HomeMy WebLinkAboutContract 48406 CITY SEC4Et'ARY
"ONTRACT ao. y0
Developer and Project Information Cover Sheet:
Developer Company Name: Victory at Heritage , LLC
Address, State,Zip Code: 8001 LBJ Freeway, Ste 400, Dallas, TX 75251
Phone &Email: 972-707-9555,tony@vg-re.com
Authorized Signatory,Title: Tony Ramji
Project Name and Brief Victory at Heritage
Description:
Project Location: Victory at Heritage
Plat Case Number: FP-16-058 Plat Name: Victory at Heritage
Mapsco: Council District: 7 City Project Number: 100485
CFA Number: 2016-095 DOE Number: None
To be completed bTaff
Received by: / ` � Date: 1
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement CITY SECRETAR11
CFA Official Release Date: 10.07.2015
Page 1 of 11 h T . WORTMTX
• a
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, Victory at Heritage, LLC , ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements") related
to a project generally described as Victory at Heritage ("Project") within the City or the
extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of
City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply
with all provisions of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 2 of 11
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by
Developer for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City-approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) FA, Sewer (A-1) FX, Paving (B) ®, Storm Drain (B-1) FX,, Street Lights &
Signs (C) ❑;.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section 11, paragraph 7 of the Policy and the contracts shall be
administered in conformance with paragraph 8, Section 11, of the Policy. Developer shall
ensure its contractor(s) pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the infrastructure for
a period of two (2) years from the date of final acceptance insuring the
maintenance and repair of the constructed infrastructure during the term of the
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 3 of 11
maintenance bond. All bonds to be furnished before work is commenced and to
meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the amounts
required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City shall be
named as additional insured on all insurance required by said documents and
same will be evidenced on the Certificate of Insurance (ACORD or other state-
approved form) supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to
be subject to inspection at any and all times by City inspection forces, to not
install or relocate any sanitary sewer, storm drain, or water pipe unless a
responsible City inspector is present and gives his consent to proceed, and to
make such laboratory tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 4 of 11
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or asserted, brought
for or on account of any injuries or damages sustained by any persons (including
death) or to any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by said Developer,
its contractors, subcontractors, officers, agents or employees, or in consequence of
any failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, b_y the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure
contemplated herein, whether or not such injuries, death or damages are caused, in
whole or in part, b_y the alleged negligence of the City of Fort Worth, its officers,
servants, or employees. Further, Developer will require its contractors to indemnify,
and hold harmless the City for any losses, damages, costs or expenses suffered by the
City or caused as a result of said contractor's failure to complete the work and
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 5 of 11
construct the improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce such
contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional
year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 6 of 11
the end of two (2) years from the date of this Agreement (and any extension
period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 7 of 11
Cost Summary Sheet
Project Name: Victory at Heritage
CFA No.: 2016-095 DOE No.: 100485
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 244,130.28
2.Sewer Construction $ 144,488.00
Water and Sewer Construction Total $ 388,618.28
B. TPW Construction
1. Street $ 76,265.55
2.Storm Drain $ 409,126.25
3.Street Lights Installed by Developer $ -
4. Signals $
TPW Construction Cost Total $ 485,391.80
Total Construction Cost(excluding the fees): $ 874,010.08
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 7,772.37
D. Water/Sewer Material Testing Fee(2%) $ 7,772.37
Sub-Total for Water Construction Fees $ 15,544.73
E. TPW Inspection Fee (4%) $ 19,415.67
F. TPW Material Testing (2%) $ 9,707.84
G. Street Light Inspsection Cost $ -
H. Signals Inspection Cost $
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 29,123.51
Total Construction Fees: $ 44,668.24
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond= 100% $ 874,010.08
Completion Agreement= 100%/Holds Plat $ 874,010.08 x
Cash Escrow Water/Sanitary Sewer= 125% $ 485,772.85
Cash Escrow Paving/Storm Drain= 125% $ 606,739.75
Letter of Credit= 125%w/2yr expiration period $ 1,092,512.60
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVEjH
Victory L C
Jesus J. Chapa
Assistant City Manager Name: i
Title:
Date: � —
Date: k t
Recommended by:
ATTEST: (Only if required by Developer)
Wendy ChidBabulal, EMBA, P.E. -
Development Engineering Manager Signature
Water Department Name:
a/� &J.
Dougl W. Wiersig, P.E.
Director
Transportation&Public Works Department
C F0
Approved as to Form &Legality: ATTEST:
P
0 0�
p o
O°gyp ®o��� -
Richard A. McCracken ManTy •
Assistant City Attorney City Secretary Y
M&C No. 41A
Date: It I Icel14
fi�M� 12.�5 : .v/lam
OFFICIAL RECORD I
City of Fort Worth,Texas
Standard Community Facilities Agreement CITY SECRETARY
CFA Official Release Date: 10.07.2015 F'I.WORTH,TX
Page 9 of 11
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
Attachment 1 - Changes to Standard Community Facilities Agreement
Location Map
Exhibit A: Water Improvments
❑X Water Cost Estimate
DX' Exhibit A-1: Sewer Improvements
FA Sewer Cost Estimate
FX Exhibit B: Paving Improvements
Paving Cost Estimate
FX Exhibit 13-1: Storm Drain Improvements
0 Storm Drain Cost Estimate
El Exhibit C: Street Lights and Signs Improvements
❑' Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 10 of 11
ATTACHMENT "I"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 100485
None
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 11 of 11
GOLDEN TRIANGLE BLVD
W HICKS RD
SITE
HERITAGE
0
TRACE PKWY
z
O
Q
I-
= w
o �
o U)
o _
Z)
0 w
287 o
5 z m
w w =
0
m -1 0
O z
INTERSTATE N TARRANT PKWY
HARMON RD 35
E BAILEY N
BOSWELL RD
NOT TO SCALE
OWNER/ DEVELOPER:
VICTORY AT HERITAGE, LLC VICTORY AT
P E LOTOSOLUTIONS DALLAS, TEXAS 7 400
5251
LAND HERITAGE
I�I�I
5751 KROGER DR,STE.,85 1 KELLER,7%]6244181]-562-nSO PHONE: 972-707-955.
I
I
N
EX 12"WL
_x .x __ -x -- -x _- w
BALD MOUNTAIN ROAD
12 W-1
---. f BLOCK I_ BLOCK,
L
LOT-9
—A I
WW
m , I Wti
--{ � � >� BLOCK
LOT 7s
N
-� BLOCKI.,
� � I
.�
LOT 10 Z Z
BLOCKLOT 6
BLOCK?
LOT 5 1 /
I.
BLOCK,
� LOT 4
BLOCK-1."
LEGEND LOT, C" / BLOCK /
PROPOSED WATERLINE
WITH GATE VALVE
PROPOSED WATER LINE
WITH FIRE HYDRANT
PROPOSED WATER LINE
WITH METER BOX
EXISTING WATER LINE / $"W-1 B
WITH GATE VALVE ——�—
i 1
o I X11
EXISTING WATER LINE _ _ Q x
I I
Q f
BLOCK 1
SLOT 2 �
I
i
i
i
I
8 W-1A
I
0
wxW _ _ _ - -� -
_ - - EX 24"WL
- --- --
HERITAGE-TRACE PARKWAY
EXHIBIT A - WATER
OWNER/ DEVELOPER:
VICTORY AT HERITAGE LLC VICTORY AT
I II P E LOTO N 8001 LBJ FREEWAY STE 400 ^ 0 100 200
LAND SOLUTIONS DALLAS, TEXAS 75251 HERITAGE --
1711 IR-11 OR,6TE,1851 KELLER,TX]6204 181 J-562-3350 PHONE: 972707-955. GRAPHIC SCALE IN FEET
BALD MOUNTAIN ROAD
-
.f-8"SS-1 i
BLOCKILOT 9 �'� �-BLOCK 1�
LOT 8 ,
h
M
r
�� Q
NN �\
ch LOT BLOCK i.-1 I ��
�\ �1 11 BLOCKI DO I �W
\ 13LOCK
'
N\ / I l LOT 6 I
BLOCKI
[_BLOCK
LOT 5_.-1
U
BLOCK I
/( $„SS LOT 4
l
BLOCK I
LOT 1-- I� / BLOCK t
I '
L LOT
„/ 1 f 1
LEGEND
PROPOSED SEWER LINE
AND MANHOLE
EXISTING SEWER LINE
jAND MANHOLEL
CJ BLOCK 1
X (' LOCK
2
� i
U � c i
I
i
I
- _ HERITAGE TRACE PARKWAY
EXHIBIT B — WASTEWATER
OWNER/DEVELOPER:
VICTORY AT HERITAGE LLC VICTORY AT
P E LOTO N 8001 LBJ FREEWAY STE 400 0 too zoo
LAND SOLUTIONS DALLAS, TEXAS 75251 HERITAGE
5751 KROGER DR,STE,1851 KELLER,TX]6244181]-562-3350
PHONE: 972-707-955. GRAPHIC SCALE IN FEET
BALD MOUNTAIN ROAD
BLOCK 1
rBLOCK i! LOT 8
LOT 9� i I
-` C) I BLOCK �
_ LOT 7 I il-1[Y
31
BLOCK
� I (_LOT 10_
Z2
BLOCK t
N LOT 6
� l
BLOCK J
J/ , L LOT 4
_ CBLO1 j
LOTCK 1 % \•� .\/
,- LEGEND
8"CONCRETE PAVEMENT
WITH R4 AT 14'O.C.EW.
I i
4"CONCRETE SIDEWALK •-'
I
LOCK 1
BLOT 2 -�
I (I
,
lu
I �
j
/
I
._ - -
HERITAGE TRACE PARKWAY
EXHIBIT C - PAVING
OWNER/ DEVELOPER:
VICTORY AT HERITAGE, LLC VICTORY AT
P E LOTO N 8001 LBJ FREEWAY STE 400 0 100 200
i LAND SOLUTIONS DALLAS, TEXAS 75251 HERITAGE
1711 11-El MITI 1851 KELtER.TX]6244 I6f]-562-3350
PHONE: 972-707-955_ GRAPHIC SCALE IN FEET
BALD MOUNTAIN ROAD
I OCK I BLOCK
LB LOT 9 L LOT 8__I
-A
Q�
W ti
-A 0 BLOCK 7
LOT _ Z�
p - �.2
ti
BLOCK t
LOT 6
LOT 5�BLOCK1�
n
BLOCK 1�
�LOT4
,_.J
BLOCK I��(
-� LOTt
3
Q
LEGEND °
PRO POSED STORM
DRAIN INLET -
o
EXISTING STORM �I _
DRAIN INLET
PROPOSEDSTORM '
BLOCK 1
DRAIN MANHOLE � I LOT 2
1
EXISTING STORM
DRAIN MANHOLE -
'., r
EXISTINGSTORM
DRAIN HEADWALL f \
I
—
HERITAGE—TRACE PARKWAY
EXHIBIT D - STORM DRAINAGE
OWNER/ DEVELOPER: O
VICTORY AT HERITAGE, LLC VICTORY AT
P E LOTO N
•• 8001 LBJ FREEWAY, STE 400 0 too Zoo
LAND SOLUTIONS DALLAS, TEXAS 75251 HERITAGE
5751 KROGER DR.STE.1851 KELLER.T%)6244 16-562-3350
PHONE: 972-707-955. GRAPHIC SCALE IN FEET
00 42 43
DAP-BID PROPOSAL
Page 1 of 2
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
UNIT I:WATER IMPROVEMENTS
1 0241.1015 Remove 12"Water Line 0241 14 LF 446 $11.75 $5,240.50
2 0241 1218 4Water Abandonment Plug 0241 14 EA 2 $525.00_ $1,050.00
3 3305.0005 12 Waterline Lowering 33 05 12 EA 1, , $4080.00
4 3311.00414"Water Pipe 3311 10 LF 26 $20.50 $533.00
-._._.._. ._ Pipe_ r.. 33 11 10 LF __ 211 $20_50 $4 325,50
P
5 _ 3311.0141Water __ _ _
6 3311 0241 8"Water
Pipe 331010 LF�_ 202 $28.50 $5,757.00
7 3311.0441 12"Water Pipe 3311 10 LF 2040 $34.50 $70,380.00
8 3312 0001 Fire Hydrant 33 12 40 EA 6 $3,275.00 $19,650.00
Connection Existing 4,-12"Water Main 33 12 25 EA 2 $1,200.00 $2400.00,
9 r 3312.0117 Cnecn toisti
_. _. ._.� .._ . �. __ _.
10 3312.2203 2"Water Service 33 12 10 EA 19 $1,877.63 $35,675.00
11 3312 3002 6"Gate Valve __33-12-20- EA 13 $,1,075.00 $131975,00
12 3312 3003 8 Gate Valve _ 33 12 20 EA 2 $1,500. _ $3 000.00
13 3312.3005 12"Gate Valve 33 12 20 EA 17 $2,335.00 $39,695.00
14 3311 0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 5.8 $6,551. 28 $37,997.44
15 3305.0109 Trench Safety 330510 LF 2479 $0.15 $371.85
TOTAL UNIT 1:WATER IMPROVEMENTS $244,130.28
UNIT It:SANITARY SEWER IMPROVEMENTS
1 0241.1000 Remove Cone.Pvmt. 0241 14 SY 12 $30.00 $360.00
3 3201.0614 Conc Pvmt Repair Residential 32 01 29 SY 12 $140,00 , ,$1,680,00
_ _
5 3331 3201 6 Sewer Service 3311 10 LF 238 $29.00 $6,902.00
6 3331.4115 8"Sewer Pipe 33 11 10 LF 1766 $31.00 $54,746.00
7 3339.0001 Epoxy Manhole Liner 33 31 70 VF 12 $91.67 $1,100.00
8 3339 1001 4"Manhole 33 39 10 EA 11 $4,400,00 _ $48,400.00,
9 3301.0101 Manhole Vacumm Testing 3301 30 EA 11 $100.00 $1,100.00
10 3305 0113 Trench Water Stop 33 05 15 EA 1.1 $250.00 _ $2,750.00
33__�,_ _ _... , _.. _... _--..330510w . $80.00 $2,880.00_
11 3305.0202 EmbedmentlBackfill,CSS
CY 36
12 05.0116 Concrete Encasement for Utility Pipes 33 05 10 CY 175 $63.77 $11,160.00
13 3305.0109 Trench Safety 33 05 10 LF 2004 $0.50_. ,_.,$1,002.00
14 3301 0002 Post CCN Inspection 3301 31 LF 2004 ,__ _ $2.00 _ _ $4,008.00
15 3471.0001 Traffic Control 3471 13 MO 1 $6,000.00 _ $6,000.00
16 9999.0001 Connect to Existing 4'Manhole EA 1 $2 400.00 $2,400.00
TOTAL UNIT It:SANITARY SEWER IMPROVEMENTS $144,488.00
UNIT III:DRAINAGE IMPROVEMENTS
1 0241 3015 Remove 24 Storm Line 0241 14 LF 30 _ $50,00 $1,500.00
m
2 0241.3017 Reove 30"Storm Line 02 4--1--1-4-- LF 96 $50.00 _ $4,800.00
3 0241 3019 Remove 36 Storm Line 0241 14 LF 21 ,,__$50.00 , $,1,050.00
4 0241.3106 30' Storm Abandonment Plug 02 41 14 EA 2
5 0241.3108 36"Storm Abandonment Plug 02 41 14 EA 2 $500.00 $1,000.00
6 0241.3401 Remove 4 Storm Junction Box 0241 14 EA 3_ $800.00 , $2,400.00
7 024 move 10'Recessed Inlet 02 41 1_4 EA 1 ,,, $4 5 75.00 _ $4,575.00
1.4101 Rem _ ._
8 0241.4202 Remove 5'Drop Inlet 0241 14 EA 1 $750.00 $750.00
9 0241.4401 Remove Headwall/SET 0241 14 EA 1 $750.00 $750.00
10 0241.0800 Remove Rip Rap 0241 14 SF 90_ _ $3.33 _,, $300.00
91 0241.1000 Remove Conc.PV`mt. 0241 14 SY 20 $30.00 $600.00
12 3341.0201 21"RCP Class III 3441 10 LF 59 $50.00 $2,950.00
13 3341.0205 24"RCP,Class III 3441 10 LF 72 $80.00 $5,760.00
14 3341.0206 24 RCP,Class IV 34 41 10 LF 75 _$80.00 _ $6,000.00
15 3341.0402 42_'RCP,Class III 3441 10 LF 78 $180.00 _'__$14,040.00
16 3341.0403 42"RCP Class IV 34 41 10 LF 575
CITY OF FORT WORTI4
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43 Bid Proposal DAP
00 42 43
DAP-BID PROPOSAL
Page 2 of 2
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
Description Unit Price Bid Value
No. Section No. Measure Quantity
17 11 3341.0409 48:R6P,Class III 3441 10 LF 801 $250.00 $200,250.00
19 33419.0002,15"Storm Junction Box 33 49 10 EA _ 3 $8,200.00 $24,600.00
20 3349.4113 48"SET,1 Pipe 33,49410 EA 1 $825.25 $825.25
21 3349.5001 10'Curb Inlet 33 49 40 EA 2 $4,050.00 $8,100.00
22 3349.6001 10'Recessed Inlet 334,912.0 EA 2 $4,400.00 $8,800.00
23 3349.7001 4'Drop Inlet 334920 EA 2 $4,100.00 $8,200.00
24 3305.0112 Cone.Collar 33 05 17 EA 1 $500.00 $500.00
25 3305.0109 Trench Safety 33,0510 LF 1660 $0.25 $415.00
26 3137.0104 Medium Stone Riprap,dry 31 3700 SY 91 $71.00 $6,461.00
TOTAL UNIT III:DRAINAGE IMPROVEMENTS1 $409,126.25
UNIT IV:PAVING IMPROVEMENTS
1 0241.1300 Remove Conc.Curb&Gutter 0241 14 LF 375 $10.00 $3,750.00
2 3123.0101 Unclassified Excavation 31 23 16 CY 165 $68.94 $11,375.10
3 3211.0211 6"Flexible Base,Type B,GR-1 32 11 23 SY 421_ $27.00 $11,367.00
4 3213.0103 8"Conc.Pvmt. 32 13 13 SY 421 $56.25 $23,681.25
5 3213.03014"Conc.Sidewalk 32 13 20 SF 3320 $4.75 $15,770.00
6 3213.0506 Barrier Free Ramp,Type P-1 321320 EA 2 $650.00 $1,300.00
7 3216.0101 6"Conc.Curb and Gutter 321613 LF 388 $5.00 _ $1,940.00
8 3217.0201 8"SLD Pvmt Marking HAS(W) 32 17 23 LF 65 $15.88 $1,032.20
9 3217.2102 REFL Raised Marker TY 1-C 32 17 23 EA 4 $12.50 $50.00
10 3471.0001 Traffic Control 3471 13 MO 1 $6,000.00 $6,000.00
TOTAL UNIT IV:PAVING IMPROVEMENTS $76,265.55
Bid Summary
UNIT I:WATER IMPROVEMENTS $244,130.28
UNIT It:SANITARY SEWER IMPROVEMENTS $14_4,488.00
UNIT III:DRAINAGE IMPROVEMENTS $409,126.25
UNIT IV:PAVING IMPROVEMENTS $76,265.55
Total Construction Bid $874,010.08
Contractor agrees to complete%VORK for FINAL ACCEPTANCE within 270 calendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION