Loading...
HomeMy WebLinkAboutContract 46848-FP3 Department #TP &W Const. Services CPN# ' D to Project Manager!BrotheFton l'l � Risk ManagemenRTWORTH ��' SECRETARLYD.O.E. �1— CFA Westerman/ScannedNO "°ONTCT ° Esteban Perez/Scanned - The Proceeding people have been Contacted concerning the request for final payment& have CATION AND PUBLIC WORKS released this project for such payment. >F PROJECT COMPLETION Developer Projects) ��E -7 3�7 Clearance Conducted By %amze gr It �Cf City Project Ns: 02516 Regarding contract 217397 for PINE MEADOWS PHASE I as required by the TRANSPORTATION & PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. lop Original Contract Price: $70,707.80 Amount of Approved Change Orders: Ne Revised Contract Amount: Total Cost Work Completed: $70,707.80 I 1/ /G Recomme de for Acceptance Date Asst. Dire or TPW - Infrastructure Design and Construction Acceptedo Date i� Director, TRANSPORTATI & PUBLIC WORI<S Asst. City Manager Date i Comments: OFFICIAL RECORD NOV P9 2016 CITY SECRE1'�RY Initial; FT.WORTH,TX I Rev.9/22/16 I FORT NORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name PINE MEADOWS PHASE I Contract Limits Project Type ST LIGHT City Project Numbers 02516 DOE Number 7397 Estimate Number 1 Payment Number I For Period Ending 7/11/2016 WD City Secretary Contract Number 217397 Contract Time 3WD Contract Date Days Charged to Date 30 Project Manager Buckley Contract is 100.00 Complete Contractor C R S UTILITY CONTRACTORS,INC. 6705 HIGHWAY 287 ARLINGTON, TX 76001 Inspectors LAYER / VEGA Thursday,October 20,2016 Page 1 of 4 City Project Numbers 02516 DOE Number 7397 Contract Name PINE MEADOWS PHASE I Estimate Number 1 Contract Limits Payment Number 1 Project Type ST LIGHT For Period Ending 7/11/2016 Project Funding STREET LIGHTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total ------------- -------------- ------------- - 1 -------- --- -------------- -- ----- 1 FURNISH/INSTALL GROUND BOX 16 EA $555.00 $8,880.00 16 $8,880.00 2 RDWY ILLUM ASSEMBLY 16 EA $2,300.00 $36,800.00 16 $36,800.00 3 FURNISH/INSTALLRDWYILLUMFOUNDATION 16 EA $1,050.00 $16,800.00 16 $16,800.00 4 2"CONDUIT PVC SCH 80 653 LF $9.85 $6,432.05 653 $6,432.05 5 6-6-6 TRIPLEX ALUM ELECTRIC CONDUCTOR653 CL $2.75 $1,795.75 —— 653 $1,795.75 ——— —— — Sub-Total of Previous Unit $70,707.80 $70,707.80 --------------------------------------- Thursday, ------------Thursday,October 20,2016 Page 2 of G t C i F City Project Numbers 02516 DOE Number 7397 Contract Name PINE MEADOWS PHASE I Estimate Number I Contract Limits Payment Number I Project Type ST LIGHT For Period Ending 7/11/2016 Project Funding Contract Information Summa► Original ContractAmount $70,707.80 Change Orders Total Contract Price $70,707.80 C/L ✓-�' Date �� Total Cost of Work Completed $70,707.80 Contract Less %Retained $0.00 7 l� Date�d J��1�, Net Earned $70,707.80 Inspc do S pe iso Earned This Period $70,707.80 Retainage This Period $0.00 Date f Less Liquidated Damages Project a er Days a /Day $0.00 Date �'� LessPavement Deficiency $0.00 s. 'rect r P,,W11-Infrastructure Design and Construction Less Penalty $0.00 I•! C—) Date Less Previous Payment $0.00 Director/ ontracting Departure Plus Material on Hand Less 15% $0.00 Balance Due This Payment $70,707.80 Thursday,October 20,2016 Page 3 of 4 City Project Numbers 02516 DOE Number 7397 Contract Name PINE MEADOWS PHASE I Estimate Number I Contract Limits Payment Number I Project Type ST LIGHT For Period Ending 7/1112016 Project Funding Project Manager Buckley City Secretary Contract Number 217397 Inspectors LAYER / VEGA Contract Date Contractor C&S UTILITY CONTRACTORS,INC. Contract Time 30 WD 6705 HIGHWAY 287 Days Charged to Date 30 WD ARLINGTON, TX 76001 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES r Line Fund Account Center Amount Gross Retainage Net ----- Funded ----- i I f - - 1 Total Cost of Work Completed $70,707.80 Less %Retained $0.00 Net Earned $70,707.80 Earned This Period $70,707.80 i Retainage This Period $0.00 Less Liquidated Damages f j 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 r Plus Material on Hand Less 15% $0.00 Balance Due This Payment $70,707.80 i E r Thursday,October 20,2016 Page 4 of 4 r FORTWORTH rev 03/05/07 TRANSPORTATION & PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:1 NAME OF PROJECT: Pine Meadows Phase 1 PROJECT NO.: 02516 CONTRACTOR: C&S Utility Contractors DOE NO.: PERIOD FROM: TO: FINAL INSPECTION DATE: 11-Jun-16 WORK ORDER EFFECTIVE: CONTRACT TIME: 30 W93 CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED]NG CREDITED 1 1, 16. 2. 17. 3. 18. 4, 19. I 5. 20. 6. 21. 7. 22. 8, 23. 9. 24. 10. 25. i 11. 26. 12. 27. 13. 28. i i 14. 29. 15. 30. i 31. SAT SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS THIS 30 PERIOD PREVIOUS 30 PERIOD TOTALS 30 TO DATE *REMARKS: �— i CONTRACTOR DATE— SPECTOR DATE ENGINEERING DEPARThl ENT g The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,Thi 76012-6311 d (817)392-7941 •Fax:(817)392-7845 FORTWORTHREV:8/20/16 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR I) CONTRACTOR&PROJECT DATA Nance of Contractor Project Nmne C&S Utility Contractors,Inc. Pine Meadows Phase 1 Inspector Cily Project Nnmber Mike Glover 2516 CcvutrucJrou Conponems Project ilanager ❑ Water❑ Waste Water❑✓ Storm Drainage[] Pavement Patrick Buckley Initial Contract,lniount Project Difficulo, $70,707.80 0 Simple OQ Routine 0 Complex Final Contract Amount Date $70,707.80 10/20/2016 D)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 3 20 15 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 3 60 45 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 3 60 45 7 Job Site Safety 15 Y 3 60 45 8 Traffic Control Maintenance 15 Y 3 60 45 9 Daily Clean Up 5 Y 4 20 20 10 Citizen's Complaint Resolution 5 Y 3 20 15 11 Property Restoration 5 Y 3 20 15 12 After Hours Response 5 Y 3 20 15 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 368 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 368 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating([TS/MSJ *100%) 368 / 448 = 82% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Inspector Signature ` 0_ Contractor Signature Inspector's Supervisor Signature ` CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth•8851 Camp Bowie West Blvd. •Fort Worth,T176116• (817)392-8306 SURETEC INSURANCE COMPANY 9737 Great Hills Trail, Suite 320, Austin, Tx 78759 OWNER ❑ CONSENT OF SURETY CONTIRAC OR TO FINAL PAYMENT SURETY OTHER ❑ BOND NO.: 4408400 TO OBLIGEE: (Name and Address) CONTRACT FOR: City of Ft Worth Pine Meadows,Phase I 1000 Throckmorton City Project#02516(Street Lights) Ft Worth,TX 76102 PROJECT: CONTRACT DATED: (Name and Address) 7-14-15 Pine Meadows, Phase I PRINCIPAL: C&S Utility Contractors,Inc. At the request of the Obligee and the Principal indicated above,(Insert name and address ofSnreq) SureTec Insurance Company, 9737 Great Hills Trail, Suite 320,Austin,Tx 78759 ,SURETY, on bond of (InsertnameandaddressofConn•acto)) C&S Utility Contractors,Inc. 6705 Hwy 287,Arlington,TX 76001 ,CONTRACTOR, and conditioned on the representation by Obligee that all Contract provisions relating to the payment of final payment under the Contract have been satisfied by Principal as of the date of final payment,and that no claims by Obligee or any third party are known or believed by Obligee or its representatives to exist as of the date of final payment,representations as to the truth and accuracy of the foregoing conditions being deemed to have been made by Obligee in connection with this request for Consent of Surety,hereby approves of the final payment to the Principal,and agrees that final payment in accordance with the terms hereof shall not relieve the Surety of its obligations to (Insert name and address of Obligee) City of Ft Worth, 1000 Throckmorton, Ft Worth,TX 76102 ,OBLIGEE, as set forth in said Surety's bond. IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: 10/26/16 (Insert in writing the month followed by the numeric date and year.) Su eT Insurance Co any (Sit•ety (Signattt• of aitthot•ized represent /lve) Rebecca D. Rockett Attest: ,Attorney-in-Fact (Seal): (Printed name and title) SURETEC CONSENT TO FINAL PAYMENT REV. 1.1.2004 SureTec Insurance Company 1330 Post Oak Boulevard, Suite 1100 Houston, TX 77056 713-812-0800 TEXAS STATUTORY PAYMENT BOND (Public Works) Bond No.:4408400 KNOW ALL MEN BY THESE PRESENTS: THAT, C & S Utility Contractors, Inc. (hereinafter called the Principal), as principal, and SureTec Insurance Company, a corporation organized and existing under the laws of the State of Texas, licensed to do business in the State of Texas and admitted to write bonds, as surety, (hereinafter called the Surety), are held and firmly bound unto The City of Ft Worth (hereinafter called the Obligee), in the amount of Seventy Thousand Seven Hundred Seven and Eighty Cents Dollars ( $70,707.80 )for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors, and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a certain contract with the Obligee, dated the 26th day of October , 2016 for Pine Meadows,Phase I, City Project#02516, which contract is hereinafter referred to as the "Contract." NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall pay all claimants supplying labor and material to him or a subcontractor in the prosecution of the work provided for in said Contract, then, this obligation shall be null and void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253 of the Texas Government Code and all liabilities on this bond shall be determined in accordance with the provision, conditions and limitations of said Chapter to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this 26th day of October, 2016. Principal: C & S UTILITY CONTRACTORS Inc. Surety: ' reTec Insur ce om an By: Rebec a Rockett, Attorn y-in-Fact The Rider Attached Hereto Is Incorporated in this Bond and Contains Important Coverage Information Rev. 1-1-06 SureTec Insurance Company 1330 Post Oak Boulevard, Suite 1100 Houston, TX 77056 713-812-0800 TEXAS STATUTORY PERFORMANCE BOND Bond No.:4408400 KNOW ALL MEN BY THESE PRESENTS: THAT, C & S Utility Contractors, Inc. (hereinafter called the Principal, and SureTec Insurance Company, a corporation organized and existing under the laws of the State of Texas, licensed to do business in the State of Texas and admitted to write bonds, as surety, (hereinafter called the Surety), are held and firmly bound unto The City of Ft Worth (hereinafter called the Obligee), in the amount of Sevent Thousand Seven Hundred Seven and Eighty Cents Dollars ( $70,707.80 ) for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors, and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a certain contract with the Obligee, dated the 26th day of October , 2016 for Pine Meadows,Phase I, City Prosect#02516, which contract is hereinafter referred to as the "Contract." NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform the work required by the Contract then this obligation shall be null and void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253 of the Texas Government Code and all liabilities on this bond shall be determined in accordance with the provision, conditions and limitations of said Chapter to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this 26th day of October, 2016. Principal: C & S UTILITY CONTRACTORS Inc. By: , w,w-ca�� 1 � Surety: SureTec Ins Y a Co ny By: Reb ca D. Rockett, Attorne -in- The Rider Attached Hereto Is Incorporated in this Bond and Contains Important Coverage Information Rev. 1-1-06 POA#: 4221716 SureTec Insurance Company LIMITED POWER OF ATTORNEY Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents make,constitute and appoint Christian Merritt, Rebecca Rockett its true and lawful Attorney-in-fact,with full power and authority hereby conferred in its name,place and stead,to execute, acknowledge and deliver any and all bonds,recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the conditions of contracts and consents of surety for: One Million and 00/100 Dollars($1,000,000.00) and to bind the Company thereby as fully and to the same extent as if such bond were signed by the President,sealed with the corporate seal of the Company and.duly attested by its Secretary,hereby ratifying and confirming all that the said Attorney-in-Fact may do in the premises. Said appointment shall continue in force until 12/31/2016 and is made under and by authority of the following resolutions of the Board of Directors of the SureTec Insurance Company: Be it Resolved,that the President, any Vice-President, any Assistant Vice-President, any Secretary or any Assistant Secretary shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: Attorney-in-Fact may be given full power and authority for and in the name of and of behalf of the Company, to execute, acknowledge and deliver,any and all bonds,recognizances,contracts,agreements or indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attorney-In-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary. Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 201'of April, 1999) In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its President,and its corporate seal to be hereto affixed this 3rd day of February,A.D. 2015 SURETEC INSURANCE COMPANY NANC w( w yg John VOXT resident State of Texas ss: 7 f y% t County of Harris YY�YY MN��" On this 3rd day of February,A.D. 2015 before me personally came John Knox Jr.,to me known,who,being by me duly sworn,did depose and say,that he resides in Houston, Texas, that he is President of SURETEC INSURANCE COMPANY, the company described in and -which executed the above instrument;that he knows the seal of said Company;that the seal affixed to said instrument is such corporate seal;that it was so affixed by order of the Board of Directors of said Company;and that he signed his name thereto by like order. E QUELYN MALDONADO Notary Public state of Texas Comm.Exp.5/18/2017 Jacq elyn Maldonado,Notary Public My commission expires May 18,2017 I,M.Brent Beaty,Assistant Secretary of SURETEC INSURANCE COMPANY,do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney,executed by said Company,which is still in full force and effect;and furthermore,the resolutions of the Board of Directors,set out in the Power of Attorney are in full force and effect. (,� Given under my hand and the seal of said Company at Houston,Texas this&(,-- of D recre ��, A.D. ZR .Bre t Beaty,Assistary Any Instrument issued in excess of the penalty stated above Is totally void and without any validity. For verification of the authority of this power you may call(713)812-0800 any business day between 8:00 am and 5:00 pm CST. SureTec Insurance Company THIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION Statutory Complaint Notice/Filing of Claims To obtain information or make a complaint: You may call the Surety's toll free telephone number for information or to make a complaint or file a claim at: 1-866-732-0099. You may also write to the Surety at: SureTec Insurance Company 9737 Great Hills Trail, Suite 320 Austin, Tx 78759 You may contact the Texas Department of Insurance to obtain information on companies, coverage, rights or complaints at 1-800-252-3439. You may write the Texas Department of Insurance at: PO Box 149104 Austin, TX 78714-9104 Fax#: 512-490-1007 Web: http://www.tdi.state.tx.us Email: ConsumerProtection@tdi.texas.gov PREMIUM OR CLAIMS DISPUTES: Should you have a dispute concerning your premium or about a claim, you should contact the Surety first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ------------------------------------------------------------------------------------------------------------------------------ I i I i I k f I t i Texas Rider 06042015 i E AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Dyana Saylors, Vice President Of C&S Utility Contractors, Inc.,known to me to be a credible person, who being by me duly sworn,upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or I property damages; i On Contract described as; 1 Pine Meadows - Street Lights a BY : F Dyana Saylors, Vice President Subscribed and sworn before me on this date 31 of October, 2016. �i G uu Notary Public uau LUCM Tarrant County, Texas * STATE OF TZK s Myr comm ���pp�011"Am r-; IDO W lvvvvvvvvvvv k n iy C&S Utility Contractors, Inc. 6705 Highway 287 Arlington,Texas 76001 (817) 829-9623 10/26/2016 City of Fort Worth CFA Administration 1000 Throckmorton St. Font Worth, TX 76102 RE: Pine Meadows DOE#: 7397 City Project# 02516 The purpose of this letter is to acknowledge that C&S Utility Contractors, Inc. has been paid in full by Pine Meadows Development Company,LLC for the public improvements constructed to serve Pine Meadows in Fort Worth, Texas. As a result,we hereby waive,release and relinquish all rights to assert any claim or demand for lien in connection with this project. i Please feel free to contact me with any questions you may have. j Sincerely, I Dyana Saylors Vice President E� f f f t ti 1 , t S FORTWORTHREV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY 1)PROJECT INFORMATION Date: 10/20/2016 Naive ofConlractor Project Nance C&S Utility Contractors,Inc. Pine Meadows Phase 1 DOE Inspector Project jifanager Alex Vega Patrick Buckley DOE Number Ptojecl D cull), Tjpe of Contmei 7397 O Simple QQ Routine Q Complex ❑ Water❑ WasteWater[] Storm DrainageE] Pavement Initial Contract Amount Final Contract Amount $70,707.80 $70,707.80 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS 1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities 3 13 Applicability of Specifications 4 Display Of Professionalism 3 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution 3 PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution 3 ADMINISTRATION 2 Availability of Project Manager 3 1 Change Order Processing Time 31 3 Communication 3 2 Timliness of Contractor Payments 3 4 Resolution of Utility Conflicts 3 3 Bid Opening to Pre-Con Meeting Timeframe 3 1II)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector .! D. Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TY 76012-6311 (817)392-7941 •Fax:(817)392-7845