HomeMy WebLinkAboutContract 31386 A C { AMENDMENT NO. 1 STATE OF TEXAS § CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and RJN GROUP, Inc (Engineer) made and entered into City Secretary Contract No. 29213 (the Contract) which was authorized by the City Council by M&C C-19775 on the 9thst day of Septmber, 2003; and WHEREAS, the Contract involves engineering services for the following project: Engineering Service For: 2004 Capital Improvement Projects D.O.E.NO. 3910 : New York Avenue From Rosedale Rd. to E. Terrell St. CONTRACT 99JJ: Sewer and Water Line Replacements-Various Locations CONTRACT 99LL:Sewer and Water Line Replacements-Various Locations WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated September 8, 2004, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total$23,732.00 2. Article H of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$170,466.55 3. -. All other provisions of the contract,which are not expressly amended herein, shall remain in full force and effect. liP � `.! �11'j�11� ' :� 1: CQ)�2 02724-05P,04 :46 .. . v��l� ��LU����;`�r�L`1 t EXECUTED on this the day of 200��in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: VED: A.Douglas Rademaker, P.E. Marc Ott Director,Department of Assistant City Manager Engineering RJN GROUP, Inc. ENGINEER ATTEST: Marty Hendrix, CYhy Secretary By: /k ��.•�'' I nI n Name: Hugh M. Kelso,P.E. Ontract Authorization Regional Vice-President Date APP VED AS TO FDT AND LEGALITY: y S i erger Assis ant City Attorney DD ;;J�'ti_� 3PER/!?MI ,� n _ RJfV GROUP, INC. 7524 Mosier View Court,Suite 106 R An Employee-Owned Firm Fort Worth,TX 76118 Engineering Consulting and 817.595.2199 information Technology Services fax 817.595.3375 www.rjn.com City of Fort Worth September 8, 2004 Department of Engineering 1000 Throckmorton Street Fort Worth, Texas 76102 ATTN: Mr. Gopal Sahu, P.E. RE: CITY OF FORT WORTH SANITARY SEWER AND WATER LINE REPLACEMENTS CONTRACT 99JJ AND CONTRACT 99LL 2004 CIP—NEW YORK AVENUE RECONSTRUCTION AMENDMENT NO. 1 Original Contract No. - 29213 Date: September 30, 2003 Original Contract Value—$146,734.55 Reference No.: C-19775 Sewer Project No.: PS58-531200-070580175060 Water Project No.: PW53-531200-060530175800 T&PW Project No.: C115-531200-020115095502 DOE No.'s: 99JJ - 2878, 2879, 2880, 2881, 2882, 2883 99LL- 2981, 2982, 2983, 2984, 2985 New York Ave. - 3910 Dear Mr. Sahu; In accordance with direction received from the City of Fort Worth Department of Engineering, RJN Group is pleased to submit this amendment for additional design services rendered on the above referenced project. The following is a summary of the additional services provided: 1. Added design for replacement of 554 LF of sanitary sewer line in Fuller Avenue for sewer lateral: L-4097 (Station 5+90 to Station 11+45) 2. Added design for replacement of an additional 675 LF of 12" water line in Fuller Avenue, from Ryan to 6th Street. DD Page 1 of 3 n, I44I11 qn l.Gt RAGROUP, INC. 7524 Mosier View Court,Suite 106 An Employee-Owned Firm Fort Worth,TX 76118 817.595.2199 Engineering Consulting and • Information Technology Services fax 817.595.3375 www.rjn.com 3. Added design for replacement of a total of 1360 LF of sanitary sewer lines in Waco Way which includes laterals: L-6455 (Station 0+00 to Station 5+88E) L-6459 (Station 0+00 to Station 3+42E) L-6458 (Station 0+00 to Station3+59E) 4. Added design for replacement of an additional 105 LF of sanitary sewer in Wosley Drive for sewer lateral: L-5237 (Station 0+00 to Station 1+05E). 5. Added design for replacement a total of 1,301 LF of sanitary sewer lines in Wessex Avenue which includes laterals: L-5851 (Station 0+00 to Station 4+59E) L-5849 (Station 0+00 to Station 7+86E) Total additional sewer design length is: 3,320 LF Total additional water design length is: 675 LF All of the design work described in Items 1 through 5 above is part of Sanitary Sewer and Water Line Replacement Contract 99LL. No additional work is anticipated at this time for Contract 9911. The estimated construction cost for each of the additional items is summarized in Table 1. Est. Construction Cost DOE Description Sewer* Water* No 1 2981 554 LF of 8" Sanitary Sewer in Fuller $ 70,973 Avenue 2 2981 675 LF of 12"Water Line in Fuller $ 67,862 Avenue 3 2983 1,360 LF of 8" Sanitary Sewer in Waco $ 174,230 Way 4 2984 105 LF of 8" Sanitary Sewer in Wosley $ 13,452 Drive 5 2985 1,301 LF of 8" Sanitary Sewer in $ 166,671 Wessex Avenue TOTALS $ 425,326 $ 67,862 TABLE 1: Additional Estimated Construction Costs (includes 10% contingency) * - Costs determined from average per linear foot costs developed in the original contract for 8" sewer and 12" waterline replacement in asphalt pavement. Table 2 summarizes the direct labor hours and costs required to perform the additional design services. L) Page 2 of 3 RJN GROUP, INC. 7524 Mosier View Court,Suite 106 An Employee-Owned Firm Fort Worth,TX 76118 817.595.2199 Engineering Consulting and Information Technology Services fax 817.595.3375 www.rjn.com DIRECT LABOR HOURS TOTAL ITEM DOE No STREET DIRECT PD PM PE CD CT CL LABOR 1 2981 Fuller(sewer) 1 4 12 16 8 2 $ 3,475 2 2981 Fuller (water) 1 4 8 14 12 2 $ 3,145 3 2983 Waco 1 11 24 36 12 2 $ 7,130 4 2984 Wessex 2 2 4 $ 720 5 2985 Wosley 1 11 24 34 12 2 $ 7,000 TOTALS 4 32 70 104 44 8 $21,470 TABLE 2: Design Fee for additional work. No additional survey is required for the design of the sanitary sewer line replacements since these streets were surveyed for the water line replacements. However, additional topographic survey will be required for the 600 LF of 12" water line replacement in Fuller. Additional printing costs will also be incurred. The following Direct Costs include actual cost plus a 10% markup. Gorrondona &Assoc.(M/WBE Provider) Survey 675' at$2.75/LF + 10% markup = $2,042 LA Blueline (M/WBE Provider) Additional Reproduction + 10% markup = 220 Total Direct Costs =$2,262 The total value of this amendment is $23,732 (Direct Labor+Direct Costs), which is 16.17% of the original contract value. The revised contract value is $170,466.55 This fee is broken out as follows: DESIGN SURVEY REPRODUCTION SEWER $ 3,475 $ 0 $ 44 WATER $ 17,995 $ 2,042 $ 176 TOTAL $ 21,470 $ 2,042 $ 220 Based on the above discussion, RJN Group, Inc. requests that you process an amendment to the original contract in the amount of$23,732. If you have any questions or require additional information to process this request, please do not hesitate to contact me. Very Truly Yours, RJN Grou , Inc. David L. Cooper, P.E. Project Manager W Page 3 of 3