Loading...
HomeMy WebLinkAboutContract 48436 CITY SECRETARY {_UNIPACT NO. Developer and Project Information Cover Sheet: Developer Company Name: Quik Trip Corporation Address, State,Zip Code: 1120 N Industrial Blvd Phone&Email: JD Dudley, 817-786-3187 jdudley@quiktrip.com Authorized Signatory,Title: .fey,Real Estate PF jeet r�µiA�= Project Name and Brief QT#959 -Water, Sewer,Paving and Drainage Description: Project Location: 5350 McCart Avenue Plat Case Number: FS-15-263 Plat Name: QT 959 Addition Mapsco: 90T Council District: 6 City Project Number: 100361 CFA Number: 2016-080 DOE Number: N/A To be completed by fa Received by: ��� 7 Date: l EOFFICIALJ City of Fort Worth,Texas Standard Community Facilities AgreementCFA Official Release Date: 10.07.2015 Page 1 of 11 STANDARD COMMiTNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, QuikTrip Corporation, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements")related to a project generally described as QT #959 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ®i, Sewer (A-1) © Paving (B) ©`, Storm Drain(B-1) ®", Street Lights & Signs (C) ❑. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with,the construction of the infrastructure contemplated herein,whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third parry beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 7 of 11 Cost Summary Sheet Project Name: QT#959 CFA No.: 2016-080 City Project No.: 100361 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developers Cost A. Water and Sewer Construction 1. Water Construction $ 17,576.20 2.Sewer Construction $ 2,680.00 Water and Sewer Construction Total $ 20,256.20 B. TPW Construction 1.Street $ 57,160.00 2.Storm Drain $ 198,081.00 3.Street Lights Installed by Developer $ - 4. Signals $ - TPW Construction Cost Total $ 255,241.00 Total Construction Cost(excluding the fees): $ 275,497.20 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 405.12 D. Water/Sewer Material Testing Fee(2%) $ 405.12 Sub-Total for Water Construction Fees $ 810.25 E. TPW Inspection Fee(4%) $ 10,209.64 F. TPW Material Testing(2%) $ 5,104.82 G. Street Light Inspsection Cost $ - H. Signals Inspection Cost $ H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 15,314.46 Total Construction Fees: $ 16,124.71 Choice Financial Guarantee Options, choose one Amount Mark one Bond=100% $ 275,497.20 X Completion Agreement=100%/Holds Plat $ 275,497.20 Cash Escrow Water/Sanitary Sewer=125% $ 25,320.25 Cash Escrow Paving/Storm Drain=125% $ 319,051.25 Letter of Credit=125%w/2yr expiration period $ 344,371.50 City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER QuikTrip Corporation Jesus J. Chapa Assistant City Manager (N)4Rje Joseph S. Faust T* le: Director of Real Estate Date: l 3 Date: ,kliq lL Recommended by: ATTEST: (Only if required by Developer) Wendy Chi-B ulal, EMBA, P.E. Development Engineering Manager Signature Water Department Name: ® ji- �-Doz Wiersig,P.E. �® Dire Tran portation&Public Works Department 4 b�. Approved as to Form &Legality: ATTEST: Richard A. McCracken Mary J. r Assistant City Attorney City Secretary M&C No. tolm. Date: U 1 L3IIIA OFFICIAL RECORD City of Fort Worth,Texas Standard Community Facilities Agreement CITY SECRETARY CFA Official Release Date: 10.07.2015 FT. WORTH,TX Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment FA Attachment 1 - Changes to Standard Community Facilities Agreement ® Location Map Exhibit A: Water Improvments Water Cost Estimate ©, Exhibit A-1: Sewer Improvements Sewer Cost Estimate Exhibit B: Paving Improvements 0 Paving Cost Estimate ®' ExhibitB-1: Storm Drain Improvements Storm Drain Cost Estimate ❑ Exhibit C: Street Lights and Signs Improvements ❑' Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100361 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 11 of 11 THE CITY OF FORT WORTH, TEXASI FORTWORTH PLANS FOR THE CONSTRUCTION OF a WR, SEWER, PAVING, DRAINAGE & SEo a REET LIGHT IMPROVEMENTS $€ TO SERVE QUIKTRIP STORE #0959 (SOUTH HILLS ADDITION, PARTS OF LOTS 213 & ALL OF LOT 4, BLOCK 67—A & ALL OF LOTS 101 11, 12, 13 & 14, BLOCK 67) SHEET INDEX X SHEET N0, pESCRIPTION BETSYPRICE SADDLER UNIT 1.116111:STORM SEW ER WATER B SANITARYS WEN IMPROV M NTS O F PRICE mCOVER S�q O MAYORROMARl LEITH O/G� w —A FINAL PIAT CON ET �LL COVERT 002e FINAL PLAT o /�T� TJX OOJ NOTES AND CONTACT LISTS q DAVID COO WES1 LD U DO4 CI OF FORT WOR HWATERANO SEWER NOTES F y FIE LEITH O oos oEMONiONPLAN F CITY MANAGER 006 Tx TRIGHTTURNLANEDEMOLITION&SITEPIAN 3�_ 0] '� 007 TDOT RIGHT TURN LANE GRADINGS PAVING PLAN 20 -^G 000 GRADING PLAN DOUGL�iG W�7T S P.E. 20 J �`G 009 PRE DEVELOPED DRAINAGEAREA MAP AS W. VYIERJIG,i 010 POST DEVELOPEDDRAINAGEAREAMAP 011 DRAINAGE CALCULATIONS DIRECTOR TRANSPORTATION AND 012 STORMSEWERPLAN PUBLIC WORKS DEPARTMENT 013 STORM SEWERPLAWPROFILE _11 014 STORM SEWERPLA"ROFILE WEDGWAY SITE � J ® 015 STORM SEWER PLANIPROFILE JOHN ROBERT CARMAN F o 015 WATER IAYOU WOSLEY S'T ��,. Fi N� TxDO a+e WATER A SANITARY SEWER LAYOUT WATER DIRECTOR �� (TS ,`�G 019A PAVING PLAN . OFF-SITE PAVING PLAN WINIFRED O ��� q 5 �\` Y 019020 EROSION CONTROL PLAN PHASE WHARTON v 921 EROS ICN CONTROL PLAN PHASE 022A SOUTHGATE TRAFFIC CONTROL PLAN m 022. TYPICAL TRAFFIC CONTROL PLAN WREN Q m 02J CITYCFFORTWORTHDETAILSSHEETI Fyy 3 024 CITYCF FCRTWORTHDETAILSSHEET2 025 CITYOFFORTWORTHDETAILSSHEET3 y INTERIM REVIEW WALTON 027 CITY OF FOORTRT WORTH DETAILS SHEET S rF xot YIImJed rm�m.wmm, 020 CITY CFF RTW CY elaing°`P-MI P.,P-. DURI GER ,, 029-0Is TrDOT DETAILS ENGINEER: P.E. SERIAL N0:__ LOCATION MAP DATE: N.T.S. DOUGLAS W.WIERSIG,P.E. DATE: DIRECTOR,TRANSPORTATION AND PUBLIC WORKS MAPSCO NO. PAGE 89 GRID O "o CITY PROJECT NO. 100361 COUNCIL DISTRICT 6 RECOMMENDED DATE: WATER PROJECT NO. 59601-0600430-001380 OWNED/DEVELOPED BY: PREPARED BY: PROGRAM MANAGER m SEWER PROJECT NO. 59607-0700430-001380 OUIKTRIP CORPORATION GLENN ENGINEERING CORPORATION 1120 N.INDUSTRIAL BLVD. TEXAS BOARD OF PROFESSIONAL ENGINEERS REGISTRATION NO.F-303 a FILE NO. K-2470 EULESS,TX.76039 105 DECKER COURT,SUITE 910 TEL:(B17)7863187 IRVING,TX.75062 REVIEWED: DATE: wa FAX:(817)858-0213 TEL:(972)717-5151 PROJECT MANAGER CONTACT:JD DUDLEY FAX:(972)717-2176 CONTACT:CHERALYN ARMIJO,P,E, 5 1s 1 fi 1 7 1 e 9 1 10 1 Il 1 12 13 1 14 1 IS 1 I — Q `\ STA. 0+00 LINE 'SS-1' (PUBLICUTILITYLEGEND(NEW)��wK CONNECT NEW 6" S.S. TO EX. S.S.M.H. / \ �"' `e�N U wrvF \ AND REPLACE EX. MANHOLE WITH NEW °abe�w \ wEs"'� LEMH �[ —uom�w�"xe ncsmKna46Pxex[u[ t za ` ' ICONE FOR 30" MANHOLE RING & COVER, P PLUG EXISTING STUB OUT,` ' N J9-9,Pp.55/) ercK a[vw owux 0°" in P - --—-- wv-- (RE: 023) / w RIM= 759.81-. w°sLF T.OG wa— SAV, qq I ' wINlRften ��� N 7x0 MM Z 1R 4 — FL EX. 6" OUT=754.28 \\ w"Aft*°N wlxe.. " / N FL EX 6" IN NORTH=754.53 r` / wA aN 3 a axa" zZ 3 N FL 6"=755.20 uft: N UTILITY LEGEND(EXISTING) V'W Vicinity Map 4aG F.19TINC.I a1F.1 \ I RN M ~ 1 1 �� a _ __ �_ 7 •� i Mel,a e mow, __ �• TA. 0+15 LINE 'SS-1' Xe(<xta'�f _ �1�-! INSTALL 6" TWO WAY CLEANOUT --- _ -R0.. °xf(w nI � a I \FL 6"=755.55 - AsPee)r a (PRIVATE) / --- --- "a" wm i Ln K 4/ — ruMm Ru w�/In�vranum Q v' ✓am-�� ���� I I \�� / ® o�uwxote >ssw, > I OT HIGH RISE PO T.�' z PoeL LE SIGN.HR-151P, fsinux vaxN,nx[ I Ir —a -- — -- 50'-0'HT..15'-1'W,x 302 S,F, tgrt Ppt —w�—� _7—'�* (RE:L0-0500) 0 TMg mm H G If t 20 o/ Q. E�\ Q / � � ��• // G -- 6 \ j r 2 a _ OT HORIZONTAL MONUMENT SIGN,MH12-2PGG, 7'-4"HT..i1'-t"W,x 53.57 S.F. (RE Lf-0500) S EXHIBIT B \ � Rerrvuxom: A ~ ` \a " SEWER LAYOUT z 3 1 a s 6 1 7 1 s _ I 9 I l0 1 11 1 12 1 13 1 14 1 15 I I SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT 1:WATER IMPROVEMENTS 1 3311.0261 8"PVC Water Pipe 3311 12 LF 412 2 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TONS 0.46 3 3312.2203 2"Water Service 33 12 10 EA 1 4 3312.2103 1 1/2"Water Service 33 12 10 EA 1 5 3305.0109 Trench Safety 33 05 26 LF 412 6 3312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 2 ------------- TOTAL UNIT 1:WATER IMPROVEMENT CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Fonn Version April 2,2014 004243 Bid Proposal_DAPrevised7.26.16 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid Description Unit Price Bid Value No. SecfionNo. I Measure Quantity UNIT II:SANITARY SEWER IMPROVEMENTS 1 3305.0107 Manhole Adjustment,Minor 33 05 14 EA. 1 2 0241.2103 8"Sewer Abandonment Plug 0241 14 EA. 1 3 0241.5001 Abandon Manhole 0241 14 EA. 1 4 3331.3201 6"Sewer Service 3331 50 EA. 1 5 3301.0101 Manhole Vacuum Testing 3301 30 EA. 1 6 3305.0109 Trench Safety 33 05 26 LF 15 7 3301.0002 Post-CCN Inspection 3301 31 LF 15 TOTAL UNIT II:SANITARY SEWER IMPROVEMENT CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 004243 Bid Proposal_DAPrevised7.26.16 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. I Measure Quantity UNIT III: DRAINAGE IMPROVEMENTS 1 3349.0001 4'Storm Junction Box 33 49 10 EA. 3 2 3349.0003 6'Stolen Junction Box 33 49 10 EA. 1 3 3341.0206 24"RCP,Class IV 3341 10 LF 1184 4 3201.0117 10'Wide Asphalt Pvmt Repair,Residential 3201 17 LF 1173 5 3305.0109 Trench Safety 33 05 10 LF 1184 6 3125.0101 SWPPP z 1 acre 31 2500 LS 1 _ 7 3471.0001 Traffic Control 3471 13 1 MO 1 TOTAL UNIT III: DRAINAGE IMPROVEMENT CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 004243 Bid Rnposal_DAPrevised7.26.16 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item SpecificationUnit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT IV: PAVING IMPROVEMENTS 1 0241.0100 Remove Sidewalk 0241 13 sf 698 2 3213.0301 4"Cone Sidewalk 32 13 20 sf 5161 3 0241.1100 Remove Asphalt Pvmt 0241 15 sy 1303 4 3201.0117 10'Wide Asphalt Pvmt Repair,Residential 3201 17 LF 1150 5 3213.0403 8"Concrete Driveway 32 13 20 sf 3682 6 3211.0502 8"Lime Treatment 32 11 29 sy 450 7 3201.0112 S Wide Asphalt Pvmt Repair, Residential 3201 17 LF 9 8 3212.0303 3"Asphalt Pvmt Type D 32 12 16 SY 220 9 3212.0501 4"Asphalt Base Type B 32 12 16 SY 220 10 3213.0103 8"Cone Pvmt 32 13 13 SY 220 TOTAL UNIT IV:PAVING IMPROVEMENT CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 004243 Bid Proposal_DAPrevised7.26.16 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid Description Unit Price Bid Value No. Section No. I Measure Quantity UNIT V:STREET LIGHTING IMPROVEMENTS -------------- TOTAL UNIT V:STREET LIGHTING IMPROVEMENT UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS CITY OF FORT NORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Fomi Version April 2,2014 00 42 43 Bid Proposal_DAPrevised7.26.16 1 1 2 1 3 1 4 5 1 6 1 7 1 a 9 10 1 11 12 1 13 1 14 15 —4 Q - 11 LIN MAT A.i650 Q � mn Ir- RE:OFF-SITE P P, tes a 01��1111 FOR PAVING IN IN ITY (PUBLIC) NEW 3" TYPE 'D' HMAC P OVER 3" TYP 'B' HMAC OVER 8" ---�,C200 PSI CONCRETE PER CITY OF FORT P WORTH T.O. Ny9.8, RE. Of M SIDEWALK ---------------s-------- Vicin Map -I--j I I L —,'-1 1 I I—LI I 7--7 -7 L _IL I +11-Ir P-Z 11 - . L L Y Ln 0r. &ph�fl I • PAVING LEGEND � K12.8 5, K ---------- all- 5' SIDEWALK 1 °s'c c 0 'C (MAX.) H .—,F, Ila,113.8.1 13.81 13,8'.L6.3- 16.3-1 16.3*1 1..3 0N 9.6' -1-Z tfl.3 la.31 I iu, 19,111 I "41l L"' a- SIDEWALK t TV G 4- EW TXDOT 4(t" —— Jg z! 1.3 TURN LANE WITH DRIVE (pr G LL'�l LI F A I E — 1 4 1 & DRIVE A— E SIDEWALK D 01/ D g%(P 7 C SIDEWALK EXHIBIT D A PAVING LAYOUT-1 1 1 5 1 6 1 7 1 9 91 10 1 11 1 12 1 13 1 19 1 1 5 5 1 -- --_-- 6 I 7 I 0 I 9 30 1 11 12 1 1314 Q ` 4 °i /\ coven° snoolfa UTILITY LEGEND(NEW) ! 15 1p' ,,/ I_ INSTALL' I ----_ _ 1-2" SERVICE LINE � (DOM.) (PUBLIC) pp ( 1 I L tc mzeu i� m / \ 9 Te aza P WITH METER BOX I 1`� W/BACKFLOW 551I / \ weocwn Mtl vaw ON, mw°" P \\\ — PREVENTOR & PRESSURE- REDUCING VALVE (PRIVATE) ' 7 ENr �` �� / N1RE0 G'E aO —'"�' 0'O K i •,• — .I I I `PRIVATE ORAINAGE, wNaa7o" z J .of TtMUA 0e0 " (RE: 024) EASLII . wae" �,..O.D M� Wa N OGIIfJQ"A IID W„[I, LLI N / NSTA ( 9 0 --- ---%- 11• --- -\ -`` `�` UTILITY LEGEND(EXISTING) N 15 L.F. OF 6" WATER I a I ' Vicinity Map ExISTNaIrtlRie9 ® y 1-6" VALVE I =. -- -- y_ i �i .,w..,. _uoe" i"o."�omui M 1-RELOCATED F.H. d (RE: 025) IJ 1 I ■ ./ ma r _ —.".s M[«,a1 - - a I tl r _ w .s a Aq.U+ I i i 4r R \\ a F17-J31) r --- --ra m owam� Ln $� K d s K 0+74.54 LINE 'A' / ✓/ d '�� a INSTALL: 292 L.F. Or 1-12" 45' BEND - r _ 12" C-900 PVC WATER O r I `'' OT HIGH RISE POLE SIGN.HR-ISLP, 50'-0'HT.x 15'-1•W.z 502 S.F. H ; ' -� - (RE U-0500) px sT"r,FaeTgm 1xR o --- • -x3�icit 0+03 LINE 'A' ------ �I 2F — \ l/ x INSTALL: G ------��° 1-12" 45' BEND ' G _ I 10 —STA. 0+15 LINE 'A' FaI 11 „ INSTALL: F _ i -2t1--- —_1-12 45' BEND F INSTAL 1—U4" SERVICE LINE (IRR.) (PUBLIC) 5°J��. E WITH METER BOX W/BACKFLOW 1 ,+ PREVENTOR AND PRESSURE 1 j / E REDUCING VALVE (PRIVATE) \ (RE: 024) 0++ 0- 00 LINE 'A' F ° CONNECT 12" WATER o TO EX. 12" WATER _ `�� j 4/ (RE: 026) OT HORIZONTAL MONUMENT SIGN,MH12-2PGO. M,x ii'-1'(RE LiSC500) \,.�• io' \ A. 2+91.67 LINE 'A' 1? - e tea, CONNECT 12" WATER TO EX. 12" WATER �` N WATEAIA W a (RE: 026) , EXHIBIT A SHffi NIIM9E0. A <, q q`��' WATER LAYOUT 30 15 0 30 60 A I 1 2 1 3 1 4 1 5 1 6 1 7 1 0 1 9 I 10 1 11 1 12 1 13 1 14 1 15 I I 6 1 7 12 1 13 1 19 1 35 C _ Q w' / 'FcovEa m$ noo�ga ��n / :.ice............. . Q v — A64�l( /// WE5)F•IFyO ,CITY (PUBLIC) NEW 3" TYPE 'D' HMAC zo eza N OVER 3" TYP 'B' HMAC OVER 8" / 1200 PSI CONCRETE PER CITY OF FORT P / �I wE00WA� I II � I I WORTH I I woslsEo � v � ®oo N „R Z .a — /�' `� i d h dh d h W wNNaTON N ❑❑IrYp° ❑c°oo o❑ ❑❑�i�u❑o`o°o ❑❑]o'rJ°CII°� °o❑°L� c❑ ou❑° n poop❑dn n�� .p- ❑ _ .0 UP waEN WaLTON ' J OOEa Vr ❑11 n ❑❑ OOp t�❑-I'J 1 ❑❑ ❑n p "n"�C ° 1(TCI .I J�'Tl❑ llu JU L'1 AsphPl( ❑°t-1❑ "❑ -.❑ _.IJ °❑,]❑�un°❑❑r❑(lp❑❑p ppp❑Cp❑Op unrJ❑❑p Ur❑❑p CIC❑❑pl ❑'1p❑❑II°C❑❑ntC❑❑❑I__u°❑❑p CI_. ❑1 p❑❑p❑❑p ppp❑❑❑Clpp C❑°❑❑p'.i P M ❑Lln _ Vicmit Ma � . SOUTHGATE DRIVE JIF (80'PUBLIC ROW.) a u d K K AphoR TY (PUBLIC) NEW 3" TYPE 'D' HMAC z as a— OVER 3" TYP '8' HMAC OVER 8" Q � 1200 PSI CONCRETE PER CITY OF FORT 3 0 WORTH — =1_—L_ Jl a rr��uu'vTJ-r-ra .n J-.]u rp-.tic=1--ufJ-�i -4. °o,']�- ,❑a❑iaU orJC c- 1o° .�=-::a>3a'rr' �nL-1-_rn crJ°c�n�ca °Si��r�n°I i r In°r�❑ nn u'"❑ u x ❑ n 3 =�❑tl.,❑❑�❑❑�Slt�p 1 C°❑❑p�❑p n❑ ❑,un ❑ °❑,- ❑ :. ..❑ _ _❑ _� L.app,n _u❑n°❑�❑❑r❑°q❑p Jr� ❑,un u ❑❑c❑I�.,p❑ Z [ _. UT8 ❑ �p]Op ❑°t]LI-n u❑ .'p LIUp LJ�❑�p�l(S�j'❑Op'❑pL`TG n:r��otSpCT�JI�CI H SOUTHGATE DRIVE L G 0 � U F ITY (PUBLIC) NEW 3" TYPE 'D' HMAC F — OVER 3" TYP 'B' HMAC OVER 8" 1200 PSI CONCRETE PER CITY OF FORT E y WORTH _ L E e � M D M I .+ :YGS❑��❑G JI❑C'J Com❑ L'�J`>>❑ I.,IJI JC ❑ y'� ❑CI°❑❑❑❑Cp IJY rJ❑Ou❑n❑❑❑°f❑❑lJ❑ p❑°p❑p L °u❑LTC ❑Il❑C❑°°Gn ❑] D 4 D — � ❑ J L TlJbuLl G°I7 �S"-flLTb�O"dE'[Ttrpp' E`p �.�Y]-❑4.4�..m�Hq-.dU� ❑-❑�pA._yJ] IJ..LOEµl�ni]❑1.Z I.�`AI!} f19fl�T - � � � 1 3AI2i0 3 LVE)Hinos T — SOUTHGATE DRIVE SOUTHGATE DRIVE i ) (80'PUBLICR.O.W.) (80'PUBLIC P.O.W.) C EXHIBIT E ° — ga e PAVING g I N PANNG UY01112 B 9 I sheer numem: — LAYOUT-2 z� � 5 A 2 3 9 1 s 1 6 1 7 1g — I 9 1 SO 1 li 1 12 1 13 1 14 1 15 1 1 THE CITY OF FORT WORTH, TEXAS al FORT WORTH PLANS FOR THE CONSTRUCTION OF $� WATER, SEWER, PAVING, DRAINAGE o & STREET LIGHT IMPROVEMENTS TO SERVE QUIKTRIP STORE #0959 (SOUTH HILLS ADDITION, PARTS OF LOTS 2, 3 & ALL OF LOT 4, BLOCK 67—A & ALL OF LOTS 10, 11, 12, 13 & 14, BLOCK 67) SHEET INDEX 5 D' SHEET NO. DESCRIPTION BETSY PRICE SADDLER UNITI IIAIII STORM SEWER WA R gNITARY RIMPR VFMFN S z mCOVER Sry MAYOR RDMq •F O/G w OOM FINALPLAT001 COVE � RT �'E/T(-� OG2B FINAL PLAT DAVID��T (� TJ}� COVERT 003 NOTES AND CONTACT LISTS I+OOlti E U 004 GITYOFFORTWORTHWATERAND SEWER NOTES 4 STpI fLD LEITH O Dos DEMOLITION PLAN s` CITY MANAGER Ooe T,OT RIGHT TURN LANE DEMOLITION 8 SITE PLAN m '( 007 T OTRIGHTTURNLANE GRADING SPAVNG PLAN ZO 'A GOGRADI B NGP AN SZO M°� EA MAP DOUGLAS W.WIERSIG,P.E. 'HO POSTDEVEOOPEDOMNAOEAREAMAP 011 DRAINAGE CALCULATIONS DIRECTOR,TRANSPORTATION AND o12 STORMSEWERPLAN WORKS ORKS DEPARTMENT o1a STORM SEWER PIAWPROFILE oll STORM SEWER PLANIPROFILE WEDGWA ® O15 STORM SEWER PLAWPROFILE JOHN ROBERT CARMAN SITE 0011 WATER LAYOUT WOSLEY S�, Off, P� TxDO 01. SAANiiRnaYSEWERLAYOUT WATER DIRECTOR WINIFRED O,,[O[.�R6sq 5 V �C� Y Dom OROEITERAION O019A —IN NINGFILATROL AN PHASE WHARTON L`F Y'� �_` 0 0= SOUTHGATETRAFFICMIN O011 EROSION CONTROL PLAN EPLAN an 072B TYPICAL TRAFFIC CONTROL PLAN 0.. WREN ? J023 W OF FO T WORTH DETAILS SHEET 1 CITY OF FORT WORTH DETAILS SHEEt2 WALTON > Q 025 CNYOF FORT WORTH DETAILS SHEET 3y () 028 CITY OF FORT WORTH DETAILS SHEET 4 U 021 CTYOF FORT WORTH DETAILS SHEET 5 �. 028 CITYOF FORT WORTH DETAILS SHEETS DURI GER 02 5 -OT DETAILS YS LOCATION MAP N.T.S. DOUGLAS W.WIERSIG,P.E. DATE: DIRECTOR,TRANSPORTATION AND PUBLIC WORKS E MAPSCO NO, PAGE 89 GRID Q CITY PROJECT NO. 100361 COUNCIL DISTRICT 6 RECOMMENDED DATE: WATER PROJECT NO. 59601-0600430-001380 OWNED/DEVELOPED BY: PREPARED BY: PROGRAM MANAGER °m u SEWER PROJECT NO. 59607-0700430-001380 OUIKTRIP CORPORATION GLENN ENGINEERING CORPORATION 1120 N.INDUSTRIAL BLVD. TEXAS BOARD OF PROFESSIONAL ENGINEERS REGISTRATION NO.F-303 i FILE NO. K-2470 EULESS,TX.76039 105 DECKER COURT,SUITE 110 TEL(01 7)786.3187 IRVING,Tx 75082 REVIEWED: DATE: ?' FAX;(817)8SM213 TEL:(972)717-5151 PROJECT MANAGER II{{u CONTACT:JO DUDLEY FAX:(972)717.2178 CONTACT;CHERALYN ARMIJO,RE, 3 p COVER SADDLER i COVERT ��STFIE�D LEITH O 20 820 m WEDGWAY SITE ® N WOSLEY Fs�c 04GP'C TxDO WINIFRED WHARTON WREN WALTON -' U U DURI GER .�. VicinityMap Not to Scale — 1 1 1 2 13 4 s 1 6 7 8 9 10 11 I 12 1 13 1 14 11s eISTATA. 0+00 LINE 'A' '� Doe Q rte, w,i uo covea rq% UTILITY LEGEND(NEW) > NDARD 6' SQUARE JUNCTION BOX 01 1 T. . APER 33 49 10—D411 (RE: 023) 95 L.F. OF 24" RCP ( xEsmeco cTx" o � ax 1.35% SLOPE _ s•P FL EX. 54"=731.221 azu —ax w —sm nex�oxo��• P A ' Fc 0' .FL 24"=731.25 —e«�w"oxx CONTRACTOR TO VERIFY ELEVATION wFo"wa ® xo—exew axe ae�e w P -- —OF EX. 54" RCP AND NOTIFY —r----- __— w�x� "s2bs a Txoo <ENGINEER OF ANY CONFLICTS —/ r w'""aEH +�s P�°"MM,xx� �€."°�— Thr —..-_��•_ �,.--'^a — ����_�—�wnlrory 3 3 xca cxcre ane,w0 amm 22 � 3 N eq•�b g"ya P /sra>m uor Hole 74l l7 I. —— UTILITY LEGEND(EXISTING) RCP Vicinity Map W �� N REFG(IPl4rom IY t=]Jl J /t „�ham,yo,w=rJ � I,. _ ax sT xcum Ties �o 7J>2s' >•'—--SQUTHGATE DRIVE — ,_——— wr e a — • Imux�onewuovnc u M _ WO SLLQ ROW) — —'---- _ c 1 ,1\ /Y / y// 'I _�L—�l f I 1+ ,I / —— _ as xc) r• a Ln P of ua"ho1e=7^a.9J — la'PVC rn ham A/rth=73617 � o PoxTn Pot[x/RMmonupr � m� C la'PVC auf to Sau1h>73G IJ n phatt "_I N cv p au u.wxote Q d N z n UK ux n uwxo e Q 3 T e —� `�___i —( --�t--1---� —r a eNxxxux i < — _=-� W-1 Cy w .x PfD6nILLW 9aN.PUY Z —_— TA. 4+50 LINE 'A' _.— Exlxnrvo PPnnlaxs H —————, _ — STA 8+50 LINE -- ----><e_ — — ---- a�STANDARD 4' SQUARE—— `_�--;STANDARD 4' SQUAREit � I '� I '— — IJUNCTION BOXJUNCTION BOX � I (RE: C574)m-r2RE: C574 F FL 24" OUT=738.99 ——— —I____—_i—i_ __ j— FL 24' OUT=742.20—_ FL 24" IN=742.24 RR FL 24" IN=739.05 KJF L I 35 L.F. OF 24" RC esr oe w> ✓� i [T 1 e ® 0.92% SLOPE 11+85 LINE A' o —STANDARD STORM MANHOLE a o (RE: C542) 5 '�. `' l ``�;, � �.• \ e FL 24" OUT=752.04 SOUTHGATE'��IVE � r, '<,� ti, �(so'PuauQ\bRIV �. F FL 12" IN=752.09 tiL o STA. 11+50 UNE 'A' �STANDARD 4' SQUARE—__ EXHIBIT C N soemvvaur B JUNCTION BOX — I (RE: C574) d _ A FL 24" OUT=751.55 i s FL 24" IN=751.72 STORM LAYOUT � III P: 1 2 3 4 ( 5 61 7 1 8 9 10 Il 1 12 1 13 1 14 1 Is (—