HomeMy WebLinkAboutContract 31390 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, Centex Homes, a Nevada General Partnership., hereinafter called
"Developer", desires to make certain improvements to _Basswood Village, Phase II,
DOE #4356, an addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through _Centex Homes Real Estate
Corporation, a Nevada Corporation, its duly authorized _Managing General Partner and
acting through Bret Pedigo, its duly authorized Vice President, and the City, acting herein
by and through Marc Ott, its duly authorized Assistant City Manager, for and in
consideration of the covenants and conditions contained herein, do hereby agree as
follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy.
02- I 'I-05PO4 : 2u RCVD
CFA REVISED FORMAT WITH 4% 1 +^' `' ' r'0 Rk r'
�U� ':y:��v�UG�UU➢� �SGU.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Policy.
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, iMether or not such injuries, death or damages are caused,
in whole or in part, by the alleged neglizence of the City of Fort Worth,
its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
1. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
Nffi
CFA REVISED FORMAT WITH 4% 2
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof.
Water(A)None; Sewer (A-1)None; Paving (B) attached; Storm Drain (13-
1) attached; Street Lights and Signs (C) attached.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
-;5�)�
construction and inspection is estimated to $J
Item Developer City Cost Total Cost
Cost
A. Construction
1. Streets $ 0.00 C)1elDO
2. Storm Drainage $ 0.00 $ 0.00 $ 0.00
3. Street Lights $ 28,600.00 $ 0.00 $ 28,600.00
4. Street Name Signs $ 400.00 $ 0.00 $ 400.00
B. Engineering Design
C. Construction Engineering
and Management by DOE 4% $ 12,403.00 $ 12,40/3,.00
TOTALS $ 0.00 $ ,
Notes:
1. All Preliminary Plats filed after July 2000, will require sidewalks on all streets.
Sidewalk cost is included under street cost. The developer is responsible for
installation of sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
CFA REVISED FORMAT WITH 4% 3
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Developer
has executed this instrument in triplicate, at Fort Worth,Texas this the day of
200
Approval Recommended:
Transportation and Public Works
Department
contract Authorization 6 // �
Robert Goode, P. E.
Director
ATTEST: City QfFgrt Worth
r� •� B
,4 'Marc Ott
City Secretary Assistant City Manager
Approved as to Form:
Assistant C' orney
ATTEST: DEVELOPER
Centex Homes
A Nevada General Partnership
By: Centex Homes Real Estate Corp.
A Nevada Corporation
Managin Partner
/,,,
By:
Corporate Secretary Vret Pedigo,Vic resident
CFA REVISED FORMAT WITH 4% 4
� a
136 \ \
3479 \
HARMON \ a
3479 \
�\ 81 J L— HOMPSON
287
PROJECT
LOCATION
I �
I
I �
L 35W
( 1 BASSWOOD
8
AS�OOD
156
f
X v
z
I0
o
WATAUGA
� FAIRWAY CROSSING
W ( 35W
m � 81
N
287
NOT TO SCALE
LOCATION MAP
BASSWOOD VILLAGE
PHASE II
Carter Burgess
CARTER & BURGESS,INC.
777 MAN STREET
FORT WORTH,TX 76102
(817)735-6000
PROJECT NO. 011907.010.1.0001
)GN=oi V ob\ 01190T\cly\ 907p2lcfa.dgn PAGE 1 OF 6
N
.00 SCALES 1" = 300'
i
I O�
'TY
8 7 6 5 4 3 2 I
555
� • ��� 54
17 24 25 25 26 53
16 23 25 24 27 52
/5 22 27 23 26 5/
14 2/ 28 22 29 50
13 20 29 2/ 30 49O
12 19 30 20 3/ 48
/! 18 31 19 32 47
8 /D � l7 32 IB 33 : 46
• • /6 33 17 34
6 15 3q 16 35 44
Q "tl 7 14® 35 l5 36 43 U1
6JZ-13 36 14 31 W . 42 �1'SeQG,9
5 rn 12 37 Q 13 38 41 �P 'g`,r
4 11 38 /2 39 40 VO\'•
3 /0 39 I• /1 40.. . 39
2 9 40 10 4/ 36
S / 9 4?
E[ 8 41 37
8 43
7 42 36 3
WAY • 7 44
28 6 43 35
27 6 45
5 44 34
O/26 5 46
4 45 33
25 9 47
G 32
\�~P 48
49
� p5`•' FSP --- - -- 30
50
29
INDIGO. RIDGE D 28
STREETS
EXHIBIT 'B'
LEGEND BASSWOOD VILLAGE
PHASE II
PROP. 29' B/B _ p
ROADWAY/50' ROW
i'
PROP. 4' SIDEWALK .................... � :..� .. Carter Burgess,.
i! CARTER & BURGESS,INC.
U 777 MUN STREET
FORT LIMITS OF PROJECT 1171795-6000 76102
PROJECT NO. 011907.010.1.0001
DGN=g1\Job\ 01190T\civ\ 907p21cfa.dgn PAGE 4 OF 6
N
SCALEI 1" = 300'
y,.
�q\
VII
/2 I/ lO 9 8 7 67" R
4 3 2 /
S 55
59
4
/7 24 25 25 26 1 'S3
/6 23 26 24 27 1 52
i5 27 27 23 26 5!
74 2/ 28 22 29 50
13 20 29 2/ 30 49O
4B
/8 31 1 /9 32 47
8 /0 1 1 /7 32 1 l8 33 46
9
16 33 17 34 45
15 34 16 35 Lp 44
7 F /4® 35 15 36 43 4 Q
6 /3 36 42
6 G� 13
H7
/2 37
4 /! 3B I /2 39 p 40
3 10 39 I 11 40.r 39
/ I 9 90L-0
/D 0 4/ 38
EPIA 1 8 41 9 42 37
7 42 8 43 36 .3
WAY 7 44
6 43 35
5 46
27 6 45
5 44 34
Of 26
4 95 33
4 47
25
5�t X 32
_.. 1"RC 4e
EXIST 15'49 3/
EXIST 10' r�x-e�°� -— INLET 30
INLET EXIST 15' EXIST 50
14CPJ INL 15 29
-- -- INDIGO; RIDGE DRIVE 28
125 21 PI
STORM DRAIN
LEGEND EXHIBIT 'B-1'
PROP. STORM DRAIN LINE BASSWOOD VILLAGE
PROP. INLET I PHASE II
PROP. MANHOLE
PROP. HEADWALL —{ Carter Burgess
0
EXIST. STORM DRAIN LINE CARTER & BURGESS,INC.
777 MAIN 5TREET
LIMITS OF PROJECT -' FORT WORTH,U 76102
(817)735-6000
PROJECT NO. 011907.010.1.0001
DGN=9i\Job\ 01190T\cly\ 907p21cfa.don PAGE 5 OF 6
N
SCALE1 1" = 300'
Std
•`4 �J
J
,�,c�p6 x,40 tirt�'
"7N� s6
lZ 11 l0 9
S N ss
54
S 26
/7 4 ?5 5 53
l6 23 26 24 27 I 52
15 22 27 23 28 5/
14 P1 28 22 29 5D
13 20 29 2/ 3D 4.90
/2 /9 30 20 3/ 48
/B 3/ I /9 32 47
8 10 I I 17 32 I 18 33 46
9 /6 33 17 34 45
B /5 34 16 35 44
R�Pe'`J 7 14® 35 IS 36 43 L @°
FW`� 6 H /3 36 CJ /4 37
t1a k` S !2 37 73 38 y 4/
4 y l I 38 I l2 39 40
3 IO 39 I rn 11 40 ~ 39
2 I 9 40 /0 4/ 38
/ 9 42
B 4! 1 37
SEPIA 8 43
WAY 7 42 36 3
28 7 44
6 43 35
27 6 45
5 44 34
V(121)26 5 46 45 33 4 47
_' 32
--`--- \4`'�-- 48
3/
._..... IGO RIDG DRIVE 50
29
2B
_.____.__ _.�_.[25 26 7=
STREET LIGHTS
LEGEND EXHIBIT 'C'
PROP. SINGLE STREET LIGHT • BASSWOOD VILLAGE
EXIST. SINGLE STREET LIGHT O PHASE II
( ON STEEL POLE WITH STREET
AND STOP SIGNS ATTACHED)
PROP. STREET SIGN �� Carter Burgess
EXIST. STREET SIGN
D �� i��`� "`, � ;` `�',''_ 1 CARTER & BURGESS,INC.
WN
LIMITS OF PROJECT — — - 777 WO sTRTX;r - FORT WORTH, 76102
(817)735-6000
PROJECT NO. 011907.010.1.0001
)GN=g7\Job\ 011907\oly\ 907p21afia.dgn PAGE 6 OF 6
PROPOSAL
(This Proposal must not be removed from this book of Contract Documents)
TO: CENTEX HOMES Fort Worth, Texas
DEVELOPER APRIL 2004
c/o CARTER & BURGESS, INC.
FOR: STREET IMPROVEMENTS FOR
BASSWOOD VILLAGE, PHASE II
DEPARTMENT OF ENGINEERING No. 4356
Pursuant to the foregoing "Notice to Bidders," the undersigned bidder having thoroughly
examined the Contract Documents, Plans, Special Provisions, Standard Special Provisions, the
site of the project, and understanding the amount of work to be done, and the prevailing
conditions hereby proposes to do all the work as provided in the Plans and Contract Documents
subject to inspection and approval by the Director of Public Works of the City of Fort Worth,
Texas, and binds himself upon acceptance of this Proposal to execute a contract and furnish an
approved Performance Bond and Payment Bond, and such other bonds as may required by
the Contract Documents, for the performing and completing of the said work. Contractor
proposes to do the work within the time stated and for the following sums:
(Furnish and Install, including all appurtenant work, complete in place, the following items):
SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT
ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID
STREET IMPROVEMENTS
210 1. 15,073 S.Y. 6" Lime Stabilized Subgrade (Includes
Preparation of Subgrade), complete in
place for the sum of
One Dollar &
Fifteen Cents per Square Yard $1.15 $17,333.95
212 2. 226 Tons Lime for Subgrade (30#/S.Y.)'
complete in place for the sum of
Eighty Nine Dollar &
No Cents per Ton $89.00 $20,114.00
01190702.00A P- 1
SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT
ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID
314 3. 14,573 S.Y. 6" Reinforced Concrete Pavement
(Includes Joint Sealer, and 7" STD
Attached Concrete Curb), complete in
place for the sum of
Sixteen Dollar &
Twenty Five Cents per Square Yard $16.25 $236,811.25
4. 8 EA. ADA Sidewalk Ramps, complete in
place for the sum of
Five Hundred Fifty Dollar &
No Cents per Each $550.00 $4,400.00
Z 5. 6,202 S.F. 4' Sidewalks, complete in place for the
sum of
Two Dollar &
Seventy Five Cents per Square Foot $2.75 $17,055.50
6. 62 S.Y. Rock Rip Rap, complete in place for
the sum of
Eighty Dollar &
No Cents per Square Yards $80.00 $4,960.00
7. 3 EA. End of Road Barricade, complete in
place for the sum of
One Thousand
Five Hundred Dollar &
No Cents per Each $1,500.00 $4,500.00
01190702.00A P-2 � ";;„^;,
SPEC PAY APPROXIMATEDESCRIPTION OF ITEMS WITH BID UNIT AMOUNT
:]
ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID
8. 1 L.S. Storm Water Management
Five Hundred Dollar &
No Cents per Lump Sum $500.00 $500.00
9. 1 L.S. Payment, Performance and
Maintenance Bonds
Four Thousand
Four Hundred Dollar &
No Cents per Lump Sum $4,400.00 $4,400.00
TOTAL STREET IMPROVEMENTS --- $310,074.70
City of Fort Worth requires a minimum of 30#/S.Y. The Paving Contractor will be responsible for a lime series test as directed by the City
of Fort Worth Construction Inspection Department.
01190702.00A P- 3
No. 011573010 Page 2
AlA. . &.BLlR s
s .ISI
.:.:.:.:.:.:...:.:.:.:...:.:.:.:.:.:.:.:.:.:.:.:
................................................
. T
y7 MAIN.S..REE.. .EORt O 'f'
y ............... V..RTHY......EXr4 ..:..7........:.....:..............................................
.(E NQ . 8S-6 Ar a17
:::. :.:..... ::::. :...:.:.:.:::::.:.:.:.:.:-:.:::.:.:.:.:.:.:.:::.:::
BASSWOOD VILLAGE
PHASE II
MAY, 2003
SIDEWALK
ITEM# IDESCRIPTION QTYJ UNIT I PRICEI AMOUNT
1 4' SIDEWALK (HOMEBUILDER) 35,111 EA. 3.50 122,888.50
TOTAL SIDEWALK $122,888.50
JTL1
G:\JOB\011573\EST\RMCFA.XLS 5/11/2004
No. 011573010 Page 1
.' 49. .17 ............................
H�DN........ ..... .... ...Q>J...... r..Mtr . ...'1. ;. ..... .....t ,...,....:.:,.,.....,.,:
.... ............................... .......................................
BASSWOOD VILLAGE
PHASE II
MAY, 2003
STREET LIGHTS & SIGNS
ITEM# DESCRIPTION QTY UNIT PRICE AMOUNT
1 STREET LIGHT POLE, BASE & COND. 13 EA. 2,200.00 28,600.00
2 STREET SIGNS 4 EA. 100.00 400.00
TOTAL STREET LIGHTS/SIGNS $29,000 00
G:\JOB\011573\EST\RMCFA.XLS 5/5/2004
I. STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 4 EA $ 2, 000 $8, 000 . 00
MID-BLOCK RESIDENTIAL 8 EA $ 2, 000 $16, 000 . 00
CHANGE OF DIRECTION RESIDENTIAL 1 EA $ 2, 000 $2, 000 . 00
MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0,000 . 00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000 . 00
RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 . 00
Subtotal $26, 000.00
City' s Cost $00, 000 . 00
Developer's Subtotal $26, 000.00
10% Contingencies $2, 600. 00
Project Total $28, 600.00
Adjacent Developer's Cost $0, 000.00
Developer's Cost $28, 600.00
2% Inspection Fee $0, 00. 00
DEVELOPER'S COST: $28,600. 00
BASSWOOD VILLAGE, PHASE II
June 11, 2004
Fort Worth, Texas
July 22, 2004
PAGE I OF Exhibit C
II. STREET LIGHTS WORK DESCRIPTION:
1. The Developer shall provide for the installation of streetlights at
the approximate locations shown in Exhibit "C" , immediately after
final acceptance of the street construction, in accordance with
engineering plans and specifications approved by the Transportation
and Public Works Department .
2 . Streetlights on residential and /or collector streets can be
installed using overhead or underground conductors with the approval
of the Director of Transportation and Public Works .
3 . The City will install all the streetlights that use overhead or
underground conductors on residential, and collector streets. the
developer agrees to pay the city the amount shown below prior to the
City starting it's design efforts.
4 . Streetlights on arterial streets shall be installed with underground
conduit and conductors .
S . The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for
the installation of any electrical transformers required for the
proper operation of the street lights
6 . The estimated cost of this street light installation is detailed on
page 1 of exhibit C and is summarized below, the street lights will
remain the property of, and will be maintained by the City of Fort
Worth.
DEVELOPER'S COST: $28,600.00
BASSWOOD VILLAGE, PHASE II
June 11, 2004
FORT WORTH, TEXAS
Page II of Exhibit C
III.
"STREETLIGHTS"
INTERSECTIONS
INDIGO RIDGE DR & TUSCAN VIEW DR 1
SIENNA RIDGE LN & TUSCAN VIEW DR 1
SCARLET VIEW TR & TUSCAN VIEW DR 1
SCARLET VIEW TR & SEPIA WAY 1
MID - BLOCK
INDIGO RIDGE DR 3
SIENNA RIDGE LN 3
SCARLET VIEW TR 2
CHANGE OF DIRECTIONS
INDIGO RIDGE DR 1
BASSWOOD VILLAGE, PHASE II
Page III of Exhibit C
IV
STREET NAME SIGNS
1 . The City of Fort Worth will install the street name signs upon
final approval of the street construction. The street name signs
will remain the property of, and will be maintained by, the City
of Fort Worth.
2 . The Developer will pay for the street name sign installations
required for this development to the extent of $100 . 00 per
intersection. This unit cost will be revised annually by the
Department of Transportation and Public Works to reflect
prevailing costs of materials and labor.
3 . This development creates the following four (4) intersections at
a cost to the Developer of $400.00 :
Sepia Way & Scarlet View Tr
Tuscan View Dr & Scarlet View Tr
Tuscan View Dr & Sienna Ridge Lane
Tuscan View Dr & Indigo Ridge Dr
Basswood Village, Phase 2
CFA code: 2004074 Date: June 18, 2004
�✓�f�J'�'��`i�� ���r�,�.,fij iii