Loading...
HomeMy WebLinkAboutContract 48421 COMPLETION AGREEMENT—LENDER FUNDED This Completion Agreement("Agreement)is made and entered into by and among the City of Fort Worth("City"), and BARHAM&HARRIS DEVELOPMENT ONE, L.P., a Texas limited partnership ("Developer"), and SOUTHWEST BANK ("Lender"), effective as of the date subscribed by the City's City Manager or Assistant City Manager. The City, the Developer and the Lender are hereinafter collectively called the "Parties". WITNESSETH: WHEREAS, the Developer owns that certain tract of real property that contains approximately 20.38 acres that is located in the City, the legal description of which tract of real property is marked Exhibit "A" — Legal Description, attached hereto and incorporated herein for all purposes ("Property"); and WHEREAS, the Developer intends to develop the Property as an addition to the City through plat FP-15-105; and WHEREAS, the Developer and the City have entered into a Community Facilities Agreement relating to the development of PARKVIEW HILLS 5C ("CFA"); and WHEREAS, the City has required certain assurances of the availability of funds to complete the water and sewer utilities, streets/paving, storm drain, street lights and street signs for the development of the Property ("Improvements"), and WHEREAS, in order to provide such assurances as have been required by the City, the Lender has agreed to advance certain funds to the City for Hard Costs (which term is hereinafter defined)subject to,and in accordance with,the terms,provisions and conditions of this Agreement; and WHEREAS, the Developer has granted to the Lender as additional security for the Loan (which term is hereinafter defined) a security interest in all plans and specifications for the development of the Property (collectively,the "Plans"); and WHEREAS, the Parties desire to set forth the terms and conditions of such accommodations as are described above. City of Fort Worth,Texas OFFICIAL RECORD Standard Completion Agreement—Lender-Funded CFA official Release bate: 07.01.2015y 22 r��16 CITY SECRETARY Page 1 of 16 X10 �t;::�`,� FT.woRTH,TX NOW THEREFORE,for and in consideration of the benefits to be derived from the mutual observance by the Parties of the terms and conditions hereof, and for and in consideration of Ten Dollars ($10.00) and other good and valuable consideration,the receipt, adequacy and sufficiency of which are hereby acknowledged, the Parties agree as follows: 1. Recitals. The foregoing recitals are true, correct and complete and constitute the basis for this Agreement and they are incorporated into this Agreement for all purposes. 2. The Completion Amount. The City and the Developer agree that the Hard Costs required to complete the Improvements in the aggregate should not exceed the sum of ONE MILLION FOUR HUNDRED SIXTY-ONE THOUSAND FOUR HUNDRED THIRTY-SEVEN Dollars ($1,461,437.00), hereinafter called the "Completion Amount". Notwithstanding the foregoing, it is acknowledged that the actual costs of completion of the Improvements may vary as a result of change orders agreed to by the Parties, but such variances for the purposes of this Agreement shall not affect the Completion Amount as used herein. 3. Adjustments to the Completion Amount. The Lender may from time to time make advances to the Developer for the development of the Property under the development loan that has been made by the Lender to the Developer for the purpose of financing the costs of constructing the Improvements for the Property (the "Loan") subject to, and in accordance with, the terms, conditions and provisions of the Loan Documents (which term is hereinafter defined) evidencing and securing the Loan. Some of those advances shall be for Hard Costs as specified in the "Approved Budget" relating to the Loan, a copy of which Approved Budget is marked Exhibit "B", attached hereto and incorporated herein for all purposes, with the Hard Costs line items highlighted. The term"Hard Costs" shall mean the actual costs of construction and installation of the Improvements. To the extent that advances under the Loan are for the payment of Hard Costs, the Completion Amount shall be deemed reduced, dollar for dollar. The Lender may withhold statutory retainage from any advances under the Loan or pursuant to this Agreement. All such retainage withheld, to the extent it is attributable to Hard Costs, shall also reduce the Completion Amount dollar for dollar. All retainage withheld by the Lender for Hard Costs that are advanced to the City pursuant to this Agreement shall be released to the City as provided in the Texas Property Code upon expiration of the statutory retainage period. City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded CFA Official Release Date: 07.01.2015 Page 2 of 16 4. Completion by the Developer. The Developer agrees to complete the Improvements on or before the date for completion that is established in the Loan Documents plus thirty (30) days (the "Completion Date"), in accordance with the CFA, the Plans approved by the Lender and the City and all documents evidencing or securing the Loan (collectively, the "Loan Documents"). For the purposes of this Agreement, the development of the Property shall be deemed complete upon acceptance by the City of the Improvements. The City shall promptly notify the Lender and the Developer upon such acceptance. 5. Completion by the City. In the event that either: (A) the development of the Property is not completed by the Completion Date for any reason whatsoever,or(B)the Developer is in default under the Loan, then the Lender, at its sole option, may request the City to complete development. The City may, at its sole option and at the cost and expense of the Developer,within 10 days from receipt of Lender's request, notify Lender that it will undertake to complete the Improvements and the City shall then commence, pursue, and complete the Improvements in a reasonably timely, diligent and workmanlike manner in accordance with the Plans, subject to the terms of this Agreement. The Lender and the Developer agree that the City may use the Plans as necessary to complete the Improvements. If the City does not timely elect to complete the construction of the Improvements or if the Lender does not request the City to complete construction of the Improvements, then the Lender may at its election terminate this Agreement, or at its option, proceed to complete the Improvements, or foreclose on any of its collateral, or take any and all such action as may be provided under the Loan Documents. 6. Advance of Completion Costs to the City and Delivery of Hard Costs Collateral to the City. In the event the Lender has requested the City and the City has elected to complete the Improvements, Lender shall transfer to the City all remaining undisbursed Hard Costs specified in the Approved Budget within 10 days of the date that the City elected to complete and provided Lender with written notice of such election. The Developer hereby authorizes and instructs the Lender to make the transfer of any remaining undisbursed Hard Costs specified in the Approved Budget to the City within 10 days of notification that the City elects to complete the Improvements. City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded CFA Official Release Date: 07.01.2015 Page 3 of 16 In the event the cost to complete the Improvements exceeds the moneys transferred to the City, City shall notify Lender and Developer in writing of the need of additional funds. The additional funds required to complete the Improvements shall be delivered to the City within 10 business days following notification to Lender and Developer. Failure to deliver the additional funds shall relieve the City of the obligation to complete the Improvements, in which event City shall use the Hard Costs funds in its possession to pay the contractor(s) all funds due it/them. Any remaining undisbursed Hard Costs shall be returned to Lender within a reasonable time. 7. Completion by the Lender. The Lender may, at its discretion, but shall not be obligated to, undertake to complete the Improvements if there is any default under any Loan Documents in lieu of requesting the City to complete the Improvements. If the Lender elects to complete the Improvements, any Hard Costs it expends shall, dollar for dollar, reduce the Completion Amount. 8. Easements. In the event the City or the Lender undertakes the completion of the Improvements, the Developer (and to the extent necessary the Lender) grants to the City and the Lender open access to the Property and shall execute and deliver such temporary easements over and across the entirety of the Property for the purpose of access and use for the completion of the construction of the Improvements in accordance with this Agreement. To the extent requested by the City and the Lender, written temporary construction easements in form acceptable to the City and the Lender shall be executed by the Developer and filed of record. Nothing in this paragraph shall reduce any rights of the Lender or obligations of the Developer under the Loan Documents. 9. Lender's Rights. Nothing in this Agreement shall affect any portion of the Lender's collateral for the Loan or limit or impair the Lender's right to foreclose the same or deal with the collateral as it elects in accordance with the Loan Documents. 10. Satisfaction of the City Requirements. The City agrees that the assurances and covenants contained in this Agreement satisfy all requirements of the City with respect to Developer's performance bond or other financial security in connection with the development of the Property and the completion of the Improvements that are contained in the CFA or in any other agreement relating thereto, and the City hereby accepts the assurances and covenants contained City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded CFA Official Release Date: 07.01.2015 Page 4 of 16 herein in lieu thereof. To the extent the CFA irreconcilably conflicts with this Agreement, the provisions of this Agreement shall control. 11. Termination. This Agreement shall terminate upon the earlier to occur of the following: (a) acceptance by the City of the Improvements; (b) mutual written agreement of all of the Parties; or (c)the reduction of the Completion Amount to zero. However, release of the plat shall be governed by paragraph 12 hereof and termination pursuant to (b) or (c) of this paragraph 11 shall not require the City to release the plat. 12. Final Plat. The Parties acknowledge and agree that the City shall hold the final plat of the Property until the Improvements are completed and accepted by the City and all Hard Costs contractors have been paid, less retainage. Upon acceptance by the City and receipt of evidence from the Developer showing that all Hard Costs contractors have been paid, including but not necessarily limited to lien waivers and bills paid affidavits,the City shall within a reasonable time file the final plat for the Property in the Plat Records of the county where the Property is located. The purpose of the City retaining the final plat of the Property as provided herein is to guarantee the Developer's obligations under the CFA are completed. 13. Construction Contracts. Developer agrees to include in each Construction contract that it enters into for the completion of the Improvements the following: a.A statement that the City is not holding any security to guarantee any payment for work performed on the Improvements; b. A statement that the Property is private property and that same may be subject to mechanic's and materialman's liens; c.A requirement that each contractor contracting with the Developer release the City from any claim that is related to the Property of the Improvements; and d. A requirement that each contractor contracting with the Developer include in each subcontract the statements contained in a., b., and c. above. 14. Miscellaneous. A. Non-Assignment of Agreement. This Agreement may not be assigned by any of the Parties without the prior written consent of all the other Parties. City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded CFA Official Release Date: 07.01.2015 Page 5 of 16 B. Notice. Any notice required or permitted to be delivered under this Agreement shall be deemed received on actual receipt by the appropriate party at the following addresses: (i) Notice to the City shall be addressed and delivered as follows: City of Fort Worth Planning and Development Department 1000 Throckmorton Street Fort Worth, Texas 76102 Attention: CFA Division Julie Westerman, Development Manager Email: Julie.Westerman@fortworthtexas.gov Confirmation Number: 817-392-2677 and/or Attention: CFA Division Email: cfa@fortworthtexas.gov Confirmation Number: 817-392-2025 With a copy thereof addressed and delivered as follows: Douglas W. Black Office of the City Attorney City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102 Confirmation Number: 817-392-7615 (ii) Notice to the Developer shall be addressed and delivered as follows: BARHAM &HARRIS DEVELOPMENT ONE, L.P. 600 SUMMIT AVE FORT WORTH, TEXAS 76102 Email: rhb@barhaminterests.com (iii) Notice to the Lender shall be addressed and delivered as follows: SOUTHWEST BANK 4809 CAMP BOWIE BLVD. FORT WORTH, TEXAS 76107 Email: Joy.Norton@southwestbank.com City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded CFA Official Release Date: 07.01.2015 Page 6 of 16 A party may change its address for notice upon prior written notice to the other parties pursuant to the terms hereof. C. Texas Law to Apply. This Agreement shall be construed under and in accordance with the laws of the State of Texas. D. Parties Bound. This Agreement shall be binding upon and inure to the benefit of the Parties and their respective legal representatives, successors and assigns. E. Legal Construction. In case any one or more of the provisions contained in this Agreement shall for any reason is held to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability shall not affect any other provision of this Agreement, and this Agreement shall be construed as if such invalid, illegal, or unenforceable provision had never been contained in this Agreement. F. Prior Agreements Superseded. This Agreement constitutes the sole and only agreement of the Parties with respect to the subject matter hereof and supersedes any prior understandings or written or oral agreements among the Parties concerning the subject matter hereof, provided, however, that this Agreement shall not supersede, amend or modify any of the Loan Documents or any portion thereof. G. Amendment. This Agreement may only be amended by a written instrument executed by all of the Parties to his Agreement. H. Headings. The headings that are used in this Agreement are used for reference and convenience purposes only and do not constitute substantive matters to be considered in construing the terms and provisions of this Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded CFA Official Release Date: 07.01.2015 Page 7 of 16 ACCORDINGLY,the City of Fort Worth,Developer and Lender have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee.: CITY OF FORT WORTH: DEVELOPER: BARHAM &HARRIS DEVELOPMENT ONE, L.P. WBY. BARHAM&HARRIS P Assistant City Manage 1 MANAGEMENT,LLC, ITS GENERAL PARTNER BY: BARHAM INTERESTS, INC., ITS Date: I I I I L A R T Approved as to Form and Legality: a e: Robert H. Barham Title: President Assistant City Attorney L��� Date: ATTEST: LENDER: OR SOUTHWEST BANK ary J. a el ®� 0000 City Secretary S.oB`� � 0 M&C: N14 S Date: $ N Norto 'ffa, YL9S N� oftom°pO e: Vice President City of Fort Worth,Texas OFFICIAL RECORD Standard Completion Agreement—Lender-Funded CITY SECRETARY CFA Official Release Date: 07.01.2015 FT.WORTH,TX Page 8 of 16 Robert H. Barham the Guarantor of the Development Loan, is executing this Completion Agreement for the sole purpose of acknowledging that advances that are made by the Lender pursuant to this Completion Agreement shall be deemed to be advances that are made under the Loan that shall be subject to and covered by the Loan Documents and the Guaranty Agreement that was executed by Robert H. Barham. TOR By- Na mJwe—: y•Name: Ikobert H. Barham City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded CFA Official Release Date: 07.01.2015 Page 9 of 16 James R. Harris the Guarantor of the Development Loan, is executing this Completion Agreement for the sole purpose of acknowledging that advances that are made by the Lender pursuant to this Completion Agreement shall be deemed to be advances that are made under the Loan that shall be subject to and covered by the Loan Documents and the Guaranty Agreement that was executed by James R. Harris. GUARANTOR By: (2 Name: J es R. Harris City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded CFA Official Release Date: 07.01.2015 Page 10 of 16 James B. Haddock the Guarantor of the Development Loan, is executing this Completion Agreement for the sole purpose of acknowledging that advances that are made by the Lender pursuant to this Completion Agreement shall be deemed to be advances that are made under the Loan that shall be subject to and covered by the Loan Documents and the Guaranty Agreement that was executed by James B. Haddock. GUARANTOR By: Name ames B. addock City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded CFA Official Release Date: 07.01.2015 Page 11 of 16 List of Exhibits to the Completion Agreement Attachment 1 —Changes to the Standard Completion Agreement Exhibit A- Legal Description Exhibit B - Approved Budget City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded CFA Official Release Date: 07.01.2015 Page 12 of 16 ATTACHMENT"1" Changes to Standard Completion Agreement None City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded CFA Official Release Date: 07.01.2015 Page 13 of 16 EXHIBIT A BEING a tract of land situated in the John Askew Survey,Abstract No. 16,A.S. Roberts Survey,Abstract No. 1262 and the Alexander F.Albright Survey,Abstract No. 1849,City of Fort Worth,Tarrant County,Texas and being a portion of a tract of land described by deed to Barham &Harris Land One, L.P.as recorded in Volume 14994, Page 311 of the Deed Records of Tarrant County,Texas(D.R.T.C.T.)and being a portion of a tract of land described in deed to Barham&Harris Development One, L.P. recorded in Volume 14994, Page 313, D.R.T.C.T.and being more particularly described by metes and bounds as follows:(Bearings referenced to U.S.State Plane Grid 1983-Texas North Central Zone(4202) NAD83 as established using GPS Technology in conjunction with the RTK Cooperative Network,all distance at ground); BEGINNING at a 5/8"capped iron rod marked "BHB INC"set(CIRS)in the south line of said Barham& Harris Land One, L.P.tract and the north line of Lot 28, Block 9, Marine Creek Hills Addition,an addition to the City of Fort Worth,Texas according to the plat recorded in Cabinet A,Slide 7987 of the Plat Records of Tarrant County,Texas, from which a 5/8"iron rod found for the southwest corner of said Barham&Harris Land One, L.P.tract bears North West,a distance of feet; THENCE North 36°58' 11" East, a distance of 154.91 feet to a CIRS; THENCE North 53°01'25"West,a distance of 4.99 feet to a CIRS; THENCE North 36°58'35" East,a distance of 50.00 feet to a CIRS; THENCE North 81°58'35" East, a distance of 14.14 feet to a CIRS; THENCE North 36°58'35" East,a distance of 210.00 feet to a CIRS; THENCE North 08°01'25"West, a distance of 14.14 feet to a CIRS; THENCE North 36°58'35" East,a distance of 50.00 feet to a CIRS; THENCE North 81°58'35" East,a distance of 14.14 feet to a CIRS; THENCE North 36'58'35" East,a distance of 105.00 feet to a 5/8" capped iron rod marked"BHB INC"found(CIRF) for the southeast corner of Lot 14, Block 5 of Parkview Hills, Phase 4,Sections A&B,an addition to the City of Fort Worth according to the plat recorded in Cabinet A,Slide 11540 and in the west Right-of-Way line of Falconer Way, a 50.00 feet wide Right-of-Way; THENCE South 53°01'25" East, along the south line of said Parkview Hills, Phase 4,Sections A&B,a distance of 50.00 feet to a CIRF for the southeast corner of said Parkview Hills, Phase 4,Sections A& B; THENCE along the east line of said Parkview Hills, Phase 4,Sections A&B and said Falconer Way the following courses and distances: North 36°58'35" East,a distance of 105.00 feet to a CIRF; North 78°57'48" East,a distance of 13.45 feet to a CIRF; North 36'58'35" East,a distance of 50.00 feet to a CIRF; North 05°00'39"West,a distance of 13.45 feet to a CIRF; THENCE North 36°58'35" East,a distance of 105.00 feet to a 5/8" iron rod found for the southwest corner of Lot 1, Block 8 of said Parkview Hills, Phase 4,Sections A&B; THENCE South 53°01' 25" East, leaving the east Right-of-Way line of said Falconer Way and along the south line of said Lot 1,a distance of 175.00 feet to a CIRF; THENCE South 56°45'58" East,a distance of 51.14 feet to a CIRF for the southeast corner of said Lot 1; THENCE along the east line of said Parkview Hills, Phase 4,Sections A&B the following courses and distances: North 02°04'59" East,a distance of 152.60 feet to a CIRF; North 00°00'41"West,a distance of 302.97 feet to a CIRF for the northeast corner of Lot 6 of said Parkview Hills, Phase 4,Sections A&B and in the south Right-of-Way line of Parkview Hills Lane,a 50.00 feet wide Right-of-Way; THENCE along the said south Right-of-Way line the following courses and distances: Along a non-tangent curve to the right having a central angle of 0433'07",a radius of 725.00 feet, an arc length of 57.60 feet and a chord which bears North 87°42'45" East,a distance of 57.58 feet to a CIRS; North 89°59' 19" East,distance of 54.13 feet to a CIRS; City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded CFA Official Release Date: 07.01.2015 Page 14 of 16 South 48°01'28" East,a distance of 13.45 feet to a CIRS; North 89°59' 19" East,a distance of 50.00 feet to a CIRS; THENCE departing the said south Right-of-Way line and along the east line of the aforementioned Barham&Harris Land One, L.P.tract the following courses and distances: South 00°00'41" East,a distance of 100.20 feet to a CIRS; Along a curve to the left having a central angle of 13°29'52", a radius of 475.00 feet,an arc length of 111.90 feet and a chord which bears South 06°45'37" East,a distance of 111.64 feet to a CIRS; South 13'30'33" East,a distance of 754.28 feet to a CIRS; Along a curve to the right having a central angle of 13°10'23",a radius of 525.00 feet,an arc length of 120.71 feet and a chord which bears South 06°55'22" East,a distance of 120.44 feet to a CIRS; South 00'20'10" East,a distance of 79.54 feet to a CIRS; Along a curve to the right having a central angle of 95°28'24",a radius of 50.00 feet,an arc length of 83.32 feet and a chord which bears South 07°11'00"West,a distance of 74.01 feet to a CIRS; South 35°04'48" East, a distance of 20.00 feet to a CIRS; South 00°20' 10" East, a distance of 135.15 feet to a CIRS for the southeast corner of the aforementioned Barham& Harris Land One, L.P.tract; THENCE along the south line of the said Barham&Harris Land One, L.P.tract the following courses and distances: North 89'55'27"West,a distance of 165.96 feet to a CIRS; Along a non-tangent curve to the right having a central angle of 39°54'51",a radius of 1,200.00 feet,an arc length of 835.96 feet and a chord which bears North 73°00'49"West,a distance of 819.16 feet to CIRS; THENCE North 53°03'09"West,a distance of 238.90 feet to the POINT OF BEGINNING and containing 887,719 Square Feet or 20.379 Acres of Land more or less. City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded CFA Official Release Date: 07.01.2015 Page 15 of 16 EXHIBIT B APPROVED BUDGET Section I Water $269,040.00 Sewer $295,780.00 Subtotal $564,820.00 Section II Interior Streets $627,465.00 Storm Drains $148,597.00 Subtotal $776,062.00 Section III Street Lights $120,555,00 Sub-total $120,555.00 TOTAL $1,461,437.00 City of Fort Worth,Texas Standard Completion Agreement—Lender-Funded CFA Official Release Date: 07.01.2015 Page 16 of 16