HomeMy WebLinkAboutContract 46800-FP2 Department of TP &W Const. Services
bDat
ject anager� /�
P o _ C91Y sEcTaRY1 Z
Risk Management Canady - - 'tT WO RT H® CONTRACT NO.
D.O.E. Brotherton
CFA Westerman/Scanned
Esteban Perez/Scanned
The Proceeding people have been Contacted
concerning the request for final payment& have ATION AND PUBLIC WORKS L'-) 333
released this project for such payment. F PROJECT COMPLETION
Developer Projects) .QOi 72 15-
Clearance Conducted By 0416re& City Project Ne: 0p2333
lo
Regarding contract 117275 for LIVE OAK CREEK PHASE 2, SECTION 1&2 as required by theC 6 O
WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the
WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works
Department has accepted the project-a
D
Original Contract Price: NOV 2 9 2016
0 $431,121.50
Amount of Approved Change Orders: By ($66,264.00) Ns 1
Revised Contract Amount: $364,857.50 /
Total Cost Work Completed: $364,857.50(Ap— i
//•?AtG
Recomme d d for Acceptance Date
Asst. Dire V,
TPW - Infrastructure Design and Construction
Accepted Date
Asst. Director, WATER DEPARTMENT
Asst. City Manager Date
OFFICIAL RECORD
Comments: P CITY SECRETARY
owWm TFlWORTHI TSL
l 0 3M
0�=V3 33
Rev.9/22/16
EC 1E0 V IE
NOV 292016 5160 - 00 ;:2,333
City Project Numbers 0233]B DOE Number 7275
Contract Name LIVE OAK CREEK PHASE 2,SECTION 1&2 Estimate Number I
Contract Limits Payment Number 1
Project Type STORM DRAIN,PAVING&ST LIGHT For Period Ending 11/18/2016
Project Funding
Project Manager Ehia City Secretary Contract Number 117275
Inspectors LAYER / SCHARFENBERG Contract Date
Contractor THB CONSTRUCTION,LLC Contract Time 120 CD
8105 ROYAL LANE STE 107 Days Charged to Date 358 CD
DALLAS, TX 75229 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
--------------------------------------
Total Cost of Work Completed $364,857.50
Less %Retained $0.00
Net Earned $364,857.50
Earned This Period $364,857.50
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $364,857.50
Friday,November 18,2016 Page 4 of 4
9(oS- o Q3 3 3
FORTWQRTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name LIVE OAK CREEK PHASE 2,SECTION 1&2
Contract Limits
Project Type WATER&SEWER
City Project Numbers 02333
DOE Number 7275
Estimate Number 1 Payment Number 1 For Period Ending 11/18/2016
CD
City Secretary Contract Number 117275 Contract Time 12GD
Contract Date Days Charged to Date 358
Project Manager Ehia Contract is 100.00 Complete
Contractor THB CONSTRUCTION,LLC
8105 ROYAL LANE STE 107
DALLAS, TX 75229
Inspectors LAYER / SCHARFENBERG
Friday,November 18,2016 Page 1 of 4
City Project Numbers 02333 DOE Number 7275
Contract Name LIVE OAK CREEK PHASE 2,SECTION I&2 Estimate Number I
Contract Limits Payment Number I
Project Type STORM DRAIN,PAVING&ST LIGHT For Period Ending 11/18/2016
Project Funding
Contract Information Summary
Original Contract Amount $431,121.50
Chance Orders
Change Order Number 1 ($66,264.00)
Total Contract Price $364,857.50
Date I r' Y Total Cost of Work Completed
$364,857.50
Contractor Less %Retained $0.00
Date Net Earned $364,857.50
pection upe isor Earned This Period $364,857.50
Retainage This Period $0.00
0- 1
�" � Date �—2�
Project ger
Less Liquidated Damages
Days @ /Day $0.00
Date i! 1 u LessPavement Deficiency $0.00
Asst.22VWIL
-Infrastructure Design and Construction Less Penalty $0.00
Date It- Less Previous Payment $0.00
Director/Contracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $364,857.50
Friday,November 18,2016 Page 3 of 4
FORTWORTH rev 03/05/07
TRANSPORTATION&PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:l
NAME OF PROJECT: Live Oak Creek Phase 2 Sec 1 &2
PROJECT NO.: CPN 2333 CONTRACTOR: THB Construction
DOE 7275 DOE NO.: 7275
PERIOD FROM:10/05/15 TO: 09/262016 FINAL INSPECTION DATE: 26-Sep-16
WORK ORDER EFFECTIVE: 10/5/2015 CONTRACT TIME: 120 0 WD 0 CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED
CREDITED
DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
& HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS
THIS
PERIOD 358
PREVIOUS
PERIOD
TOTALS
TO DATE 1358
*REMARKS:
17
CONTRACTOR DATE fNEC DATE
ENGINEERING DEP TMEN
The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012-6311
(817)392-7941 -Fax:(817)392-7845
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Live Oak Creek Phase 2 Sec 1 &2
PROJECT NUMBER: 2333
DOE NUMBER: 7275
WATER
PIPE LAID SIZE TYPE OF PIPE LF
C900 8 PVC 2038
C901 8 PVC 79
FIRE HYDRANTS: 2 VALVES(16"OR LARGER) 2117
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: YES
NEW SERVICES: 1" Copper 39EA
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
D3034 8 PVC 163
D3035 8 PVC 1602
D3036 8 PVC 119
PIPE ABANDONED SIZE TYPE OF PIPE LF 1884
DENSITIES: YES
NEW SERVICES:
/494
TRANSPORTATION AND PUBLIC WORKS
° The City of Fort Worth•1000 Thsockmorton Street•Fort Worth,TX 7601y-6311
LIVE OAK 40 DEVELOPMENT, LLC
5137 DAVIS BLVD
Fort Worth,Texas 76180
(972)7623900
October 18, 2016
VIA EMAIL
City of Fort Worth
Roy Scharfenberg
CFW Inspector
8851 Camp Bowie West
Fort Worth, Texas 76116
Re: Live Oak Creek—Phase 2, Sections 1 and 2
Water, Sanitary, Paving, and Drainage Improvements
To Mr. Scharfenberg:
This letter is to serve notice that Live Oak 40 Development, LLC will not charge
any liquidated damages to THB Construction, LLC. in the above referenced project.
Very truly yours,
Kyle Kruppa,
Authorized Representative
Live Oak 40 Development, LLC
AFFIDAVIT
STATE OF Texas
COUNTY OF Dallas
Before me,the undersigned authority,a notary public in the state
and county aforesaid,on this day personally appeared Travis Boney, Sole
Member Of THB Construction,LLC,known to me to be a credible
person,who being by me duly sworn,upon his oath deposed and said;
That all persons, firms,associations, corporations,or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Grading,Ret Wall,Water,Sewer,Draina cTravis
2333/DOE 7275
BY
ey/Sole Member
Subscribed and sworn before me on this date 28th of October, 2016.
\tit\ti;lu i 1 f ii rr4
U
Notdry Public = 0 1 °r�
rtk a
County,State
OKLAHOMA SURETY COMPANY
Affidavit
With respect to Bond No. 1012794 ,we hereby request the following:
❑ Release of Retainage
in the sum of$ 0.00 El Final Payment
We hereby make the following declarations and agreements:
1. The amount owed by us to the subcontractors, suppliers, etc., for this project is
$ 0.00 (Please attach a separate list of names and
amounts.)
2. If complete,the date of completion was 10.07.2016
3. If not complete,the anticipated completion date is --
4. The final contract price, including change orders, etc. is $ 990,982.09
The money received by us, in accordance with your consent,will be used
exclusively to pay outstanding bills on this contract and for no other purpose until all bills
are paid on this contract.
10.18.2016 THB Co uction,4C
{Date) ont tor}
ontract is Signature}
Witnessed this 7th day of_oc-tahPr
personally appeared Travis Bonet' AO made oath t4at the above
statements are true.
6
{Commission} {Notary ublic)
Misty Moreno MlO,�/''��.
{Commission No.} {Typed
�9TF OF�L}
'••.EXPIR��'•'•1
06-10-`LO�\\`\`��
''���/l1111111111��\\
P.O.BOX 1409 TULSA,OKLAHOMA 74101-1409 918-587-7221 1-800-722-4994 FAX:918-588-1296
OKLAHOMA SURETY COMPANY
1437 SOUTH BOULDER,SUITE 200 TULSA, OKLAHOMA 74119 •918-587-7221 -FAX 918-588-1253
POWER OF ATTORNEY.
KNOW ALL MEN BY THESE PRESENTS: That the OKLAHOMA SURETY COMPANY ,a corporation organized and existing under
and by virtue of the laws of the State of Ohio,does hereby nominate,constitute and appoint the person or persons named below,each individually If
more.than one is named;Its true and lawful attorney-in-fact,for it and in its name,place and stead to execute on behalf of the said Company,as surety,
any and all bonds,undertakings and contracts of suretyship,or other written obligations in the nature thereof, James W.Leeker, Linda S.
Nichols and Linda J. Peeples,all of ROCKWALL,TX.
-IN WITNESS WHEREOF,the.OKLAHOMA SURETY COMPANY has caused these presents to be signed and attested by Its appropriate
officers and ifft rporate sea]hereunto affixed this 09' day of March 2015
%t►trR �•'�
^y � K
.,;;R SEAL
OKLAHOMA SURETY COMPANY
ATTEST.''2j)gJ4 +++
SHARON!Fi CKi,' Secretary TODD BA7ATA VICE PRESIDENT
On this 09-day of March. , 2015 before me personally appeared TODD BAZATA ,to me known,being
duty sworn,deposes and says that s/he resides in Broken Arrow,Oklahoma,that s/he is a Vice President of Oklahoma Surety Company,the company
described in and which executed the above Instrument;that s/he knows the seat of the said Company;that the seal affixed to the said Instrument is such
corporate seal;that it was so affixed by authority of herlhis office under the By-taws of said Company,and that s/he signed his name thereto by like
authority.
11008253
STATE OF OKLAHOMAJ { '{y.`lAf :y:r CommissionSS
#
COUNTY OF TULSA $• }G 'i MY C ion expir Vis: —08-15
'�:gtNR Gbri�� JUL[E AL HAN Notary Public
7�l7�ll► .
This Power of Attorney Is granted by authority of the following resolutions adopted by the Board of Directors of Oklahoma Surety Company
by unanimous written consent dated September 25,2008.
RESOLVED: That the President,the Executive Vice President,the several Senior Vice Presidents and Vice Presidents or any one of them,
be and hereby is authorized,from time to time,to appoint one or more Aitomeys-in-Fact to execute on behalf of the Company,as surety,any and all
bonds,undertakings and contracts of suretyship,or other.wfitten obligations In the nature thereof;to prescribe theirrespective duties and the respective
ilmlts of their authority;and to revoke any such appointment at any time. •
RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant Secretary of
the Company may be affixed by facsimile to any power of attorney or certificate of either given for the execution of any bond,undertaking,contract of
suretyship,or other written obligation in the nature thereof,such signature and seal when so used being hereby adopted by the Company as the original
signature of such officer and the original seal of the Company,to be valid and binding upon the Company with the same force and effect as though
manually affixed.
CERTIFICATION
i, SHARON HACKL Secretary of Oklahoma Surety Company,do hereby ce ify that the foregoing Power
of Attorney and the Resolutions of the Board of Directors of September 25,2009 have not been revoked and are now I force and ffect. /
+t,+ts r i);,t Signed and sealed this t day of wvM/?,o
k ,:,. , .
\-�w �. r r
�`c�i ' rfiY•'' G%L2�
:c SEAL: 4.
r
SHARON HACKL Secretary
VOID IF BOX 18 EMPTY
TXO-1012794
OWNER M
CONSENT OF SURETY ARCHITECT []
TO FINAL PAYMENT CONTRACTOR
Conforms with the American Institute of STY
Architects,AIA Document G707 OTHER
TO OWNER: City of Fort Worth,City Hall ARCHITECTS PROIECTNO.:
1000 Throckmorton St.
Fort Worth,Texas 76102 12
(Nauemuladdress) and Live Oak 40 Development,LLC
CONTRACT FOR:
Live Oak Creek,Phase 2,Sects 1&2 Water,Sanitary
Sewer,Storm Drain,Paving,Street&Light Improvements
PROJECT: Live Oak Creek,Phase 2,Sects 1 &2 CONTRACT DATED:
(Name mxladdress) FortWorth,Texas 76102 February 25,2015
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(Imert none and address of&rety)
Oklahoma Surety Company
1437 S.Boulder Avenue,Ste.200
Tulsa,OK 74119 ,SURETY,
on bond of
(lined nmae andaddressofComraelar)
THB Construction,LLC
1544 Valwood Pkwy.,
Carrollton,Texas 75006 ,CONTRACTOR,
hereby approves of the final payment to the Contractor,and agrees that final paynnent to the Contractor shall not relieve the Surety of any
of its obligations to
(Irueri name azul address of Owner)
City of Fort Worth,City Hall
and Live Oak 40 Development,LLC
OWNER,
as set forth in said Surety's bond.
IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: November 1,2016
(huert in withig the month folloxed by the numeric dale andyear.)
,IIIiuut,iiilr Oklahom Surety Company
1)i_{1 l (Surely) IMP
f
Attest: j I (Sig lure ofaui ronzedrep,ese )
Linda S.Nichols Attorney-in-Fact
(Prinied natne and tide)
.1,11%;)r;IN100),
LMS-12134 10101
FORT WORTH REV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
1)PROJECT INFORMATION Date: �p ►
Name of onmactor Project A'ame
DOEInspector Project Manager
DOE Number Project Difficult) ] 7jp aJCwuract
0 Simple Qf Routine 0 Complex [Water awaste Water 5(storm Drainage [S Pavement
milia!Contract Amount Final Contmct Amount
i 05 Z -- ---- ---- -99 9$2.09 - - - -
ED PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent _
ELEMENT RATING ELEMENT —- — RATING
(0-4) (0-4)
_INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 _Availability of Inspector__ _ _ 1 Accuracy of Plans to Existing Conditions
2 Knowledge 0f1W
ector12 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 3 99And/Or
of S ecifications
4 Display Of Professionalism 4 f Plan Quantities
5 Citizen Complaint Resolution PRNAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs—( 1 Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor I
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
, •rr The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941•Fac(817)392-7845
i
I
FORTWORTHREV:8/20/16
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
n CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
THB Construction Live Oak Creek Phase 2 Sec 1&2
Inspector City Project Number
Roy Scharfenberg 2333
Construction Components Project Manager
❑ Water ❑ Waste Water o Storm Drainage o Pavement Fred Ehia
Initial Contract Amount Project Difficulty
$431,121.50
Simple o Routine o Complex
Final Contract Amount Date
$364,875.50 10/26.16
H)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 Y 3 20 15
3 Plans on Site 5 Y 3 20 15
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 3 60 45
6 Finished Product 15 Y 3 60 45
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 3 20 1 15
11 Property Restoration 5 Y 3 20 15
12 After Hours Response 5 Y 3 20 15
13 Project Completion 5 Y 3 20 15
TOTAL ELEMENT SCORE(A) 366
BONUS POINTS(25 Maximum)(B)
CONTRACTOR'S RATING TOTAL SCORE(TS) 366
IIn
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating(ITS/MS]x 100%) 366 / 448 = 82%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF)4NUS POINTS AWARDED)
Inspector Signature Contractor Sib afore 1�—
Inspector's Supervisor Signature
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•8851 Camp Bowie West Blvd.•Fort Worth,TX 76116•(817)392-8306