Loading...
HomeMy WebLinkAboutContract 48338 CITY SECRETARY CONTRACT 140. Developer and Project Information Cover Sheet: Developer Company Name: HPC Wellington South Development Corporation Address, State,Zip Code: 3001 Knox St. Ste 207 Phone&Email: 214-373-1892, ben@hanoverroperty.com Authorized Signatory,Title: Ben Luedtke Project Name and Brief Wellington Area 1 South Ph.l Description: Project Location: Southwest corner of Willow Springs Road and Blue Mound Road Plat Case Number: FP-16-001 Plat Name: Wellington Mapsco: 19A,19E,19F Council District: 7 City Project Number: 100339 CFA Number: 2016-061 DOE Number: <DOE#> To be completed by ff Received by: /G� �(/,l�L Date: FOFFICIALCORD TARY City of Fort Worth,Texas H,TXStandard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, HPC Wellington South Development Corporation, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Wellington Area 1 South Ph.l ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Proj ect. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) .®, Sewer (A-1) �, Paving (B) ®i, Storm Drain (B-1) �, Street Lights & Signs (C) �'. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in ivhole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 7 of 11 Cost Summary Sheet Project Name: Wellington Area 1 South Phase 1 CFA No.: 2016-061 DOE No.: None An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 481,497.50 2.Sewer Construction $ 644,408.65 Water and Sewer Construction Total $ 1,125,906.15 B. TPW Construction 1.Street $ 1,687,938.50 2.Storm Drain $ 777,877.75 3.Street Lights Installed by Developer $ 115,454.25 4. Signals $ - TPW Construction Cost Total $ 2,581,270.50 Total Construction Cost(excluding the fees): $ 3,707,176.65 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 22,518.12 D. Water/Sewer Material Testing Fee(2%) $ 22,518.12 Sub-Total for Water Construction Fees $ 45,036.25 E. TPW Inspection Fee(4%) $ 98,632.65 F. TPW Material Testing(2%) $ 49,316.33 G. Street Light Inspsection Cost $ 4,618.17 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 152,567.15 Total Construction Fees: $ 197,603.39 Choice Financial Guarantee Options,choose one Amount Mark one Bond= 100% $ 3,707,176.65 Completion Agreement=100%/Holds Plat $ 3,707,176.65 x Cash Escrow Water/Sanitary Sewer=125% $ 1,407,382.69 Cash Escrow Paving/Storm Drain=125% $ 3,226,588.13 Letter of Credit=125%w/2yr expiration period $ 4,633,970.81 City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER HPC Wellington South Dev ment Corporation Jesus J. Chapa Assistant City Manager Name: Ben Luedtke Title: Exec.Vice President Date: Date: Recommended by. ATTEST: (Only if required by Developer) Wendy Chi-Bdbulal, EMBA,P.E. Development Engineering Manager Signature Water Department Name: ,�),4- cJ, t..J Douglas Wiersig, P.E. Director Transportation&Public Works Department Approved as to Form &Legality: ATTEST: 11Z NLS 7 a-,4� Richard A. McCracken a J. Kayser Assistant City Attorney y 0 CP M&C No. #V 1A ®a°° Q Date: 6141le OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement FT.WORTH, TX CFA Official Release Date: 10.07.2015 _ Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 - Changes to Standard Community Facilities Agreement Location Map Exhibit A: Water Improvments Water Cost Estimate Exhibit A-1: Sewer Improvements Sewer Cost Estimate Exhibit B: Paving Improvements Paving Cost Estimate I Exhibit 13-1: Storm Drain Improvements Storm Drain Cost Estimate If Exhibit C: Street Lights and Signs Improvements D3 Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100339 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 11 of 11 Z N N � J BOAZ V J_ � 1 N C J a rn ui 0 N M t0 O� 3 VON ..°1+ BLUE MOUND 6'c' X 8 W BLUE MOUN BLUE MOUND BLUE MOUND Q VQ ' J V V 7 N H G fA J � 3 CL t HICKS- DALE 0 O !n PROJECT j HICKS LOCATION Q AIRFIELD V_ 8/ a r Li co 0 ti N VICINITY MAP V WELLINGTON O BOND RANCH NOT TO SCALE AREA 1 SOUTH, PHASE 1 tn f0 X MAPSCO NO. 19A, 19E, & 19F 0 0 COUNCIL DISTRICT NO. 7 JAmklcoBS 0 N X 777 MAIN STREET 3 FORT WORTH, TX 76102 PHONE 817-735-6000 CONNECT TO N �y 'pEXISTING 9 -- 16'1'\ 7 8 9 10 11 ' I 28 33 I U 6 \ 10F'p - ---� y 17 \.�__-_.___ 34 ( I 5``\\` 11 //'' s 1S2 3 4 5 I _ 27 4 12 a' ---� , 35 \ `, 13 O SCALE:1' 400' y 26 I I 12 13 3 \ 6 i t �Tll 21 222324 � >��25 36 1 14 2 �. �\ /'' /•' /�, 2 �F,. 16 �Q 7 Q CONNECT TO 143 OF 15 cr 8 1 16 15 EXISTING / / 4 p�O� 18 17 u z s—� 19 Q 0 13 j r 20 Ld la e O2 21 12 11 1 I 23 24 25 N _� % , / -- U z 3 26 o LEGEND \---- 4 n I =- 7 6 Lo 5 1 PROPOSED WATER LINE a 0 l0 9 8 IN 21 9 413 1211 8 , \\`G- '4 , 2 , �_ ---- PROPOSED GATE VALVE y 15 16 IRP'\�. 7 \ 10 t 6 ' �OpP -- 6 \ a PROPOSED FIRE HYDRANT X 7ui 18 a9 65 54 \1`\ 1\x 13 EXISTING WATER LINE — Of 19 1 10 4 3 `I 14 ` O a EXISTING GATE VALVE - 20 11 3 `I m 2 1 \U - W u 24 2 1 12 112 1 1 to �0 w T 22 13 , w' EXISTING FIRE HYDRANT t 22a ) 4 PPRE%°N 9 O 26 w LIMITS OF PROJECT ---------- a 0 6 8 1\I�\ 6 A w�� IK PROPOSED WATER LINES ARE 8" 6 ` 1 17 7, ` 1�C UNLESS OTHERWISE INDICATED 6 VI IS 23 15 'O 5 S 11\G 4 Y .. `\ 3 13 G 25 13 -A 3 % 12lP� 26 12 `Y 2 `Q lai 2 11 2 27 1, 10 1 28 10 1 -p'�VO�NCE 9 O 29 9 \ ' t e �� 3° e \ CONNECT TO W 7 31 7 1 2 3 EXISTING 12' WATER N 6 1 f 32 6 \ ``\`� 5 ' EXHIBIT 'A' O 4 1 N 34 4 `a, 5 \ __ -------------- 3 J O .. - -d U 3 35 3 6O �'�_, f EAGLE BOULEVARD 3 cn I M N - ------- -------------- WELLINGTON 2 36 2 _ X J O � w X3 j 1 , WL-2512- WL-25MEX AREA 1 SOUTH, PHASE 1 Lo WL-25 FUTURE WASSEL ROAD W�-25 N EAGLE X79 ifp , 2 3 1, 5 6 BOULEVARJA na 3 _ CO� C X x o ----- - -- - - --- -- - — - — -- —._._ m N x 777 MAIN STREET FORT 0 PHONE 817-735-6000WORTH, In Pave�nf5 QUANTITY MATRIX Project Item Inf rmation Bidder.,Proposal Bidlist Item Description Speci5carlon Section No. Unit oCMeasurc Page Page Page Page Page Page Puge Page Page Page Page Na R 9 l0 11 12 II 1p Bid Quantity Unit Priee Bid Volae UNIT I:WATER IMPROVEMENTS 1 3311.0441 12"Water Pie 33 11 10,33 11 12 LF 251 251 $37.00 $9,287.00 2 3305.2004 12"Water Carrier Pie 33 05 24 LF 257 257 $52.00 $13,364.00 3 3305.1104 24"Casing By Other than Open Cut 33 05 22 LF 254 254 $105.00 $26,670.00 4 3311.0241 8"Water Pie 33 11 10,33 11 12 LF 9695 9,695 $22.00 $213290.00 5 3312.3005 12"Gate Valve 33 12 20 EA 2 2 $2,400.00 $4,800.00 6 3312.3003 8"Gate Valve 331220 EA 3 7 2 6 5 2 25 $1,250.00 $31,250.00 7 3312.0001 Fire Hydrant 33 12 40 EA 2 1 2 1 2 1 9 $2,450.00 $22,050.00 8 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 1.18 0.51 0.66 0.6 0.73 0.39 4 $5,000.00 $20,350.00 9 3312.2203 2"Water Service 31 1210 EA 1 1 $2,000.00 $2,000.00 10 3312.21031 1 1/2"Water Service 331210 EA 1 1 $1,500.00 $1,500.00 11 3312.2003 1"Water Service 33 12 10 EA 216 216 $600.00 $129,600.00 12 9999.0001 1"Water Service with 100'copper roll 33 12 10 EA 1 1 $600.00 $600.00 13 3312.4109 12"x 12"Tapping Sleeve&Valve 33 12 25 EA 1 1 $4,000.00 $4,000.00 14 3305.0109 Trench Safety33 05 10 LF 9946 9,946 $0.25 $2,486.50 15 3125.0101 SWPPP>1 acres 31 25 00 ILS 1 1 $250.00 $250.00 UNIT I:WATER IMPROVEMENTS $481,497.50 arta t Snmh.1M1 1 CPA Sia Bank 15. 29 32 ' 10 161, �, 7128 SJ I 1 11 17 I 34 I 5 it CONNECT TO 4 �� Q 3 5 I z7 4 12 EXISTING ps 2 N 18' U21 _ 35 12 313 NT , 6SCALE:1" 400' 19 23 24 '26 36 �__u 1 , 14 ` ` / © s 9/ J 16� r14 6 .c / / �\�\ 5 Q 18 FO 9 i �, 1a J ' ' 19 1(71/1 rZ 10 6 �j 1 20 O 13 d l . 114 e 7 �� 522 21 72 ILLI IN ® v �- 04 24 25 i O __� i __—.____- 26- LEGEND cq tc) I' 6 7 8 R R\yq4 F - - 28 ' PROPOSED SANITARY SEWER ,. -- -- - 3 3 12 " 6 e z" 3 2 PROPOSED MANHOLE ul . 1$ 14 `j P,\\" 7 \` 1 o i�" fi�5 413 L 0 16 C) 5,20 1, ` 6 , 11 1 �6`'�� � EXISTING SANITARY SEWER — — — — — — W 6 5 111 x 12 NN,I- > EXISTING MANHOLE — — — — — 18 9 5 4 N Q Q 19 70 4 ` , N 3 \ 8" $5-26 Ld 20 tLLLJ 12 N 01 N jFjP\\ o z / 24 21 ` U1 112 , 0 13 •/ EN50 •'0 23 14 d 10 0 2a-� O w ?� 19 ee ,\,9� 6 13;a 8" SS-27 j 20 i6 -1' \ 21 1 17 �` 1 5 1 N� (p 16 22 16 ' 6 ,Q)\ 4 , NN 15 G 23 15 1` 5 4 \�, , 14 �Na 24 14 4 1,`(�\ 2 d13 2513 \�,1 Z 3 1s— / 12 26 12 , ` 2 ,,\Q �Z ss- 2 U 3 11 O 27 11 10 90 28 10 R pEr\CE kYNe S 29 P \'.- 0 0 0 CONNECT TO 9 9 2• RR W t 8 30 8 �' $� W7 31 , 2 `\\;`\ EXISTING 16" WASTEWATER N 04 5 rD, 32 5 \ j NN 3 Np 4 5 y 4 33 `�� ��' = 34 4 5 ----------------- EXHIBIT 'A-1 ' 0 , O, 35 , 1 6O '�_- -EAGLE BOULEVARD -- - 2 36 2 __------- - \ WELLINGTON 37 1 8" SS-18' J' UTURE WASSEL ROAD 5" SS-1 16 SS-1 -\- 16-5� -6, AREA 1 SOUTH, PHASE 1 m - - SS-1 4 8 N r- X 3Y 1 1 2 3 3 b 1 C O/ --..__.—-.- ........ 1% 1x co N X 777 MAIN STREET 3 FORT WORTH, TX 76102 g PHONE 817-735-6000 Ln Pupe 2 of 5 QUANTITY MATRIX Project Item Information Bidder's Proposal Bidliu Lem Descri tion 3 Page Pole Page Page Page Page Page Page Page Pagc Page Nn P peci6cstinn Section No. Unit nCMeasure Bid Quamity UnitPrice Bid Value 16 17 IR 19 20 21 22 23 24 25 26 UNIT II:SANITARY SEWER IMPROVEMENTS 1 3331.4218 16"Sewer Pipe(DR-25 C905(GREEN)) 3311 10,33 31 12 LF P417 936 $55.00 $51,480.00 2 3331.4215 15"Sewer Pipe(SDR-26,ASTM D3034) 33 11 10,33 31 12,3331 20 LF 327 $46.00 $15,696.00 3 9999.0002 12"Sewer Pipe(SDR-26,ASTM 2241) 3311 10,33 31 12,3331 20 LF 1082 96 1,293 $40.00 $51,720.00 4 3331.4208 12"Sewer Pipe(SDR-26,ASTM 3034) 3311 10,3331 12,333120 LF 819 1,236 $40.00 $49,440.00 5 9999.0003 8"Sewer Pipe(SDR-26,ASTM 2241) 3311 10,3331 12,333120 LF 349 93 415 1,266 $29.00 $36,714.00 6 3331.4115 8"Sewer Pipe(SDR-26,ASTM D3034) 3311 10,3331 12,333120 LF 571 1245 1355 4,631 $29.00 $134,299.00 7 3331.3101 4"Sewer Service 3331 50 EA 22 71 62 30 3P751 251 $525.00 $131,775.00 8 3305.0116 Concrete Encasement for Utili Pipes3305 10 CY . 16.5 5.3 7.3 58.60 $145.00 $8,497.00 9 3339.1001 4'Manhole 33 39 10,33 39 20 EA 3 5 5 8 33 $2.450.00 $80,850.0010 3339.1002 4'Drop Manhole 33 39 10,33 39 20 EA 3 1 6 $4,200.00 $25,200.00 11 9999.0004 4'Manhole with Bolt Down Lid 31 2500 EA 1 1 $2,890.00 $2,890.00 12 3339.1003 4'Extra Depth Manhole 33 39 10,33 39 20 VF 55 70 21 10 16 188.00 $125.00 $23,500.00 13 3339.0001 Epoxy Manhole Liner 33 39 60 VF 13.7 23.7 25.5 11.6 74.50 $175.00 $13,037.50 14 3305.0109 Trench Safety 33 05 10 LF 1795 1901 1016 1338 1770 9,689 $0.25 $2,422.25 15 3301.0002 Post-CCN Inspection 33 9121 LF 1795 1901 1016 1338 1770 9,689 $1.10 $10,657.90 16 3301.0101 Manhole Vacuum Testing 33 01 30 EA 4 8 5 9 8 6 40 $150.00 $6,000.00 17 3125.0101 SWPPP>1 acres1312500 LS 1 1 $230.00 $230.00 TOTALUNIT II:SANITARY SEWER IMPROVEMENT $644,408.65 nrcu I snmh.Pb-t CFA spec Honk. I 29 32 i 10 a 9 10 11 i 28 33 I 1, 6 \`°tt �z 3 4 s I I - - 27 3. -- t 18 -- _ _ 35 I 12 13 3 13 , SCALE:1" 400' V 19 20 21 22 23 24 2s -- 2 N _��� O 15'a t /'' / y16 1 .rte © ` 1i3 17 is �p 8 I I�� 5 W y 6 19 to IZJ . 20 I9 13 10 7 21 12 'w 11 '2 22 - ---� -- 1 24 —I 255 LEGEND c1l\ 26 `�i- - 4 to 7 6 5 PROPOSED 29'B—B 26 ROADWAY/50'ROW 3 13 12 11 8 y 2 t -- 5 14 7 7,.6 �i3: 6" THICKNESS L 111 18 - T . ( 8 „ ;. j 8\ \l 0 -- PROPOSED 37'B—B x 7 O \\l. W17 � � a' 6 �� 5 2 ROADWAY/60'ROW x W8" THICKNESS 5 Y{r- a 13 1)� 3 PROPOSED 2-21' 0 0 0 0 0 0 0 Q 19 �� 4 a 2 11 3ROADWAY/80'ROW Q 20 � 2 W o 0 0 0 0 0 0 U 6" THICKNESS U 24 21 ; t2 112 1 W ;, 223 4. o to e �� PROPOSED 4'SIDEWALK 24 �' ;m (BY DEVELOPER) d - J 19 9 6Ld 221 9 a �o PROPOSED 4'SIDEWALK Z'5 6 22 16 '6 �54,� {� E (BY HOMEBUILDER) 1. a ,G 24 15 �r 5 r 3 a PROPOSED ADA RAMPS z `c (BY DEVELOPER) a2 26 2 i �'� 2 a LIMITS OF PROJECT ---------- 28 10 9 , 2 9 3 V C 8 30 9 >< W 7 31 7 00 5 33 a PAVING 34 EAGLE BOULEVARD 1 1 4 4 EXHIBIT B Q 3 ` , 35 3 1. 6 O O 2 36 2 ------ - WELLINGTON 37 AREA 1 SOUTH, PHASE 1 u WASSEL ROAD toN x b, 7Y y , 2 3 3 I I O II� oix ,x N X 777 MAIN STREET 3 FORT WORTH, TX 76102 V) PHONE 817-735-6000 Popo 4aI5 QUANTITY MATRIX Project Item Information Bidder's Proposal Bidlistem Deacri tion 5 ecification Section Nn. Unit arMea vrc Page Puge Page Puge Page Page Puge Page Puge Page Page Na.OP P 74 75 76 77 7x 79 %e xl %2 83 84 Bid Qumtrty Unit Price Bid Value UNITIV:PAVING IMPROVEMENTS K71 3213.0103 8"Conc Pvmt 32 13 13 Sy 12490 12,490 $33.00 $412,170.00 2 3213.0101 6"Conc Pvmt 32 13 13 Sy 28120 28,120 $28.25 $794,390.00 3 3305.1104 24"Casing B Other than Open Cut 32 13 13 Sy 94 94 38 226 $30.00 $6,780.00 4 3211.0502 8"Lime Treatment .32 11 29 Sy 13110 13110 $3.60 $47,196.00 5 3211.0501 6"Lime Treatment 3211 29 Sy 29930 29,930 $3.25 $97,272.50 6 3211.0400 Hydrated Lime 3211 29 TN 685 685 $140.00 $95,900.00 3213.0301 4"Conc Sidewalk 132 13 20 SF 1 1 23,920 $4.00 $95,680.00 8 3213.0503 Barrier Free Ramp,Type M-1 1321320 EA 43 $1,250.00 $53,750.00 9 3213.0506 Barrier Free Ramp,Type P-1 132 1320 EA 48 $1,250.00 $60,000.00 10 9999.0012 Ins tall EOR Barricade 3471 13 EA 1 1 3 2 2 10 $1,500.00 $15,000.00 11 3471.0001 Traffic Control 34 71 13 MO 3 3 $3,100.00 $9,300.00 12 3125.0101 SWPPP>1 acres 31 2500 LS 1 1 $500.00 $500.00 TOTALUNIT IV:PAVING IMPROVEMENT $1,687,938.50 n,w 15 '\ ® ,—J I 29 32 i 10 7 �,9 I�L�LJ�/ �,1,�(�1�� 16`1�', 7 8 9 10 11 I 28 33 1/ e 5 .10 4 ' I 17 \ 27 34 5 L 18.1';`---- 12 13 4 \,\ 1213 `'�T.p9T0�\ , 2 60� SCALE:1" = 400' _ V �21 __ � /M. s zoz1 Izz 23 zsz , \ / / .)AA- > 7 J1J� 36 __ / / 16 r is 1 /'� 2 I� C I I 16 15 © 1�3 Q 7 / ', ,EX 5'X3' RCB 4 p�.' 16 14 O . dr 1`\ / J 8�/(`V 20 IOS 13 J 1 r 148 7 22 21 12 N ® 27" 24 25 o / U'�C �'' _ EX 5'X3' RCB N 1- ---- / 0 3 2 1 I I 26 ' LEGEND (\p `', , 6 5 �l 27" I OI EX 7'X4' RCB PROPOSED STORM DRAIN LINE o o Ti e s s 6 QR1�E -30 ze 14 13 12 " 8 `, g�`��NOER-4 3 2 ' '_ PROPOSED INLET T w \� -�Rp,�� 7 \ 10 / 6 6 30" t111 16 1 9PELL,--`I 6 \ 11 l` 8 ;\ _- 36" PROPOSED MANHOLE x /6 O 5 1� W 17 ` , 6 'O `\1 ,`t X 12 ` l N ,8 G 9 5 r 4 +k \ 13 EXISTING STORM DRAIN LINE - -- a 20 0 W ,rNo 4 3 \ `\Q'i 11 3 2 ' LIMITS OF PROJECT m`24 21 `m; 12 11 2 1`/ Z 22 13 , ` 1 W , ,4 O tm 224'\Q`1 PP j�NSj /19 m O7 \1` a 21 , 17 ` O 7 ` (eft, 5 O'L 0133 16 ` ` 22 16 `.� d , 14 24 4 `,tT\ 2 13 �O, 25 13 y` 3 \�` 21" 12 `Zm 26 12 2 ,\Q 21" 27" U '11 �O, 27 24" 10 28 0 9 29 y 42" L 6 ` 30 8 W 7 31 7 2 " 03 6 32 6 3 ` � . STORM DRAIN 5 33 45 ``� "`\�,`_27" 42" 30, 5-6'X3' MBC EXHIBIT B-1 Q4 34 .t 4 `"\ �-- 'X3' RCB' - ----- 30" L) 3 35 3 6O `-�-- __— ___7'X3' RCB__ "21" 30" 0 2 ; 24 2 ----------" 27" WELLINGTON 24 '27 X37 24" AREA 1 SOUTH, PHASE 1 S4" 36 --27 36" WASSEL ROAD i I r 36" — i ,s 0 x1100%co� N X 777 MAIN STREET 3 FORT WORTH, TX 76102 1n PHONE 817-735-6000 QUANTITY MATRIX Pro)ccl Item Information Bidders Proposal 61dIN"Ilem Descri tion g Page Page Page Puge Page Page Page Page Page Page Page Bid Quantity Unit Price Bid Value p peci5cation Section No. Unit oCMeasure 55 56 57 58 59 F() 61 62 63 F4 79 UNIT III:DRAINAGE IMPROVEMENTS 1 3341.0201 21"RCP,Class III 3341 10 LF 43 229 51 33 356 $50.00 $17,800.00 2 3341.0205 24"RCP,Class III 3341 10 LF 1 B 65 83 $63.00 $5,229.00. 3 3341.0208 27"RCP,Class III 3341 10 LF 43 37 74 57 21 38 270 $70.00 $18,900.00 4 3341.0302 30"RCP,Class III 3341 10 LF 499 32 35 566 $81.00 $45,846.00 5 3341.0309 36"RCP,Class III 3341 10 LF 49 276 103 428 $105.00 $44,940.00 6 3341.0402 42"RCP,Class III 3341 10 LF 135 394 529 $130.00 $68,770.00 7 3341.0502 54"RCP,Class 111 3341 10 LF 114 114 $188.00 $21,432.00 8 3341.0602 60"RCP,Class 111 3341 10 LF 129 129 $248.00 $31,992.00 9 3341.1201 5x3 Box Culvert 3341 10 LF 260 1 1 260 $238.00 $61,880.00 10 3341.1302 6x3 Box Culvert 3341 10 LF 375 375 $280.00 $105,000.00 11 3341.1401 7x3 Box Culvert 3341 10 LF 405 405 $320.001 $129.600.00 12 3305.0112 Concrete Collar 33 05 17 EA 2 1 3 $405.00 $1,215.00 13 3349.5001 10'Curb Inlet 33 49 20 EA 2 2 1 2 3 10 $4,050.00 $40,500.00 14 3349.5002 15'Curb Inlet 33 49 20 EA 2 2 2 2 8 $4,500.00 $36,000.00 15 3349.7001 4'Drop Inlet 33 49 20 EA 1 1 1 3 $4,000.00 $12,000.00 16 3339.1001 4'Storm Junction Box 33 49 10 EA 1 1 1 3 $3,460.00 $10,380.00 17 3339.1101 5'Storm Junction Box 33 49 10 EA 1 1 $4,050.00 $4,050.00 18 3339.1201 6'Storm Junction Box 33 49 10 EA 2 1 1 1 1 3 $5,700.00 $17,100.00 19 9999.0005 CH-FW-O TxDOT Headwall 21"RCP;4:1 slopes) 33 49 40 EA 1 1 $2,500.00 $2,500.00 20 9999.0006 PSET-SC TxDOT Headwall 30"RCP;4:1 slopes) 33 49 40 EA 1 1 $2,500.00 $2,500.00 21 9999.0007 CH-PW-0 TxDOT Headwall 60"RCP;4:1 Slopes) 33 49 40 EA 1 1 $7,000.00 $7,000.00 22 9999.0008 PW TxDOT Headwall 5-6'x3'RCB;4:1 slopes) 33 49 40 EA 2 2 $32,500.00 $65,000.00 23 9999.0009 Type PR-1 Handrail at Headwall ora roved equal) 00 00 00 LF 175 175 $130.00 $22,750.00 24 9999.0010 Flexmat-10'Roll 00 00 00 SY 117 117 $30.00 $3 510.00 3137.0110 Special Riprap[3"-5"Diameter Rock with 6"depth per TxDOT 803.3, 25 2004 at end of street 31 3700 SY 19 19 $45.00 $855.00 26 3305.0109 Trench Safe 33 05 10 LF 292 337 800 474 303 426 499 192 154 38 3,515 $0.25 $878.75 27 3125.0101 SWPPP>1 acres 31 2500 LS 1 1 $250.00 $250.00 TOTA-UNIT 111:DRAINAGE IMPROVEMENT $777,877.75 Q,wntily M.-IA-1 Suuth 1M1 11.x1. 01 1 29 32 I ; 10 7 � 16�, �, 7 6 9 10 t i 2B 33 n fi IO 17 �j 34 5 '��` „ / J �s O 3 a 6 SCALE:1" = 400' 11:`------------- ' 27 12 ,' �'' �'' J`TQ` 1 OI 18 U`al- _ . 136 23 24 26 i `_- 2 •\ • / / '•! ��' �-- �I O r 15 O 143 ' 15 Y 16 17 ��^ 191B 14 Q� T6o / . 20 15 13 W 10 7 2 12 - - w� o14ar 242' — _ LEGEND M \ /" / 25 PROPOSED SINGLE STREET LIGHT �l�c 13 3 2 1 I I 26 15 -- 28 LIMITS OF PROJECT u 2 8 3 2 In i 15 14 13 �" 4 7 10 5 p 7 1 -- 3 10 16 �� \7 B 5 6 11\ 11B\ 6 O v \\6 tll 17 , fi 1\ x iB 9 12 ` L5 4 1\ 13 j W 19 4 10 3 14 5 Q 20 11 3 2 11\13/ ly W U 24 21 12 ❑2 1 U / Z '6 11 223 1 14 J jRP�L p O1U 24 O7 L Q 19 g d 20 16 rt.. 17 21 3 17 7 p 16 22 16 O 6 \ 1 4 11\ (n 15 1 23 15 10 5 5 G� 3 14 24 14 1 4 !\ - 0 13 25 13 3 Q12 26 12 ,9 2 Q U =11 27 11 / 10 1 28 10 , EN +q' 9 29 9 QRUO ' '1 L B 30 B \5 w 3, STREET LIGHTS 2 00 6 32 fi \`` / 5 � EXHIBIT 'C' 4 34 4 5 B EAGLE BOULEVARD V 32 33fi 32 4 -----�-- �r�---�--�---� WELLINGTON 0 X37 -1J WASSEL ROAD C'4 AREA 1 SOUTH, PHASE 1 b -- X7y I 11 2 3 4 5 61 J/�CO�iS 3 I 1 o/ 11X_.- N X 777 MAIN STREET FORT WORTH, TX 76102 C3 PHONE 817-735-6000 1n r17 � 29S2i0 7 t 9 " LL_LL_LJ1 8 9 10 it 28 }3 ti 6.. .\� ,'\ 101` 4-- -' 27 4 '\ 1112 / sJ,. 3 5— "" ' oOI SCALE:1" = 400' __ _ _ 12 136 21 22 23 24 ,�� 25 36 1a 2 Rl / 1 �1� � / 16 1 2 T 1I�a 15 17 15C 18 14 6 Q'' 20 its 13 p^j li 9 22 21 - -12 W I I 23 24 --- -� 26 o LEGEND 13 6 N 4 6 3 5 --1 t 9 8 g 9 6 2e DR\V� PROPOSED STREET SIGN ° _ 14 ,} 12 11 e ���\N�'�R"4 3 2 1 '___ --- LIMITS OF PROJECT ------------- 15 � 7 ,`\` 10 8 6 5 12 16 6 1r �, 5 Lu 7 8 6 12 1, w N 1a` G 9 5 , 4 3 ` 19 `�1 10 4 3 .p Q20 lPO 11 3 `1 9` 2 `1 L 14 W . 24 2 2� 11112 1 1a ` Ld 3 22 0) 1n 23 y`1 14 N pN R 107 o 24 �P�E 0 19 Ld Of is 17 ` 21 17 O 7 (n� 5 OCL L=i p 16 22 16 4 1 ` 15 23 15 {` 5 <`\ _`\ 3 C((ffLL11 2 14 !' 24 14 -A 4 C�� d 13 Q` 25 13 y 3 \7� / 12 `Z26 m 12 2 1 lai 2 11 C 27 11 9 Q 229 19 w ' 6 30 1 a 12 STREET SIGNS 00 6 32 6 ] N 5 33 4 4 34 4 5 EXHIBIT 'C-1 ' v 3 35 3 60 '' BOULEVARD 2 36 2 ----------- --EAGLE-- -- ---� __ - WELLINGTON �71� / AREA 1 SOUTH, PHASE 1 n WASSEL ROAD FUTURE WASSEL ROAD 1 2 3 4 j 6' I x1 x IJ/�COBS N 777 MAIN STREET 3 FORT WORTH, TX 76102 J PHONE 817-735-6000 N r"rr s ors QUANTITY MATRIX Projcci 11—Infnnnation Bidder's Prnpnsal Bidlist Item Deeeriptinn Specification Section Na Unit of Measure pane Page Paga Page Page Page Page Page Puge Page Page No' 96 97 113 I t4 I15 116 117 Bid Quantity Unit Price Bid Value UNIT V:STREET LIGHTING IMPROVEMENTS 1 3441.3303 Rdwy Illum Foundation TY 7 3441 20 EA 62 62 $650.00 $40,300.00 2 3441.3035 Furnish/Install utility Washington Postlite Series Luminaire Full Cutoff LED and Pole 3441 20 EA 62 62 $325.00 $20,150.00 3 3305.1104 24"Casing By Other than Open Cut 26 05 33 LF 4515 4,515 $6.00 $27,090.00 4 3441.1408 NO 6 Insulated Elec Condr 3441 10 LF 9030 9,030 $1.00 $9,030.00 5 3441.1410 NO 10 Insulated Elec Condr 3541 10 LF 4515 4,515 $0.95 $4,289.25 6 3441.4003 Furnish/Install Alum Sign Ground Mount City Std:Blade Pair Only 3441 30 EA 2 2 4 $450.00 $1,800.00 7 3441.4003 Furnishf Install Alum Sign Ground Mount City Std:Stop&Blade Pair 3441 30 EA 11 1 12 $585.00 $7,020.00 8 3441.4003 Furnish/Install Alum Sign Ground Mount City Std:Right Turn&15 MPH 3441 30 EA 21 1 3 1 $585.00 $1,755.00 9 3441.4003 Furnish/Install Alum Sign Ground Mount City Std:Lek Turn&15 MPH 3441 30 EA 2 2 $585.00 $1,170.00 10 3441.4003 Furnish/Install Alum Sign Ground Mount City Std:Median Warning 3441 30 EA 1 2 3 $450.00 $1,350.00 11 3441.4004 Furnish/Install Alum Sign Ex.Pole Mount-Blade Pair Only 34 41 30 EA 31 3 $250.00 $750.00 12 3441.4004 Furnish/Install Alum Sign Ex.Pole Mount-Stop&Blade Pair 3441 30 EA 1 1 2 $375.00 $750.00 TOTALUNIT V:STREET LIGHTING IMPROVEMENTS $115,454.25 Bid Summary UNIT 1:WATER IMPROVEMENTS $481,497.50 UNIT It:SANITARY SEWER IMPROVEMENTS $644,408.65 UNIT III:DRAINAGE IMPROVEMENTS $777,877.75 UNIT IV:PAVING IMPROVEMENTS $1,687,938.50 UNIT V:STREET LIGHTING IMPROVEMENTS a $115,454.25 Total Construction Bid $3,707,176.65 Attu 1 finuth.PA—I CFn Free.-I