HomeMy WebLinkAboutContract 38580-A1 AMENDMENT NO. 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and M J Thomas Engineering, LLC, (Engineer) made and entered into City Secretary Contract No. 38580, (the Contract) which was authorized by the City Council by M&C C-23479 on the 28th day of April 2009; and WHEREAS, the Contract involves engineering services for the following project: 2008 CIP Arterial Street Project - Silver Creek Road, Project No. 01293; DOE No. 6196 WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated March 2, 2010, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $33,416. 62 . 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $194,809.62 . 06-1 B_10 A 11 ;0 0 ►N OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the �s day of , 2010, in Fort Worth, Tarrant County, Texas. 0 Fir ��po4oAn�II ATTEST: p 000000000;q PA0 WO Marty Hendrix �o o° City Secretary % ao'�Id °o00 °�00000 G 4§t APPROVAL RECOMHENDED: APPROVED: 10K-7-William . Verk ;'15'-.E. Fernando Costa Director, Department of Assistant City Manager Transportation and Public Works M J Thomas Engineeriqg, LLC ENGINEER -� By: / NO M&C REQUIRED Name: Micke Tho s, P.E. Prin 3400 ulent Street, Suite 100 Fort Worth, Texas 76107 APPROVED AS TO FO LEGALITY: Assistant 01ty Attorney -2- OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX THOMAS March 2,2010 Mr. Leon Wilson City of Fort Worth Transportation Programming and Capital Projects 1000 Throckmorton Street Fort Worth,Texas 76102 Re: City Project No.01293 Silver Creek Road Improvements Dear Mr.Wilson: This letter is written in response to your request for Ml Thomas Engineering to prepare a contract amendment for additional engineering and surveying services for the design of the Silver Creek Road Improvements. M1T will complete the following scope: Proiect Scope Task NO. 1—Suryeyinp 1) Establish horizontal and vertical control for the ottsite drainage project from existing project control. Cstablish at least one benchmark for the iww pooject. Thm hud/untdl r,unuul alldll be NAD83, north central zone with a detailed description being given for each control point. 2) Locate property corners and establish property lines north of Silver Creek Road for offsite drainage project. Update existing prupCrty 111dp to lm ludo new property information. Deliverables include an updates property map to overlay onto the topographic survey prepared in a MicroStation V8 file format or AutoCad file format, along with copies of deeds, subdivision Platt.and tax ownership information. 3) Provide a topographic survey of the proposed open channel from the north right-of-way of Silver Creek Road north to the south curb of Brewer High School entrance road with the limits depicted on Exhibit A. The topographic survey shall Include SO ft.cross-sections,and at all grade breaks. The topographic survey shall include, but not limited to, locations in all existing features such as water valves,curb and gutter,asphalt,sidewalks,medians,fences,driveways,storm and sewer manholes, trees 6 in. and larger, tops and toes of slope, power poles, buildings, mailboxes,signs,telephone risers and other visible features. 4) Provide a topographic survey of the existing drainage structures located north of Brewer High School entrance road with the limits being as defined in an e-mail from MJ Thomas dated 2/22/2010. The topographic survey shall include 50 ft. cross-sections, and at all grade breaks around the existing culverts.The topographic survey shall include, but not limited to,locating all 3400 Hulen Street, Suite 100 P: (817)732. 838. Fort Worth, Texas 78107 P (8171`732-9841 Registration#F=9436 existing features such as water valves, curb and gutter, asphalt, sidewalks, medians fences, driveways, storm and sewer manholes,trees 6" and larger,tops and toes of slope, power poles, mailboxes,signs,telephone risers and other visible features. 5) Provide a topographic survey of an area south of silver Creek Road for the proposed force main re-route and provide a topographic survey of a proposed new driveway and gate fencing with the fencing depicted on Exhibit A.The topographic survey shall include cross-sections, and at all grade breaks. The topographic survey shall include, but not limited to, locating all existing features such as water valves, curb and gutter, asphalt, sidewalks, medians, fences, driveways, storm and sewer manholes, trees 6" and larger,tops and toes of slope, power poles, mailboxes, signs,trees 6" and larger,telephone risers and other visible features. 6) Deliverables shall include a MicroStation V8 drawing file or an AutoCAD file showing all of the features located, ground elevations, a TIN and TIN file, along with one-foot interval contours. Provide copies of the survey field notes, a hardcopy of the coordinates and an ASCII file of the coordinates for the points located. Task No.2—Easements 1) Prepare two permanent easement to the City of Fort Worth Standards. The permanent easement shall include a legal description with exhibit of the proposed easement. The fee for the permanent easement shall be$800.00. 2) Prepare three temporary construction easement to the City of Fort Worth Standards. The temporary construction easement shall include a legal description with exhibit of the proposed easement.The fee for the temporary construction easement shall be$600.00. Task No. 3—Civil Design 1) MJT will provide civil engineering design and coordination of the off-site channel improvements from Silver Creek Road north to the existing culvert at the Brewer High School entrance road. Compensation MJT proposes to provide the above mentioned services for the lump sum fees listed below: Task No. 1-Surveying.................................................................$13,770.10 TaskNo.2-Easements............................................................... .$3,910.00 Task No.3-Civil Design.............$180,620.00 x 10.25%x 85%_$15,736.52 Thank you, MJ T as ineenn LC. Michae P: —Principal MATAS 506-004_Prop_Mdrtion*_Services Lwilson_30.03A2_AS MJ Thomas Engineering,LLC. Page 2 of 2