AMENDMENT NO. 1
STATE OF TEXAS CITY SECRETARY CONTRACT NO. 28559
COUNTY OF TARRANT
WHEREAS, the City of Fort Worth (City) and Chiang, Patel & Yerby, Inc. (Engineer)
made and entered into City Secretary Contract No. 28559 (the Contract), which was authorized
by the City Council by M&C C-19523 on the 25th day of March, 2003; and
WHEREAS, the Contract involves engineering services for the following Project:
Construction Management of West Side IV Pump Station and
North Side III Pump Station
Project No.: PW77-539120-06077016021
WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to
include an increased scope of work and revised maximum fee;
NOW, THEREFORE, City and Engineer, acting herein by and through their duly
authorized representatives, enter into the following agreement, which amends the Contract:
1.
Article 1 of the Contract is amended to include the additional engineering services
specified in a proposal letter dated July 29, 2004, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional services to be performed by Engineer
total is $24,500.
2.
Article 11 of the Contract is amended to provide for an increase in the maximum fee to be
paid to Engineer for all work and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not exceed the sum of$198,949.
3.
All other provisions of the Contract, which are not expressly amended herein, shall
remain in full force and effect.
-f
Page 1 of 2 ORIGINAL July 29,2004
EXECUTED on this the - J-C day of Alt,s t , 2004, in Fort Worth, Tarrant
County, Texas.
APPROVAL RECOMMENDED: APPROVED:
Dale A. Fisseler, P.E. Marc A. Ott
Director, Water Department Assistant City Manager
Chiang, Patel & Yerby, Inc.—ENGINEER ATTEST:
William E. Carroll, P.E. Marty HeArix
15100 Trinity Blvd., Suite 200 City_ Secretary
Fort Worth, TX 76155 r
APPROVED AS TO FORM AND LEGALITY: �otract Authorizatioa
7 Date
Gary Steinberger
Assistant City Attorney
H-
Page 2 of 2 L"U y 29, 2004
P&YJ'. Partners for a Better Quality of Life
July 29, 2004
Mr. Seiavash Mir
City of Fort Worth Water Department
1000 Throckmorton
Fort Worth, Texas 76102
RE: City of Fort Worth North Side III Construction Management
Additional Construction Management Services
CP&Y Project No.: CFW0254
Dear Mr. Mir:
The purpose of this letter is to request an increase in our scope of services and related fee for
the construction management services on this project. We respectfully submit the following
items for your consideration.
Item 1. Additional Site Trips
Task 2 of Attachment A to our Agreement for Engineering Services contains our scope of
services related to observations of construction progress. Our services are part-time and are
based on a pre-determined number of site trips. The site trips and observations occur during
specific construction phases, or after specific portions of the work are completed.
As discussed previously, we have conducted a number of additional trips due to conditions
beyond our control. These conditions include, but are not limited to, incomplete work by
Contractor, unacceptable work by Contractor, and re-inspection of corrective work by
Contractor. These conditions resulted in 9 additional trips. Please refer to the attached site trip
log. We request an increase of$4,500 for this additional effort.
Item 2. Project Schedule
Our routine monthly duties include corresponding with the contractor, project meetings,
reviewing pay requests, reviewing change order requests, and general project administration.
Task 5 in Attachment A to our Agreement limits our scope to eight months from Notice to
Proceed to Final Inspection. The Notice to Proceed date was February 10, 2003. The eight -
month time period ended on October 10, 2003. The construction contractor experienced delays
and the project schedule extended beyond the original completion date.
We processed the last operation and maintenance manual on June 22, 2004. As a result, we
extended our services by about 8.5 months. We request an increase of $20,000 for this
additional effort.
A table indicating the major services provided during this period is attached„ In addition to the
listed items, we continued to maintain routine correspondence with the Contractor and City) u
during this period, and to complete our administrative tasks on the project.
Chiang,I Pa Ye4Ny, k"L
15100 Trinity Blvd.,Suite 200 -
TAPROJECTS\CFW02541WESTSIDE IVWGREEMENTS\CPY AMENDMENMADDL CM SERVICES.DOCWN Fort Worth,Texas 75155
817.354.0189-817.540.4220 metro-817.354.4935 fax
www.cpyi.com
Mr. Seiavash Mir
July 29, 2004
Page 2
Summary
We request the following fee increases for the additional services we provided on this project:
Item 1. Additional Site Trips $4,500
Item 2. Additional Contract Time 20,000
TOTAL $24,500
We appreciate your review of our request. As always, we are available at your convenience to
discuss your comments and respond to your questions.
Sincerely,
William E. Carroll, P.E.
Vice President
WEC/kn
Enclosures
cc: CFW0254-2—Corr.
pr¢1O�1
TAPR0JECTS\CFW0254\WESTSIDE IVWGREEMENTS\CPY AMENDMENTSWDDL CM SERVICES.DMM Partners for a Better Quality of Life C RY-)
North Side III
Site Trip Log
MM/DD/YY Project purpose of the Trip Remarks
Number
February
2/10/2003 CFW0254-02 Ductbank Installation
2/13/2003 CFW0254-02 Ductbank Work Progress Inspection
2/28/2003 CFW0254-02 Duct Work Inspection
March
3/5/2003 CFW0254-02 Ductbank Backfillin
3/6/2003 CFW0254-02 Drilled Penetrations @ E62/Holloman's Office
3/14/2003 CFW0254-02 Site Inspection
3/17/2003 CFW0254-02 Sidewalk Concrete Pour
3/19/2003 CFW0254-02 Slab Concrete Pour
3/20/2003 CFW0254-02 Stairs Concrete Pour
3/24/2003 CFW0254-02 Slab Demolition/removal Unscheduled.
3/31/2003 CFW0254-02 Slab Pour Unscheduled
April
4/11/2003 CFW0254-02 I Inspected MCC Appropriately Protected
4/16/2003 CFW0254-02 linspected Sidewalk Crack lUnscheduled
May
5/1/2003 CFW0254-02 Concrete Removal Inspection
5/2/2003 CFW0254-02 Raw Water VFD Demo. Inspection.
5/6/2003 CFW0254-02 Switch ear Installation/Cable Tray &Terminations
5/28/2003 CFW0254-02 JPumps Base Plate Bolts Damaged I Unscheduled
5/30/2003 CFW0254-02 I Pipe Support Install./Base Plate Bolts Re-Ins ection
June
6/3/2003 CFW0254-02 Pumps/Pipes Disinfection, Installation.
6/4/2003 CFW0254-02 Shutdown/Venturi Removal/Trans-T-S ool In
6/11/2003 CFW0254-02 HSP-10 Start-Up- Initially Scheduled
6/19/2003 CFW0254-02 HSP-11 Motor Inspect. W/Tem . Valve
6/26/2003 CFW0254-02 1 Raw Water VFD Installation
Jul
7/10/2003 CFW0254-02 Shutdown Valves Install. On Accum. Oil Line. Unscheduled
7/15/2003 CFW0254-02 HSP-11 Start-up
7/17/2003 CFW0254-02 Valve Installation Inspection
7/21/2003 CFW0254-02 HSP-10 Start-up Unscheduled
August
8/21/2003 CFW0254-03 VFD#3 Installation Inspection
8/26/2003 CFW0254-03 Pressure Tap Installation
8/29/2003 CFW0254-03 VFD#3 Start-up Re-Scheduled.
September
9/15/2003 CFW0254-03 I Pumps Vibration Test, NS-III -Not Done
9/17/2003 CFW0254-03 JPumps Vibration Test, NS-III Re-Scheduled.
�61L 1 E �
M:\CFW0254\NORTHSIDE III\CORR\FIELD TRIPSALS N�tl 6% !�'o;,�t\x/39/2 04
Northside III Pump Station
Major Service Items Provided by CP&Y
October 9, 2003 to June 22, 2004
Item Date Description of Service
1 10/9/2003 HSPs Heat Trace and Insulation
2 10/13/2003 Eagle Mountain Programming Schedule
3 10/13/2003 HSPs Heat Trace and Insulation Schedule
4 10/13/2003 HSPs Heat Trace and Insulation Schedule
Preliminary O&M Instrumentation Manual
5 10/14/2003 Preliminary Submittal
6 10/22/2003 HSPs Heat Trace and Insulation
7 10/23/2003 Eagle Mountain Training Cancellation
Preliminary O&M Instrumentation Manual
8 10/24/2003 Review Comments
Eagle Mountain WTP Schedule Meeting to
9 10/27/2003 Resolve VFD Issues
10 10/29/2003 Review Comments
11 12/3/2003 Eagle Mountain VFD Program issues
12 12/15/2003 VFDs Programming
Eagle Mountain VFD Programming
13 12/15/2003 Schedule
Eagle Mountain VFD Schedule
14 12/22/2003 Coordination
15 12/23/2003 Training
16 12/29/2003 VFD Modifications and Training
17 12/30/2003 VFD Modifications and Training
18 1/5/2004 VFD Modifications and Training
19 1/5/2004 VFD Modifications and Training
20 1/5/2004 Eagle Mountain VFD Modifications
21 1/7/2004 VFDs Updated Schedule
22 1/712004 VFDs Communications Issues
23 1/7/2004 VFDs Punch List Items/Finish Work
24 1/7/2004 VFDs-Overseeing Vendor Issues
25 1/12/2004 Submittal Issues
26 1/13/2004 Training, HSPs and VFDs
27 1/15/2004 HSPs/VFDs Comments and Issues
28 1/22/2004 HSPs/VFDs Comments and Issues
29 1/23/2004 HSPs/VFDs Comments and Issues
30 1/28/2004 Items
31 1/28/2004 VFDs Holloman Contact Person
32 1/29/2004 VFDs Contact Phone Numbers
33 2/3/2004 VFDs Performance Update
34 2/5/2004 Eagle Mountain VFD and HSP Training
C' IVY �V 04
M:\CFW0254\NORTHSIDE IIIICORRWDDITIONAL ITEMS.XLS\KN
35 2/10/2004 North Side III Comments to As-Builts
North Side III O&M Manuals and Training
36 2/10/2004 Schedule
37 2/11/2004 VFDs/HSPs
38 2/12/2004 Coordination of O&M Meeting
Medium Voltage Motor Control Centers
39 2/17/2004 Final O&M
40 2/17/2004 Final O&M
41 2/18/2004 Training Schedule Coordination
42 2/18/2004 Eagle Mountain Training
43 2/18/2004 Training
44 2/19/2004 Training Coordination
45 2/20/2004 Eagle Mountain Training Coordination
46 2/20/2004 Eagle Mountain Training Coordination
47 4/20/2004 Submittals
48 4/27/2004 Preliminary O&M Review Status
49 6/22/2004 APCO/Willamette O&M Manual (Valves)
MACFW0250NORTHSIDE IIIICORR1ADDITIONAL ITEMSALSWN