AMENDMENT NO. 1
STATE OF TEXAS § CITY SECRETARY CONTRACT NO.
(No M&C Needed)
COUNTY OF TARRANT §
WHEREAS, the City of Fort Worth (City) and RJN GROUP, Inc (Engineer)
made and entered into City Secretary Contract No. 29213 (the Contract) which was
authorized by the City Council by M&C C-19775 on the 9thst day of Septmber, 2003;
and
WHEREAS, the Contract involves engineering services for the following project:
Engineering Service For:
2004 Capital Improvement Projects
D.O.E.NO. 3910 : New York Avenue From Rosedale Rd. to E. Terrell St.
CONTRACT 99JJ: Sewer and Water Line Replacements-Various Locations
CONTRACT 99LL:Sewer and Water Line Replacements-Various Locations
WHEREAS, it has become necessary to execute Amendment No. 1 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their duly
authorized representatives, enter into the following agreement, which amends the
Contract:
1.
Article I of the Contract is amended to include the additional engineering services
specified in a proposal letter dated September 8, 2004, a copy of which is attached hereto
and incorporated herein. The cost to City for the additional services to be performed by
Engineer total$23,732.00
2.
Article H of the Contract is amended to provide for an increase in the maximum
fee to be paid to Engineer for all work and services performed under the Contract, as
amended, so that the total fee paid by the City for all work and services shall not exceed
the sum of$170,466.55
3. -.
All other provisions of the contract,which are not expressly amended herein, shall
remain in full force and effect.
liP � `.!
�11'j�11�
' :� 1: CQ)�2
02724-05P,04 :46 .. . v��l� ��LU����;`�r�L`1
t
EXECUTED on this the day of 200��in
Fort Worth, Tarrant County, Texas.
APPROVAL RECOMMENDED: VED:
A.Douglas Rademaker, P.E. Marc Ott
Director,Department of Assistant City Manager
Engineering
RJN GROUP, Inc.
ENGINEER
ATTEST:
Marty Hendrix, CYhy Secretary
By: /k ��.•�'' I nI n
Name: Hugh M. Kelso,P.E. Ontract Authorization
Regional Vice-President
Date
APP VED AS TO FDT AND LEGALITY:
y S i erger
Assis ant City Attorney
DD
;;J�'ti_� 3PER/!?MI
,� n
_ RJfV GROUP, INC. 7524 Mosier View Court,Suite 106
R An Employee-Owned Firm Fort Worth,TX 76118
Engineering Consulting and 817.595.2199
information Technology Services fax 817.595.3375
www.rjn.com
City of Fort Worth September 8, 2004
Department of Engineering
1000 Throckmorton Street
Fort Worth, Texas 76102
ATTN: Mr. Gopal Sahu, P.E.
RE:
CITY OF FORT WORTH
SANITARY SEWER AND WATER LINE REPLACEMENTS
CONTRACT 99JJ AND CONTRACT 99LL
2004 CIP—NEW YORK AVENUE RECONSTRUCTION
AMENDMENT NO. 1
Original Contract No. - 29213
Date: September 30, 2003
Original Contract Value—$146,734.55
Reference No.: C-19775
Sewer Project No.: PS58-531200-070580175060
Water Project No.: PW53-531200-060530175800
T&PW Project No.: C115-531200-020115095502
DOE No.'s: 99JJ - 2878, 2879, 2880, 2881, 2882, 2883
99LL- 2981, 2982, 2983, 2984, 2985
New York Ave. - 3910
Dear Mr. Sahu;
In accordance with direction received from the City of Fort Worth Department of Engineering,
RJN Group is pleased to submit this amendment for additional design services rendered on the
above referenced project.
The following is a summary of the additional services provided:
1. Added design for replacement of 554 LF of sanitary sewer line in Fuller Avenue for
sewer lateral: L-4097 (Station 5+90 to Station 11+45)
2. Added design for replacement of an additional 675 LF of 12" water line in Fuller
Avenue, from Ryan to 6th Street.
DD
Page 1 of 3 n,
I44I11 qn
l.Gt
RAGROUP, INC. 7524 Mosier View Court,Suite 106
An Employee-Owned Firm Fort Worth,TX 76118
817.595.2199
Engineering Consulting and
• Information Technology Services fax 817.595.3375
www.rjn.com
3. Added design for replacement of a total of 1360 LF of sanitary sewer lines in Waco
Way which includes laterals: L-6455 (Station 0+00 to Station 5+88E)
L-6459 (Station 0+00 to Station 3+42E)
L-6458 (Station 0+00 to Station3+59E)
4. Added design for replacement of an additional 105 LF of sanitary sewer in Wosley
Drive for sewer lateral: L-5237 (Station 0+00 to Station 1+05E).
5. Added design for replacement a total of 1,301 LF of sanitary sewer lines in Wessex
Avenue which includes laterals: L-5851 (Station 0+00 to Station 4+59E)
L-5849 (Station 0+00 to Station 7+86E)
Total additional sewer design length is: 3,320 LF
Total additional water design length is: 675 LF
All of the design work described in Items 1 through 5 above is part of Sanitary Sewer and Water
Line Replacement Contract 99LL. No additional work is anticipated at this time for Contract
9911.
The estimated construction cost for each of the additional items is summarized in Table 1.
Est. Construction Cost
DOE Description Sewer* Water*
No
1 2981 554 LF of 8" Sanitary Sewer in Fuller $ 70,973
Avenue
2 2981 675 LF of 12"Water Line in Fuller $ 67,862
Avenue
3 2983 1,360 LF of 8" Sanitary Sewer in Waco $ 174,230
Way
4 2984 105 LF of 8" Sanitary Sewer in Wosley $ 13,452
Drive
5 2985 1,301 LF of 8" Sanitary Sewer in $ 166,671
Wessex Avenue
TOTALS $ 425,326 $ 67,862
TABLE 1: Additional Estimated Construction Costs (includes 10% contingency)
* - Costs determined from average per linear foot costs developed in the original contract for 8"
sewer and 12" waterline replacement in asphalt pavement.
Table 2 summarizes the direct labor hours and costs required to perform the additional design
services.
L)
Page 2 of 3
RJN GROUP, INC. 7524 Mosier View Court,Suite 106
An Employee-Owned Firm Fort Worth,TX 76118
817.595.2199
Engineering Consulting and
Information Technology Services fax 817.595.3375
www.rjn.com
DIRECT LABOR HOURS TOTAL
ITEM DOE No STREET DIRECT
PD PM PE CD CT CL LABOR
1 2981 Fuller(sewer) 1 4 12 16 8 2 $ 3,475
2 2981 Fuller (water) 1 4 8 14 12 2 $ 3,145
3 2983 Waco 1 11 24 36 12 2 $ 7,130
4 2984 Wessex 2 2 4 $ 720
5 2985 Wosley 1 11 24 34 12 2 $ 7,000
TOTALS 4 32 70 104 44 8 $21,470
TABLE 2: Design Fee for additional work.
No additional survey is required for the design of the sanitary sewer line replacements since
these streets were surveyed for the water line replacements. However, additional topographic
survey will be required for the 600 LF of 12" water line replacement in Fuller. Additional
printing costs will also be incurred. The following Direct Costs include actual cost plus a 10%
markup.
Gorrondona &Assoc.(M/WBE Provider) Survey 675' at$2.75/LF + 10% markup = $2,042
LA Blueline (M/WBE Provider) Additional Reproduction + 10% markup = 220
Total Direct Costs =$2,262
The total value of this amendment is $23,732 (Direct Labor+Direct Costs), which is 16.17% of
the original contract value. The revised contract value is $170,466.55
This fee is broken out as follows:
DESIGN SURVEY REPRODUCTION
SEWER $ 3,475 $ 0 $ 44
WATER $ 17,995 $ 2,042 $ 176
TOTAL $ 21,470 $ 2,042 $ 220
Based on the above discussion, RJN Group, Inc. requests that you process an amendment to the
original contract in the amount of$23,732. If you have any questions or require additional
information to process this request, please do not hesitate to contact me.
Very Truly Yours,
RJN Grou , Inc.
David L. Cooper, P.E.
Project Manager
W
Page 3 of 3