HomeMy WebLinkAboutOrdinance 8463~..
ORDINANCE NO ~ 4 ~ 3
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF FOSSIL CREEK BOULEVARD
AND PORTIONS OF SUNDDRY OTHE#t STREETS , AVENUES AND PUELIC PgACES
IN THE CITY OF FORS F1bRTH9 TEXASa DECLARING THE CONTRACT taIT~I
J L BERTRAM CONSTR & ENGR ZINC. FOR THE CONSTRICTION OF
SAID IMPROVEMENTS FULLY COMP3aETED AND PERFORMED DIRECTING ~~
ISSUANCE 9 E~CECUTION A1VD DELIi1ERY OF CERTIFICATES IN EVIDENCE OF
SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS
HEREIN AUTHORIZED A1VD ALLOkTEID AGAINST SOME OF SAID ASSESSMENTS;
DIRECTING THE CIT~P SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE
BY COPYING THE CAPTION OF SAME IN THE MINUTE EOOIL OF THE CITY
COUNCIL. OF FORT Tp10RTH, TE7CASa AND RY FILING THE COMPLETE.. ORDINANCE
IN APPROPRIATE ORDINANCE R~COItDS OF SAID CITYa AND PROVIDING AN
EFFECTIVE DATE
Y~REASa the City of Fort Worthy Texasa has heretofore entered into a contract
with J. L. Bertram Construction & Engineering Tnr , for the maleing snd construction of
certain street impx°ovea~ents on ~e hereinafter descx°ibed portions of streetsp avenues and
public places in said City9 tom~,rit
FOSSIL CREEK BOULEVARD, PHASE I
From Interstate 35W to North Beach Street known and
designated as Project No 021-36526 a seven-inch
thick reinforced concrete pavement on an eight-inch
thick lime stabilized subgrade with seven-inch high
superimposed concrete curb on two twenty-six foot
traffic lanes
~~
WHEREAS, by sundry proceedings heretofore passed by the City Council of the
Gity of Fort Worth, Texas, including Ordinance No f3 31 , a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public places and against
the rtal and true owners thereof; and,
wHEt~;AS, the City council of the pity of Fort Y~orth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No Rz31 , and
WHEIi~:AS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NU4d, TtiEFt~FOI~,
BE IN ONDATtJF:D I3Y THE CITY COUNCIL OF TtIF, CITY OF FORT WORTH,
TF:xa~, TxAT
I
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed
II
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed and shall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon The
numbers of the certificates, with the property descriptions to be shown on the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after diving
effect to such credit, if any, are hereby enumerated and itemized as follows
TII
When each of the certificates has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price
IV
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worths Texass
and by filing the complete ordinance in the appropriate Ordinance Records of said City
V
This ordinance sha11 take effect and be in full force and effect from and after
the date of its passage
PASSED ANA APPRO~D THIS 1 a day of ~~~!%YY~~G~- ~ 19~
APPROi1ED AS ~0 FORM AND LEGALITY
City Attorney
PROJECT NO 021-36526-00, FOSSIL CREEK BOULEVARD PHASE I, FROM INTERSTATE 35W TO NORTH
BEACH S R~ET, to a improved by constructing a seven=inch thick reinforced concrete pavement
on an eight-inch thick lime stabilized subgrade with seven-inch high superimposed concrete
curb on two twenty-six foot traffic lanes
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE
Woodbine Development Tract 1
Corp Ind
3200 1st Nat'l Bank Bldg
Dallas TX 75202
Attn Ron Richards
Street A intersects
Woodbine Development Tract 1
Corp Ind
3200 ist Nat'l Bank Bldg
Dallas, TX 75202
Attn Ron Richards
Woodbine Development Tract 1
Corp Ind
3200 1st Nat'l Bank Bldg
Dallas TX 75202
Attn Ron Richards
Riverside Drive intersects
Woodbine Development Tract 1
Corp Ind
3200 1st Nat'l Bank Bldg
Dallas TX 75202
Attn Ron Richards
J A WALKER SURVEY
735 54' Pavement & curb
735 54' Storm drain
735 54' Street lights
60'
580 Pavement & curb
580' Storm drain
580' Street lights
$57 43 $42 242 06
24 98 18 373 79
2 27 1 669 68
$57 43 $33 309 40
24 98 14,488 40
2 27 1 316 60
W 6 DEWEESE SURVEY
2130 Pavement & curb
2130' Storm drain
2130' Street lights
$ 62 285 53
$ 49 114 40
$57 43 $122 325 90
24 98 53 207 40
2 27 4,835 10
$180,368 40
120'
770' Pavement & curb
770' Storm drain
770' Street lights
$57 43 $44 221 10
24 98 19 234 60
2 27 1,747 90
JAMES M ROBINSON SURVEY
$ 65 203 60
Woodbine Development Tract 1-A-1 184' Pavement & curb $57 43 $10,567 12
Corp Ind 184' Storm drain 24 98 4 596 32
3200 1st Nat'l Bank Bldg 184' Street lights 2 27 417 68
Dallas TX 75202 $ 15,581 12
Woodbine Development Tract 1-A 2248 03' Pavement & curb $57 43 $129,104 36
Corp Ind 2248 03' Storm drain 24 98 56 155 79
3200 1st Nat'l Bank Bldg 2248 03' Street lights 2 27 5 103 03
Dallas, TX 75202 $190 363 18
-1-
'PROJ`ECT NO 021-36526-00, FOSSIL CREEK BOULEVARD; cone
BLOCK
OWNER LOT ZONING FRONTAGE
SOUTH SIDE
Woodbine Development 1 1
Corp Ind
3200 1st Nat'l Bank Bldg
Dallas, TX 75202
Woodbine Development 2 1
Corp Ind
3200 1st Nat 1 Banc Bldg
Da11as, TX 75202
Woodbine Development 3 2
Corp Ind
3200 1st Nat'l Bank Bldg
Dallas, TX 75202
Str~pt. B ~'nters~cts
Woodbine Development 1 2
Corp Ind
3200 .1st Nat'l Bank Bldg
Dallas, TX 75202
Woodbine Development 2 2
Corp Ind
3200 1st Nat'l Bank Bldg
Dallas, TX 75202
Riverside Drive intersects
Woodbine Development 2 3
Corp Ind
3200 1st Nat'l Bank Bldg
Dallas, TX 75202
Woodbine Development 1 3
Corp / Coca Cola. Co Ind
3200 1st Nat'l Bank Bldg
Dallas, TX 75202
r
FOSSIL CREEK ADDITION
RATE AMOUNT
1065 28' Pavement & curb $57 43 $61,179 03
1065 28' Storm drain 24 98 26,610 69
1065 28' Street lights 2 27 2,418 19
1238 83' Pavement & curb $57 43 $71 146 O1
1238 83' Storm drain 24 98 30,945 97
1238 83 Street lights 2 27 2,812 14
260 12` Pavement & curb $57 43 $14 938 69
260 12' Storm drain 24 98 6 497 80
260 12' Street lights 2 27 590 47
60'
ASSESSMENT
$ 90 207 91
$104 904 12
$ 22 026 96
249 98' Pavement & curb $57 43 $14 356 35
249 98' Storm drain 24 98 6,244 50
249 98' Street lights 2 27 567 45
$ 21,168 30
350 09' Pavement & curb $57 43 $20,115 67
350 09' Storm drain 24 98 8,745 25
350 09' Street lights 2 27 794 70
120'
704 09' Pavement & curb $57 43 $40,435 89
704 09° Storm drain 24 98 17,588 17
704 09' Street lights 2 27 1,.598 28
$ 29,645 62
$ 59,622 34
1946 71' Pavement & curb $57 43 $111,799 56
1946 71' Storm drain 24 98 48,628 82
1946 71' Street lights 2 27 4,419 03
$164,847 41
-2-
PROJECT NO 021-36526, FOSSIL CREEK BOULEVARD, cont
OWNER
SOUTH SIDE
Street A intersects
ZONING
LOT BLOCK FRONTAGE
DAVID ODUM SURVEY
RATE
Woodbine Development Tract 12-E 772 47' Pavement & curb
Corp Ind $57 43
3200 1st Nat'l Bank Bldg 772 47' Storm Drain 24 98
Dallas Tx 75202 772 47' Street lights 2 27
Attn Ron Richards
Total cost to property pwners (assessments)
Total cost to City of Fort Worth
Total construction cost
_3-
AMOUNT ASSESSMENT
$44 362 95
19,296 30
1 753 51
$65,412 76
$1,120 751 65
$ 169,839 06
$1,290 590 71
~' ~`~~ ~ City of fort Worth, ~'exas
1~ayor and Council Communa.cation
DATE REFERENCE 8UBlECT FOSSIL CREEK DEVELOPMENT PHASE I PAGE
NUMDER FOSSIL CREEK BLVD-I-35 W TO BEACH
'O'ff
11/10/81 **FP-1595 PROJECT NO 021-36526 029-36526-FINAL `"
PAYMENT
Final Council action is requested on the subject project
Project Description
Name Fossil Creek Development Phase I
Fossil Creek Blvd (I35 to Beach)
Project No 021-36526,029-036526
Contractor J L Bertram Const & Engr Inc
Contract Awarded 11-12-80 M&C C-5378
Work Order Dated 1-5-81
Work Order Effective On or Before 12-11-80
Work Began 1-13-81
Contract Time Began 12-11-80
Pro3ect Substantially Complete and Final Inspection Made 8-26-81
Affidavit Received 9-23-81
Final Construction Approval 10-13-81
Working Time Provided 150 Days
Working Time Used 127 Days
Project Cost
Original Bid Price $1,262,903 85
Final Contract Price $1 229,134 O1
Partial Payments Previously Made 7 Amount $1,101,271 02
Final Payment Due $127 862 99
Deviation from Bid Price
Final measured quantities at contract unit prices yield an earned total price
of this contract which is $33,769 84 (2 67y) under the bid price The underrun
is the result of differences between quantities estimated for the contract
documents and quantities actually used to complete the work
APPROVED BY
Financing (~~ r A~~+~
~
~}~6i~~~`1~]~be made
Sufficient funds are available for the recommended fint~l.
from the Project Account No 029-036-526-00
Nov 10 1981
Com liance with S ecifications
of the
The project has een comp eted in accordance with th req~ir
~
contract c~ czetarq o ct--e""'-
C oP sort Worth, rexa~
Recommendation
It is recommended that the pro3ect described above be accepted by the adoption
of an ordinance and final payment of $127,862 99 be made to J L Bertram
Construction and Engineer, Inc
~
~~
GG dt
`
LIIDMITTEDTOR THE
GER'a
A
~ DI TION DY COUNCIL• rROCESSED BY
AF
FICE
BV ^ APPROVED
ORIGINATING ^ OTNER (OELCRIOE)
DEPARTMENT NERD: CITY RECRETARY
FOR ADDITIONAL INFORMATION
CONTACT JOh JO eS GATE