Loading...
HomeMy WebLinkAboutContract 47490-A1 CITY SECRETARY (f 0 41 CONTRACT NO. AMENDMENT No. 1 1� INTERLOCAL COOPERATION AGREEMENT FOR DESIGN SERVICES OF �n FUTURE THOMPSON ROAD AT NORTH RIVERSIDE DRIVE WHEREAS, KELLER INDEPENDENT SCHOOL DISTRICT, a Texas independent school district, ("District") and the City of Fort Worth, a Texas municipal corporation ("City"), entered into City Secretary Contract No. 47490, an Interlocal Cooperation Agreement for design services ("Agreement"), regarding roadway and street improvements to future Thompson Road at North Riverside Drive in the City of Fort Worth, Tarrant County, Texas, (the"Project"); and WHEREAS, District and City (collectively, the "Parties") desire to amend the Agreement in order to accomplish the construction goals of the Parties ("Amendment"); and WHEREAS, the construction of future Thompson Road by the District requires a connection not only to North Riverside Drive but also to the northbound frontage road of Interstate Highway 35W ("Revised Project"), currently under construction by the Texas Department of Transportation("TXDOT"); and WHEREAS, District agrees to fund its portion of the costs for the intersection improvements with future Thompson Road at both the IH-35 frontage and at North Riverside Drive; and WHEREAS, District has reviewed the scope, costs, and schedule for the construction of the Revised Project and finds them to be fair and reasonable; and WHEREAS, City has agreed to enter into an Advanced Funding Agreement with TXDOT for construction of the deceleration and turn lane from the new IH-35W frontage road onto future Thompson Road; and WHEREAS, the intersection improvement at future Thompson Road at North Riverside Drive include a connection to and portion of a roundabout ("NRD Intersection"), estimated to cost $330,720 as further detailed on Attachment"A"; and WHEREAS, the intersection improvement at future Thompson Road and IH-35W frontage road include a deceleration lane turn lane from the northbound frontage road and other improvements ("IH-35 Intersection"), estimated to cost $60,056 as further p detailed on Attachment"B"; `� C9 NOW, THEREFORE, for and in consideration of the above recitals and the rn � covenants and conditions contained herein, City and District do hereby agree as follows: t'r General ® A. The Revised Project will generally consist of improvements related to the KISD-CFW Amendment 1 to Interlocal Agreement re: Thompson Road at North Riverside Drive Improvements Page 1 construction of Thompson Road where it intersects with North Riverside Drive and where it intersects with the northbound frontage road of Interstate 35W as further described herein. B. 1. District agrees to pay to City $330,720 for estimated construction costs on a reimbursement basis for construction services performed for or to be performed by City to construct the NRD Intersection. Final costs will be determined by actual constructed quantities. District will supply additional funding should the final amount exceed the estimated costs. 2. District agrees to pay to City $60,056 for estimated construction costs on an upfront basis for construction services perfonned for or to be performed by City to construct the IH-35 Intersection. Final costs will be detennined by actual constructed quantities. District will supply additional funding should the final amount exceed the estimated costs. C. City will publicly seek bidders to construct improvements to North Riverside Drive, including the NRD Intersection. D. City and TXDOT will enter into an Advance Funding Agreement for the construction of the IH-35 Intersection. E. All payments, if any, required to be made by City or District shall be payable from such party's current revenues or other funds lawfully available for such purpose. F. The Parties agree that City and District have not waived their respective sovereign or governmental immunity by entering into and performing their respective obligations under this Amendment. G. All other terns and conditions, general or specific, not amended hereby remain unaffected and in force. [the remainder of this page is intentionally left blank;signature page to follow) KISD-CFW Amendment 1 to Interlocal Agreement re: Thompson Road at North Riverside Drive Improvements Page 2 ACCORDINGLY, City and District have each caused this Amendment to be executed in quadruplicate in its name and on its behalf by its duly authorized representative. EXECUTED and EFFECTIVE as of the date last subscribed by a signatory,below. APPROVED: CITY: DISTRICT: CITY OF FORT WORTHI.S.D ER j� Jesus J. Chapa Craig Alle Assistant City Manager Keller ISD Board President DATE: / �� DATE: 2 AP ROVAL RECOMMENDED: �> W Dougl . Wiersig,P.E. Director, Transportation and Public Works Department APPROVED AS TO FORM AND LEGALITY: M&C: G ` 2- y �f Date: t - 2. S'- !j� Douglas W. Black Assistant City Attorney T °po°0000�°°O6'0 ATT , ®o° ° •� oSr °°OOOU5000 000 °6° ary J. Kayser ��YJ OFFICIAL RECORD City Secretary =r�` CITY SECRETARY FT,WORTH,TX KISD-CFW Amendment 1 to Interlocal Agreement re: Thompson Road at North Riverside Drive Improvements Page 3 ` 16-0422 OPC-West Thompson Rd Roundabout Leg Baird,Hampton&Brown 5/24/2016 Engineering&Surveying 4550 SH 360,Ste.180,Grapevine,TX 76051 Tel 817-251-8550,w .bhbinc.com ATTACHMENT "A" Engineer's Preliminary Opinion of Probable Cost for West Thompson Rd Roundabout Leg-Dunaway's Portion City of Fort Worth,Texas April 22,2016 Item Spec Number Spec Item Number Description Unit Quantity Unit Price Extended Price Roadway Improvements 1 3125.0101 31 2500 Erosion Control Measures LS 1.0 $ 5,000.00 $ 5,000 2 3110.0101 31 1000 Site Clearing LS 1.0 $ 7,500.00 $ 7,500 3 3211.0400 3211 29 Hydrated Lime(at 36 Lbs./SY) TN 42.3 $ 175.00 $ 7,396 4 3211.0502 3211 29 8"Lime Treatment SY 2348.0 $ 4.00 $ 9,392 5 3213.0103 32 13 13 8"Concrete Pvmt SY 2171.0 $ 55.00 $ 119,405 6 9999 9999 Integral Colored/Textured 4"Concrete(Medians) SF $ 12.00 $ - 7 9999 9999 Integral Colored/Textured 8"Concrete(Truck Apron&Behind Mount.Curb) SY 62.0 $ 140.00 $ 8,680 8 9999 9999 Integral Colored 5"Concrete Sidewalk(Splitter Islands) SF $ 15.00 $ - 9 9999 9999 Integral Coloredfrextured 4"Concrete(Splitter Islands) SF 1166.0 $ 12.00 $ 13,992 10 9999 9999 8"Wide x 6"Tall Curb LF 172.0 $ 25.00 $ 4,300 11 3213.0301 32 13 20 4"Conc Sidewalk(6'Wide) SF 2772.0 $ 4.00 $ 11,088 12 3213.0302 32 13 20 5"Conc Sidewalk(10'Wide) SF 2655.0 $ 5.00 $ 13,275 13 3213.0504 32 13 20 Barrier Free Ramp,Type M-2(MODIFIED;5WIDE) EA 2.0 $ 750.00 $ 1,500 14 3213.0506 33 13 20 Barrier Free Ramp,Type P-1 EA 10.0 $ 750.00 $ 7,500 15 3213.0510 34 13 20 Barrier Free Ramp,Type C-3 EA 1.0 $ 750.00 $ 750 16 3291.0100 3291 19 Imported Topsoil(2"Thick in Hydromulch Areas) CY 3.8 $ 40.00 $ 153 17 3291.0100 3291 19 Imported Topsoil(4"Thick in Sod Areas) CY 51.7 $ 40.00 $ 2,067 18 3292.0100 32 92 13 Block Sod Placement(Parkway) SY 465.0 $ 5.00 $ 2,325 19 3292.0400 32 92 13 Seeding,H dromulch Median SY 69.0 $ 1.00 $ 69 Subtotal Roadway Improvements $ 214,392 Contingency 10.1% $ 21,608 Total Roadway Improvements $ 236,000 Overall Earthwork 1 3123.0101 31 23 16 Unclassified Excavation by Plan(Cut) CY 783 $ 15.00 $ 11,745 2 3124.0101 31 2400 Embankment by Plan On-Site CY 391.5 $ 12.00 $ 4,698 Subtotal Overall Earthwork $ 16,443 Contingency 9.5% $ 1,557 Total Overall Earthwork $ 18,000 Roadway Signage&Striping Improvements 1 3217.0002 32 17 23 4"SLD Pvmt Marking HAS(Y) LF 378 $ 1.75 $ 662 2 3217.0005 32 17 23 4"DOT Pvmt Marking HAS(W) LF 48 $ 1.75 $ 84 3 3217.0301 32 17 23 12"SLD PVMT Marking HAE(W) LF 24 $ 2.00 $ 48 4 9999 9999 Lane Legend Yield EA 1 $ 250.00 $ 250 5 9999 9999 Land Legend Bike EA 3 $ 250.00 $ 750 6 3441.1623 3441 10 Furnish/Install Mast Arm 16'-36' EA 1 $ 2,750.00 $ 2,750 7 3441.1612 3441 10 Furnish/Install Type 42 Signal Pole EA 1 $ 4,500.00 $ 4,500 8 3441.1703 3441 10 TY 3 Signal Foundation EA 1 $ 3,500.00 $ 3,500 9 3441.4001 3441 30 Furnish/Install Alum Sign Mast Arm Mount EA 2 $ 400.00 $ 800 10 3441.4003 3441 30 Furnish/Install Alum Sign Ground Mount City Std. EA 9 $ 700.00 $ 6,300 Subtotal Roadway Signage and Striping Improvements $ 19,644 Contingency 12.0% $ 2,357 Total Roadway Signage&Striping Improvements $ 22,000 Lighting 1 3441.3003 3441 20 Rdwy Ilium Assmbly TY 18,18A,19,and D40 EA 2 $ 1,700.00 $ 3,400 2 3441.3302 3441 20 Rdwy Illum Foundation TY 3,5,6,and 8 EA 2 $ 1,600.00 $ 3,200 3 3441.3201 3441 20 LED Lighting Fixture EA 4 $ 700.00 $ 2,800 4 2605.3016 26 05 33 2"Sch 80 PVC(includes Trenching&Backfill) LF 376 $ 7.00 $ 2,632 5 3441.3404 3441 20 2-2-24 Quadpiex Alum Elec Condr LF 376 $ 9.01 $ 3,388 6 3441.1502 3441 10 Ground Box,Small,w/Lid Apron EA 3 $ 1,000.00 $ 3,000 7 9999 9999 Furnish&Install 9T arm for Type D40-9 pole EA 4 $ 500.00 $ 2,000 Subtotal Lighting Improvements $ 20,420 Contingency 7.7% $ 1,580 Total Lighting Improvements $ 22,000 1 of 2 16-0422 OPC-West Thompson Rd Roundabout Leg Baird,Hampton&Brown 5/24/2016 Engineering&Surveying 4550 SH 360,Ste.180,Grapevine,TX 76051 Tel 817-251-8550,mm.bhbinc.com Item Spec Number Spec Item Number Description Unit Quantity Unit Price Extended Price J.Thompson Roundabout West Leg by Dunaway Summary 1 Roadway Improvements $ 214,392 2 Overall Earthwork $ 16,443 3 Roadway Signage&Striping Improvements $ 19,644 4 Lighting $ 20,420 Subtotal Thompson Roundabout West Leg $ 270,898 Contingency 15.2% $ 41,102 Subtotal: Thompson Roundabout West Leg by Dunaway $ 312,000 Estimated Testing&Inspection Cost 6% $ 18,720 Total Estimated Cost S 330,720 Note: This does not include any City project management fees. 6% of is an estimated testing & inspection fee, so it is subject to change. 2 of2 Thompson Road Access Permit I ATTAC H M E NT ��B„ CSJ:0014-16-255,ETC. DISTRICT COUNTY CSJ PROJ NAME ESTIMATOR DATE Fort Worth Tarrant 0014-16-255,ETC. CAM 5/16/2016 ITEM CODE DESCRIPTION UNIT QUANTITY BID PRICE TOTAL ROADWAY 132 2025 EMBANKMENT FINAL DENS CONT TY Cl) CY 91 $7.60 $691.60 164 2007 BROADCAST SEED PERM URBAN CLAY SY 167 $0.14 $23.38 247 2056 FL BS CMP IN PLC TY D GR 4 FNAL POS CY 320 $30.50 $9,760.00 260 2016 LIME HYD,COM,OR QK SLURRY TON 18 $138.00 $2,491.45 260 2027 LIME TRT EXST MATL 8" SY 283 $1.50 $424.50 260 2022 LIME TRT EXIST MATL 18" SY 320 $2.10 $672.00 310 2026 PRIME COAT EC-30 GAL 96 $3.05 $292.80 346 2030 STONE-MTRX-ASPH SMA-F SAC-B PG76-22 TON 21 $82.00 $1,726.87 360 2009 CONC PVMT JOINTED-CPCD 8" SY 272 $65.00 $17,680.00 529 2004 CONC CURB&GUTTER TY II LF 245 $15.00 $3,675.00 529 2006 CONC CURB MONO TY II LF 141 $5.00 $705.00 531 2010 CURB RAMPS TY 7 EA 2 $1,100.00 $2,200.00 531 2015 CONC SIDEWALKS 4" SY 170 $33.00 $5,610.00 531 2017 CURB RAMPS TY 21 EA 1 $1,700.00 $1,700.00 3224 2008 D-GR HMA QCQA TY-B PG64-22 TON 84 $62.74 $5,285.06 5049 2001 BIODGRD EROSION CONTROL LOGS 8"DIA LF 409 $2.25 $920.25 SUBTOTAL $53,857.91 DRAINAGE 464 2003 RC PIPE CL III 18 IN LF 10 $31.00 $310.00 465 2005 MANH COMPL TY M EA 1 $3,000.00 $3,000.00 SUBTOTAL $3,310.00 SIGNING&PAVEMENT MARKINGS 644 2001 IN SM RD SN SUP&AM TYIOBWG 1 SA P EA 4 $360.00 $1,440.00 666 2012 REFL PAV MRK TY I W 4" SLD 100MIL LF 343 $0.85 $291.55 666 2036 REFL PAV MRK TY I W 8" SLD 100MIL LF 225 $0.85 $191.25 666 2048 REFL PAV MRK TY I W 24"SLD 10OMIL LF 69 $5.00 $345.00 666 2054 REFL PAV MRK TY I W ARROW IOOMIL EA 2 $140.00 $280.00 666 2096 REFL PAV MRK TY I W WORD 100MIL EA 2 $170.00 $340.00 SUBTOTAL $2,887.80 PROJECT TOTAL $60,055.71 Dunaway Associates,L.P. 5/16/2016 Uj IL I I III 5 i STA 30+54.85 THOMPSON ROAD CL 9 END 4TH LEG N 70099JJ.44 E 2334958.56 STA 25+74.88 THOMPSON ROAD CL BEGIN 4TH LEG o --------------- N 7009807.29 E 2JJ4500.23 55 00 o 00 J0, E 00 My / / 0 ��DUNAWAY 0 EXHIBIT A 100 200 550 Bailey Avenue -Suite 400 - Fort Worth,Texas 76107 4TH LEG THOMPSON ROAD Tel:8'7.335.1121 (TX REG. F-1114) SCALE: 1"= 100 ft. m 3 Z a u u i l � I w - o � STA 0+43.84 THOMPSON ROAD CL � I END TXDOT ROAD 1 t N 7009548.68 m E 2332102.99 S W 0 0 1+00 2+00 3+00 4+00 5+00 6+00 7100 Pm THOMPSONROAD — BxoQ wSTA 0+01.00 THOMPSON ROAD CL \ BEGIN TXDOT ROAD \ 0 1 s '�+ N 7009548.00 � 0 E 2332060.16 a` E v Z, v w r r 0 H a J Pi Q O F- � I O N i \ 'H I C n T Q D U N AWAY EXHIBIT A 0 100 200 550 Bailey Avenue •Suite 400 • Fort Worth,Texas 76107 TXDOT CONNECTION m Tel:817.335.1121 p (TX REG. F-1114) w o SCALE: 1"= 100 ft. a M&C Review Page 1 of 3 Official site of the City of Fort Worth, Texas CITY COUNCIL AGENDA FORT , COUNCIL ACTION: Approved on 10/25/2016 - Ordinance No. 22485-10-2016 & Resolution No. 4693-10-2016 REFERENCE ** 20N RIVERSIDE-KISD ILA DATE: 10/25/2016 NO.: C-27974 LOG NAME: AMENDMENT 1- 02272 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 1 to City Secretary Contract No. 47490, an Interlocal Cooperation Agreement, with Keller Independent School District in the Amount of$390,776.00 for the Construction of the Thompson Road Intersection with North Riverside Drive and a Deceleration Lane from the Northbound Frontage Road of Interstate Highway 35W for Future Thompson Road, Thereby Increasing Keller Independent School District's Total Contribution to $405,776.00, Adopt Resolution Authorizing Execution of an Advanced Funding Agreement with the Texas Department of Transportation in an Amount Up to $70,000.00 to Construct a Frontage Road Right-Turn Deceleration Lane to the Future Thompson Road and Adopt Appropriation Ordinance (COUNCIL DISTRICT 4) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the North Riverside Drive Project— North Tarrant Parkway to Old Denton Road of the Developer Contribution Fund in the amount of$405,776.00; 2. Authorize the execution of Amendment No.1 to City Secretary Contract No. 47490, an Interlocal Cooperation Agreement, with Keller Independent School District in the amount of$390,776.00 for the construction of the future Thompson Road intersection at North Riverside Drive and the Northbound Interstate Highway 35W Frontage Road right-turn deceleration lane to the future Thompson Road, thereby increasing Keller Independent School District's total contribution to $405,776.00; 3. Adopt the attached resolution authorizing execution of an Advanced Funding Agreement with the Texas Department of Transportation in an amount up to $70,000.00 to construct a Northbound Interstate Highway 35W frontage road right-turn deceleration lane to the future Thompson Road; and 4. Authorize a payment to the Texas Department of Transportation in an amount up to $70,000.00. DISCUSSION: The 2014 Bond Program includes funding for roadway capacity improvements along North Riverside Drive from North Tarrant Parkway to Old Denton Road. This project includes widening the roadway from two lanes to four lanes, left and right turn lanes, roundabouts at Summerfields Boulevard and Thompson Road, storm drainage improvements, shared use paths, streetlights and traffic signal modifications at North Tarrant Parkway. On February 9, 2016, the City administratively authorized an Interlocal Cooperation Agreement with Keller Independent School District (KISD) for the design of proposed Thompson Road at North Riverside Drive in the amount of$15,000.00. Under this amendment, KISD will provide an additional $390,776.00 for the construction of the intersection of Thompson Road with North Riverside Drive by the City and the Northbound Interstate Highway 35W Frontage Road deceleration lane to Thompson http://apps.cfwnet.org/council_packet/mc_review.asp?ID=22916&councilda... 11/4/2016 M&C Review Page 2 of 3 Road by the Texas Department of Transportation. The Advanced Funding Agreement with the Texas Department of Transportation (TxDOT) will provide for the State to construct the deceleration lane on the northbound frontage road of Interstate Highway 35W at Thompson Road. Construction of the Thompson Road intersection at North Riverside Drive has components of the overall project that include design, construction, project management, easements and right-of-way acquisition, construction administration, material testing, inspection and contingencies. The City project budget for the full improvements described above is $13,365,776.00. Additionally, construction of the northbound frontage road of Interstate Highway 35W is a component of a KISD development project involving a Community Facilities Agreement with the City of Fort Worth. A portion of this project will include 2014 Bond Funds. Available resources within the General Fund will be used to provide interim financing for these expenses until debt is issued. Once debt associated with this project is sold, bond proceeds will reimburse the General Fund, in accordance with the statement expressing official Intent to Reimburse, that was adopted as part of the ordinance canvassing the bond election (Ordinance No. 21241--05-2014) and the subsequent ordinance authorizing debt in 2016 (Ordinance No. 22216-05-2016). Construction of North Riverside Drive is anticipated to begin in Spring 2017 and end in Spring 2019. The Project is located in COUNCIL DISTRICT 4, Mapsco 35G. This contract will be with a governmental entity, state agency or public institution of higher education: Keller Independent School District and the Texas Department of Transportation. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the 2014 Bond Program and the Developer Contribution Fund. Description Existing Appropriations Proposed Appropriations Per M&C Appropriations 2014 Bond Program $11,610,000.00 $ 0.00 $11,610,000.00 34014 Developer Contribution $ 0.00 $405,776.00 $ 405,776.00 Fund 30104 Stormwater Capital Project- $ 1,075,000.00 $ 0.00 $ 1,075,000.00 Bonds Fund 59651 TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year (Chartfield 2) FROM Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year (Chartfield 2 Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Douglas Wiersig (7801) http://apps.cfwnet.org/council_packet/mc_review.asp?ID=22916&councilda... 11/4/2016 M&C Review Page 3 of 3 Additional Information Contact: Mike Weiss (8485) ATTACHMENTS 20N RIVERSIDE-KISD ILA AMENDMENT 1 - 02272R.docx KISD ILA MAP.pdf RESOLUTION THOMPSON ROAD CONSTRUCTION(10. 13.16).doc http://apps.cfwnet.org/council_packet/mc_review.asp?ID=22916&councilda... 11/4/2016 A Resolution NO. A RESOLUTION AUTHORIZING THE EXECUTION OF AN ADVANCE FUNDING AGREEMENT WITH THE TEXAS DEPARTMENT OF TRANSPORTATION IN AN AMOUNT OF $77,966, WITH CITY PARTICIPATION IN AN AMOUNT UP TO $70,000, FOR CONSTRUCTION OF A NORTHBOUND INTERSTATE HIGHWAY 35W FRONTAGE ROAD RIGHT-TURN DECELERATION LANE TO THE FUTURE THOMPSON ROAD WHEREAS, the City of Fort Worth and Keller Independent School District identified the need to construct a Northbound Interstate Highway 3 5 W frontage road right-turn deceleration lane to the future Thompson Road; and WHEREAS, the Keller Independent School District will provide up to $70,000 to the City of Fort Worth for the construction of a Northbound Interstate Highway 35W frontage road right-turn deceleration lane to the future Thompson Road; and WHEREAS, the City of Fort Worth intends to enter into an Advance Funding Agreement with the Texas Department of Transportation in the amount of$77,966, with City participation in the amount of $70,000, plus any cost overruns, for the construction of a Northbound Interstate Highway 35W frontage road right-turn deceleration lane to future Thompson Road; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH THAT: The City Manager is hereby authorized to execute an Advance Funding Agreement with the Texas Department of Transportation in the amount of$77,966, with City participation in the amount up to $70,000, plus any cost overruns, for construction of a Northbound Interstate Highway 35W frontage road right-turn deceleration lane to the future Thompson Road. Adopted this day of----------------- 2016. ATTEST: By: --------------------------------- Mary Kayser, City Secretary ���FftTWORTH Ordinance No. AN ORDINANCE INCREASING THE ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE AMOUNT OF $405,776.00, IN THE DEVELOPER CONTRIBUTION FUND, FOR THE PURPOSE OF CONSTRUCTING THE FUTURE THOMPSON ROAD INTERSECTION AT THE NORTH RIVERSIDE DRIVE AND A DECELERATION LANE FROM THE NORTHBOUND FRONTAGE ROAD OF INTERSTATE HIGHWAY 35W; PROVIDING FOR A SEVERABILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH; AND PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS: SECTION 1. That in addition to those amounts allocated to the various City departments for Fiscal Year 2016-2017 in the Budget of the City Manager, there shall also be increased estimated receipts and appropriations in the amount of $405,776.00, in the Developer Contribution Fund, for the purpose of constructing the future Thompson road intersection at the North Riverside drive and a deceleration lane from the northbound frontage road of Interstate highway 35W. SECTION 2. That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall be and remain in full force and effect. SECTION 3. That this ordinance shall be cumulative of Ordinance 22394-09-2016 and all other ordinances and appropriations amending the same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed. SECTION 4. This ordinance shall take effect upon adoption. APPROVED AS TO FORM AND LEGALITY: CITY SECRETARY Douglas W Black Mary J. Kayser Sr. Assistant City Attorney ADOPTED AND EFFECTIVE: MAYOR AND COUNCIL COMMUNICATION MAP 20N RIVERSIDE - KISD ILA AMENDMENT 1 - 02272 ' 0 it 1.1 Miles r l r � Q • I HARMUN RD PKWY • !?tjML1Ef2f IELDS BLVD f` ➢ W 16 • ,z � Z Wi.:t0D LVCs d. P t,SSIL TRLE LN r_ 1-:H BLOSSOM RD ACOMA TRL L ti 1Y BRO41 111 r OG tx W x Proposed Thompson Road L ° �+ a ° a > a, t W °c Z Still N 2i x w FORT WORTHa, CITY PROJECT#02272 This product is for informational purposes and may not have been prepared for or be suitable for legal,engineering,or surveying pwposes.The City of Fort Worth assumes no responsibility for the accuracy of said data.