HomeMy WebLinkAboutContract 46976-CO1 FORTWORTHO, CITY SECRETARY/ J
CONTRACT W.
City Of Fort Worth
Change Order Request
Facility and
Project Norah Service Center
City Sec No. 46976 City Proj.No. 02105
Contractor: Ridgemont Commercial Construction Change Order#0 Dale: 1213012015
City Project Mgr.1 Ronnie Clements City Inspector Mike Milam
Phone Number: (817)392-8014 Phone Number: (817)392-2277
Phase 1
Contract Time
(CD)
Phase 1 Contract Amount----------------------------------------------------------------------------- $14,457,634.15 -376
JUSTIFICATION(REASONS)FOR CHANGE ORDER
This is a no cost change order for the construction cost of Phase 1 for the North Service Center as designed by Quorum Architects on 19
August 2015.The total firm fixed construction costs of Phase 1 is$13,448,962.00 as per attached cost breakdown,plus a 7.5%Owners
Contingency Allowance($1,008,672.15)for a total construction cost of$14,457,634.15.Attached is the contractors schedule.The total
contract price remains at$25,462,938.00,to include a 7.5%Owners Contingency Allowance.M&C C-27384 was approved by city council on
21 July 2015.
OFFICIAL RECORD`
CITY SECRETARY
FT. WORTH, TX
Contractor's Company Name Contractor Name Contractor Sig alure Date
Ridgemont Commercial Construction SAS
PMD Inspector Date Project Vinaget Date
•S•Ito ''�.N)C:L —° � (,5.t(.
PMD S perinlendenl Date Arch'ecural Services Manager Date
-%-
r,,,ar •`.� f_ _ �_S=/.E --• NIA
Project Architect Date Director/Property Management Department Date
N/A N/A
Assistant City Attorney Date Assistant City Manager Darte
NIA NIA
M&C Number N/A M&C Date Approved N/A
Projoct: North Service Center-Phase IPmj. Typ.:Industrial
Locaa.d: 301 HIIIshIra Drive,Ft Worth 4^011 Eadmawr.CMULL
Job No: 1500609 R I D G E M O N T Tam Coati 1 's.sz v,o1o.1 s9.ac
Bldg SF: 13,960 ...... SFICeat Bldg-76:.39
Schlmtlul: 14.0 Add..da:1 Am.lr4@ MnYM
Bid Dara: 11-Dec-15 61B_ AME 28.60% 3202%
1M1�
Sp- Crand
nev.Ae,xn. WCMa.a.w. va,m.
S.cllen bawl den Stu nark Bulldln TOMI CaaoSF 1UCeat SubcaninMn MBE panld Ilan eWMlepu..>•.Y .a9lw.das
Va2NO
C l C.rldfi.. 378.359 202555 579,014 41.48 431%RCC
Insuranms 48392 26,805 75197 5.44 OS7%RCC
B.Idrw Pamdt-Esduded 0 0.00 0.00%B 0-
Naudais T.su -ExdudW 0 0.00 0.00% Owner
Pntan3auc0on for_ 2.500 2.500 0.18 002%
O.maiWm-v .arthwvrk 0 0.00 D.m%
R.binln Wars-v.lh=.m. 0 a00 000%
T.m,eaT--.t 1400 1400 0.10 am%RCC .1600
E-6an/Subll d.n 1 A31 993 1 8.11 993 151.23 13.62%VMawr -184 L2 D.I.0 Om.at W dow11 an.
=400 Landso /1 .&. 19 5 S19 41.01 1.26%SLS 5712 8600 -115500 WBdibw.r L Sol Pmp,Ch.".Sod
02500 SA.Uoud.s W 858 0 688 6814 708%W hl Co- 552800 1,400 D.-Clunoue oat n uk.d
02600 Pawme.Uwdkbg,SI"..Pa B-p- 22.872 32.01M 235 014%tin.Al
02650 5u 0dareanveu ienm al b 0 0 0.00 0.00%S. rbr moven O.I.W Added mnoet avaa-11
02600 Fendn/Omamenbl tanm =248 238,248 17.07 1.77%Am.d-
(M000 Tum Canaan 2 396 950 1'"O'560 3 437 24614 255610 Ma.,Sk.. 53437 a0 144400 D.INed Oebm pLem and fmlln s at Same wall
01100 T)M.bd a 265.000 20.000 18.96 197%'CF W
- Mason -Buldinssrre zvaon Ovals 99098 629855 728MI 5222 SA2%Badar 3750531• Dewm O.kw 14000o/Meson Sdmemo0
05120 eed S ,a r 'Steel 196 500 198 500 14.06 1 A8%M.mn -191m0
06100 Roan 4800 4800 0.34 0.84%RCC .1g 0D
06200 FWbh MOhwrk "8562 48562 3.48 0.36%5 ria .29.769
07120 M.ulwall ands Mt oats-wW,moMI 0 0 0.00 0.00%
07130 S..Wms 6 W.urpmofin 94412 94"12 6.76 0.70%SAWN swuuana -33560 D.%-O.Wl.-1.rn hent al stmenw .t
amo S hsWalWn-wane 1 a a 0.00 0.00%
01300 Solahlba kyllghb-Willa El.cWcW 0 0 0.00 0.00%S-..
OT515 Reef 9-1200 67+00 4.81 OLD%Msh-Tom� -1084 Use Johns-Mem ale roofs um
08100 HM 00om Fens 6 H.rd tan 37,753 37753 2.70 019%OFW -G 000
aa20a Owrhud D.- 13,151 13,151 3.D9 0.32%TX-.M-d I -23057
MOO Dart.W ..t-r11h OH deem 0 0 000 0.00%7%w.rhaad
08520 Alumkwm S-f- "0866 40666 293 030%Radl.rrt I .94aA1 -1 D.Ieu 3rd pr,walurb
09250 D tla ACT 110396 '10ml; dt
7.91 O %D IrE-lud,- I 5110 8 n68666
06400 VCT/
4�21A 4-714 0.30 0,03%PDL -26]56
09600 c-'rac 780 24,300 24,300 1.74 0.19%AWL -27.600
09800 Eporl noodnq 13138 13138 0.94 0.10%MRK 113130 .17661
09900 P.Ift.Q 47432 47432 3.40 0.35%WBb 37288
10am 5 WId- 9.771 9.771 0.70 0.07%SBM ♦9807
10800 Ice MSNWe 5,100 5,100 0.37 Dol%Rcc
10800 Dbhwash.r 6630 5.630 DAO 0.04%RCC
MOO P.D.shades 3L22 3522 027 0.0]%SOL
14200 Fu.I M-WW dkvb,oquipment 868492 965492 69.36 710%SWvaO I
i0ace Tm&..Ir "0334 "0]34 2.89 0.30%Pi--
MOO V.a,ums 5040 50x0 0.76 O.d%Twln Duubule
14200 Pro .unto 128758 125756 912 096%Erni!
10800 SI. %in 9,129 O.es 0007%T.W.-IFS! -9000
1mca Flag alm 3150 3.150 ami 0.02%86 Pea.
15100 Pn Fhlm-d Go .f/S..- 210136 210,133 16.05 1.56%Rad Dat
141m Washd I mens 13,720 13.720 035 0.10%A .
14604 IK..rW m 102985 10 9a6 7.36 0.77%Sh.r4n0/RCC
15500 Plumb! 2r2.5251 ZJ2825 19.51 Z03%Read -170
151m Flo SpH.1d.m-N0 work h phna I 1 a 0.00 4.00%Sawke R. 39 600
MOO HVAC 1n3050 111050 9.53 0.99%Ph •1 000
imao soler.nel--,W.-VE 240000 240000 17.19 1.Te%A1dum -197500 AMmau solar ono
16ao0 Elodh l 106 D 7 10 027 76.06 7.90%SmvaO .239]87 41200 00101a htln canbahAlsoePVc 90'3
10050
R.AWrm-WM efecak.l I 0 0.00 0.00%
Sub Touts F--'- 0 7,187,0 5,475,1451 1 665 770 SG7.251 941 T8�
% S3, 6,110.09 -2.2'12E73 -505.726
Fee 399,000 399,000 2858 2.97% 0 0
ConOns.cy 280,000 I 280,000 20.08 208% 0 0
Sub Total »>»>»> 7187 025 -1,4711.1411 13 770 955.89 99.22% 1 873 -505 726
P 3 P bond >-H 1 104,722 751 0.78% 0 0
PHASE I LUMP SUM GRAND TOTAL»»»»> ;3,448,962 963.39 100.00. 2;2,9 3
Phase land 0 Grand total Budget
EXHIBIT - FORTS
R I D G E M O N T FORT WORTH NORTH SERVICE CENTER
PHASE I CONSTRUCTION SCHEDULE
ID Task (Task Name Duration Son: Trish %Compltte .July 11
0 IMOC! _5�1 RnF 1?nuayl June 11 Ncr ber 2t Mryl 0-1tvll M—hZ ISapumbarl Fh
1 ! lin tn7 an ry2 era ttnn�ys aR3__1P-_92< vn0__2(K 5/13_ 7�19J_1gD,q_lyJO_
Gty of Fort Worth North Senriae Center 547 days, Tbu 9/3/15 wed 10/25/v 2%
2
Gty of Fort Worth North Service Center
r
3 4 Phase I
37 4 Pre4:DM1�1 Pnxonstruction-Phase I
odays Wed 1/13/16_ Wed 1/13/16 0%
38 t City Prc{onsaruction Meeting 0 days Wed 1/13/16 Wed 1/13/16 0% City Pre-Construction Meeting
39 alt
4o J t
Construction-Phasel
- s NTP
4I K Mobilize, 10 days Wed 12/30/15 Wed 1/13/16 0% or Mobilia
42 _-
44 _._ SkG StIflRy - 3days Thu 1/14/16 Mon 1/18/16 0%__ _ a Sib Survey
43 stt (tranciiie L 226 days Thu 1/21/16 Wed 12/7/16 0% 1 Franchise Utilities
A
Site work
52 Temporary Facilities 15 days Thu 3/14/16 Wed 2/3/16 0% _ n Temporary Facilities
S6 Strip&Stockpile To ays
- psoil 40 dThu 1/21/16 Wed 3/16/16 0% r-1 Strip&Stockpile Topsoil
61 - SWPPP(Install BMPs) 32 days Thu 1/21/16 Fri 3/4/16 0% r1 SWPPP pnsteli BMPS)
F67 Remove and Relocate Existing Stockpiles 10 days Thu 2/4/16 Wed 2/17/16 0% eRemove and Relocate 6dsting Stockpiles(Drop Off Area)
(Drop Off Area)
Remove and relocateTemp Haul Road 10 days p Thu 3/17/16 Wed 3/30/16 0% Remove and relocate TemHaul Road
Existing Utilities Investigation 10 days Thu 2/4/16 Thu 2/18/16 0% b E"rig Utilities Investigation
Over Excavate Stream Bottoms 15 days Thu 2/18/16 Wed 3/9/16 0% me Over Excavate Stream Bottoms
1 71 ! Rough Grade Site 7S days Thu 2/18/16 Thu 6/2/16 0% r-1 Rough Grade Site
76 eir Sanitary Sewer Utilities 40 days Thu 2/18/16 Wed 4/13/16 0% r-i SanitarySower Utilities
81 Storm,Water&Gas Utilities 90 days Thu 3/10/16 Fri 7/1S/16 0% r—� Storm,Water&Gas Utilities
86 SWPPP-Storm Utilities(install BMPs) 72 days Thu 4/7/16 Tue 7/19/16 0% r� SWPPP-Storm utilities(LtstB BMPS)
91 Site Electric Underground 75 days _Thu 3/10/16 Thu 6/23/16__ 0% Site Electric Underground
96 Ume StabRlze Subgrade 95days Thu 4/7/16 Fri 8/19/16 0% - r —T Lime Stabilize Subgndo
100 Concrete Paving 90 days Thu S/S/16Mon 9/12/16 0%
- t Concrete Paving
104 W. Misc Site Foundations 340 days Thu 3/10/16 Mon 9/26/16 0% r�� 1 Mix Site Foundations
113 Sidewalks&Pavers_ 35 days Mon 30/17/16 Fd 11/4/16 0% r-1 Sidewalks&Pavers
115 Flex Base Iaydown Yard 35 days Tue 9/13/16 Mon 10/31/16 0% aemer Flex Base Laydown Yard
116 (Concrete)Screen Wa0 30 days Tueg/27/16 Mon 11/7/16 0% mmm(Concrete)Screen Wall
117 ei Fencing - 30 days Tue 11/8/16 Tue 12/20/16 0% mmm Fencing
1ffi _light Pole Bases 30 days Tueg/13/16 Mon 9/26/16 0% _ m light Pole Base
119 Fine Grade/Spread Topsoil 25 days _Wed 12/21/16 Thu 1/26/17 0% r--1 Fine Gnde/Spread Topsoil
124 .y Site Ughting 10 days Tue9/27/16 Mon 10/10/16 0% re Site Lr htin
�+ irtigation 86 days Thu 12/29/16 Fri 4/29/17 0% Irrigation
130 r landscaping 106 days_Rl 3/6/17 Mon 6/5/17 O% _ Landscaping
135 BioSwales&Turf Matting '106 days Fri 1/6/17 Mon 6/5/17 O% k—�-I SioSwales&Turf Matting
240 PavingSealanu '30 days Tue 6/6/17 Mon 6/19/17 0% Paving Sealants
144a�
111 Pavement Markings&ADA Signage 10 days Tue 6/6/17 Mon 6/19/17 0% Pavement Markings&ADA Signage
� Buildings&Stuctures
143 r TxDOT Bridge 37d 3
ays Thu Fri 5/20/16 OK r----1 TxDOT Bridge
145 Gate House 143 days Thu 4/7/16 Thu 10/27/16 O% Gate House
167 a►„ Swap Shop 3S days Fri 6/3/16 Fri 7/22/16 0% r---jS—P Shop
175 Solar Panels 35 days Fri 6/3/16 Fri 7/27116 0% r-1 Solar Panels
180 Fuel Station 190 days Thu S/5/16 Thu 2/2/17 0% Fuel Station
011111111:Tue 12MMS TarSu"nwr I1 I.—Mik— a,.a-o ly sun-only E Ettema MRc one antral P o
grr•
••••••••�•, , - Mawal Summary RalluPWJ[.ony ] OenEGna
Pagatel2 P'[ ... ..�.�.. ProJeas[m,may "—� wnrvesvmma F :.
Milrcone O knot-Task Manual Task I -1 Manual Summa, E-,,,Wast: .._.. PIN_
Page 1
EXHIBIT F- FORT WORTH
R I D G E M O N T FORT WORTH NORTH SERVICE CENTER
m•- PHASE I CONSTRUCTION SCHEDULE
m ask Task Name ,Duration Start Rnkh I%Complem
Mode 21 Ja--M Jun 6n NovemterII Mayl Octobttll Marty 21 sep[amberl FeG
7 4/3 6n9_9/a 2125 sy13 7129 .10/14 17/30
TPW Covered Storage 86 days Tue 11/1/16 Fd 3/3/17 0% I----•1 TPW Covered Storage
795 Weigh Station 45 days Tue11/1/16 Thu 1J5/17 0% r1 Weigh Station
200 ee Remaining Weather Delays 40 days Tut 6/20/17 Tue 8/15/17 O% Remaining Weather Delays
2a — O Substantial Completion-Phase 1
202 I• Punch List-Phase 1 20 days _We_d_8/1C�/17 Wed 9/13/17 0% Punch List-Phase 1
20B MPrepare Closeout Documents _ _- -__ 30 drys Thu 9/_14/17 Wed 10/25/17 0% Prepare Closeout Documents
2M Final Acceptance 0 days Wed 10/25/27 Wed 10/25/17 0%
__ o Final Acceptance
205 20phase n
6 P_rcmnsw_ctl l _ d 3/ � 1 Preconstruction-Phase II
207 ® rr 60%DDs _ 0 days Tue 3/1/16 Tue 3/1/16 0% ♦60%DDS
206
Z. Plan Review&Budgeting 15 days_ Tue 3/1/16 Mon 3/21/16 0% M Plan Review&Budgeting
209 95%Bid/Permit DDa 0 days Mon 3/21A6 Mon 3/21/16 O% ♦95%Bid/Permit Dots
210 Bid 20 days Tue 3/2Z116 Mon 4/18/16 0% ! i Bid
-- - - --- ._4/18/1
211 ! Sub Bids Due 0 days Mon 4/18/16 Mon 6 0% sub Bids Due
212 ei Prepare Qty Proposal _ 10 days_ Tue 4/19/16 Mon 5/2/16 0% r Prepare City Proposal
213 r City Proposal Review 1 day Tue 5/3/16 Tue 5/3/16 0% ♦City Proposal Review
214 Contract Amendment _ 10 days Wed S/4/16_ Tue 5/17/16 0% a Contract Amendment
21S rr Submittal_s _ _ _ 60 days Thu 6/2/16 Thu 8/25/16 0% _ _ i submittals
216 ie Pre-Cons 1 day Thu 6/2/16 Thu 6/2/16 0% 1 Pre-Com
217 day Thu 6/2/16 Thu 6/2/16 0% A City Pre-Construction Meeting
278
r 7 days Tue 5/17/16•. /]8/17 0% Construction-Phase II
e - _C
Construction nstrlle'llar MaeSfng 1dayS___Tue SJ17/]5 -:__e S/17/16 NTP
TP
770 ! Mobilize _ 10 days Wed 5/18/16 Wed 6/1/16 0% ■Mobilize
771 Site Survey 1 day Thu 6/2/16 Thu 6/2/16 0% Site Survey
222 _ Site Work 6days__Frf 6/3/16__ Tue_7/]8/170% Site Work
Earthwork _ __ 30 days Fri /3/6 16 Fri 715 6 0%
I
223 Earthwork / 1Earthwork/
224 �� Utilities 20 days Mon 7/13/16 Fri 8/12/16 0% Utilities
225 ! Lime Stabiilze Subgmde 30 days Mon 8/22/16 Mon 10/3/16 0% Lime Stabilize Subgmde
226 r. Concrete Paving 30 days Tue 10/4/16 Mon 11/14/16 0% Concrete Paving
227 MR Place Topsoil IS days Tue 11/15/16 Tue 12/6/16 0% Place Topsoil
228 Fencing 20 days Wed 12/21/16 Thu 1/19/17 0% Fencing
229 t Irrigation 10 days Mon 5/1/17 Fri S/12/17 0% In igatlan
230 4 Landscaping 10 days Tue 6/6/17 Mon 6/19/17 0% Lands ping
231 M BioSwales&Turf Matting 30 days Tue 6/6/17 Tue 7/18/17 0% BioSwales&Turf Matting
232 S Paving Sealants 5 days Tue 6/20/17 Mon 6/26/17 0% Paving Sealants
733 Pavement Markings&ADA Signage 3days Tue 6/20/17 Thu 6/22/17 0% _ Pavement Markings&ADA Signage
234 �. �.tilding;8y_ 227.do 6/2/lb Fr14/21/17 I Buildings&Structures
235
at Admin Building 227 days Thu 6/2/16 Fri 4/21/17 0% 1 Admin Building
277 t Service guiding 220 days Mon 6/13/16 Fri 4/21/17 0% Service Buiding
278 4 Remaining Weather Delays -- - 20 days -Wed 7/19/17 Tue 8/15/17 0% Remaining Weather Delays
Subslarltlal gpWletlon-Phase 11 0 dans Ttl /lSh7 e8(7S/17 _Q74__ 0 Substantial Completion-Phase 11
2B0 4 Punch List-Phase II 20 days Wed 8/16/17 Wed 9/13/17 0% Punch list-Phase II
281 am Prepare Closeout Documents-Phase 11 30 days Thu 9/14/17 Wed 10/25/17 0% Prepare Closeout Documents-Phase II
262 t Final Acceptance-Phase II 0 days Wed 10/25/17 Wed 10/25/17 0%
u Final Acceptance-Phue II
DaWT1S'1229i75 Tao _ Summary 1�1 Na a Miles one Du adore-oNy Sart-on y C Ea ema MaGrcne Maraud Progress
Page2e12 split ..... Profen Summary bua-Summary Menial Summary RNWp Fm'rJi-only ] Deadline
Mlletone O I--Task Manual Task Mesal summa t'�1 fslerrul Ta•-ks
ry Prape^.
Page 2
EXHIBIT Q
FORT WORTH.::
RIDGEMONT
commercial construction
QUALIFICATION BY DIVISION
City of Fort Worth
North Service Center— PHASE I January 4, 2016
The following is an outline of Ridgemont's preliminary proposal for the above referenced
project. This outline is intended to be a description of each line item of our spreadsheet.
Proposal is based on specifications and drawings by Quorum Architects dated 8/20/15, ESK-1,
ESK-2, and Electrical service narrative by M.E.P. consulting engineering dated 8/20/15.
Reference RCC Drawing Log Dated 11/16/15,for specific list of drawings and specifications
included in this proposal.
RFI#1 response dated 10/14/15, RFI#2 response dated 10/19/15 and Acoustical panel specs
dated 10/30/15.
Reference RCC Drawing Log Dated 11/16/15,for specific list of drawings and specifications
included in this proposal.
This Proposal is expressly contingent upon the conversion of the Contract to a stipulated sum
agreement with payment to be made on a percent complete basis utilizing a schedule of values.
*This proposal EXCLUDES the ADMINISTION BUILDING complete,from back of curb.
Earthwork to be left at rough grade, and utilities to be brought to 5' of building as shown.
Administration Building to be part of Phase II, complete.
Division 1- General Requirements
The general requirements include all overhead materials, labor and services associated with this
project such as, construction insurance, survey and layout of building corners,project
superintendent,project management,job trailer,daily and final cleanup of the building and site,
temporary toilets, dumpsters, tools and equipment as required to complete the project.
We specifically exclude the following:
1. All meter fees, tap fees, permit fees, impact fees and inspection fees.
2. Sales tax on incorporated materials.
3. Investigation, identification, removal, or remediation of hazardous materials.
EXHIBIT Q Page 1 of 5
EXHIBIT Q
QUALIFICATION BY DIVISION
City of Fort Worth
North Service Center— PHASE I January 4, 2016
4. Building, or structures permits of any kind.
5. Materials testing.
6. LEED commissioning.
7. Architectural, Engineering,or Design services or fees.
8. Casing of piers (unit prices have been included if required).
9. Traffic signals,Radar detection system, Emergency vehicle pre-emption equipment and
Accessible pedestrian signals (see sheet CO.1)
10. Operable partitions—Not shown
11. Low voltage security or access controls of any kind.
All items as specified unless noted otherwise
Division 2 — Site work
Termite treatment—No Specs,provided industry standard.
It is assumed that ALL onsite spoils,including miscellaneous concrete, asphalt, etc and all
other unknown materials may be repurposed for general fill on site.
Excavation—Included in Base Bid
VE Alt 1 —Delete Lime at Flexbase Laydown Yard
Excavation—Owner Options—Not Included in base bid
ADD Alt I —Add Seal Coat at Flexbase Laydown Yard
Landscape/Irrigation—Included in the base bid.
VE Alt 1 -Delete wildflower seed at future service area
VE Alt 2-Delete Hydro mulch cap after drill seeding
VE Alt 3 -Delete re-tilling at wild flower areas
VE Alt 4-Change Buffalo Sod to Bermuda
Site Utilities—Included in Base Bid
VE alt 1 —Cleanouts not required—revision 12/14/15
Fencing- Owner option—Not included in base bid
VE Alt 1 —Ornamental-Provide Fortress fence product in lieu of Ameristar. S ecs and
brochure included in bid book.
Division 3 — Concrete — As specified unless noted otherwise
Concrete Foundation/Slab Finish—Owner Option—Not included in base bid
EXHIBIT Q Page 2 of 5
EXHIBIT Q
QUALIFICATION BY DIVISION
City of Fort Worth
North Service Center— PHASE I January 4, 2016
Add alt 1 —Sika 40 admixture—Phase I(includes Admin)
Unit prices(excludes bridge) Pier size Add Deduct Casing(add only)
6"paving $3.65 psf 18" $33.00 $9.75 $26.50
8"paving $4.40 psf 24" $45.00 $13.50 $30.00
4"walks $4.80psf 30" $68.25 $20.50 $50.00
Mow ships $15.00pif
Casing Bridge Piers Excluded—Add LS$6500 if required.
Division 4 — Masonry
No Qualifications
Division 5 — Metals
No Qualifications
Division 6 — Carpentry
Architectural Woodwork—Included in base bid
Add Alt 1 -Includes Plywood Construction
Division 7 — Moisture and Thermal Protection
Metal wall and roof panels—Berridge products
Asphalt Roofing -Included in base bid-
VE Alt 1 - Johns-Manville roofing system in lieu of U.S.Ply. (Deduct is for Gate house
building).
Waterproofing& Sealants—Included in base bid -
VE Alt 2—Use Hot Pour Site Sealants in lieu of Urethane
Division 8 — Doors, Windows and Glass
Aluminum storefront—Included in Base Bid
VE Alt 1 -Water testing by subcontractor
Division 9 — Finishes
Ceramic Tile—Owner option -Not included in base bid.
VE Alt 1—Add Polished Tile
EXHIBIT Q Page 3 of 5
EXHIBIT Q
QUALIFICATION BY DIVISION
City of Fort Worth
North Service Center— PHASE 1 January 4, 2016
Division 10 — Specialties
Glass Marker Boards—Owner option -not included in base bid.
VE Alt 1 —provide magnetic marker board in lieu of Glass—At Administration building
(moved to phase H) (-$12,756) Pending
Operable partitions—NONE SHOWN-EXCLUDED
Division 11 — Equipment
Propane tanks—Included in Base Bid—Turnkey Installation
500 Gallon Propane Tank is based on one year lease by Ridgemont
3900 Gallon Propane Tank is based on one year lease by Ridgemont
One time fill for 500&3900 Gallon Tanks only included
18,000 Gallon Tank is based on Purchase(Excludes Propane)
Division 12 — Furnishings
No Qualifications
Division 13 — Special Construction
No Qualifications
Division 14 — Conveying Systems
None Required
Division 15 — Mechanical Systems
No Qualifications
Division 16 — Electrical System
Solar canopies—Included in Base Bid
VE Alt 3 Alternate solar system (Design Build)
i
Solar Panels—Owner Options—Not included in base bid
VE Alt 6 -Alternate solar modules (.10,000) Not Accepted
Add Alt 1 —System capacity 57.6kW $58,150 Not Accepted
Electrical—Included in Base Bid -
VE alt 1 —delete lighting controls $ 0
VE alt 2—Use PVC 90's in lieu of coated rigid (-$7,200) Pending
EXHIBIT Q Page 4 of 5
EXHIBIT Q
QUALIFICATION BY DIVISION
City of Fort Worth
North Service Center— PHASE I January 4, 2016
Electrical—Owner Options—Not included in Base Bid -
VE alt 4—Delete concrete encasement at primary conduit
VE alt 5—alternate light fixture package (-$38,000) Pending
Lump Sum Proposal:
City of Fort Worth North Service Center—Phase I:
Thirteen Million, Three Hundred Thirteen Thousand, Seven Hundred Ei2hty-
Nine Dollars: $13,448,962
EXHIBIT Q Page 5 of 5