Loading...
HomeMy WebLinkAboutOrdinance 8297.._ ORDINANCE NO ~,~, q ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF y,~rmE SFTmr,Fr~tvT ROAD AND PORTIONS OF SUNDRY OTHE~t STREETSs AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTHe TEXASe DECLARING THE CONTRACT k1ITH J L BERTRAM CONSTRUCTION & ENGINEERINGFOR THE CONSTRUCTION OF SAID IMPROVEMENTS FULLY COMPIoETED AND PERFORMED; DIRECTING THE ISSUANCEq EXECUTION A1~1D DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESSrtENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED AND ALLOi+1EED AGAINST SOME OF SAID ASSESSMENTS DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINU1°E BOOY~ OF THE CITY COUNCIL OF FORT GIORTHs TEXAS9 AND BY FILING THE COMPLETE-.ORDINANCE IN APPROPRIATE ORDINANCE RECORDS OF-SAID CITY AND PROVIDING AN EFFECTIVE DATE ~ Y~REASp the City of Fort Worth9 Texasa has heretofore entered into a contract with J. L. Bertram.Construction & Enaineerina a for the malting aired construction of certain street improvements on the hereinafter described portions of streets9 avenues and public places in said Cityn to®~iit WHITE SETTLEMENT ROAD From Peckham Boulevard to 2 550 east known and designated as Project No 021-36500-00 a seven-inch thick reinforced concrete pavement on a six-inch thick lime stabilized sub- grade with seven-inch high superimposed concrete curb so that the finished roadway will consist of two twenty-six foot tarffic lanes with a forty-eight foot median ^ tivHEREAS, by sundry proceedings heretofore passed by the City Council of the City of Fort Worth, Texas, including Ordinance No 8002 , a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above described portions of streets, avenues and public places and against the real and true owners thereof; and, WHEREAS, the City council of the pity of Fort Y~orth, Texas, has, upon review, found and determined that, in some instances, in order to effect substantial justice and equality, it is desirable and necessary to grant and issue certain credits against some one or more of the assessments levied by Ordinance No ~oR~ , and 4~H~;fi~:A,~, the street improvements hereinabove mentioned have been completed upon each of the portions of streets, avenues and public places hereinabove described, and have been inspected and found to be in complete accordance t~rith the contract therefor; NOLd, THE1~'ORE, BE IN ORDAINED BY THE CITY COUNCIL OF Tt~E CITY OF FORT WORTH, TEXAS, THAT I The improvements on each of the portions of streets, avenues and public places hereinabove described be, and they are hereby, accepted; and the contract with reference thereto be, and it is hereby, found and declared fully completed and perfontned II The Mayor, be, and he is hereby, directed to issue and execute in the name of the City, certificates in evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City Secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance Frith the proceedings relating to such improvements and assessments The certificates shall be numbered, shall describe the property against which the assessment has been levied, shall, where known, state the name or names of the true owners of the respective parcels of pro- perty assessed and shall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon The numbers of the certificates, with the property descriptions to be shown on the respective certificates, together with the names of the owners of said property, the principal amount of the assessment, the respective credits, if any which are hereby authorized, granted and allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after diving effect to such credit, if any, are hereby enumerated and itemized as follows III When each of the certificates has been duly executed as hereinabove provided, same shall be delivered to the Tax Assessor-Collector as part payment of the contract price IV The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worths T~xasa and by filing the complete ordinance in the appropriate Ordinance Records of said City V This ordinance shall take effect and be in full force and effect from and after the date of its passage PASSED AND APPROVED THIS APPROVED AS TO FORM AND I.E(aAI,ITY day of ~ 19 City Attorney PROJECT NO 021-36500-00, WHITE SETTLEMENT ROAD FROM P~.CKHAM BOULEVARD TO 2,550 BEET EAST, ~o be improved by constructing a seven-inch thick reinforced concrete; pavement on a six-inch thick lime stabilized subgrade with seven-inch high superimposed concrete curb, so that the finished roadway will consist of two twenty-six foot traffic lanes with a forty-eight foot median OWNER NORTH SIDE Stubbs Realty Corp Rt 8, Box 597 Fort Worth, Texas 76108 BLOCK LOT ZONING FRONTAGE W C SMITH SURVEY Tr 135 Res 90' Pavement Vol 4941 90' Curb Page 999 Payment for right-of-way RATE AMOUNT ASSESSMENT $13 33 $ 1 199 70 2 17 195 30 $ 1,395 00 $1,001 11 (No enhancement) -0- Verna Burns Stubbs Tr 2 & Agr 1,220' Pavement $62 20 $75,884 00 Rt 8, Box 597 2=A 1,200' Curb 2 17 2,604 00 Fort Worth, Texas Vol 2227 76108 Page 473 Deferred payment $78 488 00 Payment for right-of-way $14,315 70 Verna Burns Stubbs Tr 3 Agr 980' Pavement $62 20 $60,956 00 Rt, 8, Box 597 Vol 2227 940' Curb 2 17 2,039 80 Fort Worth, Texas Page 473 76108 Deferred payment $62 995 80 J W HAYNES SURVEY Verna Burns Stubbs Rt 8, Box 597 Fort Worth Texas 76108 SOUTH SIDE Westpoint Development Corp James A Hall & Assoc 600 Jefferson Cullen Houston Texas 77002 Tr 1 Agr 560' Pavement $62 20 $34 832 00 Vol 2227 540' Curb 2 17 1,171 80 Page 473 Deferred payment $36,003 80 WESTPOINT ADDITION 21 31 768 83' Pavement $62 20 $47,821 23 Comm 768 83' Curb 2 17 1,668 36 $49,489 59 1 PROJECT NO 021-36500-00, WHITE SETTLEMENT ROAD FROM PECKHAM BOULEVARD TO 2,550 FEET EAST Continued OWNER SOUTH SIDE West point Development Corp James A Hall 6 Assoc 600 Jefferson Cullen Houston, Texas 77002 BLOCK LOT ZONING FRONTAGE RATE AMOUNT ASSESSME'~T WESTPOINT ADDITION 1 31 120' Side lot adjusted to Res 100' Pavement $13 33 $1,333 00 100' Curb 2 17 217 00 $1 550 00 Buttonwood Drive intersects Westpoint Development 16 Corp James A Hall & Assoc 600 Jefferson Cullen Houston Texas 77002 Westpoint Development Corp James A Hall & Assoc 600 Jefferson Cullen Houston Texas 77002 17 Grand Meadow Drive intersects 28 Res 28 Res Westpoint Development 30 32 Corp Res James A Hall & Assoc 600 Jefferson Cullen Houston Texas 7700 Westpoint Development Corp James A Hall & Assoc 600 Jefferson Cullen Houston, Texas 77002 1 32 Res 115' Side lot adjusted to 100' Pavement $13 33 $1 333 00 100' Curb 2 17 217 00 115' Side lot adjusted to 100' Pavement $13 33 $1,333 00 100' Curb 2 17 217 00 120' Side lot adjusted to 100' Pavement $13 33 $1,333 00 100' Curb 2 17 217 00 115' Side lot adjusted to 100' Pavement $13 33 $1 333 00 100' Curb 2 17 217 00 $1 550 00 $1 550 00 $1 550 00 $1 550 00 2 PROJECT NO__ 021-36500-00, WHITE SETTLEMENT ROAD FROM PECKHAM BOULEVARD TO 2,550 FEET EAST, Continued BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE WESTPOINT ADDITION Buffalo Grove Road intersects Westpoint Development 15 33 120' Side lot adjusted to Corp Res 100' Pavement $13 33 $1,333 00 James A Hall & Assoc 100' Curb 2 17 217 00 600 Jefferson Cullen $1,550 00 Houston, Texas 77002 Westpoint Development 1 33 120' Side lot adjusted to Carp Rea 100' Pavement $13 33 $1,333 00 James A Hall & Assoc 100' Curb 2 17 217 00 600 Jefferson Cullen $1,550 00 Houston, Texas 77002 Bugle Drive intersects Westpoint Development 7 34 125' Side lot adjusted to Corp Res 100' Pavement $13 33 $1,333 00 James A Hall & Assoc 100' Curb 2 17 217 00 600 Jefferson Cullen $1,550 00 Houston, Texas 77002 Westpoint Development 1 34 125' Side lot adjusted to Corp Res 100' Pavement $13 33 $1,333 00 James A Hall & Assoc 100' Curb Z 17 217 00 600 Jefferson Cullen $1,550 00 Houston, Texas 77002 Flaxseed Lane intersects Westpoint Development 17 35 120' Side lot adjusted to Corp Res 100' Pavement $13 33 $1,333 00 James A Hall & Assoc 100' Curb 2 17 217 00 600 Jefferson Cullen $1,550 00 Houston, Texas 77002 3 PROJECT NO 021-36500-00, WHITE SETTLEMENT ROAD FROM PECKHAM BOULEVARD TO 2,..550 FEET EAST continued BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE WESTPOINT ADDITION (Back lot credit) Westpoint Development 5 35 85 Pavement $6 67 $566 95 Corp Res 85 Curb 1 08 91 80 James A Hall & Assoc $ 658 75 600 Jefferson Cullen Houston Tx 77002 Westpoint Development 4 35 Corp Res James A Ha11 & Assoc 600 Jefferson Cullen Houston Tx 77002 Westpoint Development 3 35 Corp Res James A Hall & Assoc 600 Jefferson Cullen Houston Tx 77002 (Back lot credit) 171 2 Pavement $6 67 $1 141 90 171 2 Curb 1 08 184 90 $1 326 80 (Back lot credit) 8b Pavement $6 67 $533 60 80 Curb 1 08 86 40 $ 620 00 R. W Peckham Boulevard intersects W C SMITH SURVEY City of Fort Worth Tract 2-B 55 Pavement -0- Res 55' Curb TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS) $ 67 595 14 TOTAL COST TO PROPERTY OWNERS (DEFERRED PAYMENTS) $177 487 60 TOTAL COST TO CITY OF FORT WORTH $748 454 58 TOTAL CONSTRUCTION COST $993 537 32 4 DATE REFERENCE SUBJECT Final Payment - White Settlement PAGE NUMBER 1 of~ 3/I.7~`81 *~FP-1.535 -- Fina1 Council awtion is requested on the subject project Project Deser~p~~lcn Name Contractor Contrast Awarded Work Order Dated Work Order Effective on. or. Before Work Began Contract Time Began Project Substant~~ally Complete. and Final Inspection Made Final Construction Apgar wa1 Working Time P~:cvaded Working Time Used White Settlement (Westpoint Addition) project N¢~ 10771 dated September 18 1979 d L Bertram Construction & Eng Tnc September 18 1979 (M&C C-4802) November 12, 1979 November 26 1979 November 23 1979 November 23 1979 December 3 1980 February 19 1981 300 Days 123 Days Project Cost Original Bid Pri~:e $959 974 14 Final Contract Price $937 299 36 Partial. Payments Previously Made 10 Amt $843 569 42 Final Payment Due $ 93 729 94 Deviation from Bid Price Final measured quantities at contract unit prises yield an earned total price of this contract which. is $22 6'1~ 78 under the bid price The underrun is the result of differences between quantities estimated for the contract documents and quantita..es actually used to complete the work Financing Sufficient funds are ava~.lable for the recommended final payment to be made from the Project Account No 021-36500 Compliane:e with Spec ificatie~ns The project has been completed in accordance with the requirements a/f the contract APPROVEDD 6Y Recommendation ~~~~ C®C! It is recommended that the project described above be accepted by the~~~~ption of an ordinance and final payment of $93 729 94 be made to ~~~~ ~~e ;tram Construction & Engineering Inc. 981 GG p1g SUB-v1lTTED FOR THE CITY MANAGER'S QFFICE BY f ORIGINATING ~"` DEPARTMENT HEAD: Gar 'anterre Ci .!'~~~ C eCZe-xY f the ~ of ,Foxt Wozth~ T ~4 SPOSITION BY COUNCIL: PROCESSED BY ^ APPROVED ^ OTHER (DESCRIBE) n CITY SECRETARY FOR ADDITIONAL INFORMATION CONTACT ~10hn Jones, Ext 7913 DATE