HomeMy WebLinkAboutContract 46522-FP2 DepartTPW Const. Services
CPN# -. _Dat
Project Manager!%>� iTY SEC ARYL
b T WORTH® w
Risk Management S. Canady CONTRACT NCO.
D.O.E. Brotherton
CFA Eester n/Scanned-o
5960) - caz)z)31
The flocciding people have been Contacted concerning the request TION AND PUBLIC WORKS
for final payment&have released this project for such payment. ?PROJECT COMPLETION -0DE-7/E?9
Clearance Conducted By Etta Bacy City Project Ne: 2231
Regarding contract 117189 for ST THOMAS THE APOSTLE CATHOLIC CHURCH as required by the
WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the
WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works
Department has accepted the project as complete.
Original Contract Prices: $84,559.90
Amount of Approved Change Orders: $2,219.38 Ns 1
Revised Contract Amount: $86,779.28
Total Cost Work Completed: $86,779.28
Less Deductions:
Liquidated Damages: Days @$210.00/Day
Pavement Deficiencies:
a
Total Deduction Amount: $0.00
Total Cost Work Completed: $86,779.28
Less Previous Payments:
Final Payment a $86,779.28 /
ecomm ded for Acceptance Date
Asst. Director, TPW - Infrastructure Design and Construction
Loal 12-211z
Accepted Date
Asst. Dire or, WATER DEPARTMENT
61L-
�&c sst. Ci y Manager J Date
Comments:
--- EMAILED
OFFICIAL RECORD NOV 2 g 2016
CITY SECRETARY
FT.WORTH,TX Initial:
Sq Vd1 -' Co aa3 �
City Project Numbers 02231 DOE Number 7189
Contract Name ST THOMAS THE APOSTLE CATHOLIC CHURCH Estimate Number I
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 8/23/2016
Project Funding
Project Manager Ehia City Secretary Contract Number 117189
Inspectors LAYER / TAEZAZ Contract Date
Contractor P.C.CONTRACTORS.LLC Contract Time 60 CD
P.O.BOX 470930 Days Charged to Date 442 CD
FORT WORTH, TX 76147 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $86,779.28
Less %Retained $0.00
Net Earned $86,779.28
Earned This Period $86,779.28
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $86,779.28
Thursday.September 01,2016 Page 5 of 5
-P CoS— 6�a31
FQRTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name ST THOMAS THE APOSTLE CATHOLIC CHURCH
Contract Limits
Project Type WATER&SEWER
City Project Numbers 02231
DOE Number 7189
Estimate Number 1 Payment Number 1 For Period Ending 8/23/2016
CD
City Secretary Contract Number 117189 Contract Time 60'D
Contract Date Days Charged to Date 442
Project Manager Ehia Contract is 100.00 Complete
Contractor P.C.CONTRACTORS,LLC
P.O.BOX 470930
FORT WORTH, TX 76147
Inspectors LAYER / TAEZAZ
Thursday,September 01,2016 Page 1 of 5
City Project Numbers 02231 DOE Number 7189
Contract Name ST THOMAS THE APOSTLE CATHOLIC CHURCH Estimate Number I
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 8/23/2016
Project Funding
WATER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
--- --- -- - - - - - -- - - -- -- - -- -- ----- - - ------ ----
1 EXPLORATORY EXCAVATION OF EXISTING 3 EA $614.00 $1,842.00 3 $1,842.00
UTILITIES(CO#1)
2 8"PVC WATER PIPE(CO#I) 1373 LF $24.61 $33,789.53 1373 $33,789.53
3 8"GATE VALVE 3 EA $1,449.00 $4,347.00 3 $4,347.00
4 6"PVC WATER PIPE 8 LF $42.87 $342.96 8 $342.96
5 6"GATE VALE I EA $1,097.00 $1,097.00 1 $1,097.00
6 DUCTILE IRON WATER FITTINGS 0.5 TN $5,288.00 $2,644.00 0.5 $2,644.00
W/RESTRAINT
7 FIRE HYDRANT I EA $3,637.00 $3,637.00 1 $3,637.00
8 2"WATER SERVICE 2 EA $1,760.00 $3,520.00 2 $3,520.00
9 2"WATER SERVICE 2 EA $183.00 $366.00 2 $366.00
11 1 1/2"WATER SERVICE 2 EA $1,445.00 $2,890.00 2 $2,890.00
13 1 I/2"WATER SERVICE 2 EA $165.00 $330.00 2 $330.00
14 4"-12"PRESSURE PLUG I EA $461.00 $461.00 1 $461.00
15 UTILITY MARKERS 1 LS $409.00 $409.00 1 $409.00
16 CONNECTION TO EXISTING 4"-12"WATER 3 EA $1,577.00 $4,731.00 3 $4,731.00
MAN(CO#1)
17 TRAFFIC CONTROL 2 MO $2,047.00 $4,094.00 2 $4,094.00
Sub-Total of Previous Unit $64,500.49 $64,500.49
SEWER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 EXPLORATORY EXCAVATION OF EXISTING I EA $634.80 $634.80 1 $634.80
UTILITIES
2 TRENCH SAFETY 290 LF $5.47 $1,586.30 290 $1,586.30
3 8"SEWER PIPE 275 LF $19.17 $5,271.75 275 $5,271.75
4 4'MANHOLE 2 EA $3,192.81 $6,385.62 2 $6,385.62
5 4'EXTRA DEPTH MANHOLE 4 VF $126.43 $505.72 4 $505.72
6 CONCRETE COLLAR 2 EA $350.46 $700.92 2 $700.92
7 POST CCTV NSPECTION 275 LF $2.40 $660.00 275 $660.00
8 MANHOLE VAUMN TESTING 2 EA $132.25 $26450 2 $264.50
9 UTILITY MARKERS 1 LS $423.20 $423.20 1 $423.20
Thursday,September 01,2016 Page 2 of 5
City Project Numbers 02231 DOE Number 7189
Contract Name ST THOMAS THE APOSTLE CATHOLIC CHURCH Estimate Number i
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 8/23/2016
Project Funding
10 4'WIDE ASPHALT PVMT REPAIR 21 LF $143.18 $3,006.78 21 $3,006.78
11 CONC PVMT REPAIR 8 SY $63.94 $511.52 8 $511.52
12 REMOVE ASPHALT PAVEMENT 18 SY $11.76 $211.68 18 $211.68
13 TRAFFIC CONTROL I MO $2,116.00 $2,116.00 1 $2,116.00
Sub-Total of Previous Unit $22,278.79 $22,278.79
Thursday,September 01,2016 Page 3 of 5
City Project Numbers 02231 DOE Number 7189
Contract Name ST THOMAS THE APOSTLE CATHOLIC CHURCH Estimate Number I
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 8/23/2016
Project Funding
Contract Information Summary
Original Contract Amount $84,559.90
Chanlse Orders
Change Order Number 1 $2,219.38
Total Contract Price $86,779.28 rj
Date Total Cost of Work Completed $86,779.28
Contractor Less %Retained $0.00
km^
Net Earned $86,779.28
/ ate Earned This Period $86,779.28
Inspection Supe isor
11 11 Retainage This Period $0.00
/^ :�L Date \l— (3— I Less Liquidated Damages
Project Manager
p / Days @ /Day $0.00
Date _ ` LessPavement Deficiency $0.00
st Rr
or IP(W ultfrastructure Design and Construction Less Penalty $0.00
i /i / Date 1 Z7-116 Less Previous Payment $0.00
Director/Contracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $86,779.28
Thursday,September 01,2016 Page 4 of 5
i
DEVELOPER-AWARDED-PROJECT CHANGE ORDER
PROJECT NAME: Water,Sewer,Paving&Draina a Improvements to serve Sl.Thomas the Apostle Catholic Church CHANGE
CONTRACT: Water,Sewer,Paving&Drainage Improvements ORDER No:
CFA# 2014-048 CITY PARTICIPATION: No
CITY PROJECT# 2231
DOE# 7189
WATER PROJECT# P265-6021502231-00 1
SEWER PROJECT# P275-7021302231-00
FILE# X-22546
INSPECTOR: Phone No:
PROJECT MANAGER: Fred Ehia Phone No: 817-392-8424
CONTRACT UNIT
WATER SEWER PAVING DRAINAGE STREET LIGHTS CONTRACT
Developer eva opor DvDeveloper DAYS
Cost cttyCaat eveloper
Cosi d(tyCast_':;core CI{y;Co�fP'`;cost CttyrGoat's:` cost City.costi
ORIGINAL CONTRACT $82,281 11 0 ODe '"; 522,280 750 00 $179,345.60
EXTRAS TO DATE
,
CREDITS TO DATE
CONTRACT TO DATE $62,281.11 $0 0p','.t $22,280.75 F r;.SO 00t„1'2 $179,345.50 e7 r?V.�lO,i $O.00 }$D.Q6. ;'. $0.00 SU:O.p 0
AMOUNT OF PROP.CHANGE ORDER $2,219.38 $14,847.21
REVISED CONTRACT AMOUNT
$64,500.49 I'S�d0„,'; _$22,200.T5 I:;;fib bll ?, $193,992.71 , ;,;_3pQ0 r $O,OD ''. �r$�1:Qb,` $0.00 S0.8tl 0
TOTAL REVISED CONTRACT AMOUNT I Z-�2 7�
PER UNIT $64,500.49 $22,280.75 $193,992.71 1 $0.00 $0.00
REVISED COST SHARE Dev.Cost: .$280,773.95 CltyrGb9 � In�ryyr
t t..,
TOTAL REVISED CONTRACT Z�-g �' �: C� '
r 17 1. $280,773.95 1r 1
I
Revised:10-12-2011 Page 1
CHANGE ORDER No. 1
for
Water,Sewer, Paving&Drainage Improvements
to serve
St.Thomas the Apostle Catholic Church
Owner: Roman Catholic Diocese of Fort Worth Date: April 20,15
Amendment No.: 1
To: P.C.Contractors,LLC
P.O. Box 470930 Engineers Project No,: 2013.708,000
Fort Worth,TX 76147 City project No,: 02231
Tel 817-3434792
As a result of city requested revisions to Construction Plans,we are making the following changes to the project
general description of workand Proposal Form Sections of the Contract Documents and construction plans:
A. PROPOSAL FORM:Revised Bid Proposal as Follows
Bid
list Specification Unit of Change in Chan a in
Item Description Bid Unit Price g
Section No. Measure value
No. Quantity
UNIT 1:WATER IMPROVEMENTS
i 1 Exploratory Excavation of Existing Utilities 33 05 30 EA +2 $614.00 +$1,228.00
2 8"PVC Water Pipe 33 11 12 LF +58 $24,61 +$1,427,38
10 2"Private Water Service 331210 LF -30 $35,21 -$1,056.30
12 11/2"Private Water Service 33 12 10 LF -30 $31,89 -$956.70
16 Connection to Existing 4"-12"Water Main 33 12 25 EA +1 $1,577,00 +$1,577.00
Sub-Total=+$2,219.38
UNIT Ill:PAVING AND DRAINAGE IMPROVEMENTS
2 Unclassified Excavation by Plan 31 23 16 CY +798 $10,36 +$8,267.28
16 Hydromulch(Basin Bottorri&Top of 32 92 13 SY
Embankment) +2196 $1.23 +$2,701.08
18 24"RCP Class 111 347113 LF -9 $67,65 -$608,85
21 5'Wide Conc.Pilot Channel(Per Detail) SF +593 $6.54 +$3,878.22
22 Seeding,Soil Retention Blanket(Basin 32 92 13 SY
Sides) -3587 $1.96 -$7,030,52
25 Grouted Stone Rip Rap 313700 Sy +18 $65.00 +$1,170.00
26 Embankment 312400 I Cy +3135 1 $2.00 1 +$6,270,00
Sub-Total=+$14,647.21
Note:Above described scope of work includes all ancillary services needed to complete-this change order;
including Excavation,Haul-off,Traffic Control,Clean-up,etc.
B. CONSTRUCTION PLANS:Revised Construction Plan Sheets as Follow
1- Plan Sheet No.2 Water&Sanitary Sewer Notes&Legend;
St.Thomas the Apostle
Change Order No. 1
Page 2 of 3
a. Updated Division 01 General Notes(Adding City Project Manager Information).
b: Updated Division 34-Transportation.
2- Plan Sheet No,3 Overview Water Layout;
a. Adding Water Connection to 8"Water Line in Crowder Dr.
b. Changed The Location of the Domestic Water Meter and Water Service at The South East Corner
of The Property.
3- Plan Sheet No.4 Overview Sanitary Sewer Layout;
a. Shifted Sanitary Sewer Line to South±4.26'.
4- Plan Sheet No.S(8''Public Water Pian);
a. Changed the location of the Domestic Water Meter and Water Service at the South East Corner of
the Property.
5- Plan Sheet No.6(8"Public Sanitary Sewer Plan&Profile);
a. Shifted Sanitary Sewer Lineto South±4,26'.
6- Plan Sheet No.13 Public Paving Plan;
a. Updated the Grading and Side Walk Layout at the South East Corner of the Property.
7- Plan sheet No.17 detention basin computations;
a. Updated Computation for Outlet Structure Design.
8- Plan Sheet No.18 Detention Basin Plan;
a. Updated the Detention Pond Layout.
b. Adding 18 SY of Grouted Rip Rap at the Downstream of Storm Drain Line A.
9- Plan Sheet No.19 Storm Drain Profiles;
a. Reduce the Length of Storm Drain Line B.
10- Plan Sheet No,20 Drainage Details;
a. Please see Revised Details in Sheet No.20
11- Plan Sheet No.21 Mass and Borrow Ditch Grading Plan;
a. Updated the Detention Pond Layout.
Note:Please see revised sheets for all revisions.
These changes result in the following adjustment to the Contract Price and Contract Time:
Original Contract Amount: $253,907.36
Net increase Resulting from Change Order(1): +$16,866_59
Contract Price including this Change Order(1): $280,773.95
Original Contract Time: 60 Working Days
Net increase Resulting from Change Order(1): 0 Working Days
Contract Time Including this Change Order(1): 60 Working Days
St.Thomas the Apostle
Change Order No, 1
Page 3of3
Engineer: Contractor: Owner:
BHB Engineering&Surveying P.0.Contractors.LLC Roman Catholic Diocese
4550 S.H.360,Suite 180 P.O.Box 470930 800 W.Loop 820 South
Grapevine,TX 76051 Fort Worth,TX 76147 Fort Worth,TX 76108
By, By: lfah/
Konstantine Bakintas,PE Chase Patterson,President
Michael F. ,SM, fthop
Date: 04/20/15 Date: �/� CatWk,Dbq9w of Fort Wodh
Parish:
St. Thomas the Apostle Parish �y Rev S"ken,Aftmisy4ri Fact
2920 Wore Ave. for MWAst F STD,BMop oftt
Fort Worth, TX 7b106-4909 t Dbem ofFodVft fi
By:
Rev. Mathew Kavipurayidam,—TOR, Pastor
Date:
rJn�rr i GYJ2 a i r:a� 151(OGV JCt3C bbl l l i i I L)I11H� t rIt "iru
rr-iUt uq
St.Tborhas the Apoade
Change Order NO, 1
Page 3 of 3
Engineer.- Contractor. Owner,
BHB E? an inetdrnr&Survevina P.C.Cantractors.uc R=jjn rathrSEl oibeese
M RPx 47-OS30 00 W.E.00n 820 South
cyraoylnt TX�Ei05� Fart Worth V 76147 I:ort Worth TX 7§3,09
t
ey' r Sv:
KanstantEne Sakintas,PE Chase Patterson,President
Date., 0412013.5 Acte:
Parish:
5t. Thoncas the Apoatle Pariah
2920 Axle Ave.
Fort: Worth, TX 76106--4909
By.—
L--4t
Ray. x thaw Kav r pir� d -OR, 'Past oY
Datea
I
CONSENT OF SURETY OWNER ❑
ARCHITECT ❑
TO FINAL PAYMENT CONTRACTOR
SURETY
Conforms with the American Institute of Architects G707 form OTHER ❑
Bond No: P131 1509800599
TO OWNER: ARCHITECT'S PROJECT NO.:
(Name and address)
Catholic Diocese of Fort Worth
800 West Loop 820 South CONTRACT FOR: Water, Sewer, Storm Drain,&Sidewalk
Fort Worth,TX 76108
PROJECT: CONTRACT DATED: 11/24/2014
(Name and address)
Water,Sewer,Storm Drain,and Sidewalk Improvements to serve St.Thomas The Apostle Catholic Church in
Fort Worth,Texas
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(Insertname and address of Surety)
Philadelphia Indemnity Insurance Company
One Bala Plaza, Suite 100
Bala Cynwyd, PA 19004
,SURETY
on bond of
(Insert name and address of contractor)
P.C. CONTRACTORS, LLC
102 West Hidden Meadow Court
Cresson,TX 76035
CONTRACTOR
hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not
relieve the Surety of any of its obligations to
(Insert name and address of Owner)
Catholic Diocese of Fort Worth
800 West Loop 820 South
Fort Worth,TX 76108
OWNER
as set forth in said Surety's bond.
IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: August 2,2016
(Insert in writing the month followed by the numeric date and year.)
Philadelphia Indemnity Insurance Company
(sure
:mss .2�.
ature of authorized representative)
Attest:
14 .Fred A.Thetford, III,Attorney-in-fac
(Seal): - (Printed name and title)
3562
PHILADELPHIA INDEMNITY INSURANCE COMPANY Bond No. PB11509800599
One Bala Plaza,Suite 100
Bala Cynwyd,PA 19004-0950
Power of Attorney
KNOW ALL PERSONS BY THESE PRESENTS:That PHILADELPHIA INDEMNITY INSURANCE COMPANY(the Company),a corporation organized and
existing under the laws of the Commonwealth of Pennsylvania,does hereby constitute and appoint Jared Young,Fred A.Thetford,Jr.,Tobin Tucker,Tom Young
and Fred A.Thetford,III of Contract Bond Agency,LLC., its true and lawful Attorney-in-fact with full authority to execute on its behalf bonds,undertakings,
recognizances and other contracts of indemnity and writings obligatory in the nature thereof•issued in the course of its business and to bind the Company thereby,in an
amount not to exceed 525,000,000.00
This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of
PHILADELPHIA INDEMNITY INSURANCE COMPANY at a meeting duly called the I'day of July,2011.
RESOLVED: That the Board of Directors hereby authorizes the President or any Vice President of the
Company to: (1)Appoint Attomey(s)in Fact and authorize the Attorney(s) in Fact to
execute on behalf of the Company bonds and undertakings,contracts of indemnity and
other writings obligatory in the nature thereof and to attach the seal of the Company
thereto; and (2) to remove, at any time, any such Attorney-in-Fact and revoke the
authoriy given. And,be it
FURTHER
RESOLVED: That the signatures of such officers and the seal of the Company may be affixed to any
such Power of Attomey or certificate relating thereto by facsimile,and any such Power of
Attorney so executed and certified by facsimile signatures and facsimile seal shall be
valid and binding upon the Company in the future with the respect to any bond or
undertaking to which it is attached.
IN TESTIMONY WHEREOF,PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSED THIS INSTRUMENT TO BE SIGNED AND
ITS CORPORATE SEALTO BE AFFIXED BY ITS AUTHORIZED OFFICE THIS 10""DAY OF JUNE 2013.
1927
(Seal)
Robert D.O'Leary Jr.,President&CEO
Philadelphia Indemnity Insurance Company
On this I&day of June 2013,before me came the individual who executed the preceding instrument,to me personally known,and being by me duly sworn said that he
is the therein described and authorized officer of the PHILADELPHIA INDEMNITY INSURANCE COMPANY,that the seal affixed to said instrument is the
Corporate seal ofsaid Company;that the said Corporate Seal and his signature were duly affixed.
COMMONWMTH OF PENNSYLVANIA
NUarhl5eal v
PaTb Y&KealeW,fMri MIC
rDM'erFMKtTkµr,�eM�K1'
IN Cbrtmhe7oh Fap4es DPL 30,1016
naDet v� oF"°r"os Notary Public: \/'�'
residing at: Bala Cynwyd.PA
(Notary Seal)
My commission expires: December 18,2016
I,Edward Sayago,Corporate Secretary of PHILADELPHIA INDEMNITY INSURANCE COMPANY,do herby certify that the foregoing resolution of the Board of
Directors and this Power of Attomey issued pursuant thereto on this le day of June 2013 true and correct and are still in full force and effect.I do further certify that
Robert D.O'Leary Jr.,who executed the Power of Attorney as President,was on the date of execution of the attached Power of Attomey the duly elected President of
PHILADELPHIA INDEMNITY INSURANCE COMPANY,
In Testimony V&ereof'l`haikjubscribed my name and affixed the facsimile seal of each Company this 2nd day of /August 2016
Edward Sayago,Corporate Secretary
�T• ,. Z, PHILADELPHIA INDEMNITY INSURANCE COMPANY
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me,the undersigned authority,a notary public in the state
and county aforesaid,on this day personally appeared Chase Patterson,
President Of PC Contractors LLC,knovm to me to be a credible person,
who being by ane duly sworn,upon his oath deposed and said;
That all persons,firms,associations, corporations,or other
organizations furnishing labor and/or materials have been paid in full.;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
I
That there are no claims pending for personal injury and/or
property damages,
On Contract described as;
St.Thomas The Apostle,Fort Worth TX
BYJ~r ' _.
Chase Patterson,President
Subscribed and sworn before me on this date 2nd of August,2016.
if
Notary Public w
Tarrant County,Texas
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: St.Thomas The Apostle Catholic Church
PROJECT NUMBER: 2231
DOE NUMBER: 7189
WATER
PIPE LAID SIZE TYPE OF PIPE LF
Water 8" PVC 1373 LF
Water
Water
Water
FIRE HYDRANTS: 1 VALVES(16"OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Yes
NEW SERVICES: 2"(2 EA) Copper 10 LF
1 1/2"(2 EA) Copper 10 LF
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
PIPE ABANDONED SIZE TYPE OF PIPE LF
Sewer 8" PVC 275
DENSITIES:
NEW SERVICES:
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,Thi 76012-6311
(817)392-7941 •Fax:(817)392-7845
BAIRD.. HAMPTON &BROWN, INC. ENGINEERING &SURVEYING
MB
Memorandum
To: Mr. Michael J Layer Re: PAY REQUEST#10 (FINAL)
Construction Inspection Supervisor by P.C. Contractors
Transportation and Public Works
Phone Number: (817)392-7928 Public Infrastructure lmprvmts.
Cell Phone: (817)999-6143 St.Thomas the Apostle
mike.layer@fortworthtex.gov
CC: Mr. Gary Fragosso, NCARB, MBA BHB Project No. 2013.708.000
Assistant Director, Property Management
Roman Catholic Dioceses of Fort Worth
800 West Loop 820 South
Fort Worth, TX 76108-2919
Tel: (817)560-2452 x 158
Mr. Chase Patterson
P.C. Contractors LLC
From: Konstantine Bakintas, PE Date: September 20, 2016
We have reviewed and approved P.C. Contractors Final Pay Request(#10)for St. Thomas the
Apostle Church Project. This pay request represented 10% of the contract amount, and was
almost entirely the previously retained amount.
Although the project contract time was exceeded, the owner is not proposing to charge
liquidated damages for this delay. P.C. Contractors worked in concert with the General
Contractor to prioritize the work in an effort to keep the overall church construction moving
forward.
This public infrastructure project is now 100% constructed/complete; and we understand PC
Contractors has submitted all paperwork required by the City of Fort Worth.
Thank you,
DEUVERING INNOVATIVE DESIGN SOLUTIONS
4550 S.H.360,Suite 180,Grapevine,TX 76051 /Tel:817-251-8550 Fax:817-251-8810
www.bhbinc.com TBPE 000044
FORTWORTHREV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION Date: 18/24/2016
(Name of Contractor Project Name
JP.C.Contractors LLC ST.Thomas The Apostle Catholic Church
DOE Inspector Project Manager
Rudy Medellin Fred Ehia
DOE Number Project Difficulty iType of Contract
7189 O Simple QQ Routine Q Complex !❑Water ❑Waste Water ❑Storm Drainage ❑ Pavement
Initial Contract Amount --4Final Contract Amounti
1$84,559.90 $86,779.28
II)PERFORMANCE EVALUATION
0-Inadequate l -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT i RATING JELEMENT RATING
I
(0-4) 1 (0.4)
iINSPECTION EVALUATION PLANS&SPECIFICATIONS
I Availability of Inspector 1 Accuracy of Plans to Existing Conditions
j 2 Knowledge of Inspector 2 Clarity&Sufficiency of Details
13 Accuracy of Measured Quantities j 3 Applicability of Specifications
4 Display Of Professionalism 4 Accuracy of Plan Quantities
15 Citizen Complaint Resolution i 'PROJECT MANAGER EVALUATION
6 Performance- Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
I11)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor Z( 20 (0
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
:^sF The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,T%76012-6311
(817)392-7941 •Fax: (817)392-7845
FORTWORTHREV:02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
1) CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
P.C. Contractos,LLC St.Thomas tholic ChurchThe Apostle Ca
DOE Inspector DOE Number
Rudy Medellin 7189
DOE Inspector Project Manager
❑� Water 0 wastewater ❑ Storm Drainage ❑ Pavement Fred Ehia
Initial Contract Amount Project Difficulty
$84,559.90 O Simple Q Routine Q Complex
Final Contract Amount Date
$86,779.28 8/24/2016
In PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 426
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 426
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating([TS/MS]* 100%) 426 / 448 = 95%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good 2:80%=Fxcellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspectory Signature Contractor
Signature DOE Inspector's Supervisor V v v cvv(Uu,
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax: (817)392-7845
FORTWORTH rev 03/05/07
TRANSPORTATION& PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO. I
NAME OF PROJECT: St Thomas The Apostle Catholic Church
PROJECT NO.: 2231 CONTRACTOR: P.C.Contractors,LLC
DOE NO. 7189
PERIOD FROM 06/08/15 TO: 08/23/16 FINAL INSPECTION DATE:-23-Aug-16
WORK ORDER EFFECTIVE 8/24/2016 CONTRACT TIME 60 O WD OO CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL
THIS &HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS
PERIOD 442
PREVIOUS
PERIOD
TOTALS
TO DATE 1442
*REMARKS:
CONTRACTOR DATE INSPECTOR DATE
ENGINEERING DEPARTMENT
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TL 76012-6311
(817)392-7941 •Fax:(817)392-7845