifiable documentation shall be submitted to the Engineer. Acetic acid cure sealants shall not be accepted. The silicone sealant shall be cold applied. 2.3 Self-Leveling Silicone Joint Sealant The joint sealant shall be Dow Corning 890-SL self-leveling silicone joint sealant as manufactured by Dow Corning Corporation, Midland, MI 48686-0994, or an approved equal. - 10/27/04 SP-17 S l I1 1 r Self-Leveling Silicone Joint Sealant i Test Method Test Requirement AS SUPPLIED **** Non Volatile Content, % min. 96 to 99 MIL-S-8802 Extrusion Rate, grams/minute 275 to 550 ASTM D 1475 Specific Gravity 1.206 to 1.340 **** Skin-Over Time, minutes max. 60 **** Cure Time, days 14 to 21 **** Full Adhesion, days 14 to 21 AS CURED -AFTER I ASTM D 412, Die C Mod. Elongation, % min. 1400 ASTM D 3583 Modulus @ 150% Elongation, psi max. 9 (Sect. 14 Mod.) ASTM C 719 Movement, 10 cycles @ +100/-50% No Failure ASTM D 3583 Adhesion to Concrete, % Elongation min. 600 (Sect. 14 Mod.) ASTM D 3583 Adhesion to Asphalt, % Elongation min. 600 (Sect. 14 Mod.) 2.4 The joint filler sop shall be of a closed cell expanded polyethylene foam backer rod and polyethylene bond breaker tape of sufficient size to provide a tight seal. The back rod and breaker tape shall be installed in the saw-cut joint to prevent the joint sealant from flowing to the bottom of the joint. The backer rod and breaker tape shall be compatible with the silicone joint sealant and no bond or reaction shall occur between them. Reference is made to the"Construction Detail'sheet for the various joint details with their respective dimensions. 3. TIME OF APPLICATION i On newly constructed Portland Cement Concrete pavement, the joints shall be initially saw cut to the required depth with the proper joint spacing as shown on ) the"Construction Detail"sheet or as directed by the Engineer within 12 hours of the pavement placement. (Note that for the"dummy"joints, the initial 1/4 inch width"green"saw-cut and the"reservoir"saw cut are identical and should be part of the same saw cutting operation. Immediately after the saw cutting pressure washing shall be applied to flush the concrete slurry from the freshly saw cut joints.) The pavement shall be allowed to cure for a minimum of seven (7) days. Then the saw cuts for the joint sealant reservoir shall be made, the ; joint cleaned, and the joint sealant installed. During the application of the joint sealant, the weather shall not be inclement and the temperature shall be 40F(4C) and rising. j 4. EQUIPMENT 1 10/27/04 SP-18 pTp I� ; 1 � t 4.1 All necessary equipment shall be furnished by the Contractor. The Contractor shall keep his equipment in a satisfactory working condition and shall be j inspected by the Engineer prior to the beginning of the work. The minimum requirements for construction equipment shall be as follows: 4.2 Concrete Saw:The sawing equipment shall be adequate in size and power to i complete the joint sawing to the required dimensions. 4.3 High Pressure Water Pump: The high pressure cold water pumping system shall be capable of delivering a sufficient pressure and volume of water to thoroughly flush the concrete slurry from the saw-cut joint. 4.4 Air Compressors: The delivered compressed air shall have a pressure in excess of 90 psi and 120 cfm. There shall be suitable reaps for the removal of all free water and oil from the compressed air. The blow-tube shall fir into the saw-cut joint. � It 4.5 Extrusion Pump: The output shall be capable of supplying a sufficient volume of sealant to the joint. 4.6 Injection Tool: This mechanical device shall apply the sealant uniformly into the joint. y4.7 Sandblaster: The design shall be for commercial use with air compressors as specified in Paragraph 5.4. 4.8 Backer Rod Roller and Tooling Instrument: These devices shall be clean and free of contamination. They shall be compatible with the join depth and width requirements. 5. CONSTRUCTION METHODS 5.1 General:The joint reservoir saw cutting, cleaning, bond breaker installation, and joint sealant placement shall be performed in a continuous sequence of operations 5.2 Sawing Joints:The joints shall be saw-cut to the width and depth as shown on the"Construction Detail"sheet. The faces of the joints shall be uniform in width and depth along the full length of the joint. 5.3 Cleaning Joints: Immediately after sawing, the resulting concrete slurry shall be completely removed from the joint and adjacent area by flushing with high r pressure water. The water flushing shall be done in one-direction to prevent joint contamination. When the Contractor elects to saw the joint by the dry method, flushing the joint with high pressure water may be deleted. The dust resulting from the sawing shall be removed from the joint by using compressed air. (Paragraph Rev. 1, October 18, 1989) , II 1 After complete drying, the joints shall be sandblasted. The nozzle shall be attached to a mechanical aiming device so that the sand blast will be directed at an angle of 45 degrees and at a distance of one to two inches from the face of the joint. Both joint faces shall be sandblasted in separate, one directional 10/27/04 SP-19 i � i i passes. Upon the termination of the sandblasting, the joints shall be blown-out using compressed air. The blow tube shall fit into the joints. i The blown joint shall be checked for residual dust or other contamination. If any dust or contamination is found, the sandblasting and blowing shall be repeated until the joint is cleaned. Solvents will not be permitted to remove stains and contamination. Immediately upon cleaning, the bond breaker and sealant shall be placed in the joint. Open, cleaned joints shall not be left unsealed overnight. Bond Breaker Rod and Tape: The bond breaker rod and tae shall be installed in the cleaned joint prior to the application of the joint sealant in a manner that will produce the required dimensions. 5.4 Joint Sealant: Upon placement of the bond breaker rod and tape,the joint sealant shall be applied using the mechanical injection tool. The joint sealant application shall not be permitted when the air and pavement temperature is less than 40F(4C). Joints shall not be sealed unless they are clean and dry. Unsatisfactorily sealed joints shall be refilled. Excess sealant left on the pavement surface shall be removed and discarded and shall not be used to seal the joints. The pavement surface shall present a clean final condition. Traffic shall not be allowed on the fresh sealant until it becomes tack-free. Approval of Joints: A representative of the sealant manufacturer shall be present at the job site at the beginning of the final cleaning and sealing of the joints. He shall demonstrate to the Contractor and the Engineer the acceptable method for sealant installation. The manufacturer's representative shall approve the clean, dry joints before the sealing operation commences. 6. WARRANTY The Contractor shall provide the Engineer a manufacturer's written guarantee on all joint sealing materials. The manufacturer shall agree to provide any replacement material free of charge to the City. Also, the Contractor shall provide the Engineer a written warranty on all sealed joints. The Contractor shall agree to replace any failed joints at no cost to the City. Both warranties shall be for two years after final acceptance of the completed work by the Engineer. 7. BASIS OF PAYMENT No direct payment will be made for this item and it shall be considered subsidiary to this contract and shall be considered full compensation for furnishing all materials and for all preparation, delivery, and application of those sealing materials and for all labor, equipment, tools and incidentals necessary to complete the silicone joint sealing in conformity with the plans and these specifications. 59. NON PAY ITEM — HAND MANIPULATION OF LIME: Because of the variability of the depth of underground telephone conduits as well as other utilities, it may be necessary for the contractor to "hand manipulate"the lime stabilization at conduit locations. 10/27/04 SP-20 i �I i f i No direct payment will be made for this item and it shall be considered subsidiary to the lime T stabilization bid item in this contract and shall be considered full compensation for furnishing all s materials and for all labor, equipment, tools and incidentals necessary. 60. NON PAY ITEM —TEMPORARY PAVEMENT MAINTENANCE: The Contractor shall be responsible for maintaining all temporary pavement within the limits of this project and making all necessary repairs for the life of the project. d All work involved with the maintenance of temporary pavement shall be considered subsidiary to the contract price and no additional compensation shall be made. p 61. PRE BID ITEM - PROJECT DESIGNATION SIGN: The Contractor shall construct and install two (2) Project Designation Signs and it will be the responsibility of the Contractor to maintain the signs in a presentable condition at all times on each project under construction. Maintenance will include painting and repairs as directed by the Engineer. It will be the responsibility of the Contractor to have the individual project signs lettered and painted in accordance with the enclosed detail. The quality of the paint, painting and lettering on the signs 4 shall be approved by the Engineer. The height and arrangement of the lettering shall be in L accordance with the enclosed detail. The sign shall be constructed of 3/4" fir plywood, grade A-C (exterior) or better. These signs shall be installed on barricades or as directed by the Engineer and in place at the project site upon commencement of construction. 3r The work, which includes the painting of the signs, installing and removing the signs, furnishing the materials, supports and connections to the support and maintenance shall be to the satisfaction of the f Engineer. The unit price bid per each will be full payment for materials including all labor, equipment, tools and i r incidentals necessary to complete the work. 62. PRE BID ITEM - UTILITY ADJUSTMENT: This item is included for the basic purpose of establishing a contract price which will be comparable to the final cost of making necessary adjustments required due to street improvements to water, sanitary sewer and natural gas service lines and appurtenances where such service lines and appurtenances are the property owner's responsibility to maintain. An arbitrary figure has been placed in the Proposal; however, this does not guarantee any payment for utility adjustments, neither does it confine utility adjustments to the amount shown in the Proposal. It shall be the "Contractor" responsibility to provide the services of a licensed plumber to make the utility adjustments determined necessary by the Engineer. No payment will be made for utility adjustments except those adjustments determined necessary by the Engineer. Should the Contractor damage service lines due to his negligence, where such lines would not have required adjustment or repair otherwise, the lines shall be repaired and adjusted by the Contractor at the Contractor's expense. The payment to the Contractor for utility adjustments shall be the actual cost of the adjustments plus ten percent(10%)to cover the cost of bond and overhead incurred by the Contractor in handling the utility adjustments. 63. PRE BID ITEM - TOP SOIL: - The proposed quantities shown are calculated to provide topsoil 4 to 6 inches in depth (compacted) over the median area and do not include deeper than design depth behind the curb. The pay item is intended to pay for topsoil that must be imported where suitable material is either not available on the job or cannot reasonably be stored on-site. Payment will be made on the basis of loose truck volume (full truck with sideboards up) tickets and material must meet City of Fort Worth standards for topsoil. Only the volume imported will be paid for and may be substantially less than the proposal quantities listed. 10/27/04 �, i 64. PRE BID ITEM - ADJUST WATER VALVE BOX: Contractor will be responsible for adjusting water valve boxes to match new pavement grade.The water valves themselves will be adjusted by City of Fort Worth Water Department forces if required. The unit price bid will be full payment for materials including all labor, equipment, tools and incidentals necessary to complete the work. 65. PRE BID ITEM - MANHOLE ADJUSTMENT: This item shall include adjusting the tops of existing and/or proposed manholes to match proposed I' grade as shown on the plans or as directed by the Engineer. Standard Specification Item No. 450 shall apply except as follows: Included as part of this pay item shall be the application of a cold-applied preformed flexible butyl rubber or plastic sealing compound for sealing interior and/or exterior joints on concrete manhole sections as per current City Water Department Special Conditions. 66. PRE BID ITEM - ADJUST WATER METER BOX: This item shall include raising or lowering an existing meter box to the parkway grade specified. No payment will be made for existing boxes, which are within 0.1'of specified parkway grade. i The unit price bid will be full payment for materials including all labor, equipment, tools and incidentals necessary to complete the work. 67. PAY ITEM - UNCLASSIFIED STREET EXCAVATION: See Standard Specifications Item No. 106, "Unclassified Street Excavation" for specifications governing this item. i Removal of existing penetration or asphalt pavement shall be included in this item. Operations necessary to windrow existing gravel base in order to lower or raise subgrade shall be considered as subsidiary to this item and no additional compensation shall be given as such. During the construction of this project, it is required that all parkways be excavated and shaped at the same time the roadway is excavated. Excess excavation will be disposed of at locations approved by the engineer. The intention of the City is to pay only the plan quantity without measurement. Should either contracting party be able to show an error in the quantities exceeding 10 percent, then actual quantities will be paid for at the unit prices bid. The party requesting the payment of actual rather than plan quantities is responsible for bearing any survey and/or measurement costs j necessary to verify the actual quantities. 68. PAY ITEM - MEDIAN CROSSOVER AND TEMPORARY ACCESS ROADS: As per the traffic control plan a temporary asphalt median crossover shall be constructed with 5" of hot-mix asphalt over 6" of flexbase material. The contractor will taper this section to provide a smooth transition where it meets the existing roadway. The contractor will be responsible for maintaining this crossover making all repairs necessary for the life of this project. After construction is complete, the contractor shall remove the median crossover and restore the median to equal or better condition. Work phases 3A and phase 5 also include temporary access roads. Asphalt will be installed as outlined above as necessary and removed when that work phase is complete. In some locations concrete curbing will have to be removed and replaced in order to provide a 12'wide driveway. The Contractor shall familiarize himself with the locations shown in the traffic control plan prior to submitting his bid. 10/27/04 SP-22 I 1 � 4 69. PAY ITEM -TRAFFIC CONTROL: The Contractor will be required to obtain a "Street Use Permit"prior to starting work. As part of the"Street Use Permit"a traffic control plan is required. The Contractor shall be responsible for following and maintaining the included traffic control plan during the construction of this project consistent with the provisions set forth in the"Latest Edition Texas Manual on Uniform Traffic Control Devices for Streets and Highways"issued under the authority of the"State of Texas Uniform Act Regulating Traffic on Highways,"codified as Article 6701d Vernon's Civil Statutes, pertinent sections being Section Nos. 27, 29, 30 and 31. The Contractor will not remove any regulatory sign, instructional sign, street name sign or other sign, which has been erected by the City. If it is determined that a sign must be removed to permit required construction, the Contractor shall contact the Transportation and Public Works Department, Signs and Markings Division, (Phone Number 871-7738) to remove the sign. In the case of regulatory signs,the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above-referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be reinstalled, the Contractor shall again contact the Signs and Markings Division to reinstall the permanent sign and shall leave his temporary sign in place until such reinstallation is completed. Because of the re-routing of traffic, the Contractor will be able to work during"peak traffic periods". The Contractor shall be paid the limp sum bid amount for Traffic Control in 4 equal payments coinciding with the first four work phases. The price bid per limp sum for TRAFFIC CONTROL as shown in the plans will be full payment for materials including all labor, equipment, tools and incidentals necessary to complete the work. 70. PAY ITEM - REINFORCED CONCRETE PAVEMENT AND BASE: (a) All applicable provisions of standard Specifications Item 314"Concrete Pavement,"shall apply. The Contractor shall use a six (6) sack concrete mix for all hand placement in the intersections. The unit price bid per square yard shall be full payment for all labor, material, equipment and incidentals necessary to complete the work. I (b) Once an evaluation of the pavement is made to determine whether the crack is due to distress or minor shrinkage, the following policy will apply: (1) When the crack is minor and due to shrinkage (cosmetic), then no further treatment will be needed. (2) If the crack is due to distress (structural), the failed pavement must be removed and replaced a minimum of 5 feet. In no case should the remaining portion of the panel be less than 5 feet wide after repairing the failed panel. (3) Any crack within 12 inches of any joint must be removed and replaced a minimum of 5 feet to prevent future spalling of the pavement. (c) All concrete pavement not placed by hand shall be placed using a fully automated paving machine as approved by the Construction Engineer. Screeds will not be allowed except if approved by the Construction Engineer. i 10/27/04 SP-23 i 71. PAY ITEM - 6"CONCRETE CURB: The Contractor may, at his option, construct either integral or superimposed curb. Standard Specification Item 502 shall apply except as follows: Integral curb shall be constructed along the edge of the pavement as an integral part of the slab and of the same concrete as the slab. The concrete for the curb shall be deposited not more than thirty(30) minutes after the concrete in the slab. If the Contractor fails to backfill behind the curb within seven (7) calendar days of pouring the curb and gutter, the amount paid for the curb shall be reduced by 25% until the backfill operation is complete. 72. PAY ITEM - HMAC TRANSITION: This item will consist of the furnishing and placing at varying thickness an HMAC surface in transition areas where indicated on the plans, as specified in these specifications and at other locations as may be directed by the Engineer. It may be necessary to place some asphalt in alleyways used for business access. This item shall be governed by all applicable provisions of Standard Specifications Item 312. The price bid per ton HMAC Transition as shown in the Proposal will be full payment for materials including all labor, equipment, tools and incidentals necessary to complete the work. 73. PAY ITEM - TRENCH SAFETY: Description: This item will consist of the basic requirements which the Contractor must comply with in order to provide for the safety and health of workers in a trench. The Contractor shall develop, design and implement the trench excavation safety protection system. The Contractor shall bear the sole responsibility for the adequacy of the trench safety system and providing"a safe place to work"for the workman. The trench excavation safety protection system shall be used for all trench excavations deeper than five (5)feet. The Excavating and Trenching Operation Manual of the Occupational Safety and Health Administration, U.S. Department of Labor, shall be the minimum governing requirement of this item and is hereby made a part of this specification. The Contractor shall, in addition, comply with all other applicable Federal, State and local rules, regulations and ordinances. Measurement and Payment: All methods used for trench excavation safety protection shall be measured by the linear foot of trench and paid at the unit price in the Proposal, which shall be total compensation for furnishing design, materials, tools, labor, equipment and incidentals necessary, including removal of the system. Trench depth for payment purposes for Trench Safety Systems is the vertical depth as measured from the top of the existing ground to the bottom of the pipe. i 74. PAY ITEM - 6"THICK LIME STABILIZED SUBGRADE &CEMENT FOR SUBGRADE STABILIZATION: See Standard Specifications Item No. 210, "Lime Treatment(Material Manipulation)"and Specification Item No. 212,"Hydrated Lime and Lime Slurry"for specifications governing this item. Quantities for this pay item are approximate and are given only to establish a unit price for the work. The price bid per square yard for"6"THICK LIME STABILIZED SUBGRADE"as shown in the Proposal will be full payment for all labor, equipment, tools and incidentals necessary to complete the work. The price bid per ton for"LIME FOR SUBGRADE STABILIZATION"as shown in the Proposal will be full payment for materials necessary to complete the work. 10/27/04 SP-24 it 75. PAY ITEM - CONCRETE FLAT WORK (CURB, CURB &GUTTER, SIDEWALKS LEADWALKS WHEELCHAIR RAMPS AND DRIVEWAYS): Concrete flatwork is defined as curb, curb and gutter, sidewalks, leadwalks, wheelchair ramps and driveways as shown in the plans.This provision governs the sequence of work related to concrete flatwork and shall be considered a supplement to the specifications governing each specific item. , E Required backfilling and finished grading adjacent to flatwork shall be completed in order for the flatwork to be accepted and measured as completed. ` No payment will be made for flatwork until the pay item has been completed, which includes r backfilling and finished grading. 76. PAY ITEM — REMOVE EXISTING CONCRETE SIDEWALK, DRIVEWAYS, STEPS, LEADWALKS AND WHEEL CHAIR RAMPS: This item includes removal of existing concrete sidewalks, driveways, steps, leadwalks and wheelchair ramps at location shown on the plans or as designed by the Engineer. See Item No. 104"Removing Old Concrete", for Specifications governing this item. i 77. PAY ITEM—REMOVE EXISTING CURB AND GUTTER: Where shown on the plans or where designated by the Engineer, existing curb and or gutter and existing laid down curb shall be removed and disposed of in a manner satisfactory to the Engineer. Measurement will be by the linear foot for curb and gutter, laydown curb removed, and for all labor, tools, and incidentals necessary to complete the job. 78. PAY ITEM —REMOVE EXISTING CURB INLET: This item shall include all labor, materials, and equipment necessary to remove and dispose of the existing inlet and removal and connection of the existing RCCP lead pipe inlet as shown on the Plans and as directed by the Engineer. 79. PAY ITEM —STANDARD 7"CURB AND 18"GUTTER: All provisions of Standard Specification No. 502`Concrete Curb and Gutter'shall apply except as modified herein: Subsidiary to the unit price bid per linear foot shall be the following: i ' a. A minimum of 5"or greater as required depth of stabilized subgrade properly compacted under the proposed curb and gutter as shown in the construction details. b. If the Contractor fails to backfill either in from of the gutter or behind the curb within seven (7) calendar days of pouring the curb and gutter, the amount paid for the curb and gutter shall be reduced by 25% until the backfill operation is complete. Standard Specifications Item No. 502, shall apply except as herein modified. Concrete shall have minimum compressive strength of three thousand (3,000) pounds per square inch in twenty-eight (28) e days. The quantity of mixing water shall not exceed seven (7) gallons per sack(94 lbs.) of Portland Cement. The slump of the concrete shall not exceed three (3) inches. A minimum cement content of five (5) sacks of cement per cubic yard of concrete is required. i 80. PAY ITEM— BORROW: 10/27/04 SP-25 ' B I Where shown on the plans or where designated by the Engineer, existing curb and or gutter and existing laid down curb shall be removed and disposed of in a manner satisfactory to the Engineer. Measurement will be by the linear foot for curb and gutter as shown on the proposal and will be full compensation for the removal and disposition of the curb, curb and gutter, laydown curb removed, and for all labor, tools, and incidentals necessary to complete the job. y 81. PAY ITEM —TRENCH EXCAVATION AND BACKFILL FOR STORM DRAIN: Work under this item includes all the proposed excavation and backfill in the project area and the necessary fill area. Payment will be made for the quantity of earth excavated/backfilled. The placing of fill shall be subsidiary to the trench excavation/backfill price. Excess material which is obtained from excavating the trench shall be used for fill placement subject to the provisions of Item 114 of the City of Fort Worth Standard Specifications. All excavated material which is unacceptable as fill material shall become the property of the Contractor to be hauled off the site and disposed of properly. Unacceptable material shall be, but not limited to: rocks, concrete, asphalt, debris, etc. The cost for removal and disposal of unacceptable material shall be subsidiary to the unit prices. 82. PAY ITEM — 2-INCH CURB AND GUTTER: Except where noted on the plans, all median curb and gutter will match the existing 2-inch curb and gutter configuration as detailed in the plans. i The price bid per linear foot for"2-INCH CURB AND GUTTER"as shown in the Proposal will be full payment for materials including all labor, equipment, tools and incidentals necessary to complete the work. 83 PAY ITEM— NEW BRICK PAVERS: All new brick pavers used on this project shall meet the specifications for ASTM C1272. The brick shall be a Type F heavy vehicular paving brick a minimum 2 5/8"thick, with spacer nibs or lugs, and match the brick installed from Eldridge to Hulen in size, shape, and color. The apparent low bidder will be required to provide color samples for approval by the Engineer. The brick pavers will be set on a sand/cement bedding mixture as detailed in the plans. The sand used shall conform to ASTM C33 excluding all stone screenings that may pass the C33 sieve analysis. The cement sand ratio shall be 1 sack cement per 1 CY of sand or as directed by the Engineer. Filter fabric 12-inches wide will be installed over every construction, and/or expansion joint as well as all vertical surfaces. Once the brick pavers have been installed they will be vibrated into the sand bed. Sand conforming to C33 will then be swept into joints and vibrated again. All brick shall be installed per the manufacturer's recommendations. The price bid per square foot for"NEW BRICK PAVERS"as shown in the Proposal will be full payment for materials including all labor, equipment, tools and incidentals necessary to complete the work. 84 PAY ITEM—INSTALL SALVAGED BRICK PAVERS: The salvaged brick pavers shall be installed as indicated on the plans using the same method as the new brick pavers. The price bid per square foot for"INSTALL SALVAGED BRICK PAVERS W BRICK PAVERS"as shown in the Proposal will be full payment for materials including all labor, equipment, tools and incidentals necessary to complete the work. I 10/27/04 SP-26 i 85 PAY ITEM —TRAFFIC BUTTONS:The contactor shall supply and install all materials necessary for the placement of traffic buttons necessary as detailed in the plan detail sheets. The lump sum unit price shall be full compensation for the contractor to supply and install Type 1-C-4 and Type W-4 c buttons as well as adequate amounts of Type III epoxy. 86 PAY ITEM —2-INCH AND 3-INCH PVC CONDUITS: At locations shown on the plans or as directed by the Engineer, the contractor shall install PVC conduit schedule 40 as detailed in the plans. The conduits shall extend 18-inches beyond the back of curb with a cap glued in place or from ground box to ground box. The price bid per linear foot as shown in the Proposal will be full payment for materials including all labor, equipment, tools and incidentals necessary to complete the work. 87 PAY ITEM—CERAMIC TILE STREET NAMES: At all locations where they currently exist, the contractor will install ceramic the street name signs integral to the proposed curb. Prior to removal, the contractor shall note the placement and pattern of the tiles and install the new street name to I' match the existing. The tiles provided shall be porcelain ceramic mosaic tiles. Tiles shall be li impervious, stain proof, dent proof, and frost proof. Tiles are to be 1"X 1". When finished, the tile surface shall be flush with the face of curb. The price bid per each for"CERAMIC TILE STREET NAMES"as shown in the proposal will be full payment for all materials, labor, equipment, tools and incidentals necessary to completer the work. Any work considered to be defective by the Engineer that needs to be corrected or completely removed and replace shall be considered subsidiary to this item. 88 PAY ITEM —REMOVE EXISTING BRICK PAVERS: Contractor shall take all precautions to carefully remove all existing brick pavers. The brick pavers shall be handled with extreme care to avoid chipping and/or breaking of pavers. The Contractor shall dispose of all pavers rejected by the Engineer as being unacceptable for future use. The intention of the City is to pay only the plan quantity without measurement. Should either contracting party be able to show an error in the quantities exceeding 10 percent, then actual quantities will be paid for at the unit prices bid. The party requesting the payment of actual rather than plan quantities is responsible for bearing any survey and/or measurement costs necessary to verify the actual quantities. The price bid per square foot will be full payment for materials including all labor, equipment,tools, and incidentals necessary to complete the work. 89 PAY ITEM —SALVAGE, CLEAN, AND PALLETIZE EXISTING BRICK PAVERS: The pavers approved by the Engineer (at least 1/3 of brick intact) shall be taken to the City stockpile yard located at 3400 Yuma Ave. where they shall be cleaned and neatly stacked on pallets ( not to exceed 3 feet in height) and secured in place using bands for use as shown on plans. The contractor is invited to visit the City stockpile site prior to bidding by contacting Mr. Paul Canales at 817-658-7019 or Mr. James Lee at 817-988-3828 48 hours in advance. The price bid per square foot for"SALVAGE, CLEAN, AND PALLETIZE EXISTING BRICK PAVERS"as shown in the proposal will be full payment for materials including all labor, equipment, tools, and incidentals necessary to complete the work. 10/27/04 SP-27 (To be printed on Contractor's Letterhead) Date: DOE No: PROJECT NAME: Water/Sanitary Sewer and Paving/Storm Drain Improvements for: MAPSCO LOCATION: LIMITS OF CONST.: Estimated Duration of Construction on your Street : days i THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL < REPLACE WATER AND/OR SEWER LINES - RECONSTRUCT THE STREET>. ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. i IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> i OR Mr. <CITY INSPECTOR> AT <TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL 871-7970 PLEASE KEEP THIS FL YER HANDY WHEN YOU CALL, 10/27/04 SP-28 ti Y � I, CITY OF FORT WORTH HIGHWAY CONSTRUCTION ` PREVAILING WAGE RATE FOR 2000 CLASSIFICATION HOURLY RATE Asphalt Raker $10.32 Asphalt Shoveler $9.75 Batching Plant Weigher $9.65 G Carpenter(Rough) $13.64 Concrete Finisher-Paving $10.16 Concrete Finisher Helper(Paving) $9.70 Concrete Finisher-Structures $13.44 Flagger $7.00 Form Builder-Structures $13.44 Form Setter-Paving &Curbs $10.25 Form Setter-Structures $9.75 Laborer-Common $7.64 Laborer-Utility $8.64 Mechanic $13.25 Servicer $10.13 Pipe Layer $7.35 Pipe Layer Helper $6.75 Asphalt Distributor Operator $11.45 Asphalt Paving Machine Operator $11.09 Concrete Paving Saw $10.53 h Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel (< 1 1/2 CY) $10.00 Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel (> 1 1/2 CY) $11.52 Front End Loader(2 1/2 CY& less) $9.94 p Front End Loader(over 2 1/2 CY) $9.32 y Milling Machine Operator $8.00 Mixer $11.00 Motor Grader Operator(Fine Grade) $12.31 Motor Grader Operator $13.75 Pavement Marking Machine $11.00 Roller, Steel Wheel Plant-Mix Pavements $9.88 Roller, Steel Wheel Other Flatwheel or Tamping $12.12 Roller, Pneumatic, Self-Propelled Scraper $8.02 Traveling Mixer $10.00 Reinforcing Steel Setter(Paving) $9.75 Truck Driver-Single Axle(Light) $8.00 Truck Driver-Tandem Axle Semi-Trailer $10.22 Truck Driver-Lowboy/Float $10.54 Truck Driver-Transit Mix $10.63 Truck Driver-Winch $9.80 p y,UL .D . • I 2- I PROJECT DESIGNATION SIGN Ile. 11/4" 1 cotyof Fort-Worth 2" 46+7Proiect T �tle _ I I/= Contractor: al/ --- Contrastors Name 73/40 I 31f3/4- 31f I Scheduled Completion Date 11/=- Year 4'-0- LONGMDRN WHITE (BLUE BACKGROUND W/WHITE LETTERS) LETTERINGaMY OF FORT WORTH-MOOKMAN DEMI ITALIC PROJECT TfTLE ,CONTRACTOR a DATE IN MELVETICA . - i A I� SOuARC FIV D1 VALLR GUTTER MEASURED FROM SACK•OF-CVRS TO IACR-O/-CURS i � E 101NTf N ARIA- rRAN11r1eM TRANSITION AREA ON AS REOUIREO) DUMIrT MATCH EXISTING A �OIMT1 OUT TER A Y, ° PIAN VIEW H Not to Scott An inr*rt M POeS Moa rla OfptA a*d•o /iu 100,111 SJM"Ift d#ptA V/// 00lrp0,lr4d /* o// B'Wle# ro/lir wttL/t. Tbi COOtfOcl0r Pill D� i•p�ir•d ho ti,7 tA• puller with tral�rb•/ori 141jo0ii atcr�t�d. T'CONCRETE f ST.M.M.AC. VALLEY ;•1{M A.0 pvm'T A BASE OUTTEA TRANSITION No3 + 24,C-C _e! f N0.3{ 11't-C V Or � M ) N.M.A.C. _`��' - .J '_•� ` Z- TRAxSITION T�6 ITEM No.302 o VVN'T • BASE CONC ■ ACTE BASE Crushed CONN CTE SASE Limestone RESIDENTIAL STREETS SECTION 'A -A' Not to Scab rhe 7 iernta✓ced concrete rolloy shallreploc, The fop 7%l Me povemant with the remoinin p portion of povement to be construcled/nc/ud/ng subgrode freat'WoOr In accordance wilh the typical por/np 80010,17. rho concre10 W110Y Wil/ba Vyff,*Id OCC t?rd%17� 10 city stondords for control, Curb and puff#4 rho eoacroto sholl be of 11'oshed and scroanee apgr,pot, with a P/n. of.fiv,(d1 J90A of COM00 oer cubic yard ofconcrete with a minimum compressive strength of 3,000 pounds per square inch in seven days. CONCRETE VALLEY tDE TA/L S 1 • y. i ATTENTION CURB RAMPS SHALL BE CONSTRUCTED PERPENDICULAR TO THE CURB AT STREET CROSSINGS WITH LANDINGS IN LIEU OF DIAGONAL CROSSINGS WHERE FEASIBLE . SEE FIGS. 58 ,59 & 60 . i WH CHAIR R [ P S T A �.. '"� D -ARD . . DE All S r i i i I CITY OF FORT VCIRTK TEXAS - CONSTRUCTION STANDARD OCTOBER, 1992 R.Q.W. MONOLITHIC SIDEWALK CURB STREET CURB �•• LINES . TO BE �+r�►c 1/4 DEEP ra►NstrloN 9 18". 1 4 JOINT, 3" GAP ,.. 4'*1203 i.. R ka. SIwVALK CURB PAY LIMIT MAX. LENGTH tr SURFACE TREA71MEW 0W=VE) S' FROM THE BACK Or CURT. EXPANSION MGITERIAL RECESSED 1/4" AND SEALEDW/S(APPLICABLE O`°ALL N T S cola-.,ouRx� . D FOR-PARKWAY WITH ELEVATION BELOW STREET ELEVATION, THE SIDEWALK CURB MUST BE 2•' HIGHER THAN THE STREET CURB. 2? SIDEWALK CURB SHALL NOT ENCROACH ON THE PROPOSED WIDTH OF THE SIDEWALK OR RAMP. 3) FOR TYPE I RAMP MAXIMUM SIDEWALK CURB HEIGHT 011 TO 711. TYPICAL RAMP X-SECTION CITY OF FORT WORTH. TEXAS .- CONSTRUCTION STANDARD OCTOBER, 1992 EXISTING 15' R SCALE 181 = S' �- SIDEWALK RAMP NOTES 11 EXPANSIOII ,AUNT AND S1LICOE SEAL94 $HALL SE SMSIDIARY TO LAIN PRICE Sit Fut SIDEVAL L cid �cmM TW ACTUAL LOOTS OP REMOVAL W 001- VG CURD NO GUTTER AND SIDEWALK7" SIiAI< K AS DIRECTED tY THE ENG1NEUt IN tHE 31 KHOLina a,R: OR FLARco Sums MAY SE INSTALLED ON WTM SIDES OF• TUE RAMP 6•' DEP£IO Na a THE nap coojTuw cot As N' a tr DIRECTED SY TK ENGMIL 0 0JRI RAMPS WITH RETtRtNED CLM MAY rE UIM WKSE PEOESTRjM1S VOLLI NOT SAMNA roe fR3tli LLV VAL K ACROSS THE RAID. SJ SLOPE OF CURD RUMP ROM SIDEWALK _.OW � SHALL K A MAXI" W 1ft FLAKY I SIDES W RAMP SHALL HAVE A MAXIMN SLOPE W bl4 UNLESS PEDESTRIANS COOLS s� WALK ACROSS n•E RAMP TH 04 THE MAXII" vat or SLOPE SHALL K WL r w.ca a�u at 6.... Mc CLO to ' T• 40 So a •, • . . •• nAINU 3WOU a as Gv" K QXM .. foe _ 04 LEGEND •4•' : ;• • - "a v no►. AAM twat Mor.r ab WHEELCHAIR RAMP , ro���' �� � ta+cKu N►war r� LAYDOWN C/O STANDARD PAY LIMIT DETAIL C17Y OF FORT VatTK TEXAS - CONSTRUCTION STANDARD OCTOBER, 1992 4 wR - i ASPHALT TIF-IN 7 77771 '. EXISTING 15' R SCALE 1" = 5' SIDEWALK RAMP .� M&WO cm i Cw"am .=ff AIiO tl umbe sem-1C :HKL at SUBUXAM TO WT PRCC tS FIR UDC1M A I Nm & M ACTUAL. t mm w Ultt7VAL W MSTTMQ CUM r NO EWrrU�¢ D M r K AS MRtMEJ BV IQ' at E4 �1VC11irM HOAC t'VfWT ' REot5110 bkcx IP PFW. C1. sw MDNMX 1C SIX%4 JK tom!/ alcove t MXTlIK ` GAWA f v.JowT>ltti. L Tm I � aot.�eta i�tJIM'ACt '' (�AMSt9f j=fT =lxne scm jw,i -- WX OF PRS. CM i PACE PROP. r CURE • QMEA V= FM c04CRTE PAVt701T TAI JOINT I DETAIL CITY OF FORT VORTK TEXAS — CONSTRUCTION STANDARD OCTOBER 1992 t i i i (a� Perpxodlenlar Pablfe Sldewam CRA Ramp ftmnel Pnbut Sldewaft Caarb Ramp •fin c� i h e 04PYd Lendft st Tkp e(Axcvfr%*ht SldewaJk Curb *hRnio Fig. Be ✓ t� Combined Q`arane Pub& ald"Ma colt us" ` bUc iSidew lk Ciub Ra=p* 4 • ■�■ = f nim //rrr >MA■ ;■ ■ A�■ ■ Sam now ONION no rrran Arrr�tM�rr I 110 J.111.1•��� � , ,•, ■■■oI�■>wilea �. �r�r>�r■rw■■■■r■ rwww�w■a0 �-i�r*■/wwr�r■■/■ �wmom mom Opole *10111 MINIM now on omn'- Mae 8101111- was sole, NEW; ! � ■/■man; ■■"�':� ■were �� a■■ /fir Pon �IMMI ■■ �M.r#w.ww�� no i r � 1 1 I ATTENTION ! CURB RAMPS SHALL BE CONSTRUCTED PERPENDICULAR TO THE CURB AT STREET CROSSINGS WITH LANDINGS IN LIEU OF DIAGONAL CROSSINGS WHERE FEASIBLE . SEE FIGS . 58 .59 & 60. L TYPICAL LAYOUTS 1 I' I CITY OF FORT VORTK TEXAS - CONSTRUCTION STANDARD OCTOBER. 199E TYPE I h EXISTING 15' R SCALE 1" 5' PROP, 4' RAMP COLORED SURFACE i VARIABLE HEIGHT CURB 1048 -Mae----- M2 VARIABLE HEIGHT CURB 1 1/2' R (TYP.) p CITY OF FORT VORI #, TEXAS - CONSTRLXTLDN STANDARD OCT09m 1992 TYPE I EXISTING 20' R SCALE 1" = S' PROP, 4' RAMP COLORED SUkFACE I. VARIABLE HEIGHT CURB ' f 8 . d2 I VARIABLE HEIGHT CURB 1 1/2' R (TYPJ I, CITY OF FORT VORTK TEXAS - CONSTRUCTION STANDARD OCTOBER, 19W TYPE I : . EXISTING 15' R SCALE 1" = 5' PROP. 4' RAMP COLORED SURFACE i s � X1148 ld2 1112 1 VARIABLE HEIGHT CURB 1 1/2' R (TYPJ CITY 13F FORT V13RTK TEXAS - CO STRVC71ON STANDARD OCT0X3 , 1992