HomeMy WebLinkAboutContract 30379 SEC RI Y ,STAR`' z- , -T N0 AMENDMENT NO. 1 STATE OF TEXAS CITY SECRETARY CONTRACT NO. 28559 COUNTY OF TARRANT WHEREAS, the City of Fort Worth (City) and Chiang, Patel & Yerby, Inc. (Engineer) made and entered into City Secretary Contract No. 28559 (the Contract), which was authorized by the City Council by M&C C-19523 on the 25th day of March, 2003; and WHEREAS, the Contract involves engineering services for the following Project: Construction Management of West Side IV Pump Station and North Side III Pump Station Project No.: PW77-539120-06077016021 WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW, THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article 1 of the Contract is amended to include the additional engineering services specified in a proposal letter dated July 29, 2004, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total is $24,500. 2. Article 11 of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$198,949. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. -f Page 1 of 2 ORIGINAL July 29,2004 EXECUTED on this the - J-C day of Alt,s t , 2004, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROVED: Dale A. Fisseler, P.E. Marc A. Ott Director, Water Department Assistant City Manager Chiang, Patel & Yerby, Inc.—ENGINEER ATTEST: William E. Carroll, P.E. Marty HeArix 15100 Trinity Blvd., Suite 200 City_ Secretary Fort Worth, TX 76155 r APPROVED AS TO FORM AND LEGALITY: �otract Authorizatioa 7 Date Gary Steinberger Assistant City Attorney H- Page 2 of 2 L"U y 29, 2004 P&YJ'. Partners for a Better Quality of Life July 29, 2004 Mr. Seiavash Mir City of Fort Worth Water Department 1000 Throckmorton Fort Worth, Texas 76102 RE: City of Fort Worth North Side III Construction Management Additional Construction Management Services CP&Y Project No.: CFW0254 Dear Mr. Mir: The purpose of this letter is to request an increase in our scope of services and related fee for the construction management services on this project. We respectfully submit the following items for your consideration. Item 1. Additional Site Trips Task 2 of Attachment A to our Agreement for Engineering Services contains our scope of services related to observations of construction progress. Our services are part-time and are based on a pre-determined number of site trips. The site trips and observations occur during specific construction phases, or after specific portions of the work are completed. As discussed previously, we have conducted a number of additional trips due to conditions beyond our control. These conditions include, but are not limited to, incomplete work by Contractor, unacceptable work by Contractor, and re-inspection of corrective work by Contractor. These conditions resulted in 9 additional trips. Please refer to the attached site trip log. We request an increase of$4,500 for this additional effort. Item 2. Project Schedule Our routine monthly duties include corresponding with the contractor, project meetings, reviewing pay requests, reviewing change order requests, and general project administration. Task 5 in Attachment A to our Agreement limits our scope to eight months from Notice to Proceed to Final Inspection. The Notice to Proceed date was February 10, 2003. The eight - month time period ended on October 10, 2003. The construction contractor experienced delays and the project schedule extended beyond the original completion date. We processed the last operation and maintenance manual on June 22, 2004. As a result, we extended our services by about 8.5 months. We request an increase of $20,000 for this additional effort. A table indicating the major services provided during this period is attached„ In addition to the listed items, we continued to maintain routine correspondence with the Contractor and City) u during this period, and to complete our administrative tasks on the project. Chiang,I Pa Ye4Ny, k"L 15100 Trinity Blvd.,Suite 200 - TAPROJECTS\CFW02541WESTSIDE IVWGREEMENTS\CPY AMENDMENMADDL CM SERVICES.DOCWN Fort Worth,Texas 75155 817.354.0189-817.540.4220 metro-817.354.4935 fax www.cpyi.com Mr. Seiavash Mir July 29, 2004 Page 2 Summary We request the following fee increases for the additional services we provided on this project: Item 1. Additional Site Trips $4,500 Item 2. Additional Contract Time 20,000 TOTAL $24,500 We appreciate your review of our request. As always, we are available at your convenience to discuss your comments and respond to your questions. Sincerely, William E. Carroll, P.E. Vice President WEC/kn Enclosures cc: CFW0254-2—Corr. pr¢1O�1 TAPR0JECTS\CFW0254\WESTSIDE IVWGREEMENTS\CPY AMENDMENTSWDDL CM SERVICES.DMM Partners for a Better Quality of Life C RY-) North Side III Site Trip Log MM/DD/YY Project purpose of the Trip Remarks Number February 2/10/2003 CFW0254-02 Ductbank Installation 2/13/2003 CFW0254-02 Ductbank Work Progress Inspection 2/28/2003 CFW0254-02 Duct Work Inspection March 3/5/2003 CFW0254-02 Ductbank Backfillin 3/6/2003 CFW0254-02 Drilled Penetrations @ E62/Holloman's Office 3/14/2003 CFW0254-02 Site Inspection 3/17/2003 CFW0254-02 Sidewalk Concrete Pour 3/19/2003 CFW0254-02 Slab Concrete Pour 3/20/2003 CFW0254-02 Stairs Concrete Pour 3/24/2003 CFW0254-02 Slab Demolition/removal Unscheduled. 3/31/2003 CFW0254-02 Slab Pour Unscheduled April 4/11/2003 CFW0254-02 I Inspected MCC Appropriately Protected 4/16/2003 CFW0254-02 linspected Sidewalk Crack lUnscheduled May 5/1/2003 CFW0254-02 Concrete Removal Inspection 5/2/2003 CFW0254-02 Raw Water VFD Demo. Inspection. 5/6/2003 CFW0254-02 Switch ear Installation/Cable Tray &Terminations 5/28/2003 CFW0254-02 JPumps Base Plate Bolts Damaged I Unscheduled 5/30/2003 CFW0254-02 I Pipe Support Install./Base Plate Bolts Re-Ins ection June 6/3/2003 CFW0254-02 Pumps/Pipes Disinfection, Installation. 6/4/2003 CFW0254-02 Shutdown/Venturi Removal/Trans-T-S ool In 6/11/2003 CFW0254-02 HSP-10 Start-Up- Initially Scheduled 6/19/2003 CFW0254-02 HSP-11 Motor Inspect. W/Tem . Valve 6/26/2003 CFW0254-02 1 Raw Water VFD Installation Jul 7/10/2003 CFW0254-02 Shutdown Valves Install. On Accum. Oil Line. Unscheduled 7/15/2003 CFW0254-02 HSP-11 Start-up 7/17/2003 CFW0254-02 Valve Installation Inspection 7/21/2003 CFW0254-02 HSP-10 Start-up Unscheduled August 8/21/2003 CFW0254-03 VFD#3 Installation Inspection 8/26/2003 CFW0254-03 Pressure Tap Installation 8/29/2003 CFW0254-03 VFD#3 Start-up Re-Scheduled. September 9/15/2003 CFW0254-03 I Pumps Vibration Test, NS-III -Not Done 9/17/2003 CFW0254-03 JPumps Vibration Test, NS-III Re-Scheduled. �61L 1 E � M:\CFW0254\NORTHSIDE III\CORR\FIELD TRIPSALS N�tl 6% !�'o;,�t\x/39/2 04 Northside III Pump Station Major Service Items Provided by CP&Y October 9, 2003 to June 22, 2004 Item Date Description of Service 1 10/9/2003 HSPs Heat Trace and Insulation 2 10/13/2003 Eagle Mountain Programming Schedule 3 10/13/2003 HSPs Heat Trace and Insulation Schedule 4 10/13/2003 HSPs Heat Trace and Insulation Schedule Preliminary O&M Instrumentation Manual 5 10/14/2003 Preliminary Submittal 6 10/22/2003 HSPs Heat Trace and Insulation 7 10/23/2003 Eagle Mountain Training Cancellation Preliminary O&M Instrumentation Manual 8 10/24/2003 Review Comments Eagle Mountain WTP Schedule Meeting to 9 10/27/2003 Resolve VFD Issues 10 10/29/2003 Review Comments 11 12/3/2003 Eagle Mountain VFD Program issues 12 12/15/2003 VFDs Programming Eagle Mountain VFD Programming 13 12/15/2003 Schedule Eagle Mountain VFD Schedule 14 12/22/2003 Coordination 15 12/23/2003 Training 16 12/29/2003 VFD Modifications and Training 17 12/30/2003 VFD Modifications and Training 18 1/5/2004 VFD Modifications and Training 19 1/5/2004 VFD Modifications and Training 20 1/5/2004 Eagle Mountain VFD Modifications 21 1/7/2004 VFDs Updated Schedule 22 1/712004 VFDs Communications Issues 23 1/7/2004 VFDs Punch List Items/Finish Work 24 1/7/2004 VFDs-Overseeing Vendor Issues 25 1/12/2004 Submittal Issues 26 1/13/2004 Training, HSPs and VFDs 27 1/15/2004 HSPs/VFDs Comments and Issues 28 1/22/2004 HSPs/VFDs Comments and Issues 29 1/23/2004 HSPs/VFDs Comments and Issues 30 1/28/2004 Items 31 1/28/2004 VFDs Holloman Contact Person 32 1/29/2004 VFDs Contact Phone Numbers 33 2/3/2004 VFDs Performance Update 34 2/5/2004 Eagle Mountain VFD and HSP Training C' IVY �V 04 M:\CFW0254\NORTHSIDE IIIICORRWDDITIONAL ITEMS.XLS\KN 35 2/10/2004 North Side III Comments to As-Builts North Side III O&M Manuals and Training 36 2/10/2004 Schedule 37 2/11/2004 VFDs/HSPs 38 2/12/2004 Coordination of O&M Meeting Medium Voltage Motor Control Centers 39 2/17/2004 Final O&M 40 2/17/2004 Final O&M 41 2/18/2004 Training Schedule Coordination 42 2/18/2004 Eagle Mountain Training 43 2/18/2004 Training 44 2/19/2004 Training Coordination 45 2/20/2004 Eagle Mountain Training Coordination 46 2/20/2004 Eagle Mountain Training Coordination 47 4/20/2004 Submittals 48 4/27/2004 Preliminary O&M Review Status 49 6/22/2004 APCO/Willamette O&M Manual (Valves) MACFW0250NORTHSIDE IIIICORR1ADDITIONAL ITEMSALSWN