HomeMy WebLinkAboutContract 31382 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. )J
WHEREAS, _Taurus Twin Mills Limited Partnership , hereinafter called
"Developer", desires to make certain improvements to Twin Mills. Phase II, Section
IAS an addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Douglas H. Gilliland______,
its duly authorized Executive Vice President of the General Partner, Taurus Twin
Mills Corp. and the City, acting herein by aAd through Marc Ott, its duly authorized
Assistant City Manager, for and in consideration of the covenants and conditions
contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section H, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section H, paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section H, of the Policy.
JC'
CFAREVISEDFORMATWITH4 tm2-IA.dbc '+l '°;'�'v�i ;f 'c Ste. d.�
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such iniuries, death or damages are caused,
in whole or in part, by the alleged negligence of the City of Fort Worth,
its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof:
J Y
CFAREVISEDFORMATWITH4_tm2-l A.dBc
Water(A)None; Sewer(A-1)None; Paving (B) attached; Storm Drain(B-
1) attached; Street Lights and Signs(C) attached.
H. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, Bl,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $cmc, .\O
Item Developer City Cost Total Cost
Cost
A. Construction
1. Streets $439,621.50 $439,621.50
2. Storm Drainage $405,895.90 $405,895.90
3. Street Lights $39,600.00 $39,600.00
4. Street Name Signs $400.00 $400.00
B. Engineering Design
C. Construction Engineering
and Management by DOE (4%) $33,820.70 $33,820.70
TOTALS $919,338.10 1 $919,338.10
Notes:
1. All Preliminary Plats filed after July 2000, will require sidewalks on all streets.
Sidewalk cost is included under street cost. The developer is responsible for
installation of sidewalk unless the City adopts a policy requiring the builder to install
sidewalks along the frontage of the individual lot.
2. Developer's column for Item C represents four percent(4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
CFAREVISEDFORMATWITH4 tm2-lA.dbc
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Developer
has executed this instrument in triplicate, at Fort Worth, Texas this the c'day of. ,1 *
200 - U
Approval Recommended:
Transportation and Public Works
no Department
Conti-act authorization.
Robert Goode, P. E.
D ate Director
ATTEST: City Of Fort Worth
B4c]
_ �n lr,
City Secretary Assistant City Manager
Appro a
as to Fo
Assistan Ci Attorney
Taurus Twin Mills Limited Partnership
ATTEST: DEVELOPER
By: Taurus Twi 'lls Corporation,
It eneral n r
By:
Corporate Secretary Douas lliland
Execut' a ice President
RE -
CFAREVISEDFORMATWITH4 tm2-lA.d4c IOU
u
O
PROJECT a 156
IOCATION ..
H HARMON
3479
PARK
ARMON
1,01,
0 0
122
CD BAILEY 505 W
BAILEY– BOSWELL �7 c:3
Lake
iilic
L
Golf Cf v
0
if Cl ousto
Park
B2B O C. j
W A P
J.
cr
U,
FD I W m R I
0
.cm' CROMWELL-m- MARINE CREEK
co
1220
Z
< oEAST F(STRIAEI
3.
N
CO EGE
J i t NORTHWEST
U,
Tarrant countY
156
Junior College
—U--j
Northwest CGnPUS
287
Ln
MARINE 820
CREEK
LAKE A I
m
VICINITY MAP
N.T.S.
\Xy j
r__
r • • b 11 Q V u ::1 5G I t: 1 k I 1Y � 7 i I ,-..._........__' ' j � I I__._..._...
`'ell i SIDE KS 0 BE
CONS RUCT D BY 1 I 3s ! I zr z!I
4
_...._...........
1
., EBUIL ER ..._............
I
I
Yr* I 3 STREET B
'
r Ie
...._......._.. i i ..._.._......�
r
! v
w T 3 w 39 21 a ....._fi......... �....,..��........ i 3a t I i ...
!
................._ j ................._ ............._.
..... I..... ...
Y srY� D! I r r
( F- 3• H 36
' I ..-
i,
....... .....................
33 . .m xT a f .,•; I i ze I 3t i x� i......_._...._...
-;
3 ! 3 nm 3. 5 34 9 i I 75 s I I <n I I 1e ... G 51 M
vry I _...._... r.._..__. ...._.._. __ n !
1 ' ..__. ..._... -
i
23 • 35 G _.......
—---
I '................_._ :............1..... I L._...... t i TWIN....MILLS..p.H.ASE I
I i 1 1 :x 3 w + j 1 i I zn i o ..............,r s(RESIDUAL) !
TWIN--MILLSI_P-RASE -- r-- _...._ r� _ 1 —_ .......
— ._.-. _
U SIDEWALKS TO BE
CONSTRUCTED BY 23 1-
-S
'
C'' PAVAN NTRA T R ° I cRESIDUAI.)e f I-. j..-____.-_... I x I I_.-_.�'.... ! ___.._._. !.........._...,......
✓ {,� 31 • Ix .................
F-
> 1 .. _.._�._.. r—'_•"___ 1 -.......... C 1 1 W .......... r W
i j •in FIF D �'.. .. FI — .............
!y i�; 1 z CONST UC7ED BY 1- I
Y 4 1 : roHON BUILDEft w o r I u W •3
n r za zS u u
50'R O.W. �.
m ....__.__..._ I L..................._ '--__--_ di
"=,y 3 ub.
Ln ro I w STREET I
+: ra 12 w STREET 1
O N Ix 1,,1 CONS RUCT D BY
cc It
•a ! 1u 3> w HO EBUIL ER
Ir w nLL 31 vi �-- DEDICATION
I ,
•
' W' ........_.._..
Yr i. u 50 .O.W." a is w I• n
�' ; T 28'F- PVMT. 2e F° P uT. lLLS BLVD _
_ .
I m' ! STREET A SIDEWALKS TO BE T IN
CONSTRUCTED BY _
1 Y, 1 PAVING CONTRACTOR
!DEW KS 0 BEI Ir'
iSi to CONSRUCT D BY ^� t
m.i I W HO EBUIL ER
I
Wj 12 30 31 23 33 24 25 3• xT Ie 29 30 '
PARK
DEDICATION
C d
I Kti i
• �SChf
r0 f
EXHIBIT "B"
PAVING PLAN
TWIN MILLS
PHASE 2 - SECTION to
TAURUS TWIN YLLS LYTED PARTNERS14P
9255 KANTNGTON SOUARE,STE.KIO
N-RICHI.AND HILLS,TEXAS 75180
(5171 785.1000
40
23
.......... ....................
i
........... N
39
51
7 — ——— -------
7 33
STREET 8
............— ........ ..................
i 4W 2.
----------
It 7
V)
...............
2. g 1 26 5h
2 ....-.».«._..... ...........— :
n
.......... ................ ................ —i«....-......
—--------- ......
r"*-"-"'— F I
1 21
25 6 V.
_.»».....».«.....
TWIN MILLiS-4AS I ........... ............
! (RESIDUAL)
22
7 24 20
TWJN--4LLS-PHASE
STREET U 27 e i I (RESIDUAL) 1
n . I . . ........
.....................
1 24 22 b II
4-
21 w
Lu 1 ....... L'i
LIRE" 0: . ........... L'i ...............
20 9 1 1 2. FU! 21 2* 'm 1. 41 Ix
30, RC
24"2R4 25
0
ir w 13
22
STREET I R p 30"RCP ..........
Ln STREET I
12 30"RCP
w
4
En 17 a u m w
0 - i -
w 4 4 7
K
cc.F--
17 1
CA 31 DEDICATION
30'*RCP
I pl.
m 301,Rcp -30"RCP
7 3-5.5RCB IN
' '
48"RCP MILLS 5L
STREET A
30"
RE2 E3. 25
2-PM L
WJNIWA L
to
PARK
DEDICATION
2-11'x4'qCI3 iSTWC
6'a3'RCB
EXHIBIT ,e-1,,
STORM DRAINAGE PLAN
TWIN MILLS
2-PARWGWAL PHAS'E 2 - SECTION IA
LA
W/,' R.L
TAURUS TWIN LULLS LRATED PARTNERSHP
2258 HUNTWTON SOUARE,STE.100
N.FdCHLAtO HLLS,TEXAS 76180
18171 788-1=
PART B - PROPOSAL
This proposal must not be removed from this book of Contract Documents.
TO: Taurus Twin Mills Limited Partnership
PROPOSAL FOR: Paving Improvements for Twin Mills -Phase 2 -- Section l A
D.O.E. NO. 4359
Includes the furnishing of all materials, except materials specified to be furnished by the
City, equipment and labor for the installation of water and sanitary sewer facilities and all
necessary appurtenances and incidental work to provide a complete and serviceable
project designated as:
Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having thoroughly
examined the Contract Documents, including plans, special contract documents, and the
General Contract Documents and General Specifications for Water Department Projects,
the site of the project and understanding the amount of work to be done, and the
prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment
and material except as specified to be furnished by the City, which is necessary to fully
complete the work as provided in the Plans and Contract Documents and subject to the
inspection and approval of the Director of the City Engineering Department of the City of
Fort Worth, Texas; and binds himself upon acceptance of this Proposal to execute a
contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond,
and such other bonds, i f a ny, a s in ay b e r equired b y t he C ontract D ocuments f or the
performing and completing of the said work. Contractor proposes to do the work within
the time stated and for the following sums:
BID SCHEDULE
TRTvV'EST ENTERPRISES
TWIN MILLS PHASE 2-SECTION IA
PAVM CONTRACT
Item Estimated Total Total
No. Quantity Unil Description of Item with Total Unit Price Written in Words Unit Price Amount
1 21,142 SY Furnish&Install Six-inch 3,000 PSI Reinforced Concrete Paving,
including 7-inch curb,complete in place,
for Sixteen dollars
and Twenty-Five cents per Square Yard S 16.25 S 343,557.50
2 . 22,600 SY Perform Lime Stabilized Subgrade Preparation,
complete in place,
for One dollars
and Thirty cents per Square Yard S 1.30 S 29,380.00
3 . 339 TON Furnish Hydrated Lime(30lbs/SY)for Subo ade Stabilization,
for Eighty dollars
and No cents per Ton S 80.00 S 27,120.00
4 . 26 EA Furnish&Install Barrer Free Ramps,
as detailed on plans,complete in place,
for Five Hundred dollars
and No cents per Each S 500.00 S 13.000.00
5 . 1,130 LF Furnish&Install 4'Reinforced Concrete Sidewalk,as detailed,
on plans,complete in place,
for Eleven dollars
and No cents per Linear Foot S 11.00 S 12,430.00
6 . 10 EA Furnish and Install End of Road Barricades,as detailed on plans
complete in place,
for One Thousand Two Hundred dollars
and No cents per Each S 1,200.00 S 12,000.00
7 . 314 LF Furnish and Install Concrete Street Header,as detailed on plans
complete in place,
Ifor Six dollars
and No cents per Linear Foot $ 6.00 S 1,884.00
i
{
1
8 . 1 LS Perform,Install,and Maintain Traffic Control Measures,as shown on plans, j
complete,
i
i
for Two Hundred FiRv dollars
` and No cents per Lump Sum S 250.00 S 250.00
TOTAL BID FOR TWIN MILLS PHASE 2-SECTION IA PAVING $ i 439,621.50
(Unit prices are to be shown in both words and figures. In case of discrepancy,the unit price in Writing will prevail. Prices listed above arc the only compensation to be
t made. All items,if work is required to complete the wort:as shown in the plans and as specified.which are not listed as a pay item in this proposal,are considered •�''�"'mac'
subsidiary to the item and the cost or the subsidiary work should be included.) t1 a •a 1:6.�.;
10 1
BID SCHEDULE
TRIWEST ENTERPRISES
TWIN MILLS PHASE 2-SECTION IA
PAVING CONTRACT
Item Estimated Total Total
No. Quantity Unit Description of Item with Total Unit Price Written in Words Unit Price Amount
7Cowactor Authorized Sign
'vim ,
PART B - PROPOSAL (Cont.)
Within ten (10) days after acceptance of this Proposal, the undersigned will execute the
formal contract and will deliver an approved Surety Bond and such other bonds as
required by the Contract Documents, for the faithful performance of the Contract. The
attached bid security in the amount of 5% is to become the property of the City of Fort
Worth, Texas, in the event the contract and bond or bonds are not executed and delivered
within the time above set forth, as liquidated damages for the delay and additional work
caused thereby.
The undersigned bidder certified that he has been furnished at least one set of the General
Contract Documents and General Specifications for Water Department Projects dated
January 1, 1978, and that he has read and thoroughly understands all the requirements and
conditions of those General Documents and the specific Contract Documents and
appurtenant plans.
The successful bidder shall be required to p erform t he w ork i n a ccord w ith t he
following publications, both of which are incorporated herein and made a part
hereof for all purposes:
1. The General Contract Documents and General Specifications for
Water Department Projects dated January 1, 1978, which may be purchased
from the Water Department.
2. The Standard Specifications for Street and Storm Drain Construction
which may be purchased from the Department of Transportation & Public
Works.
The undersigned assures that its employees and applicants for employment and those of
any labor organization, subcontractors, or employment agency in either furnishing or
referring employee applicants to the undersigned are not discriminated against as
prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No.
7400.
The Bidder agrees to begin construction within 10 calendar days after issue of the
work order, and to complete the contract within 60 calender days after beginning
construction as set forth in the written work order to be furnished by the Owner.
(Complete A or B below, as applicable:)
A. The principal place of business of our company is in the State of
Nonresident bidders in the State of , our prin6pa
place of business, are required to be percent lower than residentiddei s
'-7 l!C
by state law. A copy of the statute is attached.
Non resident bidders in the State of , our principal
place of business, are not required to underbid resident bidders.
_X—B. The principal place of business of our company or our parent company or
majority owner is in the State of Texas.
1
1
I
I
I
i ..
k
k
I(we) acknowledge receipt of the following addenda to the plans ands specifications, all of
P ,
the provisions and requirements of which have been taken into consideration on
preparation of the foregoing bid:
Addendum No. 1 (Initials) Addendum No. 3 (Initials)
i Addendum No. 2 (Initials) Addendum No. 4 (Initials)
Respectfully submitted,
GIICO COr*aCtirg, w1C.
By:
Title Gale R. Gill reaft.
President
Address
Gilco Contracting, Inc.
42on S Hu1_en St., Suite 513
Fort Worth, Texas 76109
Telephone: 81 p C7
(Seal)
Date: 3 - -0`-f
BID SCHEDULE
TRIIVEST ENTERPRISES
TWIN MILLS PHASE 2-SECTION IA
UTILITY CONTRACT
1 Item Estimated Total Total
No. Quantity Unit Description of Item with Total Unit Price Written in Words Unit Price .Amount
STORM SEWER ITEYIS
12. 433 LF Fumish&Install 48-inch Reinforced Concrete Pipe,including
excavation,embedment and backfill,complete in place,
for One Hundred dollars
and Fifty cents per Linear Foot S 100.30 $ 43.516.50
13 . 341 LF Fumish&Install 42-inch Reinforced Concrete Pipe,including
excavation.embedment and backfill,complete in place,
for Eighty-One dollars
and Fifty cents per Linear Foot $ 81.50 $ 27.791.50
14. 151 LF Furnish&Install 36-inch Reinforced Concrete Pipe,including
excavation,embedment and backfill,complete in place,
for Sixty dollars
and Fiftv cents per Linear Foot $ 60.50 $ 9,135.50
15. 1,699 LF Furnish&Install 30-inch Reinforced Concrete Pipe,including
excavation,embedment and backfill,complete in place,
for Fourtv-Eieht dollars
and Seventv cents per Linear Foot 3 48.70 $ 82.741.30
16. 54 LF Furnish&Install 24-inch Reinforced Concrete Pipe,including
excavation,embedment and backfill,complete in place,
for Thirty-Three dollars
and Sixtv cents per Linear Foot S 33.60 $ 1,814.40
17. 138 LF Furnish&Install I t'x 4'Reinforced Concrete Box,including
excavation,embedment and backfill,complete in place,
r:
for Four Hundred Fourty-Five dollars
and No cents per Linear Foot S 445.00 $ 61,410.00
18, 190 LF Fumish&Install 5'x S'Reinforced Concrete Box,including
excavation,embedment and backfill,complete in place,
-
for One Hundred Sixty-Five dollars
and No cents per Linear Foot S 165.00 $ 31.350.00
19. 2 EA Construct in place 48"Sloped-End Headwall,as shown in plans,
for Two Thousand One Hundred dollars
and No cents per Each S 2,100.00 $ 4,200.00
BID SCHFDULE
TRIwEST ENTERPRISES
TNVI.N MILLS PHASE 2-SECTION IA
UTILITY CONi'R\CT
Item Estimated Total Total
No. Quantity Unit Description of Item with Total Unit Price Written in Words Unit Price Amount
20. l EA Construct in place 42"Sloped-End Headwall,as shown in plans.
for Two Thousand One Hundred dollars
and No cents per Each $ 2,100.00 $ 2.100.00
21 2 EA Construct in place 36"Sloped-End Headwall,as shown in plans,
for One Thousand Six Hundred dollars
and No cents per Each $ 1.600.00 $ 3,200.00
22. 2 EA Construct in place l I'x 4'Parallel Wingwall,as shown in plans,
for Fourteen Thousand Five Hundred dollars
and No cents per Each $ 14.500.00 $ 29.000.00
23 . 2 EA Construct in place 5'x 5'Parallel Wingwall,as shown in plans,
for Firteen Thousand One Hundred Twenty-Five dollars
and No cents per Each $ 15,125.00 $ 30.350.00
24. 2 EA Furnish&Install 20-Foot Standard Curb Inlet,including
excavation,backfill and materials,complete in place,
for Three Thousand Five Hundred dollars
and No cents per Each $ 3.500.00 $ 7.000 00
25 . 13 EA Furnish&Install 10-Foot Standard Curb Inlet,including
excavation,backfill and materials,complete in place,
for Two Thousand Three Hundred Twenty dollars
777 and No cents per Each $ 2,320.00 $ 30,160.00
25 . 521 CY Furnish&Install Stone Rip-Rap.
for Fifty-Two dollars
and No cents per CY $ 52.00 $ 27.092.00
26. 2 EA Furnish&Install 4'x4'Manhole,including excavation,
backfill and materials,complete in place,
For Two Thousand Seven Hundred dollars
and No cents per Each $ 2,700.00 $ 5,400.00
BID SCHEDULE
TRIWEST ENTERPRISES
TWIN MILLS PHASE 2-SECTION 1A
UTILITY CONTRACT
Item Estimated Total Total
No. Quantity Unit Description of Item with Total Unit Price Written in Words Unit Price Amount
27 . t EA Furnish&Install 5'e5'Manhole,including excavation,
backfill and materials,complete in place,
for Three Thousand One Hundred Fifty dollars
and No cents per Each $ 3.150.00 S 3.150.00
1 . 2.747 LF Implementation of Trench Safety system including sheeting,shoring,
and bracing,complete in place,
for No dollars
and Ten cents per Linear Foot $ 0.10 $ 274.70
2 1 LS Perform,Install,and Maintain Traffic Control Measures,as shown on plans,
complete,
for One Thousand Two Hundred dollars
and No cents per Lump Sum $ 1.10000 $ 1.200.00
3 140 SY SavVCUL,Remove and Replace existing asphalt pavement,
complete in place,
for Thirty-Six dollars
and Fifty cents per Square Yard $ 36.50 $ 5,1 10.00
ri
SUBTOTAL STORE[SEWER ITEMS $ 405,395.90
i
r I
:r
BID SCHEDULE
TRIWEST ENTERPRISES
TNN,IN MILLS PHASE 2-SECTION 1A
UTILITY CONTRACT
Item Estimated Total Total
No. Quantity Unit Description of Item with Total Unit Price Written in Words unit Price Amount
MISCELLANEOUS ITEMS
13 . 15 EA Install Street Light Bases,as indicated in plans.complete in place,
for Nine Hundred Ten dollars
and Sixty-One cents per Each S 910.61 S 13.659 15
SUMMARY-TWIN MILLS PHASE 2-SECTION IA UTILITIES
SUBTOTAL WATERLINE ITEMS $ 198,669.60
SUBTOTAL STORM SEWER ITEMS $ 405,395.90
SUBTOTAL SANITARY SEWER ITEMS $ 181,977.05
SUBTOTAL MISCELLANEOUS ITEMS S 13,659.15
TOTAL BID FOR TWIN MILLS PHASE 2-SECTION IA UTILITIES S 800,201.70
(Unit prices are to be indicated in both words and figures. In case of discrepancy,the unit price in writing will prevail. Prices listed above are the only compensation to be
subsidiary to the item and the cost of the subsidiary work should be included.)
Contractor F D CONSTR TION INCI
Authorized Signature
Jason J. D nie VP of 0 erations
Date March 16 2004
PART B - PROPOSAL (Cont.)
Within ten (10) days after acceptance of this Proposal, the undersigned will execute the
formal contract and will deliver an approved Surety Bond and such other bonds as
required by the Contract Documents, for the faithful performance of the Contract. The
attached bid security in the amount of 5% is to become the property of the City of Fort
Worth, Texas, in the event the contract and bond or bonds are not executed and delivered
within the time above set forth, as liquidated damages for the delay and additional work
caused thereby.
The undersigned bidder certified that he has been furnished at least one set of the General
Contract Documents and General Specifications for Water Department Projects dated
January 1, 1978, and that he has read and thoroughly understands all the requirements and
conditions of those General Documents and the specific Contract Documents and
appurtenant plans.
The successful bidder shall be required to perform the work in accord with the
following publications, both of which are incorporated herein and made a part
hereof for all purposes:
I. The General Contract Documents and General Specifications for
Water Department Projects dated January 1, 1978, which may be purchased
from the Water Department.
2. The Standard Specifications for Street and Storm Drain Construction
which may be purchased from the Department of Transportation & Public
Works.
The undersigned assures that hat its employees and applicants for employment and those of
any labor organization, subcontractors, or employment agency in either furnishing or
referring employee applicants to the undersigned are not discriminated against as
prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No.
7400.
The Bidder agrees to begin construction within 10 calendar days after issue of the
work order, and to complete the contract within 60 calender days after beginning
construction as set forth in the written work order to be furnished by the Owner.
(Complete A or B below, as applicable:)
A. The principal place of business of our company is in the State of
Nonresident bidders in the State
of , our principal
place of business, are required to be percent lower than resident bidders
'IJ °' ..
by state law. A copy of the statute is attached.
Non resident bidders in the State of our principal
place of business, are not required to underbid resident bidders.
—X—B. The principal place of business of our company or our parent company or
majority owner is in the State of Texas.
I
I
p
1011CC,Jf,11 SECS.�,p,
I (we) acknowledge receipt of the following addenda to the plans and specifications, all of
the provisions and requirements of which have been taken into consideration on
preparation of the foregoing bid:
Addendum No. 1 (Initials) Addendum No. 3 (Initials)
Addendum No. 2 (Initials) Addendum No. 4 (Initials)
Respectfully submitted,
FOUR D CONSTRUCTION, INC
By:
Ja on J. Dani s
Title
P of 0 erations
Address
11200 Old Seagoville Road
Balch Springs, TX 75180
�i
Telephone: 972-286-0094
(Seal)
Date: March 16, 2004
III. STREET LIGHTS:
1. STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 12 EA $ 2, 000 $24, 000 . 00
MID-BLOCK RESIDENTIAL 3 EA $ 2, 000 $6, 000 . 00
CHANGE OF DIRECTION RESIDENTIAL 3 EA $ 2, 000 $6, 000 . 00
MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000 . 00
RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 . 00
Subtotal $36, 000. 00
City' s Cost $00, 000 . 00
Developer's Subtotal $36, 000.00
10% Contingencies $3, 600. 00
Project Total $39, 600.00
Adjacent Developer' s Cost $0, 000 . 00
Developer's Cost $39, 600. 00
2% Inspection Fee $0, 00. 00
DEVELOPER'S COST: $39, 600.00
(REVISED 4-22-04)
TWIN MILLS ADDITION, PHASE II - SECTION IA
March 10, 2004
Fort Worth, Texas
April 22, 2004
PAGE 1 OF Exhibit Ct�
VB�•L' \I�'�'L C� r '',
2. STREET LIGHTS WORK DESCRIPTION:
1. The Developer shall provide for the installation of streetlights at
the approximate locations shown in Exhibit "C" , immediately after
final acceptance of the street construction, in accordance with
engineering plans and specifications approved by the Transportation
and Public Works Department .
2 . Streetlights on residential and /or collector _ streets can be
installed using overhead or underground conductors with the approval
of the Director of Transportation and Public Works .
3 . The city will install all streetlights that use overhead or
underground conductors on residential, and collector streets. The
developer agrees to pay the City the amount shown below prior to the
City starting its design efforts.
4 . Streetlights on arterial streets shall be installed with underground
conduit and conductors .
S . The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for
the installation of any electrical transformers required for the
proper operation of the street lights
6 . The estimated cost of this streetlight installation is detailed on
page 1 of exhibit C and is summarized below the streetlights will
remain the property of, and will be maintained by the City of Fort
Worth.
DEVELOPER'S COST: $39,600.00
TWINS MIIILS ADDITION, PHASE II - SECTION IA
March 10, 2004
FORT WORTH, TEXAS
Page 2 of Exhibit C
"STREET LIGHTS"
INTERSECTIONS
WHEATFIELD TRL & WILD OATS DR 1
WHEATFIELD TRL & CORN FIELD DR 1
WHEATFIELD TRL & THORNBUSH DR 1
WHEATFIELD TRL & THRESHING DR 1
WHETAFIELD TRL & BARLEY DR 1
WHETAFIELD TRL & RYE DR 1
COTTON TAIL DR & WIND ROW DR 1
COTTON TAIL DR & MOLASSES DR 1
COTTON TAIL DR & SORGUM DR 1
WIND ROW DR & ROW CROP DR 1
WIND ROW DR & SILO DR 1
ROW CROP DR & SORGUM DR 1
MID - BLOCK
WIND ROW DR 1
SORGUM DR 2
CHANGE OF DIRECTIONS
WIND ROW DR 2
THRESHING DR 1
TWIN MILLS ADDITION, PHASE II - SECTION IA
Page 3 of Exhibit C
IV
STREET NAME SIGNS
1 . The City of Fort Worth will install the street name signs upon
final approval of the street construction. The street name signs
will remain the property of, and will be maintained by, the City
of Fort Worth.
2 . The Developer will pay for the street name sign installations
required for this development to the extent of $100. 00 per
intersection. This unit cost will be revised annually by the
Department of Transportation and Public Works to reflect
prevailing costs of materials and labor.
3 . This development creates the following four (4) intersections at
a cost to the Developer of $400.00:
Twin Mills Blvd & Street Q
Twin Mills Blvd & Street R
Street P & Street Q
Street P & Street R
Twin Mills, Phase 2, Section 1A
CFA code: 2004075 Date: June 18, 2004