Loading...
HomeMy WebLinkAboutContract 48445 c1TY SECRrAT_A �yy) Developer and Project Information Cover Sheet: Developer Company Name: D.R.Horton-Texas,LTD Address, State,Zip Code: 6751 North Freeway,Fort Worth,TX 76131 Phone&Email: 817-230-0800,mpallen@drhorton.com Authorized Signatory,Title: Mark Allen,Assistant Secretary Project Name and Brief Hawthorne Meadows Phase 1 Description: Project Location: Bluemound Rd Hwy 287 and East Bonds Ranch Rd. Plat Case Number: FP-16-77 Plat Name: Mapsco: 20U Council District: 7 City Project Number: 100515 CFA Number: 2016-101 DOE Number: None To be completed b .staff Received by v Date: / Q FOFFICIALORD ARY TX City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, D.R. Horton - Texas, LTD , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Hawthorne Meadows Phase 1 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ® Sewer (A-1) ®, Paving (B) ® Storm Drain (B-1) M Street Lights & Signs (C) M. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section Il, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected ' with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period)the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 7 of 11 Cost Summary Sheet Project Name: Hawthorne Meadows Phase 1 CFA No.: 2016-101 DOE No.: 100515 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 503,253.23 2.Sewer Construction $ 511,388.90 Water and Sewer Construction Total $ 1,014,642.13 B. TPW Construction 1.Street $ 1,119,078.42 2.Storm Drain $ 615,744.50 3.Street Lights Installed by Developer $ - 4. Signals $ - TPW Construction Cost Total $ 1,734,822.92 Total Construction Cost(excluding the fees): $ 2,749,465.05 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 20,292.84 D. Water/Sewer Material Testing Fee(2%) $ 20,292.84 Sub-Total for Water Construction Fees $ 40,585.69 E. TPW Inspection Fee(4%) $ 69,392.92 F. TPW Material Testing(2%) $ 34,696.46 G. Street Light Inspsection Cost $ - H. Signals Inspection Cost $ H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 104,089.38 Total Construction Fees: $ 144,675.06 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 2,749,465.05 x Completion Agreement=100%/Holds Plat $ 2,749,465.05 Cash Escrow Water/Sanitary Sewer=125% $ 1,268,302.66 Cash Escrow Paving/Storm Drain=125% $ 2,168,528.65 Letter of Credit=125%w/2yr expiration period $ 3,436,831.31 City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 8 of 11 ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER D.R.Horton—Texas,LTD. A Texas Limited Partnership, By: D.R. Horton, Inc., ` A Delaware Corporation Jesus J. Chapa Its Authorized Agent Assistant City Manager Date: /;? '``4 Recommended by: Name: Mark Allen Title: Assistant Secretary Date: Wendy Chi Babulal, EMBA, P.E. ATTEST: (Only if required by Developer) Development Engineering Manager Water Department Signature —D� 6—� (, Name: Douglas _ Wiersig, P.E. Director Transportation &Public Works Department Approved as to Form &Legality: �$ a $ °; o ° ATTEST: Richard A. McCracken Assistant City Attorney M&C No. ary J. Ka r Date: 94,lite City Secretary F«wk z4 = 1.44 City of Fort Worth,Texas Standard Community Facilities Agreement OFFICIAL RECORD CFA Official Release Date: 10.07.2015 Page 9 of 11 CITY SECRETARY FT.WORTH,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 - Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A: Water Improvments Water Cost Estimate Exhibit A-1: Sewer Improvements M Sewer Cost Estimate Exhibit B: Paving Improvements Paving Cost Estimate ® Exhibit 13-1: Storm Drain Improvements Storm Drain Cost Estimate ❑ Exhibit C: Street Lights and Signs Improvements ❑ Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100515 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 11 of 11 ------------------------------------------------------------------------------------------------------------------------------------------------- 0 BLUE MOUND ROAD W OL�� MOUNO ROAD E m O Z O❑ ❑ wO Z Qw �❑ _ O GOLDEN TRIANGLE BOULEVARD w 287 J m �=ra� W BONDS E BONDS @ rjW RANCH ROAD RANCH ROAD PROJECT I� l��E LOCATION J o NRB�o�wpFtO w Z O Z = O ❑ Z❑ Z 0 o0 W°❑ co ❑ o ��a Z O ami° , o 0 w NORTH TqR m �Nr PARKWAY HARMON ROAD E BAILEY BOSWELL ROAD =------------------------- --------- ----------- ------- -------------------—------- ------- ------------------- ENGINEER: HAWTHORNS MEADOWS OWNER/ DEVELOPER: 11!11 PELOTON PHASE 1 DR NORTON—TEXAS, LTD a LAND SOLUTIONS NORTH 6751 NORTH FREEWAY 5751 KROGER DRIVE NOT TO SCALE FORT WORTH,TX 76131 SUITE 185 PHONE: 817-230-0800 KELLER,TX 76244 DATE:AUGUST,2016 PHONE:817-562-3350 LEGEND --H— PROPOSED WATER LINES FUTURE WATER LINES -- e� EXIST WATER LINES NOTE:ALL PROPOSED WATER LINES ARE 8"UNLESS OTHERWISE NOTED ww EX 36"W (CITY FILE-15206) J EAST BONDS RANCH ROAD CITY OF HASLET ---y� Ifo---��• '.- _�_Cr_t=`_._R;� _��•.A�`r�t. T�-.. _J / $tt W f I PIERZ DRIVE PIERZ DRIVE i I I I O I y� a Q 1 I au- bo 00F �y LOT 7X g w OPEEN_PRIVATE WTHORNE MEADOWS 8„ HASE 1hjA I I BOWLUS DRIVE (I CHIN J.CHANG I J INST# D212308972 I CR i EXIST'AG'ZONING LOT 20X I FORTUNE 88 OW PAC "'ATEE INST#D210210847 C.R.TC.T. EXIST T ZONING I LITTLE FALLS TRAIL IF G� ( GJ0 I I LU LU PHASE 1_ PHASE 2 / li _ ' d Q L / fJCID II L _ L v CHIN J.CHANG M` QO o INS#D212308972 p EXIST'AG'ZONING I I NPw�NO NP,SE 2 _ �'°_--------- ---- P I '--- - -CP#02053 - ---,0 Pi;Est[?I�33'ri8 4 t ----- -------------- L l GIS \\ 13: P ESIR OZ2d3025 EXHIBIT A - WATER ---" -- X ��" e ,w 0 --------� P E LOTO N HAWTHORNE MEADOWS OWNER/ DEVELOPER: o NORTH 300' WATER DR HORTON-TEXAS LTD ILII LARD 6DLUT�DH3 r ' 5751 KROGER DRIVE PHASE 1 6751 NORTH FREEWAY SUITE 185 o FORT WORTH,TX 76131 KELLER,TX 76244 GRAPHIC SCALE DATE:SEPTEMBER,2016 PHONE: 817-230-0800 PHONE:817-562-3350 LEGEND �— PROPOSED SEWER LINES ——Os—— FUTURE SEWER LINES (5)—SSX— EXIST SEWER LINES NOTE:ALL PROPOSED SANITARY SEWER LINES ARE 8"UNLESS OTHERWISE NOTED �tll �< / EAST BONDS RANCH ROAD CITY OF HASLET CITY OF FT.WORTH Elk PIERZ DRIVE PIERZ DRIVE I _J Ww 1 C In fD o Q: d' D_' LL PWLOT W J OPEN SPACE o = g m K WTHORNE EADOWS PHASE 1 I I I BOWLUS DRIVE II CHIN J.CHANG ( 1 INST# D212308972 I J EXIST'AG'ZONING LOT PMAT I FORTUNE 88 PM ATE OPEN SPACE INST#D210210847 C.R.T.C.T. EXIST'I'ZONING LITTLE FALLS TRAIL J I 5 w PHASE 1 PHASEi' p /¢, r ¢' n I /2 PyAs�21 Q /ss G I CHIN J. OW E0 INS#D2123 8972 D XIST'AG'ZONING IogoA R PSE HPN2 I s - L OP x#02053 I ---------------- a n b '_JN _--___---� XjST A-7.6 Zvi'• I , E ——— ------ PftFS1010220025 I i� ; r EXHIBIT Al - SANITARY SEWER _ '" rC7c ___- _ f HAWTHORE MEADOWS OWNER/ DEVELOPER: li! P E LOTO N 0 NORTH 300' SANITARY SEWER DR NORTON-TEXAS LTD IIIII LAND :D�U7�UM6 """— ' 5751 KROGER DRIVE If PHASE 1 6751 NORTH FREEWAY SUITE 185 FORT WORTH,TX 76131 KELLER,TX 76244 GRAPHIC SCALE DATE:SEPTEMBER,2016 PHONE: 817-230-0800 PHONE:817-562-3350 LEGEND 5' CONC. SIDEWALK TO BE CONSTRUCTED BY PAVING CONTRACTOR 16.5' B-B W/ MEDIAN /70' ROW ---- 5' CONC. SIDEWALK TO BE CONSTRUCTED BY HOMEBUILDER 29B-B /60' ROW © INTERSECTION TYPE R-1 RAMP OI TYPE P-1 PERPENDICULAR CURB RAMP 29' B-B / 50' ROW (TYP) TYPE M-2 MID BLOCK RAMP w —L EAST BONDS RANCH ROAD CITY gF HASLET J I I —— — PIERZ DRIVE ————— PIERZ DRIVE i I I l I I I >I ISI LOT 7x lol II I of (a) ISI ISI I I I I I I PRNATE I W �I (j I 1 4 1 OPEN SPACE I I a m I gj I I I IHAWTHORNE I II I I I I I EADOWS j I I I PHASE 1 I 7, CHIN J.CHANG I '` ' �. FORTUNE 88 INST# D212308972 I i INST#D210210847 EXIST'AG'ZONING C.R.T.C.T. \ j LOT 20X I EXIST'I'ZONING PRNATE OPEN SPAM LITTT FALLS TRAIL I PHASE 1_— / I w I I� PHASE2 I I. CHIN J.CHANG OVVS IS INStt D212308972 D EXIST'AG'ZONING NPW�N PSE 2 i –– — -- --------.---_- N n ----- --� i �RESI�21 X1844;1 o --------- _-INST , ZbNING-�-------' i ( ----- EiKIST I LL j PEgIDI0225 028 it i r EX IBI T B - PAVING - -_-- _______ 1 INTI R?G f' 1� Jj _ i--- l'!!I P E LOTO N 0 Ip1 1 HAWTHORNE MEADOWS OWNER/ DEVELOPER: �, � LAND SOLUTIONS 0 NORTH 300' PAVING DR HORTON-TEXAS, LTD 5751 KROGER DRIVE PHASE 1 6751 NORTH FREEWAY SUITE 185 FORT WORTH,TX 76131 KELLER,TX 76244 GRAPHIC SCALE DATE:SEPTEMBER,2016 PHONE: 817-230-0800 PHONE:817-562-3350 LEGEND T PROPOSED STORM DRAIN LINES -- -- FUTURE STORM DRAIN LINES ---i-- PROPOSED STORM DRAIN MANHOLE PROPOSED STORM DRAIN HEADWALL wW W� EAST BONDS RANCH ROAD CITY OF HASLET --------------------- \� CITY OF FT.WORTH I PIERZ DRIVE 1-10' INLET 21" P I >_ o HD � � J of LL OT 7X W_ N O J PRNATE I d. Q F- OPEN SPACE J m F J 2-10' NLET WTHORNE 2-1' [ LETS EADOWS I I N i BOWLUS DRIVE 4'x4' UNC 10 PHASE 1 I CHIN J.CHANG ( FORTUNE 88 INST# D212308972 I " INST#D210210847 EXIST'AG'ZONING LOT PO% C.R.T.C.T. OPEN SPAT CE I EXIST T ZONING I FLARED HDWL I 2-10' INLETS 4' JUTI BOX 2-6'x5'BOX C ERTS I ' I S I24 RCP 1" Ga, 2 " 4'x4'WYE �G " �� LITTLE FA LLS TRAIL INLET ���"� PARALLEL D L 2-10' IN S G�5 "RCP j 4'x4'JUNCTIO C "R W PHASE 1 CP " i --� 3 PHASE Co 36"SLOPING x - ---------------------- I HDWL m 4 H � n "SLO I G HDWL I J C I 4'x4'WYE CHIN J.CHANG S C INLET INS#D212308972 cMEp,D O EXIST'AG'ZONING N` 4x4O JUN TIO BOX _..... Np,W�N pNPSE 2 -10' IN IET 24"RCP _ 2-5'x4'BOX CULV ru 1-10' INLET 0 1 -6'x4'B X CUL R S LU MODIFIED FLARE D I PRESI0 113$ 1 v m INST#R-r- C? NTNG I PARALLEL H L ExA'7 5 zo I L n ' L eves PRE5I102253p25 r EXHIBIT B1 - STORM D AIN AGEINS -p HAWTHORNE MEADOWS I%I PELOTON OWNER/ DEVELOPER: o NORm 300' STORM DRAINAGE DR HORTON-TEXAS LTD IIT LAND : � 5751 KROGERDRI NS DRI ' VEE PHASE 1 6751 NORTH FREEWAY SUITE 185 FORT WORTH,TX 1 KELLER,TX 76244 3 PHONE: 817 230-0800PHONE:817-562-3350 GRAPHIC SCALE DATE:SEPTEMBER,2016 LEGEND ® PROPOSED STREET NAME SIGNS A FUTURE STREET NAME SIGNS W, J ` EAST BdNDS RANCN ROAD ��ITY OF HASLET I PIERZ DRIVE PIERZ DRIVE i I J w w 7 J t 1 � � LOT'!X W_ ♦� JO PEN SPACE I i a g m H WTHORNE J EADOWS PHASE 1 I I BOWLUS DRIVE I CHIN J.CHANG I FORTUNE 88 INST# D212308972 EXIST'AGZONING INST#D210210847 C.R.T.C.T. LOT 2" EXIST'I'ZONING I PRIVATE OPEN SPACE I LITTLE FALLS TRAIL I �G w PHASE PHASE 2 l ---------- --------- � n ( HASF2 �e II CHIN J.CHANG MEPDpWS T o INS#D212308972 i p EXIST'AG'ZONINGPw. p H P J I , ------------ i --T �RESI,bIo3 pan - -- �NStC � z9N)NG -- I ----- - 7 P sT — j TSID O d�2 #Dl1� r EX IBIT Cl - STREET NAME SIGNS -------- --— _ lil( HAWTHORNE MEADOWS OWNER/ DEVELOPER: p1I P E LOTO N LAND f0 LUT10 Nb c 0 NORTH 300' STREET NAME SIGNS DR HORTON-TEXAS, LTD 5751 KROGER DRIVE 6751 NORTH SUITE 15 PHASE 1 ORT WORTH,TTXE 6WAY 131 KELLER,TX7 6244 GRAPHIC SCALE DATE:SEPTEMBER,2016 PHONE: 817-230-0800 PHONE:817-562-3350 PELOTON LAND SOLUTIONS,LLC 5751 KROGER DR,SUITE 185,KELLER,TX 76244(817)562-3350 HAWTHORNE MEADOWS PHASE 1 1111/2016 WATER IMPROVEMENTS ITEM# DESCRIPTION UNIT QTY UNIT PRICE TOTAL 3311.0261 8"PVC Water Pipe LF 6,558 34.00 222,972.00 3312.2003 1"Water Service EA 128 850.00 108,800.00 3312.2103 11/2"Water Service EA 10 1,800.00 18,000.00 3312.3003 8"Gate Valve EA 18 1,150.00 20,700.00 3312.0001 Fire Hydrant EA 6 4,500.00 27,000.00 3311.0001 Ductile Iron Water Fittings w/Restraint TON 4 4,000.00 17,200.00 3312.4311 36"x 8"Tapping Sleeve&Valve EA 1 7,500.00 7,500.00 3305.0003 8"Waterline Lowering EA 4 2,200.00 8,800.00 3312.0117 Connection to Existing 4"-12"Water Main EA 1 1,000.00 1,000.00 3305.0108 Miscellaneous Structure Adjustment EA 2 2,000.00 4,000.00 3305.0109 ITrench Safety LF 1 6,558 0.25 1,639.50 TOTAL WATER $437,611.50 TOTAL WATER 15%CONTINGENCY $503,253.23 SANITARY SEWER IMPROVEMENTS ITEM# IDESCRIPTION UNIT QTY UNIT PRICE TOTAL 3331.4115 8"Sewer Pipe LF 5,771 38.00 219,298.00 3305.3002 8"Sewer Carrier Pipe LF 20 100.00 2,000.00 3339.1001 4'Manhole EA 21 3,600.00 75,600.00 3339.1002 4'Drop Manhole EA 3 4,000.00 12,000.00 9999.0001 CSS Encasement for Utility Pipes LF 160 20.00 3,200.00 3305.0116 Concrete Encasement for Utility Pipes LF 37 20.00 740.00 3305.1003 20"Casing By Open Cut LF 20 200.00 4,000.00 3339.1003 4'Extra Depth Manhole VF 93 175.00 16,275.00 3301.0101 Manhole Vacuum Testing EA 24 50.00 1,200.00 3339.0001 Epoxy Manhole Liner VF 40 195.00 7,800.00 3331.3101 4"Sewer Service EA 128 650.00 83,200.00 9999.0013 Connect to Ex 10"to 8"SS EA 2 1,000.00 2,000.00 3305.0109 Trench Safety LF 5,791 1.00 5,791.00 3301.0002 Post-CCTV Inspection LF 5,791 2.001 11,582.00 TOTAL SANITARY SEWER $444,686.00 TOTAL SANITARY SEWER 15%CONTINGENCY $511,388.90 STORM DRAINS IMPROVEMENTS ITEM# IDESCRIPTION UNIT CITY UNIT PRICE TOTAL 3341.1304 6x5 Box Culvert LF 140 300.00 42,000.00 3341.1303 6x4 Box Culvert LF 92 280.00 25,760.00 3341.1202 5x4 Box Culvert LF 184 235.00 43,240.00 3349.0001 4'Storm Junction Box EA 4 4,000.00 16,000.00 3349.7001 4'Drop Inlet EA 2 4,200.00 8,400.00 3341.0309 36"RCP,Class III LF 246 85.00 20,910.00 3341.0305 33"RCP,Class 111 LF 603 80.00 48,240.00 3341.0208 27"RCP,Class III LF 219 60.00 13,140.00 3341.0205 24"RCP,Class III LF 951 48.00 45,648.00 3341.0201 21"RCP,Class III LF 229 42.00 9,618.00 9999.0002 5'Curb Inlet EA 2 2,200.00 4,400.00 3349.5001 10'Curb Inlet EA 11 2,500.00 27,500.00 3137.0102 Large Stone Riprap,dry SY 368 75.00 27,600.00 3137.0103 Large Stone Riprap,grouted SY 989 85.00 84,065.00 9999.0003 27"Sloping Headwall EA 1 3,000.00 3,000.00 9999.0004 36"Sloping Headwall EA 1 3,500.00 3,500.00 9999.0005 21"Sloping Headwall EA 1 2,000.00 2,000.00 9999.0006 TxDOT Std Flared Headwall,2 Box Culverts EA 1 19,500.00 19,500.00 9999.0007 TxDOT Sid Parrallel Headwall,2 Box Culverts EA 1 17,500.00 17,500.00 9999.0008 TxDOT Modified Headwall,3 Box Culverts EA 1 28,500.00 28,500.00 9999.0016 TxDOT Std Parrallel Headwall,3 Box Culverts EA 1 26,000.00 26,000.00 9999.0014 Pedestrian Handrail LF 171 95.00 16,245.00 3305.0109 Trench Safety LF 2,664 1.00 2,664.00 TOTAL STORM DRAIN $535,430.00 TOTAL STORM DRAIN 15%CONTINGENCY $615,744.50 PAVING IMPROVEMENTS ITEM# DESCRIPTION UNIT CITY UNIT PRICE TOTAL 9999.0009 7.5"Conc Pvmt SY 1,086 40.00 43,440.00 3213.0101 6"Conc Pvmt SY 20,086 34.00 682,924.00 3213.0301 4"Conc Sidewalk SF 21,355 3.00 64,065.00 3211.0502 8"Lime Treatment SY 1,140 3.00 3,420.90 3211.0501 6"Lime Treatment SY 21,090 2.75 57,998.33 3211.0400 Hydrated Lime TN 361 175.00 63,243.44 3213.0501 Barrier Free Ramp,Type R-1 EA 10 1,200.00 12,000.00 3213.0504 Barrier Free Ramp,Type M-2 EA 8 1,000.00 8,000.00 3213.0506 Barrer Free Ramp,Type P-1 EA 10 1,000.00 10,000.00 3217.0503 24"SLD Pvmt Marking Paint(W) LF 154 20.00 3,080.00 3137.0102 Large Stone Riprap,dry SY 166 75.00 12,450.00 9999.0010 End of Road Barricade EA 3 600.00 1,800.00 9999.0015 Remove End of Road Barricade EA 1 500.00 500.00 9999.0011 Std Street Header LF 87 20.00 1,740.00 9999.0012 Street Sign EA 13 650.001 8,450.00 TOTAL PAVING $973,111.67 TOTAL PAVING 15%CONTINGENCY $1,119,078.42 PROJECT TOTAQ $2,390,839.17 PROJECT TOTAL 15%CONTINGENCY1 $2,749,465.04 11/8/2016 ITEM TOTAL UNIT PRICE ITEM TOTAL COS ITEM NO. BID ITEM UNIT 35 36 52 1 8"PVC Water Pie LF 6,558 $34.00 $222,972.00 2 1"Water Service EA 128 $850.00 $108,800.00 3 11/2"Water Service EA 10 $1800.00 $18,000.00 4 8"Gate Valve EA 18 $1,150.00 $20,700.00 5 Fire Hydrant EA 6 $4,500.00 $27,000.00 6 Ductile Iron Water Fittings w/Restraint TON 4.3 $4,000.00 $17,200.00 7 36"x 8"Tapping Sleeve&Valve EA 1 $7,500.00 $7,500.00 8 8"Waterline Lowering EA 4 $2,200.00 $8,800.00 9 Connection to Existing 4"-12"Water Main EA 1 $1,000.00 $1,000.00 10 Miscellaneous Structure Adjustment EA 2 $2,000.00 $4 000.00 11 Trench Safety LF 6,558 $0.25 $1,639.50 12 8"Sewer Pie LF 5,771 $38.00 $219,298.00 13 8"Sewer Carrier Pie LF 20 $100.00 $2000.00 14 4'Manhole EA 21 $3,600.00 $75,600.00 15 4'Drop Manhole EA 3 $4,000.00 $12,000.00 16 CSS Encasement for Utility Pipes LF 160 $20.00 $3,200.00 17 Concrete Encasement for Utility Pipes LF 37 $20.00 $740.00 18 20"Casing By Oen Cut LF 20 $200.00 $4,000.00 19 4'Extra Depth Manhole VF 93 $175.00 $16,275.00 20 Manhole Vacuum Testing EA 24 $50.00 $1,200.00 21 Epoxy Manhole Liner VF 40 $195.00 $7,800.00 22 4"Sewer Service EA 128 $650.00 $83,200.00 23 Connect to Ex 10"to 8"SS EA 2 $1,000.00 $2,000.00 24 Trench Safety LF 5,791 $1.00 $5,791.00 25 Post-CCTV Inspection LF 5,791 $2.00 $11,582.00 26 6x5 Box Culvert LF 140 $300.00 $42,000.00 27 6x4 Box Culvert LF 92 $280.00 $25,760.00 28 5x4 Box Culvert LF 184 $235.00 $43,240.00 29 4'Storm Junction Box EA 4 S4,000.00 $16,000.00 30 4'Drop Inlet EA 2 $4,200.00 $8,400.00 31 36"RCP Class III LF 246 $85.00 $20,910.00 32 33"RCP,Class III LF 603 $80.00 $48,240.00 33 27"RCP,Class IB LF 219 $60.00 $13,140.00 34 24"RCP,Class III LF 951 $48.00 $45,648.00 35 21"RCP Class BI LF 229 $42.00 $9,618.00 36 5'Curb Inlet EA 2 $2,200.00 $4,400. 0 37 10'Curb Inlet EA 11 $2,500.00 $27,500.00 38 Large Stone Riprap,dry SY 368 $75.00 $27,600.00 39 Large Stone Ri ra,grouted SY 989 $85.00 $84,065.00 40 27"Sloping Headwall EA 1 $3,000.00 $3,000.00 41 36"Sloping Headwall EA 1 $3,500.00 $3,500,00 42 21"Sloping Headwall EA 1 $2,000.00 $2000.00 43 TxDOT Std Flared Headwall 2 Box Culverts EA 1 $19,500.00 $19,500.00 44 TxDOT Std Parrallel Headwall,2 Box Culverts EA 1 $17,500.00 $17,500.00 45 TxDOT Modified Headwall 3 Box Culverts EA 1 $28,500.00 $28,500.00 46 TxDOT Std Parrallel Headwall 3 Box Culverts EA 1 $26,000.00 $26,000.00 47 Pedestrian Handrail LF 171 $95.00 $16245.00 48 Trench Safety LF 2,664 $1.00 $2,664.00 49 7.5"Cone Pvmt SY 0 0 0 1,086 $40.00 $43,440.00 50 6"Cone Pvmt Sy 5 1,147 1,878 20,086 $34.00 $682,924.00 51 4"Cone Sidewalk SF 7 74 653 21,355 $3.00 $64,065.00 52 8"Lime Treatment SY 0 0 0 1,140 $3.00 $3,420.90 53 6"Lime Treatment Sy 6 1,204 1,972 21,090 $2.75 $57 998.33 54 Hydrated Lime TN 4 19 32 361 $175.00 $63,243.44 55 Barrier Free Ram Type R-1 EA I I 1 10 $1200.00 $12000.00 56 Barrier Free Ramp,Type M-2 EA 2 I 0 8 $1,00000 $8,000.00 57 Barrer Free Ramp,Type P-1 EA 1 I 1 10 $1,000.00 $10,000.00 58 24"SLD Pvmt Marking Paint LF 4 14 14 154 $20.00 $3,080.00 59 Large Stone Ri ra d SY 4 51 0 166 $75.00 $12,450.00 60 End of Road Barricade EA 1 1 0 3 $600.00 $1800.00 61 Remove End of Road Barricade EA 0 0 1 1 $500.00 $500.00 62 Std Street Header LF 9 29 0 87 $20.00 $1,740.00 63 Street Sign EA 1 I 1 13 $650.00 $8,450.00 UNIT TOTAL $2,390,839.17 UNIT TOTAL 15%CONTINGENCY $2,749,465.04