HomeMy WebLinkAboutContract 48406 CITY SEC4Et'ARY "ONTRACT ao. y0 Developer and Project Information Cover Sheet: Developer Company Name: Victory at Heritage , LLC Address, State,Zip Code: 8001 LBJ Freeway, Ste 400, Dallas, TX 75251 Phone &Email: 972-707-9555,tony@vg-re.com Authorized Signatory,Title: Tony Ramji Project Name and Brief Victory at Heritage Description: Project Location: Victory at Heritage Plat Case Number: FP-16-058 Plat Name: Victory at Heritage Mapsco: Council District: 7 City Project Number: 100485 CFA Number: 2016-095 DOE Number: None To be completed bTaff Received by: / ` � Date: 1 City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement CITY SECRETAR11 CFA Official Release Date: 10.07.2015 Page 1 of 11 h T . WORTMTX • a STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Victory at Heritage, LLC , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Victory at Heritage ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) FA, Sewer (A-1) FX, Paving (B) ®, Storm Drain (B-1) FX,, Street Lights & Signs (C) ❑;. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section 11, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section 11, of the Policy. Developer shall ensure its contractor(s) pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, b_y the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, b_y the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 7 of 11 Cost Summary Sheet Project Name: Victory at Heritage CFA No.: 2016-095 DOE No.: 100485 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 244,130.28 2.Sewer Construction $ 144,488.00 Water and Sewer Construction Total $ 388,618.28 B. TPW Construction 1. Street $ 76,265.55 2.Storm Drain $ 409,126.25 3.Street Lights Installed by Developer $ - 4. Signals $ TPW Construction Cost Total $ 485,391.80 Total Construction Cost(excluding the fees): $ 874,010.08 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 7,772.37 D. Water/Sewer Material Testing Fee(2%) $ 7,772.37 Sub-Total for Water Construction Fees $ 15,544.73 E. TPW Inspection Fee (4%) $ 19,415.67 F. TPW Material Testing (2%) $ 9,707.84 G. Street Light Inspsection Cost $ - H. Signals Inspection Cost $ H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 29,123.51 Total Construction Fees: $ 44,668.24 Choice Financial Guarantee Options,choose one Amount Mark one Bond= 100% $ 874,010.08 Completion Agreement= 100%/Holds Plat $ 874,010.08 x Cash Escrow Water/Sanitary Sewer= 125% $ 485,772.85 Cash Escrow Paving/Storm Drain= 125% $ 606,739.75 Letter of Credit= 125%w/2yr expiration period $ 1,092,512.60 City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVEjH Victory L C Jesus J. Chapa Assistant City Manager Name: i Title: Date: � — Date: k t Recommended by: ATTEST: (Only if required by Developer) Wendy ChidBabulal, EMBA, P.E. - Development Engineering Manager Signature Water Department Name: a/� &J. Dougl W. Wiersig, P.E. Director Transportation&Public Works Department C F0 Approved as to Form &Legality: ATTEST: P 0 0� p o O°gyp ®o��� - Richard A. McCracken ManTy • Assistant City Attorney City Secretary Y M&C No. 41A Date: It I Icel14 fi�M� 12.�5 : .v/lam OFFICIAL RECORD I City of Fort Worth,Texas Standard Community Facilities Agreement CITY SECRETARY CFA Official Release Date: 10.07.2015 F'I.WORTH,TX Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 - Changes to Standard Community Facilities Agreement Location Map Exhibit A: Water Improvments ❑X Water Cost Estimate DX' Exhibit A-1: Sewer Improvements FA Sewer Cost Estimate FX Exhibit B: Paving Improvements Paving Cost Estimate FX Exhibit 13-1: Storm Drain Improvements 0 Storm Drain Cost Estimate El Exhibit C: Street Lights and Signs Improvements ❑' Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 10 of 11 ATTACHMENT "I" Changes to Standard Agreement Community Facilities Agreement City Project No. 100485 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 11 of 11 GOLDEN TRIANGLE BLVD W HICKS RD SITE HERITAGE 0 TRACE PKWY z O Q I- = w o � o U) o _ Z) 0 w 287 o 5 z m w w = 0 m -1 0 O z INTERSTATE N TARRANT PKWY HARMON RD 35 E BAILEY N BOSWELL RD NOT TO SCALE OWNER/ DEVELOPER: VICTORY AT HERITAGE, LLC VICTORY AT P E LOTOSOLUTIONS DALLAS, TEXAS 7 400 5251 LAND HERITAGE I�I�I 5751 KROGER DR,STE.,85 1 KELLER,7%]6244181]-562-nSO PHONE: 972-707-955. I I N EX 12"WL _x .x __ -x -- -x _- w BALD MOUNTAIN ROAD 12 W-1 ---. f BLOCK I_ BLOCK, L LOT-9 —A I WW m , I Wti --{ � � >� BLOCK LOT 7s N -� BLOCKI., � � I .� LOT 10 Z Z BLOCKLOT 6 BLOCK? LOT 5 1 / I. BLOCK, � LOT 4 BLOCK-1." LEGEND LOT, C" / BLOCK / PROPOSED WATERLINE WITH GATE VALVE PROPOSED WATER LINE WITH FIRE HYDRANT PROPOSED WATER LINE WITH METER BOX EXISTING WATER LINE / $"W-1 B WITH GATE VALVE ——�— i 1 o I X11 EXISTING WATER LINE _ _ Q x I I Q f BLOCK 1 SLOT 2 � I i i i I 8 W-1A I 0 wxW _ _ _ - -� - _ - - EX 24"WL - --- -- HERITAGE-TRACE PARKWAY EXHIBIT A - WATER OWNER/ DEVELOPER: VICTORY AT HERITAGE LLC VICTORY AT I II P E LOTO N 8001 LBJ FREEWAY STE 400 ^ 0 100 200 LAND SOLUTIONS DALLAS, TEXAS 75251 HERITAGE -- 1711 IR-11 OR,6TE,1851 KELLER,TX]6204 181 J-562-3350 PHONE: 972707-955. GRAPHIC SCALE IN FEET BALD MOUNTAIN ROAD - .f-8"SS-1 i BLOCKILOT 9 �'� �-BLOCK 1� LOT 8 , h M r �� Q NN �\ ch LOT BLOCK i.-1 I �� �\ �1 11 BLOCKI DO I �W \ 13LOCK ' N\ / I l LOT 6 I BLOCKI [_BLOCK LOT 5_.-1 U BLOCK I /( $„SS LOT 4 l BLOCK I LOT 1-- I� / BLOCK t I ' L LOT „/ 1 f 1 LEGEND PROPOSED SEWER LINE AND MANHOLE EXISTING SEWER LINE jAND MANHOLEL CJ BLOCK 1 X (' LOCK 2 � i U � c i I i I - _ HERITAGE TRACE PARKWAY EXHIBIT B — WASTEWATER OWNER/DEVELOPER: VICTORY AT HERITAGE LLC VICTORY AT P E LOTO N 8001 LBJ FREEWAY STE 400 0 too zoo LAND SOLUTIONS DALLAS, TEXAS 75251 HERITAGE 5751 KROGER DR,STE,1851 KELLER,TX]6244181]-562-3350 PHONE: 972-707-955. GRAPHIC SCALE IN FEET BALD MOUNTAIN ROAD BLOCK 1 rBLOCK i! LOT 8 LOT 9� i I -` C) I BLOCK � _ LOT 7 I il-1[Y 31 BLOCK � I (_LOT 10_ Z2 BLOCK t N LOT 6 � l BLOCK J J/ , L LOT 4 _ CBLO1 j LOTCK 1 % \•� .\/ ,- LEGEND 8"CONCRETE PAVEMENT WITH R4 AT 14'O.C.EW. I i 4"CONCRETE SIDEWALK •-' I LOCK 1 BLOT 2 -� I (I , lu I � j / I ._ - - HERITAGE TRACE PARKWAY EXHIBIT C - PAVING OWNER/ DEVELOPER: VICTORY AT HERITAGE, LLC VICTORY AT P E LOTO N 8001 LBJ FREEWAY STE 400 0 100 200 i LAND SOLUTIONS DALLAS, TEXAS 75251 HERITAGE 1711 11-El MITI 1851 KELtER.TX]6244 I6f]-562-3350 PHONE: 972-707-955_ GRAPHIC SCALE IN FEET BALD MOUNTAIN ROAD I OCK I BLOCK LB LOT 9 L LOT 8__I -A Q� W ti -A 0 BLOCK 7 LOT _ Z� p - �.2 ti BLOCK t LOT 6 LOT 5�BLOCK1� n BLOCK 1� �LOT4 ,_.J BLOCK I��( -� LOTt 3 Q LEGEND ° PRO POSED STORM DRAIN INLET - o EXISTING STORM �I _ DRAIN INLET PROPOSEDSTORM ' BLOCK 1 DRAIN MANHOLE � I LOT 2 1 EXISTING STORM DRAIN MANHOLE - '., r EXISTINGSTORM DRAIN HEADWALL f \ I — HERITAGE—TRACE PARKWAY EXHIBIT D - STORM DRAINAGE OWNER/ DEVELOPER: O VICTORY AT HERITAGE, LLC VICTORY AT P E LOTO N •• 8001 LBJ FREEWAY, STE 400 0 too Zoo LAND SOLUTIONS DALLAS, TEXAS 75251 HERITAGE 5751 KROGER DR.STE.1851 KELLER.T%)6244 16-562-3350 PHONE: 972-707-955. GRAPHIC SCALE IN FEET 00 42 43 DAP-BID PROPOSAL Page 1 of 2 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT I:WATER IMPROVEMENTS 1 0241.1015 Remove 12"Water Line 0241 14 LF 446 $11.75 $5,240.50 2 0241 1218 4Water Abandonment Plug 0241 14 EA 2 $525.00_ $1,050.00 3 3305.0005 12 Waterline Lowering 33 05 12 EA 1, , $4080.00 4 3311.00414"Water Pipe 3311 10 LF 26 $20.50 $533.00 -._._.._. ._ Pipe_ r.. 33 11 10 LF __ 211 $20_50 $4 325,50 P 5 _ 3311.0141Water __ _ _ 6 3311 0241 8"Water Pipe 331010 LF�_ 202 $28.50 $5,757.00 7 3311.0441 12"Water Pipe 3311 10 LF 2040 $34.50 $70,380.00 8 3312 0001 Fire Hydrant 33 12 40 EA 6 $3,275.00 $19,650.00 Connection Existing 4,-12"Water Main 33 12 25 EA 2 $1,200.00 $2400.00, 9 r 3312.0117 Cnecn toisti _. _. ._.� .._ . �. __ _. 10 3312.2203 2"Water Service 33 12 10 EA 19 $1,877.63 $35,675.00 11 3312 3002 6"Gate Valve __33-12-20- EA 13 $,1,075.00 $131975,00 12 3312 3003 8 Gate Valve _ 33 12 20 EA 2 $1,500. _ $3 000.00 13 3312.3005 12"Gate Valve 33 12 20 EA 17 $2,335.00 $39,695.00 14 3311 0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 5.8 $6,551. 28 $37,997.44 15 3305.0109 Trench Safety 330510 LF 2479 $0.15 $371.85 TOTAL UNIT 1:WATER IMPROVEMENTS $244,130.28 UNIT It:SANITARY SEWER IMPROVEMENTS 1 0241.1000 Remove Cone.Pvmt. 0241 14 SY 12 $30.00 $360.00 3 3201.0614 Conc Pvmt Repair Residential 32 01 29 SY 12 $140,00 , ,$1,680,00 _ _ 5 3331 3201 6 Sewer Service 3311 10 LF 238 $29.00 $6,902.00 6 3331.4115 8"Sewer Pipe 33 11 10 LF 1766 $31.00 $54,746.00 7 3339.0001 Epoxy Manhole Liner 33 31 70 VF 12 $91.67 $1,100.00 8 3339 1001 4"Manhole 33 39 10 EA 11 $4,400,00 _ $48,400.00, 9 3301.0101 Manhole Vacumm Testing 3301 30 EA 11 $100.00 $1,100.00 10 3305 0113 Trench Water Stop 33 05 15 EA 1.1 $250.00 _ $2,750.00 33__�,_ _ _... , _.. _... _--..330510w . $80.00 $2,880.00_ 11 3305.0202 EmbedmentlBackfill,CSS CY 36 12 05.0116 Concrete Encasement for Utility Pipes 33 05 10 CY 175 $63.77 $11,160.00 13 3305.0109 Trench Safety 33 05 10 LF 2004 $0.50_. ,_.,$1,002.00 14 3301 0002 Post CCN Inspection 3301 31 LF 2004 ,__ _ $2.00 _ _ $4,008.00 15 3471.0001 Traffic Control 3471 13 MO 1 $6,000.00 _ $6,000.00 16 9999.0001 Connect to Existing 4'Manhole EA 1 $2 400.00 $2,400.00 TOTAL UNIT It:SANITARY SEWER IMPROVEMENTS $144,488.00 UNIT III:DRAINAGE IMPROVEMENTS 1 0241 3015 Remove 24 Storm Line 0241 14 LF 30 _ $50,00 $1,500.00 m 2 0241.3017 Reove 30"Storm Line 02 4--1--1-4-- LF 96 $50.00 _ $4,800.00 3 0241 3019 Remove 36 Storm Line 0241 14 LF 21 ,,__$50.00 , $,1,050.00 4 0241.3106 30' Storm Abandonment Plug 02 41 14 EA 2 5 0241.3108 36"Storm Abandonment Plug 02 41 14 EA 2 $500.00 $1,000.00 6 0241.3401 Remove 4 Storm Junction Box 0241 14 EA 3_ $800.00 , $2,400.00 7 024 move 10'Recessed Inlet 02 41 1_4 EA 1 ,,, $4 5 75.00 _ $4,575.00 1.4101 Rem _ ._ 8 0241.4202 Remove 5'Drop Inlet 0241 14 EA 1 $750.00 $750.00 9 0241.4401 Remove Headwall/SET 0241 14 EA 1 $750.00 $750.00 10 0241.0800 Remove Rip Rap 0241 14 SF 90_ _ $3.33 _,, $300.00 91 0241.1000 Remove Conc.PV`mt. 0241 14 SY 20 $30.00 $600.00 12 3341.0201 21"RCP Class III 3441 10 LF 59 $50.00 $2,950.00 13 3341.0205 24"RCP,Class III 3441 10 LF 72 $80.00 $5,760.00 14 3341.0206 24 RCP,Class IV 34 41 10 LF 75 _$80.00 _ $6,000.00 15 3341.0402 42_'RCP,Class III 3441 10 LF 78 $180.00 _'__$14,040.00 16 3341.0403 42"RCP Class IV 34 41 10 LF 575 CITY OF FORT WORTI4 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 00 42 43 Bid Proposal DAP 00 42 43 DAP-BID PROPOSAL Page 2 of 2 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid Description Unit Price Bid Value No. Section No. Measure Quantity 17 11 3341.0409 48:R6P,Class III 3441 10 LF 801 $250.00 $200,250.00 19 33419.0002,15"Storm Junction Box 33 49 10 EA _ 3 $8,200.00 $24,600.00 20 3349.4113 48"SET,1 Pipe 33,49410 EA 1 $825.25 $825.25 21 3349.5001 10'Curb Inlet 33 49 40 EA 2 $4,050.00 $8,100.00 22 3349.6001 10'Recessed Inlet 334,912.0 EA 2 $4,400.00 $8,800.00 23 3349.7001 4'Drop Inlet 334920 EA 2 $4,100.00 $8,200.00 24 3305.0112 Cone.Collar 33 05 17 EA 1 $500.00 $500.00 25 3305.0109 Trench Safety 33,0510 LF 1660 $0.25 $415.00 26 3137.0104 Medium Stone Riprap,dry 31 3700 SY 91 $71.00 $6,461.00 TOTAL UNIT III:DRAINAGE IMPROVEMENTS1 $409,126.25 UNIT IV:PAVING IMPROVEMENTS 1 0241.1300 Remove Conc.Curb&Gutter 0241 14 LF 375 $10.00 $3,750.00 2 3123.0101 Unclassified Excavation 31 23 16 CY 165 $68.94 $11,375.10 3 3211.0211 6"Flexible Base,Type B,GR-1 32 11 23 SY 421_ $27.00 $11,367.00 4 3213.0103 8"Conc.Pvmt. 32 13 13 SY 421 $56.25 $23,681.25 5 3213.03014"Conc.Sidewalk 32 13 20 SF 3320 $4.75 $15,770.00 6 3213.0506 Barrier Free Ramp,Type P-1 321320 EA 2 $650.00 $1,300.00 7 3216.0101 6"Conc.Curb and Gutter 321613 LF 388 $5.00 _ $1,940.00 8 3217.0201 8"SLD Pvmt Marking HAS(W) 32 17 23 LF 65 $15.88 $1,032.20 9 3217.2102 REFL Raised Marker TY 1-C 32 17 23 EA 4 $12.50 $50.00 10 3471.0001 Traffic Control 3471 13 MO 1 $6,000.00 $6,000.00 TOTAL UNIT IV:PAVING IMPROVEMENTS $76,265.55 Bid Summary UNIT I:WATER IMPROVEMENTS $244,130.28 UNIT It:SANITARY SEWER IMPROVEMENTS $14_4,488.00 UNIT III:DRAINAGE IMPROVEMENTS $409,126.25 UNIT IV:PAVING IMPROVEMENTS $76,265.55 Total Construction Bid $874,010.08 Contractor agrees to complete%VORK for FINAL ACCEPTANCE within 270 calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT 1VORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 00 42 43 Bid Proposal DAP