Loading...
HomeMy WebLinkAboutContract 48422 ciTyy'�sU ECR {i�ARY V{/pR 1 RAC tl MO. Developer and Project Information Cover Sheet: Developer Company Name: Quail Valley Devco I, LLC Address, State, Zip Code: 8401 N. Central Expressway, Suite 350 Dallas TX 75225 Phone & Email: 214-292-3410, cyeager@republicpropertygroup.com Authorized Signatory, Title: Clint Yeager,Vice President Project Name and Brief Walsh Ranch Quail Valley Phase 1 C On-Site Description: Project Location: Plat Case Number: FP-16-049 Plat Name: Walsh Ranch Quail Valley Phase 1C Mapsco: 761-G Council District: 3 City Project Number: 100454 CFA Number: 2016-103 DOE Number: None To be completed by staff Received by: �� (.�'�► Date: City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Quail Valley Devco I, LLC , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Walsh Ranch Quail Valley Phase 1C On-Site ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 2 of 11 further acknowledges that said acceptance process requires the Developer's contractor(s) to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ®, Sewer (A-1) M', Paving (B) ®, Storm Drain (B-1) FA, Street Lights & Signs (C) M. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s) pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period)the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 7 of 11 Cost Summary Sheet Project Name: Walsh Ranch Quail Valley Phase 1C On-Site CFA No.: 2016-103 CP No.: 100454 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. I An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 2,314,042.54 2.Sewer Construction $ 2,590,853.00 Water and Sewer Construction Total $ 4,904,895.54 B. TPW Construction 1.Street $ 4,645,831.62 2.Storm Drain $ 1,964,354.00 3.Street Lights Installed by Developer $ - 4. Signals $ - TPW Construction Cost Total $ 6,610,185.62 Total Construction Cost(excluding the fees): $ 11,515,081.16 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 98,097.91 D. Water/Sewer Material Testing Fee(2%) $ 98,097.91 Sub-Total for Water Construction Fees $ 196,195.82 E. TPW Inspection Fee(4%) $ 264,407.42 F. TPW Material Testing(2%) $ 132,203.71 G. Street Light Inspsection Cost $ - H. Signals Inspection Cost $ H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 396,611.14 Total Construction Fees: $ 592,806.96 Choice Financial Guarantee Options,choose one Amount Mark one Bond= 100% $ 11,515,081.16 Completion Agreement= 100%/Holds Plat $ 11,515,081.16 x Cash Escrow Water/Sanitary Sewer=125% $ 6,131,119.43 Cash Escrow Paving/Storm Drain=125% $ 8,262,732.03 Letter of Credit=125%w/2yr expiration period $ 14,393,851.45 City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Quail Valley Devco I,LLC 2.o�L� f esus . Chapa Assistant City Manager Name: Clint Yeag Title: Vice Present Date: Date: //Am/ Recommended by: ATTEST: (Only if required by Developer) Wendy Chi-B bulal, EMBA, P.E. Development Engineering Manager Signature Water Department Name: Douglas L91. Wiersig,P.E. Director Transportation&Public Works Department Approved as to Form &Legality: ATTEST: Richard A. McCracken Maryay e Assistant City Attorney City Se ar M&C No. Ow ® 0F°O� , Date: �� 'Itt �q 0 W° ° e 1295 : n�llr}- a o OFFICIAL RECORD l °o°°°°°�°°° CITY SECRETARY AS City of Fort Worth,Texas Standard Community Facilities Agreement FT, WORTH,TX CFA Official Release Date: 10.07.2015 Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment �i Attachment 1 - Changes to Standard Community Facilities Agreement Location Map Exhibit A: Water Improvments Water Cost Estimate Exhibit A-1: Sewer Improvements Sewer Cost Estimate Exhibit B: Paving Improvements Paving Cost Estimate Exhibit B-1: Storm Drain Improvements L ' Storm Drain Cost Estimate FA Exhibit C: Street Lights and Signs Improvements ®' Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100454 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 11 of 11 IOLD W�THERFORD ROADS - J .I I PROJECT SITE i - - - - � ti -v NORTH \ v NTEF? TTATE 20 INTERSTATE 30 x W W LOCATION MAP a N.T.S. U J_ U Z U cn LdLd d O N O O 0 n of 0 O Of S COVER SHEET N FRANCH LEY - PHASE 1C - ON-SITE T November 8, 2016 N HUITT-MLLARS C) M BCOLE 11/08/2016 7:30AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_WATR.DWG 8" WATER Ll \ FIRE ANT �Q FIRE AN 8" WA T E GA VALVE 8" WATER ��' 8" GTE VAL E LINE LTi 8" GATE U VE \®` 8" TE VALVE WA T LINE 1 0 t" 1 vw P RgLINE WAY FIR 8., GAT 1 HYD NT I 8' WATE ' r I h 8" GAT / III 9 i [ 8" TE VALV VALVE I I I 1 8" WATER LINE 1I GATE VALVE I I Q W 8" WATER LIE 8" GATE VALVE �J v 3 8" WATER LIE 1 SWE TWAL PLACE II 1 I 1 I o 8' GAEVLVE \w FIRE DRANT � II II W gLsx w\ \ 8" WA T R L NE � Avg w Id III —w-- �„ ' W WA LIN W ` 12" WATER INE Www - I _ 0 111 � 11}11 1 LEGEND NORTH EXHIBIT 'A' WATER LINE WATER LINE SHEET 1 OF 9 FIRE HYDRANT ' , QUAIL VALLEY - PHASE 1 C - ON-SITE GATE VALVE November 7, 2016 w PH 1 C WATER LINE 4- PH 1 C FIRE HYDRANT SCALE: 1' = 160' PH1C WATER LINE HUITTZOLLARS � EXISTING FIRE HYDRANT 0 80 160 320 —" EXISTING WATER LINE WALSH RANCH BCOLE 11/08/2016 7:30AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_WATR.DWG �r 1 I I LEGEND WATER LINE A"LVE WATER LINE I I I FIRE HYDRANT GATE VALVE I f l Iw 111 WATER LINE s" GATE VALV j Il� I 4- 111 FIRE HYDRANT F I ;I I II 11 II III GATE VALVE w II �51� I 4- EXISTING FIRE HYDRANT —W--- EXIS77NG WATER LINE w - - - - �� � If I I III 1V I I I 1 I I ;I 1 I I I II 1 I I ISI I I 1 III I I 1 8" WA R LINE l EXISTING 30'" I I 1 1 FIR HYDRAN f— I WATER LINE gOAD I II II G00 EL I 1 1 I I NORTH 8" GATE VALVE WA TE LINE 8" TER LINE 8 GA I I I III i I I I / , 8"' WATER IN I I I I ill I I 1 FIRE HY RANT I it I I I SCALE: 1" = 160' 8" WA ER LIN III I I 0 80 160 320 ER INE 1 II I I EXHIBIT 'A' TEM LANE x \\ \� I I I WATER LINE SHEET 2 OF 9 LEATxE 8' GATE VALVE \ I I I QUAIL VALLEY - PHASE 1 C - ON-SITE a \ \ November 7,2016 8" GATE V LVE a A I 8 WATER LINE WAIs�� HUITT ZOLLARS RANCH BCOLE 11/08/2016 7:30AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_WATR.DWG Z _--A L -OHE � I - �. �-OHE- - -OHE- - � -OHE- EXISTING 16" WATER LINE MARY SGE ROAD \ 87 �VK_j,1 f�nll III II FIRE HPDR T \ I 8" WATER UNE ( / �l�'Lill II I I \ 141 8" GA V 8" WA ER LINE FIRE DRANT 8" TER LIN FIRE YDRANT SHADE TREJ STREET I' 8" GATE VE Li LEGEND EXHIBIT 'A' WATER LINE NORTH WATER LINE SHEET 3 OF 9 FIRE HYDRANT QUAIL VALLEY - PHASE 1C -ON-SITE GATE VALVE ' , November 7, 2016 w PH 1 C WATER LINE -- PH 1 C FIRE HYDRANT 1 GATE VALVE SCALE: 1" = 1 60' EX HUIIT Z�JLLARS EXISTING ING FIRE HYDRANT 0 80 160 320 —w— EXISTING WATER LINE WALS171 RANCH BCOLE 11/08/2016 7:31AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_WATR.DWG LEGEND WATER LINE FIRE HYDRANT GATE VALVE w PH 1 C WATER LINE 4- PH1C FIRE HYDRANT PH 1 C GATE VALVE 4- EXISTING FIRE HYDRANT —W— EXISTING WATER LINE � L \\ _—_----------® 8" GATE VALVE / T _ _ U — —_—_ — — - _------- f MARY'S RIDGE ROAD _-- -OHE- -OHE- ®-u- 12" WATER LINE EXISTING 16" WATER LINE 0 -OHE- OH -FIRE HYDRANT -OHE-- 8" WATER LINE FIRE HY ANT 8" A VALVE 8"' WATER NORTH LINE 8" W TER LINE W ,.e �. Ie D SCALE: 1" = 160' tr 8" GATE VALVE I E HYD R NT m 0 80 160 320 � b EXHIBIT 'A' " GATE ALVE WATER LINE SHEET 4 OF 9 s' GATE VA VE 8 GATE V VE ° QUAIL VALLEY - PHASE 1C -ON-SITE Wb 8" WATER LINE November 7, 2016 CRESTE RID E R0AHUITT OLLARS 8' GATE VA VE 8" VAL 8" WA TE LINE 8" W ER LINE WALSH I / RANCH BCOLE 11/08/2016 7:31AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_WATR.DWG 8" GA VALVE " GATE VALVE a" wnr LINE TT I I LEGEND S 8" WA R LINE WATER LINE 8"' GAT VALVE I I 4- FIRE HYDRANT GATE VALVE w PH 1 C WATER LINE PH 1 C FIRE HYDRANT 8" GATE VALVE PH 1 C GATE VALVE 0 8" GAT ALVE FIRE HYDRANT 8" WA R LINE FIRE HY RANT 8" WATER LINE GATE LVE FIR HY RAN 8" WATER LINE y G E V LVE W W 8" TE VALVE 3 y 8" GATE VA VE h � q r 8" GATE VA VE 2 v � "• GATE VALVE NORTH Y FIRE YD R NT 8" WATER INE GA E VA VE R AD SCALE: 1" = 160' N ELM 8 TER LINE Q $Q 160 320 " WA RLI E GREE 1 8"' A VE EXHIBIT 'A' 8 GATE VALVE HYDRANT WATER LINE SHEET 5 OF 9 8" W TER LI E QUAIL VALLEY - PHASE 1C -ON-SITE 8" w ER INE November 7, 2016 8" GA E VALE r]E M LA RS�E WATER LIN 8" WA TE LINE HUITT-MBARS L�AT � WALSH - RANCH BCOLE 11/08/2016 7:31 AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_WATR.DWG 8" GA E VALVE " GATE VA FIRE H TDING 0 K STR E 8" WATER INE $E 8 WA T LIN 8" G VALV WATER LIN 8" TE VA VE FIRE HYD T 8" TER LINE 8" GAT VALVE �p " GATE VALV 12" WATER LINE 12" GATE VA L C, WATER E & AUTO FLUSH ALVE 8" ATER LINE C 8" INE fir/ 8 1 ATE VALVE 8 E ALVE8" TE VALVE s� FI E HYD ANT 8" ATE U LVE 8" R LIN 8" GATE LVE 8 GATE VALVE " DISCOVE4,Y RO GATE VALVE 8" ATER L E D pL9G'�' ELM 8" WATER LINE B" WATER LINE t� 8" WATER LINE 12" WATER LINE 8" VALVE p-W—_ FIRE HYD A 8WA ER LINE 4p NUS w\ w � \ W�—w _^ LEGEND NORTH EXHIBIT 'A' WATER LINE WATER LINE SHEET 8 OF 9 FIRE HYDRANT ' , QUAIL VALLEY - PHASE 1 C -ON-SITE GATE VALVE November 7, 2016 w PH 1 C WATER LINE 4- PH 1 C FIRE HYDRANT SCALE: 1" = 160' PH1C GATE VALVE 0 80 160 320 v�R HU IT ZOLLARS WALSH RANCH BCOLE 11/08/2016 7:31AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_WATR.DWG FIRE HYDRA T LEGEND 8" GAT VALVE WATER LINE FIRE HYDRANT 1 8" E LINE GATE VALVE w PH 1 C WATER LINE 8" E NE 1� 4- PH1C FIRE HYDRANT 81" GATE VA E Sg PH 1 C GATE VALVE 8" WATER LIN �V W V4 FIRE RANT ~ FIRE HYDRAN 8" GAT VALVE ti E VALVE 8" GATE VAL E Ra8 GATE LVE lLIN J G FIRE YDRANT HEIGHTS LANE 8" WATER LINE - Z 8" GA E VALVE WA T R LINE 8" G TE VALVEpK E 140 ROAD N -- p G0 � NORTH FI E HYD ANT 8' GATE ALVE .N " WA TE LINE 8" ATE VA VE " WA TE LINE SCALE: 1" = 160' 0 80 160 320 EXHIBIT 'A' WATER IN WATER LINE SHEET 6 OF 9 QUAIL VALLEY - PHASE 1 C - ON-SITE November 7,2016 HUITT--ZOLLARS WALSH RANCH BCOLE 11/08/2016 7:32AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_WATR.DWG 1 LEGEND WATER LINE 2" w FIRE HYDRANT GATE VALVE w PH 1 C WATER LINE / PH 1 C FIRE HYDRANT PH1C GATE VALVE R LINE Qt 4 q GA r VALv L 8" TER INE � V W W 12"'1 ATE ALVE gLVE O / w LINE 12" WATER LINE NORTH / 8"' WA TE LINE ' , ' FIRE HYDRANT SCALE: 1" = 160' 0 80 160 320 EXHIBIT 'A' r\ WATER LINE SHEET 7 OF 9 QUAIL VALLEY - PHASE 1 C - ON-SITE November 7, 2016 wt HIATT ZOLLARS WALSH RANCH BCOLE 11/08/2016 7:32AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1 C\EXHIBITS\CFA_PH 1 C_WATR.DWG LEGEND WATER LINE FIRE HYDRANT -OHE- ------- GATE VALVE W— PH 1 C WATER LINE -- PH 1 C FIRE HYDRANT PH1C GATE VALVE 4- EXISTING FIRE HYDRANT —w— EXISTING WATER LINE / l ISTING WATER L NE -OHE- / - -OHE- -OHE- _J ' -OHE- IE VALVE II ' 8" GA E VA VE II I FIRE HYDRAN I I II 8'" ATER LINE 12-. NORTH T 8" VALVE WATER 12/ GA TE SCALE: 1" = 160' 12" ATER LINE �� VALVE 8" WATER LI v 0 80 160 320 O \ \ 8" G TE VALVE 12" GATE EXHIBIT 'A' \ VALVE WATER LINE SHEET 9 OF 9 I E HYDRANT QUAIL VALLEY - PHASE 1 C -ON-SITE IRNovember 7, 2016 � VALVE S UMARD WAY WATER e LINE wt Hu1TT ZOLLARS 1 '" GA 12" TE VALVE 72" WAR LINE / RWALSH ANCH BCOLE 11/08/2016 7:34AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1 C\EXHIBITS\CFA_PH 1 C_SSWR.DWG I , 4' DIA. MH 4' DIA. MH 8" PVC 4' DIA. MH 81" C 4" DIA. MH 11 1 I�I 1 1 4' DIA. MH 4' DIA. MH 4DIA. MH 4' DIA. MH \ 4' DIA. MH PVC 4' DIA. MH 1 1 PVC 8" \ II 1 4' DIA. MH 4' DIA. MHtA 4' DIA. MH 8" PVC % � I II 1 ` I 4" DIA. MH le I 1 1 4' DIA. MH le I I 1 W 8" PC V 4' DIA. MH 8' PVC C 8" PV DROP MH 4" DIA. MH I I III 1 W 4' DIA, MH F PVC 8'" PVC 4' DIA. MH 1 1 I 1 1 Z4' DIA. MH yy PVC 11 III 1 a TWA K PLA E 1 PV N 4' DIA. MH 1 N Rl1� 4' DIA. MH I I 4' DIA. MH I I I f 8 PV I III cl — — �® 8" PVC \ I I I � I ®® 4' DIA. MH w NORTH EXHIBIT 'A-1' SANITARY SEWER SHEET 1 OF 9 QUAIL VALLEY - PHASE 1 C - ON-SITE LEGEND November 7, 2016 ss SSWR LINE SCALE: 1" = 200' ® SSWR MANHOLE HUI T-ZOLLARS ss PH 1 C SSWR LINE 0 100 200 400 • PH1C SSWR MANHOLE WALSH RANCH BCOLE 11/08/2016 7:35AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_SSWR.DWG 4' DIA. MH 8" PVC 4' DIA. MH 4' DIA. MH \ \ 1 J 4' DIA. MH4' DIA. PVC DROP MH I III III � I 8" PVC y 8' PVC 4' DIA. MH 4' DIA. MH f t I I p� 8" PVC 1 9 4" DIA. MH PVC 4' DIA. MH ' 8" Pvc 4' DIA. MH PVC 4' DIA. MH 11 � II� j 1 8" Pvc III I - - 4' DIA. MH 8" PVC 1 NORTH 4' DIA. MH 1 8" PVC I 1 I SCALE: 1" = 200' 4' DIA. MH 1 I I 1 I 0 0 100 200 400 EXHIBIT 'A-1' F RY SEWER SHEET 2 OF 9 LLEY - PHASE 1 C - ON-SITE LEGEND November 7, 2016 ss SSWR LINE SSWR MANHOLE HUITTZJLLARS PH1C SSWR LINEPH1C SSWR MANHOLE EMMI BCOLE 11/08/2016 7:35AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_SSWR.DWG \ \ LEGEND \ �\ ss SSWR LINE \\�\ SSWR MANHOLE \ \ ss PH 1 C SSWR LINE • PH1C SSWR MANHOLE —ss— EXISTING SSWR LINE �`f\\ EXISTING SSWR MANHOLE ' SSS OFFSITE ITEMS SHOWN IN OFFSITE CFA EXHIBITS �I NORTH SCALE: 1" = 200' OHE- 0 100 200 400 Irl 'E ' -OHE- _0HE- -OHE- EXHIBIT 'A-1' I I ' - I -OHE- SANITARY SEWER SHEET 3 OF 9 a" PVC — s�— QUAIL VALLEY - PHASE 1C - ON-SITE I I I November 7, 2016 _ 4' DIA. MH �4 DIA. MH \ / I III Hu11TZ�JLLARC 8" PVC ' 11 V I Illy RANCH I BCOLE 11/08/2016 7:35AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_SSWR.DWG EX. 30 SS _ ------ -_ss- _ -ss- ss ® ORAL. —OHE— — �OHE' o OL_DOHATM 2W I I \ OFFSITE ITEMS SHOWN IN OFFSITE CFA EXHIBITS —_-- _ 4' DIA. MH — — —= 8 C a(� — IItY�RIDGTs ROtID 8" DHE— ��� ———— __ • 4' DIA. 8' PV—C�— — DROP MH 4' DIA. 4" DIA. MH O 4' DIA. MH I II DROP MH O 2" PVC / � �_ —OHE— \ HO L- — \ —OHE— 8" PVC \ eQ� _ 4' DIA. MH \ & A 4' DIA. MH r 8" PVC 4' DIA. MH \ — — — 4' DIA. MH 0 4" DIA. MH �� 8"• PVC 8"' VC - 4' DIA. MH 4" DIA. MH Z_ 8" PVC 8" PVC LEGEND EXHIBIT 'A-1' ss NORTH SSWR LINE � SANITARY SEWER SHEET 4 OF 9 SSWR MANHOLE QUAIL VALLEY - PHASE 1 C - ON-SITE ss PH1 C SSWR LINE ' , November 7,2016 • PH1C SSWR MANHOLE -ss- EXISTING SSWR LINE EXISTING SSWR MANHOLE SCALE: 1" = 200' HUI1T Z�JLLAR 0 100 200 400 WALSH RANCH BCOLE 11/08/2016 7:36AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_SSWR.DWG 8" PVC LEGEND 4' DIA. MH 4' DIA. MH SS SSWR LINE " Pvc SSWR MANHOLE 4' DIA. MH 4' DIA. MH ss PH 1 C SSWR LINE 8" Pvc 4' DIA, MH B" Pvc PH1C SSWR MANHOLE 4' DIA. MH 4' DIA. MH 8" PVC 8" PV 4' DIA. MH PVC SyO� 8" P 4' DIA. MH 8' PVC 4' DIA. MH �� 4" DIA. MH 4' DIA. MH �c 4' DIA. MH CIRCLE 8" Pvc 8"' C �V 8„ c �y�� �541FF B" PVC 4' DIA. MH 8" PVC 4' DIA. MH �0 B" PVC �Q 8" PVC 4' DIA. MH 4" DIA. MH 8" PVC 4' DIA. MH MH 4' DIA. MH 4' DIA. MH4' DIA. MH 8" PVC 8" PVC 8"" PVC 8" PVC 8" PVC 8" PV 4' DIA. MH 4' DIA. MH 4' DIA. MH 4' DIA. MH PVC B" 4' DIA. MH 4' DIA. MH 4' DIA. MH 8" PVC 8" P 4' DIA. MH 8"' PVC 4' DIA. MH 4' DIA. MH " PVC 8"" PVC 4' DIA. MH 4' DIA. MH /$L PVC B" PVC 4' DIA. MH NORTH EXHIBIT 'A-1' 4' DIA. MH FRA RY SEWER SHEET 5 OF 9 LLEY - PHASE 1 C - ON-SITE November 7, 2016 SCALE: 1" = 200' 0 100 200 400H L.l I�ZOLL� BCOLE 11/08/2016 7:36AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_SSWR.DWG 4DIA. MH I 4' DIA. MH 8" PVC 4' DIA. 4' DIA. MH 4' DIA. MH DROP MH ca & 8" PVC 4' DIA. MH 4' DIA. MH 4" DIA. MH 4' DIA. MH 8" PVC 8" PVC 0 4" DIA. MH 9 4' DIA. MH 8" PVC 8" PVC c' ~ 8 PV 4' DIA. MH 4' DIA. MH n 4" DIA. MH 4' DIA. MH 8" PVC 4' DIA. MH 4' DIA. MH4' DIA. MH 4" DIA. MH 8" VC 8" PVC 4' DIA. MH 4' DIA. MH 4" DIA. MH 4" DIA. MH 4' DIA. MH 4' DIA. MH 4' DIA. MH4' DIA. MH 8" PVC 4' DIA. MH \ 8" P 4" DIA. MH 4' DIA. MH o 4' DIA. MH 8" PC VC / 4' DIA. MH 8" PVC 4' DIA. MH 8" PVC g" P 4" DIA. MH 4' DIA. MH4' DIA. MH ..AL 4" DIA. MH 4' DIA. MH c N — \ MH 8" PVC \ 4' DIA. MH 4' DIA, MH 4' DIA. MH An NORTH EXHIBIT 'A-1' SANITARY SEWER SHEET 6 OF 9 QUAIL VALLEY - PHASE 1 C - ON-SITE LEGEND November 7, 2016 ss SSWR LINE SCALE: 1" = 200' ® SSWR MANHOLE =09HUIT OLLARS ss PH 1 C SSWR LINE 0 100 200 400 • PH1C SSWR MANHOLE WALSH RANCH BCOLE 11/08/2016 7:37AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_SSWR.DWG 4' DIA. MH LEGEND 8" Pvc ss SSWR LINE 8" PV 4' DIA. MH m SSWR MANHOLE 4' DIA. MH 8" PVC ss PH1C SSWR LINE • PH1C SSWR MANHOLE 4' DIA. MH 8'" VC 8' PVC 4' DIA. MH 4' DIA. MH 8" PVC 4' DIA. MH 8" PVC 4' DIA. MH 8" VC 4' DIA. MH 8" PVC 4' DIA. 8' PVC DROP MH 4' DIA. MH 8 VC AD 8•• P, " PVC C 4' DIA. MH 8" PV 4" DIA. MH PVC 4' DIA. MH 4' DIA. MH 4' DIA, MH 4' DIA. MH 8" PVC ' C 4' DIA. MH 8" Pvc NORTH 8 P B, PVC 4' DIA. MH 4' DIA. MH 4' DIA. MH 8" Pvc SCALE: 1" = 200' 8" VC 0 4' DIA. MH 100 200 400 8" PVC C 8' VC ' 4DIA. MH 4' DIA. MH fCX� 4' DIA. MH EXHIBIT 'A-1' 8" Pvc s LgNe 8„ c 8" Pvc SANITARY SEWER SHEET 7 OF 9 4' DIA. MH 4' DIA. MH QUAIL VALLEY - PHASE 1C -ON-SITE 8" Pvc November 7, 2016 vet HUITT--ZOLLARS WALSH RANCH BCOLE 11/08/2016 7:37AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHI13ITS\CFA_PH1C_SSWR.DWG -OHE- -OHE PVC (I LEGEND I4" DIA. MH SS SSWR LINE �I s' Pv o SSWR MANHOLE I I 4' DIA. MH SS PH1C SSWR LINE OFFSITE ITEMS SHOWN I PH1C SSWR MANHOLE IN OFFSITE CFA EXHIBITS I I 4' DIA. MH O J / 4' DIA. MH 8 PVC I / I 4' DIA. MH 4' DIA, MH 4' DIA. MH 8" P C 1 4' DIA. MH 1 4' DIA. MH 8" PVC 4' DIA. MH / 8" VC ' 4' DIA. MH 4' DIA. MH 8" PVC 8" PVC 4' DIA, MH 4' DIA. MH NORTH " PVC 4' D/A. MH '8" PVC 4' DIA. MH SCALE: 1" = 200' MOM / 4' DIA. MH 8" PVC 0 100 200 400 / EXHIBIT 'A-1' 8" P c 4' DIA. MH SANITARY SEWER SHEET 8 OF 9 8" Pvc QUAIL VALLEY - PHASE 1 C - ON-SITE 4' DIA. MH November 7,2016 / w / 8° VC 4' DIA. MH ® HUITT OLLARS WALSH RANCH BCOLE 11/08/2016 7:37AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_SSWR.DWG II LEGEND ss SSWR LINE ° SSWR MANHOLE I ss PH1C SSWR LINE �SS�X 30 • PH 1 C SSWR MANHOLE \ —ss— EXISTING SSWR LINE ._ss_ ss�` EXISTING SSWR MANHOLE Ln I Ln I � 1 I I I II I I I V I I I II II I I� l ° �I \ �_____------ f \ °—ss --- --- —ss- .° I II II I �I� I o N 0 RTH OFFSITE ITEMS SHOWN Illj I I N OFFSITE CFA EXHIBITS II I SCALE: 1 200' 0 100 200 400 s" PVc —o EXHIBIT 'A-1' 4' DIA. MH —OHE— SANITARY SEWER SHEET 9 OF 9 ,o o _ —OHE— QUAIL VALLEY - PHASE 1C - ON-SITE November 7,2016 ACCESS \\ \\ DIA. MH CHAMBER 8 PV —OH E TT -daHE= / /—0 — „ PVC e HUIT OLLARS OHE �T HE —OHE— —SHF— RANCH BCOLE 11/08/2016 7:44AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_PAVE.DWG 52' R.0.W. 16' PARKWAY 28" FACE OF CURB 8' PARKWAY ?� 1',5' SIDEWALK 10' ' PARALLEL PARKING I ' PARALLEL PARKIN 3 2% 71P. 3 3 2% 71P. 2$ 7W. 2% 7YP. 2 SECTION A—A nor m xwe 60 R.O.W. 16' PARKWAY 28' FACE OF CURB 16" PARKWAY p� 1' 5' SIDEWALK 10" ' PARALLEL PARKIN I " PARALLEL PARKIN 10' 5' SIDEWALK 1' 3 2% TIP. 3 1 I 3 2% 7YP. 2% 7YP. 2 k VV `^ SECTION B-B nor m laic 44' R.O.W. 8' PARKWAY 20' FACE OF CURB 16' PARKWAY 5' 8' PARALLEL PARKIN 10" SIDEWALK 1" 2% TYP. 1 I \ 22- 1YP. 2% 7YP. 2% TYP. EXHIBIT 'B' 2 PAVING SECTIONS SHEET 1 OF 3 ��y 4 QUAIL VALLEY - PHASE 1 C - ON-SITE SECTION E-E November 7 2016 nor m go" HUITTZOLLA.RS WALSH RANCH BCOLE 11/08/2016 7:44AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_PAVE.DWG 60 R.O.W. 16' PARKWAY 28' FACE OF CURB 16' PARKWAY 1' 5' SIDEWALK 10' ' PARALLEL PARKING I ' PARALLEL PARKIN 10' 5' SIDEWALK 1' 3 o:l 10 2% T1P. 3 r 3 2% TYP. 2R TYP. 2R TYP. 2 SECTION 1-1 nor To SME VARARIE WIDTH R.O.W. 16' PARKWAY ' FACE OF CURB VARIABLE WIDTH ' FACE OF CURB 16' PARKWAY 5' MEDIAN 5 x. 1' 10' 8' PARALLEL PARKING 8' PARALLEL PARKING 10' SIDFWAI K 1 2% TYP. 1% MIN. M/4 r 2 TYP.2.� 3 r 1% MIN.3 2% TYP. �1 G 4% MAX. Ei���`v 2 2 .n SECTION F-F nor To smu 40' R.O.W. 8' PARKWAY 20' FACE OF CURB 12' PARKWAY 5' A� 8' PARALLEL PARKING 6' 1' 29 TYP. a 2% TYP. 2% TYP. EXHIBIT 'B' PAVING SECTIONS SHEET 2 OF 3 2 QUAIL VALLEY - PHASE 1 C - ON-SITE SECTION G-G November 7,2016 norm aoKE wt HLII1T-ZOLLAR`� WALSH RANCH BCOLE 11/08/2016 7:45AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_PAVE.DWG 48' R.0.W. 8' PARKWAY 24' FACE OF CURB 16' PARKWAY 8' PARALLEL PARKING 8' PARALLEL PARKING 10' 5 1' �I 2% TYP. 2% TYP. I 2% TYP. �\ 2% TYP. SECTION D-D NOT TO SMILE 53' R.O.W. 12' PARKWAY 28.0' 12.5' PARKWAY 1'5' SIDEWA K 6' 27. TYP. I I� p�• 2% TYP.2% TYP. 27. TYP. 2% TYP. \gyp I 4, z R, SECTION H1-H1 < nor TO SMILE 16' R.O.W. 12' EDGE OF PAVEMENT EXHIBIT 'B' PAVING SECTIONS SHEET 3 OF 3 QUAIL VALLEY - PHASE 1 C - ON-SITE November 7,2016 SECTION C—C wr ro rKc HUITf ZOLLARS WALSH EMMM RANCH BCOLE 11/08/2016 7:45AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_PAVE.DWG MATCHLINE 6+00 SEE SHEET 2 OF 4 .F. I I I ' S EW L I y TYP. Ic �0 I a I ,B 1 'B G EN 111 A�� I WALK I� 0 �Z'A ty � � c• h � t 1 � I Waisa I m�- VrsA'U� 4' c• c II c. I NORTH 1 ' , SCALE: 1" = 300' 0 150 300 600 EXHIBIT 'B' PAVING SHEET 1 OF 4 LEGEND QUAIL VALLEY - PHASE 1 C - ON-SITE 6" THICK CONCRETE PAVEMENT November 7, 2016 5" THICK SIDEWALK BY DEVELOPER O\&q HUI1T-7SJLLARS WALSH RANCH BCOLE 11/08/2016 7:45AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1 C\EXHIBITS\CFA_PH1 C_PAVE.DWG -- _ _SS- 5_ SSS" SCJ I --- II � — O / _=L_ Off/ B � / NORTH ' SID AL 4 111 II / SCALE: 1" = 300' 0 150 300 600 c 'c' 111 EXHIBIT 'B' .c I PAVING SHEET 2 OF 4 MATCHLINE 6+00 SEE QUAIL VALLEY - PHASE 1 C - ON-SITE LEGEND SHEET 1 OF 4 November 7, 2016 6" THICK CONCRETE PAVEMENT 5" THICK SIDEWALK BY DEVELOPER HUIT MOLARS WALSH RANCH BCOLE 11/08/2016 7:46AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_PAVE.DWG -z ULD 0LD1IlSL 7jWMRD RUAD / I � li' MARY'S wmGE R0A•D - -� 5' SIDE — —cHE-- —`- NP1 5' SIDEWALK 'B TYP. I a a Kq N 49 A C E ED 1 e NORTH� 5' SID A K C' 'C' TyP' C' 'C' SCALE: 1" = 300' I F' A' 0 150 300 600 EXHIBIT 'B' MATCHLINE 6+00 SEE PAVING SHEET 3 OF 4 LEGEND SHEET 4 OF 4 QUAIL VALLEY - PHASE 1 C - ON-SITE November 7,2016 6" THICK CONCRETE PAVEMENT 5" THICK SIDEWALK BY DEVELOPER VOW HUITT ZOLLAR WALSH RANCH BCOLE 11/08/2016 7:46AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHI8ITS\CFA_PH1C_PAVE.DWG MATCHLINE 6+00 SEE SHEET 3 OF 4 b A. S 00 'C' l� L aw B' c E• ,8 A. � E. a• I W W W P $L �W a 'B' 'B 'c' 'c NORTH \ ` WALSH AVENZJ� ®® SCALE: 1" = 300' 0 150 300 600 EXHIBIT 'B' PAVING SHEET 4 OF 4 LEGEND QUAIL VALLEY - PHASE 1 C - ON-SITE 6" THICK CONCRETE PAVEMENT November 7,2016 5" THICK SIDEWALK BY DEVELOPER HUITf ZOLLARS WALSH RANCH BCOLE 11/08/2016 7:50AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_STRM.DWG 10' CURB INLT \ 21" RCP I 1 1 — :• 10' CURB INLT 24" RCP `� � I I 21" RCP '. 21" RCP 10' CURB INLT '- \ `� 10' CURB INLT ` K .21" RCP 10' CURB INLT 21" RCP': � .................... I I i 1 1 � 10' CURB INLT . . . .••` �� .. 21" RCP 24" RCP :......... 24" RCP C 1 I 21'..RCP' I PCZ-- 10' CURB INLT 4' SQ. MH t4 21" RCP ' RCP.• � 21" RCP" //� II I i I 1 1 4' SQ. MH 21 RCP 10' CURB INLT n I 1 10' CURB INLT 1 21" RCP I I I 21" RCP`. 21" RCP 1 21' RCP : l ]0 CURB INLT 10' CURB INLT Er 10' CURB INLT , 10' CURB INLT 10' CURB INLT I I 1 10' CURB INLT �.: .. IU R 1 1 �, MED MDY AK 24"'RCP..:. RIP-RAP I 1 21" RCP •....::..... pL-ACS I I I ' 21" RCP`9�G k: 1 I I I 36" RCP �Y ; 21" RCP 21" RCP I I PHASE 1A 10' CURB INLT TYPE 'B" d.' 10 CURB INLT HDWL N:_ 10' CURB INLT 1I III _ I I 10' CURB INLT _ L21" RC'P RC I I IW \\ 21" RCP III I „ —W_. PHASE21 1A 10' CURB INLT 24" RCP 30" RCP \ PHASE 1 PHASE 1A d \J 60" RCP PHASE 1A 48" RCP PHASE 1A SII � 24" RCP 30" RCP PHASE 1A 60" RCP PHASE 1A PHASE 1 `V EXHIBIT 'B-1' NORTH STORM SHEET 1 OF 9 QUAIL VALLEY - PHASE 1 C - ON-SITE November 7, 2016 SCALE: 1" = 160' w= H i r UIiTT ZOLM 0 80 160 320 WALSH xAKIT CH BCOLE 11/08/2016 7:50AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHI8ITS\CFA_PH1C_STRM.DWG V 10' CURB INLT 10' CURB INLT 21" RCP fsj 4' SQ. MH l TYPE "B" HD WL 21" RCP MEDIUM DRY I RIP-RAP l W A LEY E Ill I w MEDIUM DRY I RIP-RAP I 10' CURB INLT "PSET-SC" HDWL \ 10' CURB INLT 10' CURB INLT 2 •• 30' RCP RI 21" RCP C/�- 42" RCP - ... .... ?1" RC.:... .. P `. 10' CURB 1 INKY P 1" RCP 21" RCP 10' CURB INLT5' SQ. MH 10' CURB INLT 'Z, 21"• "' 21" RCP 14' DROP INL RCP 21 RCP 10' CURB INLT I I 36" RCP 36" RCP " .� •'' � T 2 4' SQ. MH 24" RCP I , 10' CURB INLT 21" RCP I I 30 I RCP INLT 21" RCP 21" RCP ... .2q" II 'I,�I NORTH 10' CURB INLT 21 RCP 2�,. RCPB INLT/ 4,i RCP � 1 - IK Nh, \ /10' CURB INLT 2 � 1 24" RCP....* - 4' .SQ. MH 10' CURB INLT 1 ` \\ SCALE: 1" = 160' / L�vgS �•• � 0 80 160 320 EXHIBIT 'B-1' STORM SHEET 2 OF 9 QUAIL VALLEY - PHASE 1C -ON-SITE November 7, 2016 wt HUITMOLLARS WALSH RANCH. BCOLE 11/08/2016 7:51AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHI8ITS\CFA_PH1C_STRM.DWG -OHE- OFFSITE ITEMS SHOWN ��E- -'- HE IN OFFSITE CFA EXHIBITS \�� * 21" RCP -- 10' CURB INLT 10CURB INLT l 21" RCPT - 15' CURB INLT _ -� �`"'..• — ...... 4' SQ. MH . — _ ——— I I MEDIUM DRY \ \ I I RIP—RAP I 21" RCP 'PSET—SC" HDWL w 24" RCP 10' CURB INLT 10' CURB INLT 5' Q. MH EF, CpUR S ADE .,REE STREET Og,N - N^ ................. ...... C 4�Q 30 RCP riR / 4' SQ. MH 10 CURB INLT 21" RCP 21" RCP / 21" RCP 10' CURB INLT 21" RCP 4' DROP INLT21" RCP' 10' CURB INLT 10' CURB INLT SCALE: 1" = 160' 10 CURB INLT � I I •••• 21" RCP �\ / 0 80 160 320 21" RCP I EXHIBIT 'B-1' 10' CURB INLT STORM SHEET 3 OF 9 TQUAIL VALLEY - PHASE 1C - ON-SITE 10' CURB INLT `_ November 7,2016 10' CURB INLT 21" RCP 21" RCP 4' DROP INLT 5' SQ. MH 10' CURB INLT 10' CUi NUITT Z�JLLARS 1 WALSH RANCH BCOLE 11/08/2016 7:51AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_STRM.DWG i MEDIUM DRY RIP_ JZ P 'PSEI'—SC" HDWL 4' SQ. MH 24" RCP 10' CURB INLT 'i 21" RCP 21 RCP 10' CURB INLT " ' 10' CURB INLT ��� '•. 1ji '• 24" RCP .............. 24" RCP CURB INLT 10' CURB INLT A ,24" RCP 4SQ. MH 24" RCP 4' DROP INLT 10' CURB INLT 24" RCP24" RCP NORTH 10' CURB INLT 24" RCP MEDIUM DRY RIP—RAP \ ' 21" RC\ SCALE: 1" = 160' 0 80 160 320 EXHIBIT 'B-1' STORM SHEET 4 OF 9 "PSET-SC" QUAIL VALLEY - PHASE 1 C - ON-SITE HDWL November 7, 2016 l I 10' CURB INLT HUIT MOLLAR WALSH RANCH BCOLE 11/08/2016 7:52AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHI8ITS\CFA_PH1C_STRM.DWG \ 4' SQ. MH 4' SQ. MH OFFSITE ITEMS SHOWN IN OFFSITE CFA EXHIBl1� - 21" RCP ' -OHE- ....-.. • � 4' SQ. MH —oHE— � 30 ... " RCP "" 10' CURB INLT ` —r)�� 21" RCP — — �' 4' DROP INLT 24" RCP___ -"HE- - --OHE- -110' CURB INLT , -� 21" RCP 4' SQ. MH 10' CURB INLT 10' CURB 21 RCP 24" RCP 21" RCP " , 4' DROP INLET 10' CURB INLT 4' SQ. MH 24" RCP / 5' SQ. MH 10' CURB INLT 21" RCP 21" ,P �� .-RCP .'OUgT NORTH •.::�� 10' CURB INLT ' .�$IEyQ C 10' CURB INLT I SCALE: 1" = 160' � 24" RCP 21" RCP ' 10' CURB INLT 24" RCP 0 80 160 320 24" RCP 4' SQ. MH 10' CURB INLT .` MEDIUM DRY ' 24" RCP RIP RAP ROAD 24 '**........ W SLI# ,-............. .. RCP •.... x': 24" RCP 10' CURB INLT 24" RCP 30" RCP 4' SQ. MH 1 EXHIBIT '13-1' 24" RCP 10' CURB INLT STORM SHEET 5 OF 9 10' CURB INLT 10' CURB INLT 21 11RCP 21" RCP ' 24" RCP 1 QUAIL VALLEY - PHASE 1C -ON-SITE 21" RCP :'N� 10' CURB INLT November 7, 2016 4' SQ. MH ;P 4' DROP INLT HU11T Z�JLLARS TYPE 'B„ _ G 10' CURB INLT :21" RCP H/DWL WALSH / RANCH BCOLE 11/08/2016 7:52AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_STRM.DWG 21" RCPT i 24" RCP 10' CURB INLT 24" RCP 21" RCP MEDIUM DRY 21" RCP _ l 10' CURB INLT RIP-RAP 10' CURB INLT 10' CURB INLT a 24 RCP 24" RCP MEDIUM DRY 24' RCP 24" RCP -21..." RCP_ RIP-RAP 4' SQ. MH 21" RCP ' � --_ - =741 , c 12" RCP c>,�J 21 RCP - 10' CURB INLT 10' CURB INLT 4' DROP INLT 4' DROP INLT '30 4' SQ. MH 4' DROP INLT 10' CURB INLT ' RCP .•.••• 4' SQ. MH 21" RCP U 'PSET-SC' HDWL - 21" RCP 'PSET-SC' HDWL � 24" RCP 10' URB IN 42" RCP 24" RCP 24" RCP - 4 RCP !"� 4' SQ. MH 24" RCP 70 4' SQ. MH E N - 21" RCP ••• •24" RC;TIT] 24" RCP v o , p................. ..... . .. . . •••••.21" RCP..... \ 21" RCP 10' CURB 21" RCP 10' CURB INLT /10' CURB INLT 24" RCP 24" RCP. 1 24" RCP 10' CURB IN 10' URB IN T 21" RCP CURB INLT 24" RCP' .• MEDIUM DRY 2 N RIP-RAP .21" RCP1 ' CUR IN 'PSET-SC HDWL' '21" RCP n \•'. 5' SQ. MH -o V. /. • 10' CURB INLT 21" RCP / ` ` 10' CURB INL /// 10' CURB INLT "..............._.......... 21" RCP ?� NORTH 4„ RCP �� 10' CU 8 IN 10' CURB INLT '\ - - ' 0' CURB INLT *.� SCALE: 1" = 160' 1 0 80 160 320 EXHIBIT 'B-1' STORM SHEET 6 OF 9 QUAIL VALLEY - PHASE 1C -ON-SITE November 7, 2016 HUHTZOLLARS WALSH RANCH BCOLE 11/08/2016 7:53AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHI8ITS\CFA_PH1C_STRM.DWG 1; '•., Y `\ \. 4' DIA. MH 21" RCP- � ... 21" RCP `• \ \\/ ���• 10' CURB IN 10' U B IN v .. c� ''•. 21" RCP 21" RCP 10' CURB I .....-.. 21" RCP 24„ RCP 10 .......................... :` 0' URB INLT ;' ." ' UR IN _ PLA \ .CR_ ... 21" RCP 10' CURB INL 21" RCP �Yry�.0• 10' R IN T 21" RCP 21" RCP10' C R INL "F 21" RCP PHASE 1 B 0 4' SQ. MH 21" RCP cp 10' CURB INLT_ 10' CURB INLT 21" RCP 24" RCP 10' CURB INLT PHASE 1A _21" RCP 10' CURB INLT 24" RCP 21" RCP PHASE IA PHASE 1 A 10' CURB INLT 4" RCP GALS$ PHASE 1A \ ` V'E'NUE 0 30" RCP 30" RCP PHASE 1A PHASE 1A EXHIBIT 'B-1' NORTH STORM SHEET 7 OF 9 QUAIL VALLEY - PHASE 1 C - ON-SITE November 7, 2016 SCALE: 1" = 160' HUITT ZOLLAIV 0 80 160 320 WALSH RANCH BCOLE 11/08/2016 7:53AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_STRM.DWG "PSET—SC" 4' DROP INLT HDWL 27" RCP 1 27" RCP . 10' CURB INLT MEDIUM DRY 1 ' e9 21" RCP ` I RIP—RAP 24" RCP 24" RCP AfR COUR� / 21" RCP 4' SQ. MH 10' CURB INLT ; 10' CURB INLT c� 21" RCP P 10' CURB INLT CN ALLEY Q - ALLEY N 1 10' CURB INLT �N {' 21" RCP - I 1 21" RCP NORTH 1 10' CURB INLT ",••..; SCALE: 1" = 160' 1 0 80 160 320 CRESCEN STREET - EXHIBIT 'B-1' STORM SHEET 8 OF 9 QUAIL VALLEY - PHASE 1C -ON-SITE November 7,2016 HUNT OLLARS WALSH RANCH BCOLE 11/08/2016 7:54AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1 C\EXHIBITS\CFA_PH 1 C_STRM.DWG -�HE� -f- -OHE- -_------------------J( -OHE- I 1 / I (I 24" RCP I I 24" RCP / 4' SQ. MH I I 10' CURB INLT l ® r I I 21" RCP J21" RCP l l 10' CURB INLT "PSET—Sc" l 24" RCP 24" RCP HDWL 21"RCP / 10' CURB INLT 36" RCP MEDIUM DRY 10' CURB INLT 4' SQ. MH RIP—RAP \ 4' SQ. MH 4' SQ. MH 10' CURB INLT NORTH 30" RCP � 30" RCP � •' I ' 24" RCP 24' RCP x ..................... / , � 21" RCP '� 10' CURB INLT 21" RCP .21" RCP SCALE: 1" = 160' ` 10CURB INLT `• 2�1' CR' CR p 10 CURB INLT .VQ 24" RCP 0 80 160 320 ,24" RCP 1 10' CURB INLT W ?cV r 21" RCP 21" RCP '• � EXHIBIT 'B-1' w: 4' SQ. MH STORM SHEET 9 OF 9 w 24" RCP QUAIL VALLEY - PHASE 1 C - ON-SITE 21 ' RCP 10' CURB INLT November 7,2016 � X24" RCP ' 10 CURB INLT 21' RCP 21" RCP � •` l v 10' CURB INLT HUITF ZOLLARS W 10' CURB INLT WALSH RANCH BCOLE 11/08/2016 8:OOAM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_SIGN.DWG POLE 31 �..: l 30" STOP SIGN POLE 39 1 2— NAME BLADES O II 30 STOP SIGN 2— NAME BLADES POLE 32 30" STOP SIGN r 2— NAME BLADES I/ POLE POLE 36 30" Wl—lR 18" W13-1P 15 MPH 30" STOP SIGN POLE 37 I 1 II II 2— NAME BLADES 30" STOP SIGN 79 2— NAME BLADES 2OL NAME BLADES 11 POLE 35 � 1 30" STOP SIGN 2— NAME BLADES = POLE 33 _ I 30" STOP SIGN i POLE 34 \ 2— NAME BLADES 30" STOP SIGN _ 2— NAME BLADES POLE 77 30" W1-1L I I 18" W 13-1 P 15 MPH I I EXHIBIT 'C-1' LEGEND SIGNAGE SHEET 1 OF 9 4" SLEEVE NA QUAIL VALLEY - PHASE 1C -ON-SITE 6" SLEEVE , ` November 7, 2016 16" SLEEVE SCALE: 11mmm60'160' HUITf ZOLRARS 0 80 160 320 RAANCH BCOLE 11/08/2016 8:01AM H:\PROJ\R30306102\04-DESIGN\CIVIL\CFA\PHASE 1C\EXHlBlTS\CFA_PH1C_SlGN.DWG _ f /� �I I I\ a" LEGEND POLE 26 I I I I 4" SLEEVE 30 STOP SIGN 2— NAME BLADES 6" SLEEVE 16" SLEEVE ' : I � J I I I II • __ i � I I I POLE 27 II 30" STOP SIGN 2— NAME BLADES POLE 29 POLE 28 NORTH 30" STOP SIGN 30 STOP 2— NAME BLADES I SIGN 2— NAME BLADES I I ' , POLE 74 I I1 30" W1-1R 18" W13-1 P 15 MPH J J I I III I SCALE: 1 160' POLE 30 80 160 320 30" STOP SIGN 2— NAME BLADES 11 I /` I EXHIBIT 'C-l' SIGNAGE SHEET 2 OF 9 POLE 80 �2— NAME BLADES QUAIL VALLEY - PHASE 1 C - ON-SITE III November 7, 2016 POLE 38 (POLE 75 30 STOP SIGN " Wl—lL 2—"NAME BLADES �30­ —1 P 15 MPH 18 W13 (& HUITMOLLARS WALSH RANCH F BCOLE 11/08/2016 8:01AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_SIGN.DWG 0 -�� r-� — POLE 1913 I 30" STOP SIGN � 2— NAME BLADES� ••/ � III POLE 25 30" STOP SIGN 2— NAME BLADES l / 6-SLaw rn. EXHIBIT 'C-1' LEGEND SIGNAGE SHEET 3 OF 9 4" SLEEVE NORTH QUAIL VALLEY - PHASE 1C - ON-SITE 6" SLEEVE November 7,2016 16" SLEEVE SCALE: 1" - 160' HLI ITT ZOLLARS 0 80 160 320 RANCH BCOLE 11/08/2016 8:01AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_SIGN.DWG LB • LEGEND O 4" SLEEVE POLE 02 6" SLEEVE \\ \ 30" W 1-1 L % 16" SLEEVE \\ 18" W13-1P 15 MPH -A / POLE 01 _ POLE 18 _ 2- NAME BLADES 30" STOP SIGN 2- NAME BLADES POLE 03 J 30" W1-1R / 18" W13-1P 15 MPH 1 a \ / •SLEEVE TM POLE 17 ✓ -. 30" STOP SIGN 1 2- NAME BLADES �" 30" DO NOT ENTER �_/. NORTH POLE 16 30" STOP SIGN d : 2- NAME BLADES I POLE 08 POLE 14 SCALE: 1" = 160' 30" STOP SIGN POLE15 30" STOP SIGN 0 80 160 320 2- NAME BLADES 30" STOP SIGN 12- NAME BLADES 2- NAME BLADES _ EXHIBIT 'C-1' J l / SIGNAGE SHEET 4 OF 9 QUAIL VALE- PHAber SE -ON-SITE 16 HUITTZOLLARS WALSH MMMMMI RANCH BCOLE 11/08/2016 8:02AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHI8ITS\CFA_PH1C_SIGN.DWG POLE 21 POLE 20 / 30" DO NOT ENTER 30" STOP SIGN -----1 / POLE 24 LEGEND Nw 30" DO NOT ENTER .........:::@ 30 STOP SIGN 2— NAME BLADES 2— NAME BLADES 4" SLEEVE / \ 6" SLEEVE 16' SLEEVE POLE 80 :\ 30" STOP SIGN POLE 222— NAME BLADES .` 30" STOP SIGN 30" DO NOT ENTER POLE 23 2— NAME BLADES 30" DO NOT ENTER 4'SLEEVE TYR POLE 73 — 30" STOP SIGN ,\ 2— NAME BLADES 30" DO NOT ENTER \ POLE 41 �1 :• 30" STOP SIGN •"'"" ' --- 2— NAME BLADES NORTH POLE .'� 30" STOP SIGN POLE 43 — NAME BLADES 30" STOP SIGN 2— NAME BLADES n SCALE: 1" = 160' 4'SLEEVE 7W. POLE 44 '� �, 0 80 160 320 30" STOP SIGN � \ 2— NAME BLADES ::. ', 6 TYR EXHIBIT 'C-1' �\ SIGNAGE SHEET 5 OF 9 POLE 40 QUAIL VALLEY - PHASE 1 C ON-SITE 30" STOP SIGN / November 7, 2016 2— NAME BLADES HUITT ZOLLAR WALSH RANCH BCOLE 11/08/2016 8:02AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_SIGN.DWG POLE 10 / LEGEND 30" STOP SIGN 4" SLEEVE 2— NAME BLADES 6" SLEEVE 44 16" SLEEVE POLE 11 30 STOP SIGN 2— NAME BLADES POLE 09 30" STOP SIGN 2— NAME BLADES P _ OLE 13 30" STOP SIGN " 2— NAME BLADES ., ---- POLE 12 30" STOP SIGN 2— NAME BLADES POLE 46 s irr 30 STOP SIGN POLE 62 2— NAME BLADES 30" STOP SIGN 2— NAME BLADES / NORTH POLE 47 30" STOP SIGN \ \`� SCALE: 1" = 160' 2— NAME BLADES \•. 0 80 160 320 EXHIBIT 'C-1' R + ' \ SIGNAGE SHEET 6 OF 9 QUAIL VALLEY - PHASE 1 C - ON-SITE November 7, 2016 �R HUITT OLLARS WALSH RANCH BCOLE 11/08/2016 8:02AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_SIGN.DWG LEGEND \ 4" SLEEVE 6" SLEEVE I16" SLEEVE I POLE 63 30" STOP SIGN h 2— NAME BLADES 30" DO NOT ENTER INORTH I — POLE 64 30 STOP SIGN 2— NAME BLADES I , 30" DO NOT ENTER .: SCALE: 1" = 160' I : ♦ 0 80 160 320 POLE 65 I�30" DO NOT ENTER XHIB E _ IT C 1 SIGNAGE SHEET 7 OF 9 QUAIL VALLEY - PHASE 1C - ON-SITE November 7,2016 VOW HUU-MLLARS WALSH RANCH BCOLE 11/08/2016 8:03AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1C\EXHIBITS\CFA_PH1C_SIGN.DWG POLE 66 POLE 67 30" DO NOT ENTER POLE 60 30" STOP SIGN 30" DO NOT ENTER \ 2— NAME BLADES POLE 61 POLE 48 30" DO NOT ENTER ' .=...... •• 30" STOP SIGN / POLE 59 \ ' ' 2— NAME BLADES POLE 68 30" STOP SIGN / 30" STOP SIGN 30" DO NOT ENTER ' 2— NAME BLADES POLE 10 2— NAME BLADES POLE 58 30 STOP SIGN POLE 69 30" STOP SIGN POLE 49 2— NAME BLADES 30" STOP SIGN 30" DO NOT ENTER 30" STOP SIGN 2— NAME BLADES 2— NAME BLADES BLADES :•: POLE 70 / POLE 57 30" DO NOT ENTER 30" STOP SIGN 30" DO NOT ENTERPOLE 56 :' = POLE 50 2— NAME BLADES — :.. 30" STOP SIGN .:•'= ` _ __ 30" STOP SIGN 2— NAME BLADES ;.;,'.� POLE 55 2— NAME BLADES POLE 71 30" STOP SIGN/'...• 30" DO NOT ENTER , 2— NAME BLADES POLE 53 POLE 54 30" STOP SIGN 30" STOP SIGN _ 2— NAME BLADES 2— NAME BLADES ` POLE 52 I POLE 72 \ 30" STOP SIGN 30" STOP SIGN 2— NAME BLADES 2— NAME BLADES — POLE 51 30" STOP SIGN \ 2— NAME BLADES EXHIBIT 'C-1' LEGEND SIGNAGE SHEET 8 OF 9 4" SLEEVE NORTH QUAIL VALLEY - PHASE 1C - ON-SITE 6' SLEEVE November 7,2016 16" SLEEVE SCALE: 1" - 160' HUHT ZOLLARS EmEq o A so 160 320 RANCH BCOLE 11/03/2016 8:03AM H:\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1 C\EXHIBITS\CFA_PH 1 C_SIGN.DWG I POLE 04 I 30" STOP SIGN I POLE 05 l 30" STOP SIGN l POLE 06 / 30" STOP SIGN 4'SLEEVE TYP. f .• POLE 78 30" STOP SIGN ;, POLE 07 30" STOP SIGN 2— NAME BLADES EXHIBIT 'C-1' LEGEND FYRAN NAGE SHEET 9 OF 9 4" SLEEVE NORTH LLEY - PHASE 1C - ON-SITE 6" SLEEVE November 7,2016 16" SLEEVE SCALE: 1" - 160' HUITMOLLARS 0 80 160 320 00 42 43 DAP-BID PROPOSAL Page 1 of 5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM-Walsh Ranch Quail Valley Phase 1 C UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT I:WATER IMPROVEMENTS 1 3311.0261 8"PVC Water Pipe 3311 12 LF 27,916 $41.94 $1,170,797.04 2 3311.0264 8"PVC Water Pipe,CLSM Backfill 3311 12 LF 140 $38.00 $5,320.00 3 3311.0461 12"PVC Water Pipe 3311 12 LF 2,406 $42.00 $101,052.00 4 3312.3003 8"Gate Valve 33 12 20 EA 95 $1,150.00 $109,250.00 5 3312.3005 12"Gate Valve 33 12 20 EA 9 $2,000.00 $18,000.00 6 3305.0003 8"Waterline Lowering 33 05 12 EA 38 $3,500.00 $133,000.00 7 3312.0001 Fire Hydrant 33 12 40 EA 28 $4,200.00 $117,600.00 8 3312.2003 1"Water Service 33 12 10 EA 482 $900.00 $433,800.00 9 0241.1118 4"-12"Pressure Plug 0241 14 EA 1 $500.00 $500.00 10 3312.4112 16"x 8"Tapping Sleeve&Valve 33 12 25 EA 4 $3,500.00 $14,000.00 11 3312.4114 16"x 12"Tapping Sleeve&Valve 33 12 25 EA 1 $4,500.00 $4,500.00 12 9999.0011 Temporary Automatic Flushing Valve 00 00 00 EA 1 $16,500.00 $16,500.00 13 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 6.00 $4,000.00 $24,000.00 14 3312.0117 Connection to Existing 4"-12"Water Main 331225 EA 14 $1,000.00 $14,000.00 15 3305.0116 Concrete Encasement for Utility Pipes 33 05 10 CY 50.8 $150.00 $7,620.00 16 3312.0002 Water Sampling Station 33 12 50 EA 2 $1,500.00 $3,000.00 17 9999.0002 Trench Safety 33 05 10 LF 30,462 $0.25 $7,615.50 18 9999.0039 1"Irrigation Service with Meter 33 12 10 EA 4 $2,000.00 $8,000.00 19 9999.0040 1 1/2"Irrigation Service with Meter 33 12 10 EA 5 $2,500.00 $12,500.00 20 9999.0041 2"Irrigation Service with Meter 331210 EA 3 $3,000.00 $9,000.00 21 9999.0042 1"Water Service Connection to Existing 16" 331210 EA PVC Water Line 28 $2,000.00 $56,000.00 22 9999.0031 3"Schedule 200 Irrigation Sleeve 000000 LF 511 $18.00 $9,198.00 23 9999.0032 4"Schedule 200 Irrigation Sleeve 000000 LF 36 $20.00 $720.00 24 9999.0033 6"Schedule 200 Irrigation Sleeve 00 00 00 LF 36 $30.00 $1,080.00 25 9999.0034 8"Schedule 200 Irrigation Sleeve 000000 LF 199 $40.00 $7,960.00 26 9999.0035 12"Schedule 200 Irrigation Sleeve 00 00 00 LF 302 $55.00 $16,610.00 27 19999.0036 16"Schedule 200 Irrigation Sleeve 1 00 00 00 ILF 207 $60.00 $12,420.00 TOTAL UNIT I:WATER IMPROVEMENTS $2,314,042.54 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS WALSH RANCH-QUAIL VALLEY-PHASE I C Form Version September 1,2015 HZ PROJECT R303061.02 00 42 43 DAP-BID PROPOSAL Page 2 of 5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM-Walsh Ranch Quail Valley Phase 1 C UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid Description Unit Price Bid Value No. Section No. Measure Quantity UNIT II:SANITARY SEWER IMPROVEMENTS 1 3331.4115 8"Sewer Pipe 3331 20 LF 28,236 $36.00 $1,016,496.00 2 3331.4116 8"Sewer Pipe,CSS Backfill 3331 20 LF 760 $56.00 $42,560.00 3 3331.4201 10"Sewer Pipe 3331 20 LF 752 $48.00 $36,096.00 4 3331.4208 12"Sewer Pipe 3331 20 LF 325 $56.00 $18,200.00 5 3331.4215 15"Sewer Pipe 3331 20 LF 1,265 $62.00 $78,430.00 6 3305.1103 20"Casing By Other Than Open Cut 33 05 22 LF 370 $260.00 $96,200.00 7 9999.0043 22"Casing By Other Than Open Cut 33 05 22 LF 36 $280.00 $10,080.00 8 3339.1001 4'Manhole 333920 EA 184 $3,200.00 $588,800.00 9 3339.1002 4'Drop Manhole 333920 EA 7 $5,200.00 $36,400.00 10 3339.1003 4'Extra Depth Manhole 333920 VF 200 $195.00 $39,000.00 11 9999.0013 Construct 5'Diameter Sanitary Sewer 00 00 00 EA Manhole Over Existing Line _ 3 $6,000.00 $18,000.00 12 9999.0014 Construct 6'Diameter Sanitary Sewer 00 00 00 EA Manhole Over Existing Line 1 $7,500.00 $7,500.00 13 3339.0003 Wastewater Access Chamber 33 39 40 EA 2 $3,500.00 $7,000.00 14 3331.3101 4"Sewer Service 33 31 50 EA 475 $650.00 $308,750.00 15 0241.2015 Remove 12"Sewer Line 0241 14 LF 38 $30.00 $1,140.00 16 3305.0113 Trench Water Stops 33 05 15 EA 76 $300.00 $22,800.00 17 3339.0001 Epoxy Manhole Liner 333960 VF 505 $175.00 $88,375.00 18 3305.0202 Imported Embedment/Backfill,CSS 33 05 10 CY 1,000 $30.00 $30,000.00 19 9999.0015 Remove Plug and Connect to Existing 00 00 00 EA 7 $1,000.00 $7,000.00 20 9999.0017 Connect to Existing 6'Diameter Sanitary 00 00 00 EA 1 $2,500.00 $2,500.00 21 0241.0100 Remove Sidewalk 0241 13 SF 2,000 $2.00 $4,000.00 22 3292.0201 Utility Service Surface Restoration Seeding 32 92 13 SY 6,000 $2.00 $12,000.00 23 3305.0110 Utility Markers 33 05 26 LS 1 $5,000.00 $5,000.00 24 3301.0002 Post-CCTV Inspection 3301 31 LF 31,744 $2.00 $63,488.00 25 3301.0101 Manhole Vacuum Testing 3301 30 EA 197 $100.00 $19,700.00 26 3305.0109 Trench Safety 33 05 10 LF 31,338 $1.00 $31,338.00 27 28 29 TOTAL UNIT II:SANITARY SEWER IMPROVEMENTS $2,590,853.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS WALSH RANCH-QUAIL VALLEY-PHASE 1 C Forth Version September 1,2015 HZ PROJECT 8303061.02 00 42 43 DAP-BID PROPOSAL Page 3 of 5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM-Walsh Ranch Quail Valley Phase 1 C UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT III: DRAINAGE IMPROVEMENTS 1 3341.0201 21"RCP, Class 111 3341 10 LF 2,150 $45.00 $96,750.00 2 3341.0205 24"RCP,Class III 3341 10 LF 11,563 $50.00 $578,150.00 3 3341.0208 27"RCP,Class 111 3341 10 LF 515 $55.00 $28,325.00 4 3341.0302 30"RCP,Class 111 3341 10 LF 2 319 $62.00 $143,778.00 5 3341.0309 36"RCP,Class III 3341 10 LF 124 $82.00 $10,168.00 6 3349.0001 4'Storm Junction Box 33 49 10 EA 27 $4,000.00 $108,000.00 7 3349.0002 5'Storm Junction Box 33 49 10 EA 5 $5,000.00 $25,000.00 8 3349.5001 10'Curb Inlet 33 49 20 EA 117 $2600.00 $304,200.00 9 3349.5002 15'Curb Inlet 33 49 20 EA 6 $3,600.00 $21,600.00 10 3349.7001 4'Drop Inlet 33 49 20 EA 9 $4,000.00 $36,000.00 11 3349.1003 24"Flared Headwall, 1 pipe 33 49 40 EA 1 $2,000.00 $2,000.00 12 3349.1005 30"Flared Headwall, 1 pipe 33 49 40 EA 2 $2,500.00 $5,000.00 13 3349.3002 21"Straight Headwall, 1 pipe 33 49 40 EA 1 $1,850.00 $1,850.00 14 3349.3003 24"Straight Headwall, 1 pipe 33 49 40 EA 3 $2,000.00 $6,000.00 15 3349.3004 27"Straight Headwall, 1 pipe 33 49 40 EA 1 $2,500.00 $2,500.00 16 13349.3005 30"Straight Headwall, 1 pipe 33 49 40 EA 2 $3,000.00 $6,000.00 17 3349.3009 42"Straight Headwall, 1 pipe 33 49 40 EA 1 $4,000.00 $4,000.00 18 9999.0003 Factory Storm Wye Connection 00 00 00 EA 110 $300.00 $33,000.00 19 3305.0112 Concrete Collar 33 05 17 EA 49 $250.00 $12,250.00 20 9999.0020 RCP Plug 00 00 00 EA 37 $300.00 $11,100.00 21 9999.0019 Remove Plug and Connect to Existing RCP 00 00 00 EA 2 $1000.00 $2,000.00 22 3136.0104 Twisted Gabion Mattresses 31 3600 CY 29.5 $200.00 $5,900.00 23 3137.0104 Medium Stone Riprap,dry 31 3700 SY 1 000 $55.00 $55,000.00 24 9999.0021 Structural Concrete Structures 00 00 00 CY 500 $650.00 $325,000.00 25 0241.3019 Remove 36"Storm Line 0241 14 LF 165 $30.00 $4,950.00 26 0241.4201 Remove 4'Drop Inlet 0241 14 EA 2 $1,000.00 $2,000.00 27 9999.0010 Remove Ex. Inlet and RCP and Conn.To 00 00 00 LS Ex. 3 $2,000.00 $6,000.00 28 3201.0614 Conc Pvmt Repair, Residential 3201 29 SY 38 $70.00 $2,660.00 29 3305.0106 Manhole Adjustment, Major 33 05 14 EA 1 $2,500.00 $2,500.00 30 13301.0002 Post-CCTV Inspection 3301 31 LF 1 16,776 $2.00 $33,552.00 31 3305.0109 Trench Safety 33 05 10 LF 16,776 $1.00 $16,776.00 32 9999.0024 Connect to Existing RCP 00 00 00 EA 1 $1 000.00 $1,000.00 33 9999.0025 Connect to Existing RCP by CORE 00 00 00 EA 2 $2,500.00 $5,000.00 34 3349.3007 36"Straight Headwall, 1 pipe 33 49 40 EA 1 $3,500.00 $3,500.00 35 9999.0026 2'x2'Grate Inlet 00 00 00 EA 1 $2,000.00 $2,000.00 36 9999.0001 12"C900-CL150 PVC 00 00 00 LF 42 $50.00 $2,100.00 37 9999.0028 Connect to Exist Concrete Structure 00 00 00 EA Manhole or Drop Inlet by CORE 2 $2,500.00 $5,000.00 38 3341.0402 42"RCP,Class 111 3341 10 LF 63 $115.00 $7,245.00 39 9999.0030 12"Parallel Headwall-1 pipe 00 00 00 EA 2 $1,500.00 $3,000.00 40 13137.0103 Large Stone Riprap,grouted 1 31 3700 ISY 1 290 $150.001 $43,500.00 TOTAL UNIT III: DRAINAGE IMPROVEMENTS $1,964,354.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS WALSH RANCH-QUAIL VALLEY-PHASE I C Form Version September 1,2015 HZ PROJECT 8303061.02 00 42 43 DAP-BID PROPOSAL Page 4 of 5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM-Walsh Ranch Quail Valley Phase 1 C UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. Measure Quantity UNIT IV: PAVING IMPROVEMENTS 1 3213.0101 6"Conc Pvmt 32 13 13 SY 97,869 $32.00 $3,131,808.00 2 9999.0009 6"Conc.Pvmt(Alley) 32 13 13 SY 4,895 $33.00 $161,535.00 3 3211.0501 6"Lime Treatment 32 11 29 SY 110,517 $5.01 $553,690.17 4 3211.0400 Hydrated Lime 32 11 29 TN 1,792 $175.00 $313,600.00 5 3213.0302 5"Conc Sidewalk 32 13 20 SF 27,327 $4.00 $109,308.00 6 3213.0506 Barrier Free Ramp,Type P-1 32 13 20 EA 71 $1,200.00 $85,200.00 7 9999.0006 Street Header 00 00 00 LF 29 $20.00 $580.00 8 9999.0022 Connect to Existing Street Header 00 00 00 LF 232 $20.00 $4,640.00 9 3217.0501 24"SLD Pvmt Marking HAE(W) 32 17 23 LF 126 $12.00 $1,512.00 10 3441.4003 Furnish/Install Alum Sign Ground Mount 3441 30 EA City Std. 88 $650.00 $57,200.00 11 9999.0005 Type III Barricade 00 00 00 EA 1 $800.00 $800.00 12 9999.0023 Remove and Dispose of Existing Barricade 00 00 00 EA 8 $300.00 $2,400.00 13 0241.1000 Remove Conc Pvmt_ 0241 15 SY 702 $12.00 $8,424.00 14 3213.0104 9"Conc Pvmt 32 13 13 SY 911 $63.95 $58,258.45 15 3211.0502 8"Lime Treatment 32 11 29 SY 1,140 $3.00 $3,420.00 16 9999.0027 Connect To Existing Concrete Pavement By 00 00 00 LF Lonqitudinal Butt Joint _ 2,053 $12.00 $24,636.00 17 9999.0037 Barrier Free Ramp,Detail'A' 32 13 20 EA 47 $1,500.00 $70,500.00 18 9999.0038 Red Curb w/4"White No Parking Marking 00 00 00 LF 3470 $6.00 $20,820.00 19 3213.0509 Barrier Free Ramp,Type C-2 32 13 20 EA 12 $1,500.00 $18,000.00 20 3213.0510 Barrier Free Ramp,Type C-3 33 13 20 EA 1 $1,500.00 $1,500.00 21 3213.0504 Barrier Free Ramp,Type M-2 .341320 EA 12 $1,500.00 $18,000.00 TOTAL UNIT IV: PAVING IMPROVEMENTS $4,645,831.62 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS WALSH RANCH-QUAIL VALLEY-PHASE 1 C Form Version September 1,2015 HZ PROJECT R303061.02 00 42 43 DAP-BID PROPOSAL Page 5 of 5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM-Walsh Ranch Quail Valley Phase 1 C UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid Description Unit Price Bid Value No. Section No. Measure Quantity Bid Summary UNIT 1:WATER IMPROVEMENTS $2,314,042.54 UNIT II:SANITARY SEWER IMPROVEMENTS $2,590,853.00 UNIT III: DRAINAGE IMPROVEMENTS $1,964,354.0_0 UNIT IV:PAVING IMPROVEMENTS $4,645,831.62 Total Construction Bid $11,515,081.16 Contractor agrees to complete WORK for FINAL ACCEPTANCE within calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS WALSH RANCH-QUAIL VALLEY-PHASE I C Form Version September 1,2015 HZ PROJECT 8303061.02