Loading...
HomeMy WebLinkAboutContract 47573-FP1 Depart t of P &W Const. Services CPN# D Project anager Risk Management Can ad )T �ORTH tAITY�,E(; �1RY ; D.O.E. ` 1 Brotherton o ;aUNTMU N0. CFA Westerman/Scanned Esteban Perez/Scanned The Proceeding people have been Contacted concerning the request for final payment& have 'ATION AND PUBLIC WORKS released this project for such payment. F PROJECT COMPLETION Clearance Conducted BY � Developer Projects) ppb amdw City Project Ns: 02688 Regarding contract 117544 for MORNINGSTAR DEVELOPMENT as required by the TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through 1vI&C N/A the director of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the Transportation& Public Works Department has accepted the project as complete. Original Contract Price: $2,290,916.75 Amount of Approved Change Orders: 7�0 Revised Contract Amount: Total Cost Work Completed: $2,290,916.75 Recome ded for Acceptance Date Asst. Die or, TPW - Infrastructure Design and Construction Acceptedo Date Director, TRANSPORTATION & PUBLIC WORKS Asst. City Manager Date Comments: OFFICIAL RECORD CITY SECRETARY NOV fl 9 2016 F-T WORTH,TX Rev.9/22/16 FORTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name MORNINGSTAR DEVELOPMENT Contract Limits INDIGO SKY DRIVE&MORNING MIST TRAIL Project Type STORM DRAIN&PAVING City Project Numbers 02688 DOE Number 7544 Estimate Number 1 Payment Number I For Period Ending 10/17/2016 CD City Secretary Contract Number 117544 Contract Time 250:D Contract Date Days Charged to Date 239 Project Manager Buckley Contract is 100.00 Complete Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 Inspectors LAYER / HOUSTON Monday,October 17,2016 Pagel of 5 City Project Numbers 02688 DOE Number 7544 Contract Name MORNINGSTAR DEVELOPMENT Estimate Number I Contract Limits INDIGO SKY DRIVE&MORNING MIST TRAIL Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 10/17/2016 Project Funding DRAINAGE Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total ----------- ------ ---------------------- I ---------- --- 1 TRENCH SAFETY 4064 LF $2.00 $8,128.00 4064 $8,128.00 2 54"RCP CLASS I11 126 LF $160.00 $20,160.00 126 $20,160.00 3 48"RCP CLASS 111 147 LF $125.00 $18,375.00 147 $18,375.00 4 42"RCP CLASS III 95 LF $95.00 $9,025.00 95 $9,025.00 5 36"RCP CLASS III 1365 LF $82.00 $111,930.00 1365 $111,930.00 6 30"RCP CLASS III 342 LF $60.00 $20,520.00 342 $20,520.00 7 24"RCP CLASS III 1347 LF $50.00 $67,350.00 1347 $67,350.00 8 21"RCP CLASS I1I 42 LF $42.00 $1,764.00 42 $1,764.00 9 3'X3'BOX CULVERT 240 LF $120.00 $28,800.00 240 $28,800.00 10 4'X3'BOX CULVERT 240 LF $135.00 $32,400.00 240 $32,400.00 11 5'X5'BOX CULVERT 120 LF $200.00 $24,000.00 120 $24,000.00 12 4'SQ Y-INLET I EA $12,500.00 $12,500.00 1 $12,500.00 13 4'STORM JUNCTION BOX 8 EA $5,000.00 $40,000.00 8 $40,000.00 14 Y STORM JUNCTION BOX 2 EA $6,000.00 $12,000.00 2 $12,000.00 15 54"SETP-CD I EA $5,000.00 $5,000.00 1 $5,000.00 16 36"SETP-CD 2 EA $4,500.00 $9,000.00 2 $9,000.00 17 24"SET(1) 5 EA $4,000.00 $20,000.00 5 $20,000.00 18 (1)5'X5'AND(4)3'X3' 2 EA $20,000.00 $40,000.00 2 $40,000.00 19 (1)5'X5'AND(4)41X3' 2 EA $25,000.00 $50,000.00 2 $50,000.00 20 10'CURB INLET I EA $2,200.00 $2,200.00 1 $2,200.00 21 15'CURB INLET 2 EA $3,800.00 $7,600.00 2 $7,600.00 22 20'CURB INLET 9 EA $4,200.00 $37,800.00 9 $37,800.00 23 LARGE STONE RIPRAP,DRY 463 SY $65.00 $30,095.00 463 $30,095.00 24 MEDIUM STONE RIPRAP,DRY 410 SY $60.00 $24,600.00 410 $24,600.00 ---- ------------------------------------ Sub-Total of Previous Unit $633,247.00 $633,247.00 PAVING Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total ---------- ------------------------------- 1 7.5"CONC PVMT 29275 SY $37.25 090,493.75 29275 1,090,493.75 2 2"ASPHALT PVMT TYPE D 331 SY $20.00 $6,620.00 331 $6,620.00 Monday,October 17,2016 Page 2 of 5 City Project Numbers 02688 DOE Number 7544 Contract Name MORNINGSTAR DEVELOPMENT Estimate Number I Contract Limits INDIGO SKY DRIVE&MORNING MIST TRAIL Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 10/17/2016 Project Funding 3 4"ASPHALT PVMT TYPE B 331 SY $26.00 $8,606.00 331 $8,606.00 4 8"LIME TREATMENT 31530 SY $3.00 $94,590.00 31530 $94,590.00 5 HYDRATED LIME 630.92 TN $175.00 $110,411.00 630.92 $110,411.00 6 4"CONCRETE SIDEWALK 78343 SF $3.00 $235,029.00 78343 $235,029.00 7 BARRIER FREE RAMP TYPE C-2 1 EA $900.00 $900.00 1 $900.00 8 BARRIER FREE RAMP TYPE P-1 22 EA $900.00 $19,800.00 22 $19,800.00 9 BARRIER FREE RAMP TYPE M-1 11 EA $900.00 $9,900.00 11 $9,900.00 10 BARRIER FREE RAMP TYPE M-2 1 I EA $900.00 $9,900.00 11 $9,900.00 11 ROUND ABOUT I LS $55,500.00 $55,500.00 1 $55,500.00 12 FURNISH&INSTALL GROUND MOUNT SIGN 13 EA $650.00 $8,450.00 13 $8,450.00 POST AND SIGN 13 STREET NAME PLATES FOR STREET 9 EA $300.00 $2,700.00 9 $2,700.00 INTERSECTION 14 24"SOLID WHITE STOP BAR PAINT 22 LF $15.00 $330.00 22 $330.00 15 STREET BARRICADE III LF $40.00 $4,440.00 111 $4,440.00 ----------------------- --------------- - Sub-Total of Previous Unit $1,657,669.75 $1,657,669.75 -------------------- ------------------ Monday,October 17,2016 Page 3 of 5 City Project Numbers 02688 DOE Number 7544 Conti-act Name MORNINGSTAR DEVELOPMENT Estimate Number I Contract Limits INDIGO SKY DRIVE&MORNING MIST TRAIL Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 10/17/2016 Project Funding Contract Information Summary Original Contract Amount $2,290,916.75 Change Orders Total Contract Price $2,290,916.75 dtl'o Date D- -1 Total Cost of Work Completed $2,290,916.75 Contr Less %Retained $0.00 / Net Earned $2,290,916.75 Ins e i e r Date J �,� W Earned This Period $2,290,916.75 Retainage This Period $0.00 Date Less Liquidated Damages Projec n r Days @ /Day $0.00 7V Date / LessPavement Deficiency $0.00 i e r/f/P!W-Infrastructure Design and Construction Less Penalty $0.00 W. IN0 ate /) Zb/1 Less Previous Payment $0.00 Director Contracting Departmen �) Plus Material on Hand Less 15% $0.00 ���.�// Balance Due This Payment $2,290,916.75 �o ZC, /4- Monday, Monday,October 17,2016 Page 4 of 5 City Project Numbers 02688 DOE Number 7544 Contract Name MORNINGSTAR DEVELOPMENT Estimate Number I Contract Limits INDIGO SKY DRIVE&MORNING MIST TRAIL Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 10/17/2016 I Project Funding i i Project Manager Buckley City Secretary Contract Number 117544 Inspectors LAYER / HOUSTON Contract Date Contractor CONATSER CONSTRUCTION TxLP Contract Time 250 CD I 5327 WICHITA ST Days Charged to Date 239 CD j FORT WORTH, TX 76119 Contract is .000000 Complete 1 i CITY OF FORT WORTH SUMMARY OF CHARGES I Line Fund Account Center Amount Gross Retainage Net Funded ----------------- ---------------------- I(I i - I i } I I t Total Cost of Work Completed $2,290,916.75 Less %Retained $0.00 Net Earned $2,290,916.75 i Earned This Period $2,290,916.75 a Retainage This Period $0.00 i Less Liquidated Damages y 0 Days c@i $0.00 /Day $0.00 E LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $2,290,916.75 i Monday,October 17,2016 Page 5 of 5 2 f FORTWORTH rev 03/05/07 TRANSPORTATION& PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO. 1 NAME OF PROJECT: Morningstar Indigo Sky Dr.and Morning Mist Trail PROJECT NO.: 02688 CONTRACTOR: Conatser Construction DOE NO. 7544 PERIOD FROM 02/08/16 TO: 10/06/16 FINAL INSPECTION DATE: 6-Oct-16 WORK ORDER EFFECTIVE 2/8/2016 CONTRACT TIME 100 O WD OO CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28• 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WE, UTILITIES OTHERS* DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS THIS 0 0 0 0 239 239 PERIOD PREVIOUS 0 0 0 0 0 0 PERIOD TOTALS 0 0 0 0 239 239 TO DATE *REMARKS: Ile CONTRACTOR DATE INSPEC DATE ENGINEERING DEPART1 AT ! The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845 FORTWORTH REV:8/20/16 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR n CONTRACTOR&PROJECT DATA Naine of Contractor Projecl Name Conatser Construction TX,LP Morningstar Indigo Sky Dr&Morning Mist Trail Inspector Cth,Projecl Number Garey Houston 02688 Construction Conponents Project Mmmger ❑Water ❑Waste Water 0 Storm Drainage (A Pavement Pat Buckley Initial ContractAmrnmt ProjectDtricalty $2,290,916.75 O Simple OO Routine O Complex Final Contract Amount Date $2,290,916.75 10/6/2016 II)PERFORMANCE EVALUATION 0-Inadequate I-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 4 20 20 10 Citizen's Complaint Resolution 5 Y 4 20 20 11 Property Restoration 5 Y 4 20 20 12 Ager Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 448 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 448 IIn CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating([TS/MS]* 100%) 448 / 448 = 1000/0 Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Inspector Signature Contractor Signature Inspector's Supervisor Signature CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth•8851 Camp Bowie West Blvd. •Fort Worth,TX 76116•(817)392-8306 No. BI-7280f POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON,DELAWARE NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully. KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company'), a corporation duly organized and existing under the laws of the State of Delaware,having its principal office in Greenwich,CT,has made,constituted �2 and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna; Don E. Cornell, Vena DeLene Marshall,Sophinle Hunter,Robb!Morales, or Kelly A. Westbrook of Aon Risk Services Southwest,Inc. of Dallas, 7X its true and lawful Attorney-in-Fact to sign its name as surety only as delineated below and to execute,seal,acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall co exceed Fifty Million and 00/100 U.S. Dollars(U.S350,000,000.00),to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. v This Power of Attorney shall be construed and enforced in accordance with, and governed by,the laws of the State of Delaware, •S without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010: a RESOLVED, that, with respect to the Surety business written by Berkley Surety Group, the Chairman of the Board, Chief Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the c corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such 5 o attorney-in-fact and revoke any power of attorney previously granted;and further RESOLVED,that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances, or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the j F `c manner and to the extent therein stated;and further I _ RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and Furth er RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any .^ power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking,recognizance, or r other suretyship obligation of the Company;and such signature and seal when so used shall have the same force and effect as though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any person or persons who shall have been such officer or officers of the Company,notwithstanding the fact that they may have .cl ceased to be such at the time when such instruments shall be issued. _E: IN WITNESS WHEREOF, the Company has cau 1 these presents to be signed and attested by its appropriate officers and its 0 o� corporate seal hereunto affixed this�iiay of 41"Y— 5- S2 Attest: Berkley Insurance Company J U r; (Seal) By / By WlimpA�A� C) -6 Tra S. a erman J CUlPres after o Senior Vice President&Secretary ide WARNING, THIS POWER INVALID IF NOT PRINTED ON BLUE"BERKLEY"SECURITY PAPER. o � - STATE OF CONNECTICUT) o COUNTY OF FAIRFIELD ) y n Sworn to before me, a Notary Public in the State of Connecticut this`)O da 2Public, ,2015, by Ira S. Lederman and Jeffrey M.Hatter who are sworn to me to be the Senior Vice President and Secre the Senior Vice Pre dent, respectively,of Berkley Insurance Company. MARIA C.RUNDBAKENNOTARY PUBLICMY COMMISSION EXPIRES otaState of Connecticut APRIL 30,2019 J z � CERTIFICATE z I, the undersigned,Assistant Secretary of BERKLEY INSURANCE COMPANY,DO HEREBY CERTIFY that the foregoing is a true,correct and complete copy of the original Power of Attorney;that said Power of Attorney has not been revoked or rescinded 5 -�5 and that the authority of the Attorney-in-Fact set forth therein, who executed the bond or undertaking to which this Power of Attorney is attached, is in full force and effect as of this date. Given under my hand and seal of the Company,this 12th day of Se tembe 2016 . 5 (Seal) A a AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc., general partner of Conatser Construction TX LP, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said: That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth, has been paid in full; and That there are no claims pending for personal injury and/or property damages; On Contract described as: MORNINGSTAR—INDIGO SKY&MORNING MIST WATER, SANITARY SEWER, STORM DRAIN &PAVING IMPROVEMENTS DOE#: N/A City Project#: N/A CITY OF FORT WORTH STATE OF TEXAS CONAT U R CONSTRUCTION TX, LP Brock Huggins Subscribed and sworn to before me this 12`h day of Septemb BERTHA 61ANULIS Notary Public in Tarrant County,Texas IdotOty PUb1iC,State of Texas My commission Expires F september 18, 20}9 ,iiu• i CONSENT OF OWNER ❑ SURETY COMPANY ARCHITECT ❑ CONTRACTOR ❑ TO FINAL PAYMENT SURETY ❑ Conforms with the American Institute of OTHER Architects, AIA Document G707 Bond No 0195681 PROJECT: (name, address)Morningstar-Indigo Sky&Morning Mist Fort Worth,TX TO (Owner) FG ALEDO DEVELOPMENT LLC&THE CITY OF ARCHITECT'S PROJECT NO: FORT WORTH CONTRACT FOR: 3045 Lackland Blvd. Momingstar-Indigo Sky&Morning Mist-Water,Sanitary Sewer, Storm Sewer and Paving Fort Worth TX 76116 —J CONTRACT DATE: CONTRACTOR: CONATSER CONSTRUCTION TX, L.P. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the there Insert name and address of Surety Company) BERKLEY INSURANCE COMPANY 475 Steamboat Road Greenwich CT 06830 , SURETY COMPANY on bond of there insert name and address of Contractor) CONATSER CONSTRUCTION TX,L.P. 5327 Wichita St. Fort Worth TX 76119-6035 , CONTRACTOR, I hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to there insert nam and address of Owner) j FG ALEDO DEVELOPMENT LLC&THE CITY OF FORT WORTH 3045 Lackland Blvd. Fort Worth TX 76116 , OWNER, I as set forth in the said Surety Company's bond. IN WITNESS,WHEREOF, G the Surety Company has hereunto set its hand this 12th day of September,2016 BERKLEY INSURANCE COMPANY Surety Company 1',11 Attest: UJ ILA 0� �=-c-�- (Seal): grgnaiture of Authorized Representative l f Robb!Morales Attorney-in-Fact r Title I NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition f ONE PAGE S i t FORTWORTHREV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY 1)PROJECT INFORMATION Date: 10/6/2016 Name of Contractor Project Name Conatser Construction Morningstar Development Indigo Sky&Morning Mist Tr DOE Inspector Project Manager Garey Houston Pat Buckley ` DOE-Number Project Difficulty T}peofCont•act 7544 O Simple OO Routine O Complex ❑water ❑waste Water R]Storm Drainage Pavement Initial Contract Amomtt Final Contract Amount $2,290,916.75 $2,290,916.75 In PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS 1 Availability of Inspector b 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector q 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities 4 3 Applicability of Specifications q 4 Display Of Professionalism y 4 Accuracy of Plan Quantities tf 5 Citizen Complaint Resolution y PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 4 1 Knowledge And/Or Problem Resolution tf ADMINISTRATION 2 Availability of Project Manager �{ 1 Change Order Processing Time q 3 Communication N 2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timefiame III)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS +, P The City of Fort Wordi•1000 Throckmortou Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845