HomeMy WebLinkAboutContract 47141-FP1 Depart a Int o�TP &W Const. Services
DOE#i =�-E- Date
Project Manager 6
Risk Management Canad IT WORTH® WNTRACT
D.O.E. Brotherton —
CFA Westerman/ScannedV' ---2--/(-
The
/{-The Proceeding people have been Contacted _
concerning the request for final payment& have ATION AND PUBLIC WORKS �� C Q �
released this project for such payment. F PROJECT COMPLETION
Clearance Conducted By Shameka Kennedy D.O.E. Ns: 7499
C oz�3o
Regarding contract 117499 for MORNINGSTAR SECTION 5 PHASE I as required by the es gy'714/
WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the
WATER DEPARTMENT upon F51ssistant Director of the Transportation&Public Works
Department has accepted the projec is.
Original Contract Prices: $564,555.20
AUG 0 4 2016 `1
Amount of Approved Change Order : N9
Revised Contract Amount:
Total Cost Work Completed: $564,555.20
Less Deductions:
Liquidated Damages: Days @$210.00/Day
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed: $564,555.20
Less Previous Payments: $0.00
Final 7 lue $564,555.20
Recomende for Acceptance Date
Asst. Director, PW - Infrastructure Design and Construction
Accepted Date
Asst. Director, WATER DEPARTMENT // 4a z
Asst. City Manager Date
Comments: P265-541200-603150263083.P275-541200-703130263083 _
jwM AMR"
NOV B 3 20%
LiUG
`(A
( 1 U.V to
0 4 2016
:5-9 � G 1- C oSy
City Project Numbers 02630 DOE Number 7499
Contract Name MORNINGSTAR SECTION 5 PHASE 1 Estimate Number 1
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 7/21/2016
Project Funding
Project Manager Buckley City Secretary Contract Number 117499
Inspectors LAYER / HOUSTON Contract Date
Contractor D T UTILITY CONTRACTORS.INC. Contract Time 100 CD
2614 CAUSBIE RD Days Charged to Date 271 CD
WEATHERFORD, TX 76087 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $564,555.20
Less %Retained $0.00
Net Earned $564,555.20
Earned This Period $564,555.20
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $564,555.20
Thursday,July 21,2016 Page 4 of 4
FORTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name MORNINGSTAR SECTION 5 PHASE 1
Contract Limits
Project Type WATER&SEWER
City Project Numbers 02630
DOE Number 7499
Estimate Number 1 Payment Number I For Period Ending 7/21/2016
CD
City Secretary Contract Number 117499 Contract Time 10(rD
Contract Date Days Charged to Date 271
Project Manager Buckley Contract is 100.00 Complete
Contractor D T UTILITY CONTRACTORS,INC.
2614 CAUSBIE RD
WEATHERFORD, TX 76037
Inspectors LAYER / HOUSTON
Thursday,July 21,2016 Page I of 4
City Project Numbers 02630 DOE Number 7499
Contract Name MORNINGSTAR SECTION 5 PHASE 1 Estimate Number I
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 7/21/2016
Project Funding
WATER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 6"WATER PIPE 90 LF $26.00 $2,340.00 90 $2,340.00
2 8"WATER PIPE 4520 LF $29.00 $131,080.00 4520 $131,080.00
3 6"GATE VALVE 9 EA $840.00 $7,560.00 9 $7,560.00
4 8"GATE VALVE 15 EA $950.00 $14,250.00 15 $14,250.00
5 8"X 12"TAPPING SLEEVE&8"GATE VALVE 2 Fes, $3,000.00 $6,000.00 2 $6,000.00
6 CONNECT TO EXISTING 12"WATER MAIN 2 EA $700.00 $1,400.00 2 $1,400.00
7 FIRE HYDRANT 9 EA $3,400.00 $30,600.00 9 $30,600.00
8 DUCTILE IRON WATER FITTINGS 3 TN $5,400.00 $16,200.00 3 $16,200.00
9 TRENCH SAFETY 4610 LF $0.40 $1,844.00 4610 $1,844.00
10 1"WATER SERVICE 72 EA $780.00 $56,160.00 72 $56,160.00
Sub-Total of Previous Unit $267,434.00 $267,434.00
SEWER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 8"SEWER PIPE J 3817 LF $34.00 $129,778.00 3817 $129,778.00
2 8"SEWER PIPE CSS BACKFILL 234 LF $50.00 $11,700.00 234 $11,700.00
3 4'MANHOLE 24 EA $3,600.00 $86,400.00 24 $86,400.00
4 4'EXTRA DEPTH MANHOLE 43 VF $150.00 $6,450.00 43 $6,450.00
5 4'SEWER SERVICE,TWO WAY CLEANOUT 68 EA $385.00 $26,180.00 68 $26,180.00
6 POST CCTV INSPECTION 4051 LF $2.80 $11,342.80 4051 $11,342.80
7 MANHOLE VACUUM TESTING 21 EA $150.00 $3,150.00 21 $3,150.00
8 EPDXY MANHOLE LINER 64 VF $250.00 $16,000.00 64 $16,000.00
9 TRENCH SAFETY 4051 LF $0.40 $1,620.40 4051 $1,620.40
10 TRENCH WATER STOPS 18 EA $250.00 $4,500.00 18 $4,500.00
---------- -----------------------------
Sub-Total of Previous Unit $297,121.20 $297,121.20
Thursday,July 21,2016 Page 2 of 4
City Project Numbers 02630 DOE Number 7499
Contract Name MORNINGSTAR SECTION 5 PHASE I Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 7/21/2016
Project Funding
Contract Information Summary
Original Contract Amount $564,555.20
Chance Orders
Total Contract Price $564,555.20
/ Date } �/ Total Cost of Work Completed $564,555.20
Contra r Less %Retained $0.00
412 f/ Net Earned $564,555.20
Date
Inspecyon a Earned This Period $564,555.20
Retainage This Period $0.00
AA Date `9 Less Liquidated Damages
Project an d
Days @ /Day $0.00
(A Dat eLessPavement Deficiency $0.00
Asst, ire or/TPW/-In/f tructure Design and Construction Less Penalty $0.00
Date 0-5-16 Less Previous Payment $0.00
Director'/'Contracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $564,555.20
Y-L/Gi
Thursday,July 21,2016 Page 3 of 4
FoRTWORTH rev 03/05/07
TRANSPORTATION& PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: Mornin-star Section 5 Phase 1
PROJECT NO.: 02630 CONTRACTOR: DT Utility Contractors
DOE NO.: 7499
PERIOD FROM:10/16/15 TO: 07/13/16 FINAL INSPECTION DATE: 20-Jul-16
WORK ORDER EFFECTIVE:(0/16/2015 CONTRACT TIME: 100 0 WE CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS CHARGED DAYS
THIS
PERIOD 0 0 0 0 271 271
PREVIOUS 0 0 0 0 0 0
PERIOD
TOTALS 0 0 0 0 271 271
TO DATE
*REMARKS:
',ffJ�
CONTRACTOR DATE INSP C DATE
ENGINEERING DEPARTMENT
g The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX7 76012-6311
(817)392-7941 •Fax:(817)392-7845
i
SURETEC INSURANCE COMPANY
9737 Great Hills Trail, Suite 320, Austin, Tx 78759
OWNER
CONSENT OF SURETY ARCHITECT p
TO FINAL PAYMENT CONTRACTOR E]
SURETY ❑
BOND NO.:4404377 OTHER ❑
TO OBLIGEE:
(Name and Address)
CONTRACT FOR:
FG Aledo Development, LLC. Utilities
3045 Lackland Rd., Fort Worth
PROJECT: CONTRACT DATED:
(Name and Address) September 16, 2015
Morningstar Section 5, Phase 1
PRINCIPAL: D.T. Utility Contractors, Inc.
At the request of the Obligee and the Principal indicated above, (Insertname and address of Surety)
SureTec Insurance Company, 9737 Great Hills Trail, Suite 320, Austin, TX 78759
on bond of SURETY,
(Insert name and address of contractor)
D.T. Utility Contractors, Inc.
2614 Causbie Rd., Weatherford, TX 76087
and conditioned on the representation by Obligee that all Contract provisions relating to the payment
of final payment under the Contract have been satisfied by Principal as of the date of final payment,
and that no claims by Obligee or any third party are known or believed by Obligee or its
representatives to exist as of the date of final payment, representations as to the truth and accuracy
of the foregoing conditions being deemed to have been made by Obligee in connection with this
request for Consent of Surety, hereby approves of the final payment to the Principal in accordance
with the executed Letter of Directive(Copy attached) and agrees that final payment inaccordance
with the terms hereof shall not relieve the Surety of its obligations to
(Insert name and address of Obligee)
FG Aledo Development, LLC.
3045 Lackland Rd., Fort Worth, TX 76116
as set forth in said Surety's bond. OBLIGEE,
IN WITNESS WHEREOF, the Surety has hereunto set its hand on this date: July 18,2016
(Insert in writing the month followed by the numeric date and year.)
SureTec Insurance Company
(Surety)
Attest: 'signature of authorised representative)
Michelle Harris, Attomey-in-Fact
(Printed name and tit(e)
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me,the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Lori Tollett, Vice
President Of D.T. Utility Contractors, Inc., known to me to be a credible
person,who being by me duly sworn,upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Morningstar, Section 5, Phase 1, Tarrant County, Texas
BY ��-
Lori Tollett, Vice President
Subscribed and sworn before me on this date 26th of July, 2016.
TANYA DAMS
Notary Public
STATE OF TEXAS
�t-aryPublic �or+ ��#00576914-4
M Comm.Exp,09-28-2017
Parker County, Texas
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Morningstar Section 5 Phase 1
PROJECT NUMBER: 02630
DOE NUMBER: 7499
WATER
PIPE LAID SIZE TYPE OF PIPE LF
6"inch PVC 90 LF
8"inch PVC 4520 LF
FIRE HYDRANTS: 9 VALVES(16"OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
N/A
DENSITIES:
NEW SERVICES: 72-1"inch copper 150 LF
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
8"inch SDR-26 PVC 3817 LF
PIPE ABANDONED SIZE TYPE OF PIPE LF
N/A
DENSITIES:
NEW SERVICES: 68-4"inch -SDR-26 PVC 1400 LF
TRANSPORTAnON AND PUBLIC WORKS
s The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
FORTWORTHREV:02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
n CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
DT Utility Contractors,Inc Morningstar Section 5 Phase 1
DOE Inspector DOE Number
Garey Houston 7499
DOE Inspector Project Manager
[D water 21 waste water ❑Storm Drainage 0 Pavement Pat Buckley
Initial Contract Amount Project Difficulty
$564,555.20 O Simple OO Routine O Complex
Final Contract Amount Date
$564,555.20 7/20/2016
II)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 4 60 60
9 Daily Clean Up• 5 Y 4 20 20
10 Citizen's Complaint Resolution 5 Y 4 1 20 1 20
11 Property Restoration 5 Y 4 20 1 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 448
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 448
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating(ITS/MS]*100%) 448 / 448 = 100%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector Signature Contractor
Signature DOE Inspector's Supervisor
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
; ;` The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
FG ALEDO DEVELOPMENT, L.L.C.
3045 LACKLAND RD.
FORT WORTH, TEXAS 76116
.duly lo, 2016
G arey Rouston
Freese and Nichols
4055 International Plaza, Suite 200
Fort Worth, Texas 76109
Re: Morningstar- Sections 5, Phase 1
DOE No. 7499, City Project No. 02630
Dear Mr. Houston,
Where are no liquidated damages for Conatser Construction, DT Utilities or
Bean Electrical, inc. on the above referenced job.
Sing-Tely,
Tim.U. Fleet
Vice President
FORTWORTHRE":02'22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION Date: 7/20/2016
Name of Contractor Project Name
DT Utility Contractors,Inc Morningstar Section 5 Phase I
DOE Inspector Project Manager
Garey Houston IPat Buckley
DOENumber Project Difficulty Type of Contract
7499 IO Simple OO Routine O Complex E Water [D Waste Water ❑Storm Drainage ❑Pavement
1Initial Contract Amount Final Contract Amount
$564,555-20 ($564,555.20
Ili)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT RATING ELEMENT RATING
INSPECTION EVALUATION (0-4) PLANS&SPECIFICATIONS (0-4)
1 Availability of Inspector if1 Accuracy of Plans to Existing Conditions ly
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities c{ 3 Applicability of Specifications
4 Display Of Professionalism ( y 4 Accuracy of Plan Quantities ly
5 Citizen Complaint Resolution y PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time q 3 Communication 4
2 Timliness of Contractor Payments G/ 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe y
M)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
0 The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012-6311
(817)392-7941 -Fax:(817)392-7845
I -