HomeMy WebLinkAboutContract 46685-FP1 Depart e to TPW Const.Services
CPN# - Date /
Project Manager
Risk Management S. Canady RT WO RT H, c+ sE(;
D.O.E. Brotherton ��
Water Dept. Esteban Perez _
CFAWest man/Scanned
'ATION AND PUBLIC WORKS
�
The ce i❑ ople have been Contacted concerning the request F PROJECT COMPLETION
for final payment&have released this project for such payment. Developer Projects) DOF 735
Clearance Conducted B Etta Bac City Project Ns: 02409
-- - C-5 X/51�$.
Regarding contract 117356 for CHAMPION CIRCLE TANGER BLVD/BUCEES BLVD as required by the
WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the
WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works
Department has accepted the project as complete.
pLC� C �ML
Original Contract Price: DEC O 2 Z��6 $414,625.55
Amount of Approved Change Orders: $63,691.80 Ns 1
a BY
Revised Contract Amount: $478,317.35
Total Cost Work Completed: $478,317.35
w
Recommen ed or Acceptance Date
Asst. Direct r, PW - Infrastructure Design and Construction
Accepted Date
Asst. Director, WATER DEPARTMENT
Asst. City Manager Date
OFFICIAL RECORD
Comments: P265-6071502409 / P275-7071302409 CITY SECRETARY
,_�T WORTH,TX
RMI&
DEC A 201
Rev.9/22/16
pI� C� L� OMf�
DEC 02 2016 �Y%6�)-Cb c?t46q
City Project Numbers 02409 By DOE Number 7356
Contract Name CHAMPION CIRCLE TANGER BLVD/BUCEES BOULEVARD Estimate Number l
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 9/29/2016
Project Funding
Project Manager Ehia City Secretary Contract Number 117356
Inspectors RODGERS / TAEZAZ Contract Date 7/23/2015
Contractor SCOT I'DENNETT CONSTRUCTION,INC. Contract Time 150 CD
2808 W.7TH ST.,#B Days Charged to Date 408 CD
FORT WORTH, TX 76107 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $478,317.35
Less %Retained $0.00
Net Earned $478,317.35
Earned This Period $478,317.35
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $478,317.35
Monday,October 31,2016 Page 5 of 5
��s-
0 a X109
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name CHAMPION CIRCLE TANGER BLVD/BUCEES BOULEVARD
Contract Limits
Project Type WATER&SEWER
City Project Numbers 02409
DOE Number 7356
Estimate Number 1 Payment Number 1 For Period Ending 9/29/2016
CD
City Secretary Contract Number 117356 Contract Time 15CD
Contract Date 7/23/2015 Days Charged to Date 408
Project Manager Ehia Contract is 100.00 Complete
Contractor SCOTT DENNETT CONSTRUCTION,INC.
2808 W.7TH ST.,#B
FORT WORTH, TX 76107
Inspectors RODGERS / TAEZAZ
Monday,October 31,2016 Page 1 of 5
City Project Numbers 02409 DOE Number 7356
Contract Name CHAMPION CIRCLE TANGER BLVD/BUCEES BOULEVARD Estimate Number I
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 9/29/2016
Project Funding
UNIT I:WATER IMPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 4-INCH PVC WATERLINE 10 LF $14.05 $140.50 10 $140.50
2 6-INCH PVC WATERLINE 5 LF $16.10 $80.50 5 $80.50
3 12-INCH PVC WATERLINE(CO#1) 1871 LF $42.87 $80,209.77 1871 $80,209.77
4 24-INCH CONCRETE WATERLINE 64 LF $308.50 $19,744.00 64 $19,744.00
5 DUCTILE IRON WATER FITTINGS WITH 3 TN $5,810.00 $17,430.00 3 $17,430.00
RESTRAINT
6 C303 FITTINGS 1 LS $12,230.00 $12,230.00 1 $12,230.00
7 4-INCH VALVE I EA $625.00 $625.00 1 $625.00
8 6-INCH VALVE 6 EA $1,116.00 $6,696.00 6 $6,696.00
9 I2-INCH VALVE(CO#1) 11 EA $2,692.00 $29,612.00 11 $29,612.00
10 24X12 TAPPING SLEEVE AND VALVE 2 EA $18,322.00 $36,644.00 2 $36,644.00
11 4-INCH WATER METER VAULT I FA $12,550.00 $12,550.00 1 $12,550,00
12 6-INCH WATER METER VAULT I EA $23,572,00 $23,572.00 1 $23,572.00
13 CONNECT TO EXISTING WATER LINE(CO#1) 3 EA $19,I67.00 $57,501.00 3 $57,501.00
14 24-INCH WATERLINE LOWERING I EA $39,621.00 $39,621.00 1 $39,621.00
15 12-INCH WATERLINE LOWERING 2 EA $5,454.00 $10,908.00 2 $10,908.00
16 RELOCATE EXISTING BLOWOFF VALVE 1 EA $5,230.00 $5,230.00 1 $5,230.00
17 FIRE HYDRANT ASSEMBLY 5 EA $3,790.00 $18,950.00 5 $18,950.00
18 CSS BACKFILL 100 LF $55.24 $5,524.00 100 $5,524.00
19 TRENCH SAFETY l LS $5,456.00 $5,456.00 1 $57456.00
20 CONNECT TO EXISTING 16"WATER LINE(CO I EA $16,300.00 $16,300.00 1 $16,300.00
#1)
21 TRENCH SAFETY(CO#1) 20 LF $1.52 $30.40 20 $30.40
22 RELOCATE&CHANGE FITTING FOR WATER 2 EA $6,316.00 $12,632.00 2 $12,632.00
METER VAULT(CO#1)
Sub-Total of Previous Unit $411,686.17 $411,686.17
UNIT II:SANITARY SEWER IMPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
- -- -- - - — --- - -------
I 6-INCH PVC PIPE 21 LF $14.10 $296.10 21 $296.10
2 8-INCH PVC PIPE 616 LF $15.73 $9,689.68 616 $9,689.68
Monday,October 31,2016 Page 2 of 5
City Project Numbers 02409 DOE Number 7356
Contract Name CHAMPION CIRCLE TANGER BLVD/BUCEES BOULEVARD Estimate Number I
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 9/29/20I6
Project Funding
3 ADDITIONAL LINE DEPTH(1 LF PER VF) 2040 VF $1.69 $3,447.60 2040 $3,447.60
4 4-FOOT DIAMETER MANHOLE(CO#1) 4 EA $4,810.00 $19,240.00 4 $19,240.00
5 5-FOOT DIAMETER DROP MANHOLE 1 EA $16,293.00 $16,293.00 1 $16,293.00
6 ADDITIONAL DEPTH MANHOLE(>6 FT)(CO#1) 45 VF $308.00 $13,860.00 45 $13,860.00
7 CONNECT TO EXISTING WASTEWATER 1 EA $1,461.00 $1,461.00 1 $1,461.00
8 TRENCH SAFETY 637 LF $1.08 $687.96 637 $687.96
9 TESTING(EXCLUDING GEOTECH) 637 LF $1.32 $840.84 637 $840.84
10 CONSTRUCT NEW MH BASE FOR MN @0400 1 EA $815.00 $815.00 1 $815.00
(CO#1)
Sub-Total of Previous Unit $66,631.18 $66,631.18
Monday,October 31,2016 Page 3 of 5
City Project Numbers 02409 DOE Number 7356
Contract Name CHAMPION CIRCLE TANGER BLVD/BUCEES BOULEVARD Estimate Number i
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 9/29/2016
Project Funding
Contract Information Summary
Original Contract Amount $414,625.55
Change Orders
Change Order Number 1 $84,767.80
Change Order Number 2 ($21,076.00) /
Total Contract Price $478,317.35 ✓
Date /l Total Cost of Work Completed $478,317.35
nLess %Retained $0.00
tr gDater( ?J 26((, Net Earned $478,317.35
Inspection Su err' r Earned This Period $478,317.35
Retainage This Period $0.00
Pro;e Manager
Date�Z—2'r l
� Less Liquidated Damages
Days @ /Day $0.00
Date LessPavement Deficiency $0.00
Asst. i etor/TPPW-Jxifrastructure Design and Construction Less Penalty $0.00
`Z Date /?- F—A Less Previous Payment $0.00
Director/Contracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $478,317.35
Monday,October 31,2016 Page 4 of 5
DEVELOPER-AWARDED-PROJECT CHANGE ORDER
PROJECT NAME: Champions Circle Tan er Blvd.S Outlet Blvd., 1=? G S I",1Ir iJ
CONTRACT: Water.Sevier. Pavin Drainage &Slreel Li hls CHANGE
CFA# ORDER No:
2014.071
CITY PROJECT 2gpg
CITY PARTICIPATION: NO
#
DOE# 7356 TPW 7392 W/SS
WATER PROJECT# P265-6071502409-00
SEWER PROJECT# P275-7071302409-00
FILE# K-2335
INSPECTOR: Rudy Meddellin Phone No: 214-223-3503
PROJECT MANAGER: Fred Ehia Phone No: 817-392-8424
CONTRACT UNIT
WATER SEWER PAVING DRAINAGE STREETLIGHTS CONTRACT
Davelopor Developer Dovelopor Developer Developer DAYS
Cost Ci Cost Cost Ci Cost Cost City Cost Cost City Cost Cost Cit Cost
ORIGINAL CONTRACT $334,203.17 $46,697.18 $693,933.98 5831.476.96
EXTRAS 70 DATE 5102,970.00 149
CREDITS TO DATE
CONTRACT TO DATE $334,203.17 S0.00 $46,697.18 MOD $693,933.96 $0.00 3831.476.96 $0.00 5102,970.00 $0.00 149
AMOUNT OF PROP.CHANGE ORDER $ 76,446.80 $ 9,321.00
0
REVISED CONTRACTAMOUNT $409,649.97 $0.00 $55,918.18 30.00 $693,933,96 $0.00 $831,476.96 $0.00 5102,970,00 $0.00 149
TOTAL REVISED CONTRACT AMOUNT
PER UNIT $409,649.97 $56,918.18 369J,933.90 $831,476.96
$102,970.00
REVISED COST SHARE Dev.Cost: $2,093,948.09 City Cost: $0.00
TOTAL REVISED CONTRACT $2,093,948.09
Revised:10-12-2011
Page 1
You are directed to make the follovAno
otitan es in the contract documents
CITY 810 ITEM
PAY ITEM ff ff GUMMY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL
3739.1001 1 EA 4'DIAMETER MANHOLE S 4,810.00--S 4,810.00
12 VF ADDITIONAL Mai DEPTH>6' S 308.00—S 3.6-MOO
1 EA CONSTRUCT NEW Udi BASE FOR MH 0+00 S 815.00--$ 015,00
3311.0461 20 LF 121N PVC WATERLINE V S 42.87--S 857.40
3312.3005 2 EA 12 IN GATE VALVE&BOX ✓ S 2,692.00 -5 5.364.00
3312.0106 1 EA CONNECT TO EXISTING 24 IN WATERLINE S J9.167.00- S 19.107.00
3312.0108 1 EA CONNECT TO EXISTING 161N WATERLINE S 16,300.00 -S 16.300.00
3305.0109 20 LF TRENCH SAFETY S 1.52 -S 30.40
2 EA RELC'CATE AND CHANGE FITTINGS FOR WATER METER VAULT S 6.310.00 •S 12.632.00
80 LF INSTALL 6"CONDUIT FOR ONCOR LOWERING S 103.45 S 8.276.CO
8o LF INSTALL 4"CONDUIT FOR AT&T LOWERING S 64.00 S 5,120.00
120 LF INSTALL ADDITIONAL 4'CONDUIT FOR AT&T LONVERiNG S 64.00 1 S 7,880.00
Totnl S 84.767.80
REASONS FOR CHANGE ORDER Record Drawings for"sting'/VTR and 4VW lines were incorrect,so an eddilional MH had to be constructed to connect to the existing MV Zine.
Walervaults to serve Buceas were moved so that they fit within the valer easement.
Ring connection required to maintain water service to Northlake N%tile the tvaledine lovnmring forChantptons Circle Is being completed.
24-inch WTR line lavering required lowering of existing AT&T&Oncor utilities
Nola:After shop dravdngs are approved Hanson needs three weeks to fabricate saddles and then anolherweek to scheudle the
installation.This%%ill delay the waterline lowering Witch Is currently scheduled to start cn Feb 25th by approximately six to seven
RECOMMENDED: APPROVED: APPROVED'
Bury-OM.Inc.T/'i� Roanoke 351.114 Partners,L.P. r Scott Dennett oM� ow
�1 -
�` B
BX - V
Name: David Pitcher Name: Name: Moot-4-
Title: Engineering Associate Title: Tithe, • Gl.M066ff�.0� !
Revised:10.12.2011 Page 2
DEVELOPER-AWARDED-PROJECT CHANGE ORDER
PROJECT NAME: Champions Circle Tan erBlvd.B Bucees Blvd. CHANGE
CONTRACT: Water Sewer Paving,Drainage,8 Street Li hts ORDER No:
CFA# 2014.071 CITY PARTICIPATION: NO
CITY PROJECT# 2409
DOE 4 7356 TPW 7392 WISS
WATER PROJECT# P265-6071502409-00
2
SEWER PROJECT P275-7071302409.00
FILE# K-2335
INSPECTOR: Hable Taezaz Phone No: 214-223.5635
PROJECT MANAGER: Fred Ehla Phone No: 817-392.8424
CONTRACT UNIT
WATER SEWER PAVING DRAINAGE STREETLIGHTS CONTRACT
Doveloper Developor DeveloperDavOlopor Davoopar DAYS
Cost Ci Cost Cost CI Coit Cost CI Coet Cost CI COSI COO City COSI
ORIGINAL CONTRACT $334,203.17 $46,697.18 $693,933.98 $631476,96 $102,970.00 149
EXTRAS TO DATE $ 75 446.00 $ 9,321.00
CREDITS TO DATE
CONTRACTTODATE 3409.649.97 30.00 $56,918.16 $0,00 $693,933.90 $0.00 $831.416.96 $0.00 3102,970.00 $0.00 149
AMOUNT OF PROP.CHANGE ORDER "il 1 $ 31,910.20 p
REVISED CONTRACT AMOUNT $388,673.97 1 40.00 $55,918.18 1 $0.00 $726,844.18 1 $0.00 $831,476,96 $0,00 $102,970.00 50.00 149
TOTAL REVISED CONTRACTAMOUNT
PERUNIT $388673.97 $5$918.18 $726,844.18 $831,475.96 $102,970.00
REVISED COST SHARE Dev.Cost: $2,104,782.29 City Cost: $0.00
TOTAL REVISED CONTRACT $2,104,782.29
Revised:10-12-2011 Page 1
i
You are directed to make the followingthan es in the contract documents:
CITY BID ITEM
PAYITEMq U QUANTITY UNIT fTEM DESCRIPTION UNIT PRICE TOTAL
80 LF INSTALL 6'CONDUIT FOR ONCOR LOWERING
SO !F INSTALL 4"CONDUIT FOR AM[LOWS 84.00 551120ERING S 103.45 $ 820.00
120 LF .00
INSTALL ADDITIONAL 4"CONDUIT FOR AT6T LOWERING 5 84.00 S 680.00
3213.0103 844 SY PCR 12 ADDITIONAL PAVING 5 49.55 S 31 910.20
Total S 10,834,20
REASONS FOR CHANGE ORDER
2 Drive Approaches added for access to Sucees
Franchise Conduit cost vras Included in the water costs Of Change Order No.1.It has been removed from this change order.
RECOMMENDED: APPROVED; APPROVED:
Slor ccrCdhi suldngg Services,Inc. Roanoke 35/114 Partners,L.P. Scott Dennelt Construction,LC
6y. By. By. Dge+y.k+�d ny sn�wn rsoo�o
/1 � ghawn Mon[eE--O ` nna0wn,w�7lon.�om,
Name: David Pilcher Name: �•�w��r' . �fjli Name: o-Dom�eu�Caa.weloa.cN=snawn
Jew M—
TIee:Civil Deslaner Tlde: _ 1-,hN� R..,-!lh—.V—d W,d—mmi
T1118: Dela'2016 10 25 16:38:75-0500'
Revised:10.12.2011
Paye 2
CONSENT OF SURETY OWNER ❑
ARCHITECT
TO FINAL PAYMENT CONTRACTOR p❑
SURETY
Conforms with the American Institute ofArchltects G707 form OTHER
Bond No: PB11509800717
TO OWNER: ARCHITECT'S PROJECT NO.: 14157
(Name and address)
City Of Fort Worth 9 P CONTRACT FOR: Utilities and Paving Improvements
1000 Throckmorton Street
Fort Worth, TX 76102
PROJECT: CONTRACT DATED: 7/21/2015
(Name and address)
CFA Number 2014-071; Utilities and Paving Improvements at Champions Circle Addition, Tanger Blvd
& Bucees Blvd
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(Insert name and address of Surety)
Philadelphia Indemnity Insurance Company
One Bala Plaza, Suite 100
Bala Cynwyd, PA 19004
,SURETY
on bond of
(Insert name and address of Contractor)
SCOTT DENNETT CONSTRUCTION, LC
2313 Cullen Street
Fort Worth, TX 76107
,CONTRACTOR
hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not.
relieve the Surety of any of its obligations to
(Insert name and address of Owner)
City Of Fort Worth
1000 Throckmorton Street
Fort Worth,TX 76102
OWNER
as set forth in said Surety's bond.
IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: July 21, 2016
(Insert in writing the month followed by the numeric date and year.)
Philadelohia Indemnity Insurance Company
(Surety)
(Signature of authorized representative)
Attest: Fred A.Thetford, III.Attorney-in-fact
(Seal): (Printed name and title)
3551
PHILADELPHIA INDEMNITY INSURANCE COMPANY Bond No: PB11509800717
One Bala Plaza,Suite 100
Bala Cynwyd,PA 19004-0950
Power of Attorney
KNOW ALL PERSONS BY THESE PRESENTS:That PHILADELPHIA INDEMiNITY INSURANCE COMPANY(the Company),a corporation organized and
existing under the taws of the Commonwealth of Pennsylvania,does hereby constitute and appoint Jared Young,Fred A.Thetford,Jr.,Tobin Tucker,Tom Young
and Fred A.Thetford,III of Contract Bond Agency,LLC., its true and lawful Attorney-in-fact with full authority to execute on its behalfbonds,undertakings,
recognizances and other contracts of indemnity and writings obligatory in the nature thereof,issued in the course of its business and to bind the Company thereby,in an
amount not to exceed S25,000,000.00
This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of
PHILADELPHIA INDEMNITY INSURANCE COMPANY at a meeting duly called the I"day of July,2011.
RESOLVED: That the Board of Directors hereby authorizes the President or any Vice President of the
Company to: (l)Appoint Attomey(s) in Fact and authorize the Attorney(s) in Fact to
execute on behalf of the Company bonds and undertakings,contracts of indemnity and
other writings obligatory in the nature thereof and to attach the seal of the Company
thereto; and (2) to remove, at any time, any such Attorney-in-Pact and revoke the
authority given. And,be it
FURTHER
RESOLVED: That the signatures of such officers and the seal of the Company may be affixed to any
such Power of Attorney or certificate relating thereto by facsimile,and any such Power of
Attorney so executed and certified by facsimile signatures and facsimile seal shall be
valid and binding upon the Company in the future with the respect to any bond or
undertaking to which it is attached.
IN TESTIMONY WHEREOF,PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSED THIS INSTRUMENT TO BE SIGNED AND
ITS CORPORATE SEALTO BE AFFIXED BY ITS AUTHORIZED OFFICE THIS IOTn DAY OF JUNE 2013.
41ti'
-- —C
(Seal)
Robert D.O'Leary Jr.,President&CEO
Philadelphia Indemnity Insurance Company
On this 10`s day of June 2013,before me came the individual who executed the preceding instrument,to me personally known,and being by me duly sworn said that he
is the therein described and authorized officer of the PHILADELPHIA INDEMNITY INSURANCE COMPANY;that the seal affixed to said instrument is the
Corporate seal of said Company;that the said Corporate Seal and his signature were duly affixed.
COMMONWEALTH OF PENNSYLVANIA
Natartei sel
Kimberly A � Pubic
lowwHer Tnrp.MmAgaftely Courgy
My CmLLEbeDec LO,zoroM
MEMMP.Pff.MYAVM ASSOOAI CN Of NOTI Notary Public:
residing at: Bala Cynwyd,PA
(Notary Seal)
My commission expires: December 18,2016
I,Edward Sayago,Corporate Secretary of PHILADELPHIA INDEMNITY INSURANCE COMPANY,do herby certify that the foregoing resolution of the Board of
Directors and this Power of Attorney issued pursuant thereto on this I P day of June 2013 true and correct and are still in full force and effect.I do further certify that
Robert D.O'Leary Jr.,who executed the Power of Attorney as President,was on the date of execution of the attached Power of Attomey the duly elected President of
PHILADELPHIA INDEMNITY INSURANCE COMPANY,
In Testimony Whereof I have eubscribed my name and axed the facsimile seal of each Company this 21 gtday of July 2016.
r Edward Sayago,Corporate Secretary
PHILADELPHIA INDEMNITY INSURANCE COMPANY
AFFIDAVIT
STATE OF Texas
COUNTY OF Tarrant
Before me,the undersigned authority, a notary public in the state
and county aforesaid,on this day personally appeared Shawn Moore,
Senior PM Of Dennett Construction, known to me to be a credible person,
who being by me duly sworn,upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Champion Circle Phase Two Buc-ee's er
BY
Shawn Moore
Subscribed and sworn before me on this date 20th of July, 2016.
L' A ,%ac
Notary Public
Tarrant County, Texas
CARRIE A. MOORE
Notary Public.state of Texas
-Z Comm.Expires 01.28-2020
'�r°a``V Notary 10 126391028
A
@- --A1A
TM
Document G706A - 1994
Contractor's Affidavit of Release of Liens
PROJECT: (Name and address) ARCHITECT'S PROJECT OWNER:
Champions Circle Addition, NUMBER: ARCHITECT:El
Tanger Blvd.&Bucees Blvd. CONTRACTOR:❑
Fort Worth,TX CONTRACT FOR:Utilities and Paving SURETY:❑
Improvements
TO OWNER: (Name and address) CONTRACT DATED:07/23/2015 OTHER:❑
Roanoke 35/114 Partners,LP
201 Main Street,Suite 3100
Fort Worth,TX 76102
STATE OF:Texas
COUNTY OF:Tarrant
The undersigned hereby certifies that to the best of the undersigned's knowledge,information and belief,except as
listed below,the Releases or Waivers of Lien attached hereto include the Contractor,all Subcontractors,all suppliers
of materials and equipment,and all performers of Work,labor or services who have or may have liens or
encumbrances or the right to assert liens or encumbrances against any property of the Owner arising in any manner out
of the performance of the Contract referenced above.
EXCEPTIONS:
Draw 12,dated 07/11/2016,in the amount of$25,038.00
Draw 13,dated 07/11/2016,in the amount of$267,224.73 (10%Retainage)
SUPPORTING DOCUMENTS ATTACHED HERETO: CONTRACTOR: (Name and address)
1. Contractor's Release or Waiver of Liens, Scott Dennett Construction,LC
conditional upon receipt of final payment. 2313 Cullen Street
Fort Worth,TX 76107
2. Separate Releases or Waivers of Liens from BY: �c
Subcontractors and material and equipment ( gnature of authorize
suppliers,to the extent required by the Owner, presentative)
accompanied by a list thereof. Janelle McElyea,Accounting
Manager
(Printed name and title) l
Subscribed and sworn to before me on this date:
Notary Public: Came A.Moore &- 0 •
My Commission Expires:01/28/2020
CARRIE A. MOORE
_:;,� •1.?Notary Public.State of iexos
Comm.Expires 01-28-2020
Notary 10 126391028
AIA Document G706ATM—1994.Copyright 0 1982 and 1994 by The American Institute of Architects.All rights reserved.WARNING:This AIA®Document is
protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA®Document,or any portion of It,may 1
result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA
software at 14:24:15 on 07/20/2016 under Order No.4633997170-1 which expires on 08/18/2016,and Is not for resale.
User Notes: (1667919448)
Scott Dennett Construction, LC Phone: 817 882-9420
C(CDONS RVCiION ( )
2313 Cullen Street Fort Worth,TX 76107 Fax:(817) 882-9424
Waiver and Release of Lien
FROM: Scott Dennett Construction, LC TO: Roanoke 35/114 Partners, L.P.
2313 Cullen Street 201 Main Street, Suite 3100
Fort Worth,TX 76107 Fort Worth,TX 76102
Project No: 14157 Contract Date: 07/30/2015
Project: 14157 Bucees Blvd
WHEREAS THE UNDERSIGNED contractor has provided labor,services, materials, or equipment for the above project,
under an agreement with: Roanoke 35/114 Partners, L.P.
PARTIAL WAIVER AND RELEASE: In consideration of partial payment for labor,services, materials, or equipment
provided in the amount of:$25,038.00
COVERING THE FOLLOWING APPLICATION FOR PAYMENT:
Application No:12 Application Date:07/11/2016
Together with any previous payment(s) already received but excluding any retainage or any labor,services, materials, or
equipment provided after the date of:07/11/2016
THE UNDERSIGNED DOES HEREBY WAIVE AND RELEASE all bond claims, liens, claims, or right of claim, or right of
lien,statutory or otherwise,against the property, project,Owner,or any other person or entity who is or may be claimed
to be liable, or any sureties,for labor, services, materials, or equipment,as provided by the Undersigned,but only to the
extent of payment received, as indicated above.
UNCONDITIONAL RELEASE: Upon receipt of payments as indicated above the undersigned will grant this release
unconditionally.
THE PERSON SIGNING below does hereby certify that State of:TX
he/she is fully authorized and empowered to execute County of:Tarrant
this instrument and to bind the Undersigned hereto, and
does in fact so execute this instrument. Subscribed and sworn to before me this:
July 19, 2016
Scott Dennett Construction, LC
2313 Cullen Street Notary Public:
Fort Worth,TX 76107 Janelle McElyea
w�tf'jfled My Commission Expires: _ STATE'
OF TX --
Shawn Moore August 21,2018 NOTARY
Agent of Scott Dennett Construction, LC ` .PUBLIC,`
Date: July 11,2016 4:24 PM
This document has been digitally signed, notarized,verified and a record log maintained by third party internet
hosting service as per the Electronic Records and Signatures in Commerce Act.
Page 414
l'OScott Dennett Construction, LC
DPhone: (817) 882-9420
C.IE NNE TT CONSTRUCTION
2313 Cullen Street Fort Worth,TX 76107 Fax: (817)882-9424
Final Waiver and Release of Lien
FROM: Scott Dennett Construction, LC TO: Roanoke 35/114 Partners, L.P.
2313 Cullen Street 201 Main Street, Suite 3100
Fort Worth, TX 76107 Fort Worth,TX 76102
Project No: 14157 Contract Date: 07/30/2015
Project: 14157 Bucees Blvd
WHEREAS THE UNDERSIGNED contractor has provided labor,services, materials, or equipment for the above project,
under an agreement with: Roanoke 35/114 Partners, L.P.
FINAL WAIVER AND RELEASE: In consideration of final payment for labor, services, materials, or equipment provided
in the amount of$267,224.73 on a total contract amount of$2,672,247.26
COVERING THE FOLLOWING APPLICATION FOR PAYMENT:
Application No: 13 Application Date:07/11/2016
Together with any previous payment(s) already received.
THE UNDERSIGNED DOES HEREBY WAIVE AND RELEASE all bond claims,liens,claims, or right of claim, or right of
lien,statutory or otherwise, against the property,project,Owner, or any other person or entity who is or may be claimed
to be liable, or any sureties, for labor,services, materials, or equipment, as provided by the Undersigned,but only to the
extent of payment received, as indicated above.
UNCONDITIONAL RELEASE: Upon receipt of payments as indicated above the undersigned will grant this release
unconditionally.
THE PERSON SIGNING below does hereby certify that State of:TX
he/she is fully authorized and empowered to execute County of:Tarrant
this instrument and to bind the Undersigned hereto, and
does in fact so execute this instrument. Subscribed and sworn to before me this:
Scott Dennett Construction, LC July 19 2016
2313 Cullen Street Notary Public:
Fort Worth,TX 76107 Janelle McElyea
Vet]fi9,d�–� My Commission Expires _ = STATE
Shawn Moore August 21 2018 _" OF TX
Agent of Scott Dennett Construction, LC — NOTARY;
PUBLIC,
Date: July 11, 20164:26 PM
This document has been digitally signed, notarized,verified and a record log maintained by third party internet
hosting service as per the Electronic Records and Signatures in Commerce Act.
Page 414
Roanoke 35/114 Partners,L.P.
201 Main Street,Suite 3100
Fort Worth, Texas 76102
July 15,2016
Scott Dennett Construction,L.C.
2313 Cullen Street
Fort Worth,Texas 76107
Attention: Shawn Moore
Re: Construction Agreement (Infrastructure) ("Agreement") between Roanoke
35/114 Partners, L.P., a Texas limited partnership ("Owner") and Scott
Dennett Construction, L.C., a Texas limited liability company ("Contractor')
for the construction of Bucees Boulevard and Tanger Boulevard at Owner's
Champions Circle development in Denton County,Texas
Dear Mr.Moore:
As you requested, this letter confirms that the above-referenced Agreement between Owner
and Contractor does not contain a liquidated damages provision and does not provide for liquidated
damages in the event of Contractor's default.
If you have any questions concerning this matter,please do not hesitate to contact me.
Very truly yours,
Roanoke 35/114 Partners,L.P.,
a Texas limited partnership
By: Roanoke 35/114 Genpar,LLC,
a Texas limited liability company,
its general partner
By:
am V.Boecker,Vice President
cc: Ken Ebeling(via e-mail)
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Champions Circle Tanger Blvd.&Bucees Blvd.
PROJECT NUMBER: 2409
DOE NUMBER: 7356
WATER
PIPE LAID SIZE TYPE OF PIPE LF
Water 4" PVC 10
Water 6" PVC 5
Water 12" PVC 1871
Water 24" Concrete Water line 64
FIRE HYDRANTS: 5 VALVES(16"OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Yes
NEW SERVICES:
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
Sanitary Sewer 6" PVC 21
Sanitary Sewer 8" PVC 616
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Yes
NEW SERVICES:
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
FORTWORTHREV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
1)PROJECT INFORMATION Date: 9/29/2016
Name of Contractor Project Name
Scott Denntt Construction L.C. Champions Circle Tanger Blvd.&Bucees Blvd.
DOE Inspector Project Manager
!Habte Taezaz Fred Ehia
jDOE Number Project Difficulty Type of Contract
j7356 O Simple (§) Routine O Complex i D Water R]waste Water ❑Storm Drainage ❑ Pavement
jInitial Contract Amount rFinal Contract Amount
1$414,625.55 1$478,317.35
Il)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
(ELEMENT RATING ELEMENT RATING
(
(0-4) (0-4)
!INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector _ 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 3 Applicability of Specifications
4 Display Of Professionalism 14 Accuracy of Plan Quantities
j 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Seton up Valve Crews,Labs _ 1 Knowled e And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
111)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
< ' The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TK 76012-6311
(817)392-7941 -Fax: (817)392-7845
FORTWORTHREV:02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
1) CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Scott Dennett Construction L.0 Champions Circle Tanger Blvd.&Bucees Blvd.
DOE Inspector DOE Number
Habte Taezaz 7356
DOE Inspector Project Manager
Q Water E Waste Water ❑Storm Drainage ❑ Pavement Fred Ehia
Initial Contract Amount Project Difficulty
$414,625.55 O Simple QQ Routine Q Complex
Final Contract Amount Date
$478,317.35 9/29/2016
I1)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 426
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 426
II1)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating([TS/MS]*100%) 426 / 448 = 95%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector £J,�2 /�k Signature Contract0
Signature DOE Inspector's Supervisor
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
FORTWORTH rev 03/05/07
TRANSPORTATION&PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: Champions Circle Tanger Blvd.&Bucees Blvd.
PROJECT NO.: 2409 CONTRACTOR: Scott Dennett Construction
DOE NO.: 7356
PERIOD FROM:08/19/15 TO: 09/29/16 FINAL INSPECTION DATE: 29-Sep-16
WORK ORDER EFFECTIVE:8/19/2015 CONTRACT TIME: 150 Q WD QQ CD
DAYS DAYS
DAY OF REASON FOR DAYS DAY OF REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
S. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS
THIS
PERIOD 408 408
PREVIOUS
PERIOD
TOTALS
TO DATE 1408 1408
*REMARKS:
L b - ,�-.� 6 101lc , 14
CO Toile- DATE INSPECTOR DATE
ENGINEERING DEPARTMENT