Loading...
HomeMy WebLinkAboutContract 46976-CO1 FORTWORTHO, CITY SECRETARY/ J CONTRACT W. City Of Fort Worth Change Order Request Facility and Project Norah Service Center City Sec No. 46976 City Proj.No. 02105 Contractor: Ridgemont Commercial Construction Change Order#0 Dale: 1213012015 City Project Mgr.1 Ronnie Clements City Inspector Mike Milam Phone Number: (817)392-8014 Phone Number: (817)392-2277 Phase 1 Contract Time (CD) Phase 1 Contract Amount----------------------------------------------------------------------------- $14,457,634.15 -376 JUSTIFICATION(REASONS)FOR CHANGE ORDER This is a no cost change order for the construction cost of Phase 1 for the North Service Center as designed by Quorum Architects on 19 August 2015.The total firm fixed construction costs of Phase 1 is$13,448,962.00 as per attached cost breakdown,plus a 7.5%Owners Contingency Allowance($1,008,672.15)for a total construction cost of$14,457,634.15.Attached is the contractors schedule.The total contract price remains at$25,462,938.00,to include a 7.5%Owners Contingency Allowance.M&C C-27384 was approved by city council on 21 July 2015. OFFICIAL RECORD` CITY SECRETARY FT. WORTH, TX Contractor's Company Name Contractor Name Contractor Sig alure Date Ridgemont Commercial Construction SAS PMD Inspector Date Project Vinaget Date •S•Ito ''�.N)C:L —° � (,5.t(. PMD S perinlendenl Date Arch'ecural Services Manager Date -%- r,,,ar •`.� f_ _ �_S=/.E --• NIA Project Architect Date Director/Property Management Department Date N/A N/A Assistant City Attorney Date Assistant City Manager Darte NIA NIA M&C Number N/A M&C Date Approved N/A Projoct: North Service Center-Phase IPmj. Typ.:Industrial Locaa.d: 301 HIIIshIra Drive,Ft Worth 4^011 Eadmawr.CMULL Job No: 1500609 R I D G E M O N T Tam Coati 1 's.sz v,o1o.1 s9.ac Bldg SF: 13,960 ...... SFICeat Bldg-76:.39 Schlmtlul: 14.0 Add..da:1 Am.lr4@ MnYM Bid Dara: 11-Dec-15 61B_ AME 28.60% 3202% 1M1� Sp- Crand nev.Ae,xn. WCMa.a.w. va,m. S.cllen bawl den Stu nark Bulldln TOMI CaaoSF 1UCeat SubcaninMn MBE panld Ilan eWMlepu..>•.Y .a9lw.das Va2NO C l C.rldfi.. 378.359 202555 579,014 41.48 431%RCC Insuranms 48392 26,805 75197 5.44 OS7%RCC B.Idrw Pamdt-Esduded 0 0.00 0.00%B 0- Naudais T.su -ExdudW 0 0.00 0.00% Owner Pntan3auc0on for_ 2.500 2.500 0.18 002% O.maiWm-v .arthwvrk 0 0.00 D.m% R.binln Wars-v.lh=.m. 0 a00 000% T.m,eaT--.t 1400 1400 0.10 am%RCC .1600 E-6an/Subll d.n 1 A31 993 1 8.11 993 151.23 13.62%VMawr -184 L2 D.I.0 Om.at W dow11 an. =400 Landso /1 .&. 19 5 S19 41.01 1.26%SLS 5712 8600 -115500 WBdibw.r L Sol Pmp,Ch.".Sod 02500 SA.Uoud.s W 858 0 688 6814 708%W hl Co- 552800 1,400 D.-Clunoue oat n uk.d 02600 Pawme.Uwdkbg,SI"..Pa B-p- 22.872 32.01M 235 014%tin.Al 02650 5u 0dareanveu ienm al b 0 0 0.00 0.00%S. rbr moven O.I.W Added mnoet avaa-11 02600 Fendn/Omamenbl tanm =248 238,248 17.07 1.77%Am.d- (M000 Tum Canaan 2 396 950 1'"O'560 3 437 24614 255610 Ma.,Sk.. 53437 a0 144400 D.INed Oebm pLem and fmlln s at Same wall 01100 T)M.bd a 265.000 20.000 18.96 197%'CF W - Mason -Buldinssrre zvaon Ovals 99098 629855 728MI 5222 SA2%Badar 3750531• Dewm O.kw 14000o/Meson Sdmemo0 05120 eed S ,a r 'Steel 196 500 198 500 14.06 1 A8%M.mn -191m0 06100 Roan 4800 4800 0.34 0.84%RCC .1g 0D 06200 FWbh MOhwrk "8562 48562 3.48 0.36%5 ria .29.769 07120 M.ulwall ands Mt oats-wW,moMI 0 0 0.00 0.00% 07130 S..Wms 6 W.urpmofin 94412 94"12 6.76 0.70%SAWN swuuana -33560 D.%-O.Wl.-1.rn hent al stmenw .t amo S hsWalWn-wane 1 a a 0.00 0.00% 01300 Solahlba kyllghb-Willa El.cWcW 0 0 0.00 0.00%S-.. OT515 Reef 9-1200 67+00 4.81 OLD%Msh-Tom� -1084 Use Johns-Mem ale roofs um 08100 HM 00om Fens 6 H.rd tan 37,753 37753 2.70 019%OFW -G 000 aa20a Owrhud D.- 13,151 13,151 3.D9 0.32%TX-.M-d I -23057 MOO Dart.W ..t-r11h OH deem 0 0 000 0.00%7%w.rhaad 08520 Alumkwm S-f- "0866 40666 293 030%Radl.rrt I .94aA1 -1 D.Ieu 3rd pr,walurb 09250 D tla ACT 110396 '10ml; dt 7.91 O %D IrE-lud,- I 5110 8 n68666 06400 VCT/ 4�21A 4-714 0.30 0,03%PDL -26]56 09600 c-'rac 780 24,300 24,300 1.74 0.19%AWL -27.600 09800 Eporl noodnq 13138 13138 0.94 0.10%MRK 113130 .17661 09900 P.Ift.Q 47432 47432 3.40 0.35%WBb 37288 10am 5 WId- 9.771 9.771 0.70 0.07%SBM ♦9807 10800 Ice MSNWe 5,100 5,100 0.37 Dol%Rcc 10800 Dbhwash.r 6630 5.630 DAO 0.04%RCC MOO P.D.shades 3L22 3522 027 0.0]%SOL 14200 Fu.I M-WW dkvb,oquipment 868492 965492 69.36 710%SWvaO I i0ace Tm&..Ir "0334 "0]34 2.89 0.30%Pi-- MOO V.a,ums 5040 50x0 0.76 O.d%Twln Duubule 14200 Pro .unto 128758 125756 912 096%Erni! 10800 SI. %in 9,129 O.es 0007%T.W.-IFS! -9000 1mca Flag alm 3150 3.150 ami 0.02%86 Pea. 15100 Pn Fhlm-d Go .f/S..- 210136 210,133 16.05 1.56%Rad Dat 141m Washd I mens 13,720 13.720 035 0.10%A . 14604 IK..rW m 102985 10 9a6 7.36 0.77%Sh.r4n0/RCC 15500 Plumb! 2r2.5251 ZJ2825 19.51 Z03%Read -170 151m Flo SpH.1d.m-N0 work h phna I 1 a 0.00 4.00%Sawke R. 39 600 MOO HVAC 1n3050 111050 9.53 0.99%Ph •1 000 imao soler.nel--,W.-VE 240000 240000 17.19 1.Te%A1dum -197500 AMmau solar ono 16ao0 Elodh l 106 D 7 10 027 76.06 7.90%SmvaO .239]87 41200 00101a htln canbahAlsoePVc 90'3 10050 R.AWrm-WM efecak.l I 0 0.00 0.00% Sub Touts F--'- 0 7,187,0 5,475,1451 1 665 770 SG7.251 941 T8� % S3, 6,110.09 -2.2'12E73 -505.726 Fee 399,000 399,000 2858 2.97% 0 0 ConOns.cy 280,000 I 280,000 20.08 208% 0 0 Sub Total »>»>»> 7187 025 -1,4711.1411 13 770 955.89 99.22% 1 873 -505 726 P 3 P bond >-H 1 104,722 751 0.78% 0 0 PHASE I LUMP SUM GRAND TOTAL»»»»> ;3,448,962 963.39 100.00. 2;2,9 3 Phase land 0 Grand total Budget EXHIBIT - FORTS R I D G E M O N T FORT WORTH NORTH SERVICE CENTER PHASE I CONSTRUCTION SCHEDULE ID Task (Task Name Duration Son: Trish %Compltte .July 11 0 IMOC! _5�1 RnF 1?nuayl June 11 Ncr ber 2t Mryl 0-1tvll M—hZ ISapumbarl Fh 1 ! lin tn7 an ry2 era ttnn�ys aR3__1P-_92< vn0__2(K 5/13_ 7�19J_1gD,q_lyJO_ Gty of Fort Worth North Senriae Center 547 days, Tbu 9/3/15 wed 10/25/v 2% 2 Gty of Fort Worth North Service Center r 3 4 Phase I 37 4 Pre4:DM1�1 Pnxonstruction-Phase I odays Wed 1/13/16_ Wed 1/13/16 0% 38 t City Prc{onsaruction Meeting 0 days Wed 1/13/16 Wed 1/13/16 0% City Pre-Construction Meeting 39 alt 4o J t Construction-Phasel - s NTP 4I K Mobilize, 10 days Wed 12/30/15 Wed 1/13/16 0% or Mobilia 42 _- 44 _._ SkG StIflRy - 3days Thu 1/14/16 Mon 1/18/16 0%__ _ a Sib Survey 43 stt (tranciiie L 226 days Thu 1/21/16 Wed 12/7/16 0% 1 Franchise Utilities A Site work 52 Temporary Facilities 15 days Thu 3/14/16 Wed 2/3/16 0% _ n Temporary Facilities S6 Strip&Stockpile To ays - psoil 40 dThu 1/21/16 Wed 3/16/16 0% r-1 Strip&Stockpile Topsoil 61 - SWPPP(Install BMPs) 32 days Thu 1/21/16 Fri 3/4/16 0% r1 SWPPP pnsteli BMPS) F67 Remove and Relocate Existing Stockpiles 10 days Thu 2/4/16 Wed 2/17/16 0% eRemove and Relocate 6dsting Stockpiles(Drop Off Area) (Drop Off Area) Remove and relocateTemp Haul Road 10 days p Thu 3/17/16 Wed 3/30/16 0% Remove and relocate TemHaul Road Existing Utilities Investigation 10 days Thu 2/4/16 Thu 2/18/16 0% b E"rig Utilities Investigation Over Excavate Stream Bottoms 15 days Thu 2/18/16 Wed 3/9/16 0% me Over Excavate Stream Bottoms 1 71 ! Rough Grade Site 7S days Thu 2/18/16 Thu 6/2/16 0% r-1 Rough Grade Site 76 eir Sanitary Sewer Utilities 40 days Thu 2/18/16 Wed 4/13/16 0% r-i SanitarySower Utilities 81 Storm,Water&Gas Utilities 90 days Thu 3/10/16 Fri 7/1S/16 0% r—� Storm,Water&Gas Utilities 86 SWPPP-Storm Utilities(install BMPs) 72 days Thu 4/7/16 Tue 7/19/16 0% r� SWPPP-Storm utilities(LtstB BMPS) 91 Site Electric Underground 75 days _Thu 3/10/16 Thu 6/23/16__ 0% Site Electric Underground 96 Ume StabRlze Subgrade 95days Thu 4/7/16 Fri 8/19/16 0% - r —T Lime Stabilize Subgndo 100 Concrete Paving 90 days Thu S/S/16Mon 9/12/16 0% - t Concrete Paving 104 W. Misc Site Foundations 340 days Thu 3/10/16 Mon 9/26/16 0% r�� 1 Mix Site Foundations 113 Sidewalks&Pavers_ 35 days Mon 30/17/16 Fd 11/4/16 0% r-1 Sidewalks&Pavers 115 Flex Base Iaydown Yard 35 days Tue 9/13/16 Mon 10/31/16 0% aemer Flex Base Laydown Yard 116 (Concrete)Screen Wa0 30 days Tueg/27/16 Mon 11/7/16 0% mmm(Concrete)Screen Wall 117 ei Fencing - 30 days Tue 11/8/16 Tue 12/20/16 0% mmm Fencing 1ffi _light Pole Bases 30 days Tueg/13/16 Mon 9/26/16 0% _ m light Pole Base 119 Fine Grade/Spread Topsoil 25 days _Wed 12/21/16 Thu 1/26/17 0% r--1 Fine Gnde/Spread Topsoil 124 .y Site Ughting 10 days Tue9/27/16 Mon 10/10/16 0% re Site Lr htin �+ irtigation 86 days Thu 12/29/16 Fri 4/29/17 0% Irrigation 130 r landscaping 106 days_Rl 3/6/17 Mon 6/5/17 O% _ Landscaping 135 BioSwales&Turf Matting '106 days Fri 1/6/17 Mon 6/5/17 O% k—�-I SioSwales&Turf Matting 240 PavingSealanu '30 days Tue 6/6/17 Mon 6/19/17 0% Paving Sealants 144a� 111 Pavement Markings&ADA Signage 10 days Tue 6/6/17 Mon 6/19/17 0% Pavement Markings&ADA Signage � Buildings&Stuctures 143 r TxDOT Bridge 37d 3 ays Thu Fri 5/20/16 OK r----1 TxDOT Bridge 145 Gate House 143 days Thu 4/7/16 Thu 10/27/16 O% Gate House 167 a►„ Swap Shop 3S days Fri 6/3/16 Fri 7/22/16 0% r---jS—P Shop 175 Solar Panels 35 days Fri 6/3/16 Fri 7/27116 0% r-1 Solar Panels 180 Fuel Station 190 days Thu S/5/16 Thu 2/2/17 0% Fuel Station 011111111:Tue 12MMS TarSu"nwr I1 I.—Mik— a,.a-o ly sun-only E Ettema MRc one antral P o grr• ••••••••�•, , - Mawal Summary RalluPWJ[.ony ] OenEGna Pagatel2 P'[ ... ..�.�.. ProJeas[m,may "—� wnrvesvmma F :. Milrcone O knot-Task Manual Task I -1 Manual Summa, E-,,,Wast: .._.. PIN_ Page 1 EXHIBIT F- FORT WORTH R I D G E M O N T FORT WORTH NORTH SERVICE CENTER m•- PHASE I CONSTRUCTION SCHEDULE m ask Task Name ,Duration Start Rnkh I%Complem Mode 21 Ja--M Jun 6n NovemterII Mayl Octobttll Marty 21 sep[amberl FeG 7 4/3 6n9_9/a 2125 sy13 7129 .10/14 17/30 TPW Covered Storage 86 days Tue 11/1/16 Fd 3/3/17 0% I----•1 TPW Covered Storage 795 Weigh Station 45 days Tue11/1/16 Thu 1J5/17 0% r1 Weigh Station 200 ee Remaining Weather Delays 40 days Tut 6/20/17 Tue 8/15/17 O% Remaining Weather Delays 2a — O Substantial Completion-Phase 1 202 I• Punch List-Phase 1 20 days _We_d_8/1C�/17 Wed 9/13/17 0% Punch List-Phase 1 20B MPrepare Closeout Documents _ _- -__ 30 drys Thu 9/_14/17 Wed 10/25/17 0% Prepare Closeout Documents 2M Final Acceptance 0 days Wed 10/25/27 Wed 10/25/17 0% __ o Final Acceptance 205 20phase n 6 P_rcmnsw_ctl l _ d 3/ � 1 Preconstruction-Phase II 207 ® rr 60%DDs _ 0 days Tue 3/1/16 Tue 3/1/16 0% ♦60%DDS 206 Z. Plan Review&Budgeting 15 days_ Tue 3/1/16 Mon 3/21/16 0% M Plan Review&Budgeting 209 95%Bid/Permit DDa 0 days Mon 3/21A6 Mon 3/21/16 O% ♦95%Bid/Permit Dots 210 Bid 20 days Tue 3/2Z116 Mon 4/18/16 0% ! i Bid -- - - --- ._4/18/1 211 ! Sub Bids Due 0 days Mon 4/18/16 Mon 6 0% sub Bids Due 212 ei Prepare Qty Proposal _ 10 days_ Tue 4/19/16 Mon 5/2/16 0% r Prepare City Proposal 213 r City Proposal Review 1 day Tue 5/3/16 Tue 5/3/16 0% ♦City Proposal Review 214 Contract Amendment _ 10 days Wed S/4/16_ Tue 5/17/16 0% a Contract Amendment 21S rr Submittal_s _ _ _ 60 days Thu 6/2/16 Thu 8/25/16 0% _ _ i submittals 216 ie Pre-Cons 1 day Thu 6/2/16 Thu 6/2/16 0% 1 Pre-Com 217 day Thu 6/2/16 Thu 6/2/16 0% A City Pre-Construction Meeting 278 r 7 days Tue 5/17/16•. /]8/17 0% Construction-Phase II e - _C Construction nstrlle'llar MaeSfng 1dayS___Tue SJ17/]5 -:__e S/17/16 NTP TP 770 ! Mobilize _ 10 days Wed 5/18/16 Wed 6/1/16 0% ■Mobilize 771 Site Survey 1 day Thu 6/2/16 Thu 6/2/16 0% Site Survey 222 _ Site Work 6days__Frf 6/3/16__ Tue_7/]8/170% Site Work Earthwork _ __ 30 days Fri /3/6 16 Fri 715 6 0% I 223 Earthwork / 1Earthwork/ 224 �� Utilities 20 days Mon 7/13/16 Fri 8/12/16 0% Utilities 225 ! Lime Stabiilze Subgmde 30 days Mon 8/22/16 Mon 10/3/16 0% Lime Stabilize Subgmde 226 r. Concrete Paving 30 days Tue 10/4/16 Mon 11/14/16 0% Concrete Paving 227 MR Place Topsoil IS days Tue 11/15/16 Tue 12/6/16 0% Place Topsoil 228 Fencing 20 days Wed 12/21/16 Thu 1/19/17 0% Fencing 229 t Irrigation 10 days Mon 5/1/17 Fri S/12/17 0% In igatlan 230 4 Landscaping 10 days Tue 6/6/17 Mon 6/19/17 0% Lands ping 231 M BioSwales&Turf Matting 30 days Tue 6/6/17 Tue 7/18/17 0% BioSwales&Turf Matting 232 S Paving Sealants 5 days Tue 6/20/17 Mon 6/26/17 0% Paving Sealants 733 Pavement Markings&ADA Signage 3days Tue 6/20/17 Thu 6/22/17 0% _ Pavement Markings&ADA Signage 234 �. �.tilding;8y_ 227.do 6/2/lb Fr14/21/17 I Buildings&Structures 235 at Admin Building 227 days Thu 6/2/16 Fri 4/21/17 0% 1 Admin Building 277 t Service guiding 220 days Mon 6/13/16 Fri 4/21/17 0% Service Buiding 278 4 Remaining Weather Delays -- - 20 days -Wed 7/19/17 Tue 8/15/17 0% Remaining Weather Delays Subslarltlal gpWletlon-Phase 11 0 dans Ttl /lSh7 e8(7S/17 _Q74__ 0 Substantial Completion-Phase 11 2B0 4 Punch List-Phase II 20 days Wed 8/16/17 Wed 9/13/17 0% Punch list-Phase II 281 am Prepare Closeout Documents-Phase 11 30 days Thu 9/14/17 Wed 10/25/17 0% Prepare Closeout Documents-Phase II 262 t Final Acceptance-Phase II 0 days Wed 10/25/17 Wed 10/25/17 0% u Final Acceptance-Phue II DaWT1S'1229i75 Tao _ Summary 1�1 Na a Miles one Du adore-oNy Sart-on y C Ea ema MaGrcne Maraud Progress Page2e12 split ..... Profen Summary bua-Summary Menial Summary RNWp Fm'rJi-only ] Deadline Mlletone O I--Task Manual Task Mesal summa t'�1 fslerrul Ta•-ks ry Prape^. Page 2 EXHIBIT Q FORT WORTH.:: RIDGEMONT commercial construction QUALIFICATION BY DIVISION City of Fort Worth North Service Center— PHASE I January 4, 2016 The following is an outline of Ridgemont's preliminary proposal for the above referenced project. This outline is intended to be a description of each line item of our spreadsheet. Proposal is based on specifications and drawings by Quorum Architects dated 8/20/15, ESK-1, ESK-2, and Electrical service narrative by M.E.P. consulting engineering dated 8/20/15. Reference RCC Drawing Log Dated 11/16/15,for specific list of drawings and specifications included in this proposal. RFI#1 response dated 10/14/15, RFI#2 response dated 10/19/15 and Acoustical panel specs dated 10/30/15. Reference RCC Drawing Log Dated 11/16/15,for specific list of drawings and specifications included in this proposal. This Proposal is expressly contingent upon the conversion of the Contract to a stipulated sum agreement with payment to be made on a percent complete basis utilizing a schedule of values. *This proposal EXCLUDES the ADMINISTION BUILDING complete,from back of curb. Earthwork to be left at rough grade, and utilities to be brought to 5' of building as shown. Administration Building to be part of Phase II, complete. Division 1- General Requirements The general requirements include all overhead materials, labor and services associated with this project such as, construction insurance, survey and layout of building corners,project superintendent,project management,job trailer,daily and final cleanup of the building and site, temporary toilets, dumpsters, tools and equipment as required to complete the project. We specifically exclude the following: 1. All meter fees, tap fees, permit fees, impact fees and inspection fees. 2. Sales tax on incorporated materials. 3. Investigation, identification, removal, or remediation of hazardous materials. EXHIBIT Q Page 1 of 5 EXHIBIT Q QUALIFICATION BY DIVISION City of Fort Worth North Service Center— PHASE I January 4, 2016 4. Building, or structures permits of any kind. 5. Materials testing. 6. LEED commissioning. 7. Architectural, Engineering,or Design services or fees. 8. Casing of piers (unit prices have been included if required). 9. Traffic signals,Radar detection system, Emergency vehicle pre-emption equipment and Accessible pedestrian signals (see sheet CO.1) 10. Operable partitions—Not shown 11. Low voltage security or access controls of any kind. All items as specified unless noted otherwise Division 2 — Site work Termite treatment—No Specs,provided industry standard. It is assumed that ALL onsite spoils,including miscellaneous concrete, asphalt, etc and all other unknown materials may be repurposed for general fill on site. Excavation—Included in Base Bid VE Alt 1 —Delete Lime at Flexbase Laydown Yard Excavation—Owner Options—Not Included in base bid ADD Alt I —Add Seal Coat at Flexbase Laydown Yard Landscape/Irrigation—Included in the base bid. VE Alt 1 -Delete wildflower seed at future service area VE Alt 2-Delete Hydro mulch cap after drill seeding VE Alt 3 -Delete re-tilling at wild flower areas VE Alt 4-Change Buffalo Sod to Bermuda Site Utilities—Included in Base Bid VE alt 1 —Cleanouts not required—revision 12/14/15 Fencing- Owner option—Not included in base bid VE Alt 1 —Ornamental-Provide Fortress fence product in lieu of Ameristar. S ecs and brochure included in bid book. Division 3 — Concrete — As specified unless noted otherwise Concrete Foundation/Slab Finish—Owner Option—Not included in base bid EXHIBIT Q Page 2 of 5 EXHIBIT Q QUALIFICATION BY DIVISION City of Fort Worth North Service Center— PHASE I January 4, 2016 Add alt 1 —Sika 40 admixture—Phase I(includes Admin) Unit prices(excludes bridge) Pier size Add Deduct Casing(add only) 6"paving $3.65 psf 18" $33.00 $9.75 $26.50 8"paving $4.40 psf 24" $45.00 $13.50 $30.00 4"walks $4.80psf 30" $68.25 $20.50 $50.00 Mow ships $15.00pif Casing Bridge Piers Excluded—Add LS$6500 if required. Division 4 — Masonry No Qualifications Division 5 — Metals No Qualifications Division 6 — Carpentry Architectural Woodwork—Included in base bid Add Alt 1 -Includes Plywood Construction Division 7 — Moisture and Thermal Protection Metal wall and roof panels—Berridge products Asphalt Roofing -Included in base bid- VE Alt 1 - Johns-Manville roofing system in lieu of U.S.Ply. (Deduct is for Gate house building). Waterproofing& Sealants—Included in base bid - VE Alt 2—Use Hot Pour Site Sealants in lieu of Urethane Division 8 — Doors, Windows and Glass Aluminum storefront—Included in Base Bid VE Alt 1 -Water testing by subcontractor Division 9 — Finishes Ceramic Tile—Owner option -Not included in base bid. VE Alt 1—Add Polished Tile EXHIBIT Q Page 3 of 5 EXHIBIT Q QUALIFICATION BY DIVISION City of Fort Worth North Service Center— PHASE 1 January 4, 2016 Division 10 — Specialties Glass Marker Boards—Owner option -not included in base bid. VE Alt 1 —provide magnetic marker board in lieu of Glass—At Administration building (moved to phase H) (-$12,756) Pending Operable partitions—NONE SHOWN-EXCLUDED Division 11 — Equipment Propane tanks—Included in Base Bid—Turnkey Installation 500 Gallon Propane Tank is based on one year lease by Ridgemont 3900 Gallon Propane Tank is based on one year lease by Ridgemont One time fill for 500&3900 Gallon Tanks only included 18,000 Gallon Tank is based on Purchase(Excludes Propane) Division 12 — Furnishings No Qualifications Division 13 — Special Construction No Qualifications Division 14 — Conveying Systems None Required Division 15 — Mechanical Systems No Qualifications Division 16 — Electrical System Solar canopies—Included in Base Bid VE Alt 3 Alternate solar system (Design Build) i Solar Panels—Owner Options—Not included in base bid VE Alt 6 -Alternate solar modules (.10,000) Not Accepted Add Alt 1 —System capacity 57.6kW $58,150 Not Accepted Electrical—Included in Base Bid - VE alt 1 —delete lighting controls $ 0 VE alt 2—Use PVC 90's in lieu of coated rigid (-$7,200) Pending EXHIBIT Q Page 4 of 5 EXHIBIT Q QUALIFICATION BY DIVISION City of Fort Worth North Service Center— PHASE I January 4, 2016 Electrical—Owner Options—Not included in Base Bid - VE alt 4—Delete concrete encasement at primary conduit VE alt 5—alternate light fixture package (-$38,000) Pending Lump Sum Proposal: City of Fort Worth North Service Center—Phase I: Thirteen Million, Three Hundred Thirteen Thousand, Seven Hundred Ei2hty- Nine Dollars: $13,448,962 EXHIBIT Q Page 5 of 5 i