HomeMy WebLinkAboutContract 30779 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.�
WHEREAS, CL Texas, L.P., a Texas Limited Partnership, hereinafter called
"Developer", desires to make certain improvements to Summer Creek Ranch, Section
XI, an addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through C 1 G'1 K111 (� 1� , its
duly authorized General Partner, and the City, acting herein by and through Marc Ott,
its duly authorized Assistant City Manager, for and in consideration of the covenants and
conditions contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section I1, of the Policy.
IV J-
CFA SUMMER CREEK RANCH SEC XI
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such iniuries, death or damages are caused,
in whole or in Part, by the allejeed negligence of the City of Fort Worth,
its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof-
CFA SUMMER CREEK RANCH SEC XI 2
U,
Water(A) None; Sewer(A-1)None; Paving (B) attached; Storm Drain (B-
1) attached; Street Lights and Signs (C) attached.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, 131, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, 131,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $320,272.00.
Item Developer City Cost Total Cost
Cost
A. Construction
1. Streets $ 258,209.00 $ - $ 258,209.00
2. Storm Drainage $ 34,745.00 $ - $ 34,745.00
3. Street Lights $ 15,400.00 $ - $ 15,400.00
4. Street Name Signs $ 400.00 $ - $ 400.00
B. Engineering Design $ - $ - $ -
C. Construction Engineering
and Management by DOE 2% $ 11,718.00 N $ 11,718.00
TOTALS $ 320,472.00 $ - $ 320,472.00
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
Developer provided a separate bond for installation of sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
CFA SUMMER CREEK RANCH SEC XI 3Uo
U 0 II�.o1.0
}
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary,with the corporate seal of the City affixed, and said Develop
has executed this instrument in triplicate,at Fort Worth,Texas this the�VU of
,200/
Approval Recommended:
Transportation and Public Works
Department
Robert Goode, P. E.
Director
ATTEST: City Of Fort Worth
By: �� �--
X Marc Ott
City Secretary Assistant City Manager
Approved as to Form: wk L6&ir�
contract Authorization
ssistant City Attorney Date
ATTEST: DEVELOPER
CL Texas, L.P., A Texas
Limited Partnership
By:
Corporate Secretary
7. Geeneral Tit Partner
CFA SUMMER CREEK RANCH SEC XI 4
III. STREET LIGHTS:
1. STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 1 EA $ 2, 000 $2, 000 . 00
MID-BLOCK RESIDENTIAL 0 EA $ 2, 000 $0, 000 . 00
CHANGE OF DIRECTION RESIDENTIAL 6 EA $ 2, 000 $12, 000 . 00
MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000 . 00
RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0 , 000 . 00
Subtotal $14, 000. 00
City' s Cost $00, 000 . 00
Developer's Subtotal $14, 000 .00
10% Contingencies $1,400 .00
Project Total $15,400. 00
Adjacent Developer' s Cost $0, 000.00
Developer' s Cost $15,400.00
2% Inspection Fee $0, 00.00
DEVELOPER' S COST: $15,400 . 00
SUMMER CREEK RANCH, SECTION XI
September 23, 2003
Fort Worth, Texas
September 24, 2003
PAGE 1 OF Exhibit C
2. STREET LIGHTS WORK DESCRIPTION:
1 . The Developer shall provide for the installation of streetlights at
the approximate locations shown in Exhibit "C" , immediately after
final acceptance of the street construction, in accordance with
engineering plans and specifications approved by the Transportation
and Public Works Department .
2 . Streetlights on residential and /or collector streets can be
installed using overhead or underground conductors with the approval
of the Director of Transportation and Public Works .
3 . The Developer's shall pay the amount shown below to the City of Fort
Worth at the time after execution of the Communities Facilities
Agreement.
4 . Streetlights on arterial streets shall be installed with underground
conduit and conductors .
S . The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for
the installation of any electrical transformers required for the
proper operation of the street lights
6 . A 3-inch schedule 80 PVC conduit is required when crossing streets
at a depth not less than 30 inches, unless indicated otherwise on
the plans concrete pull boxes shall be provided at the crossing
points .
7 . The developer or their contractor shall contact City' s street light
division 48 hours prior to starting any installation of conduit
and/or streetlights at (817) 871-8100 to insure proper inspection of
work.
DEVELOPER'S COST: $15,400.00
SUMMER CREEK RANCH, SECTION XI
FORT WORTH, TEXAS
September 23, 2003
Page 2 of Exhibit C
r,o or
"STREET LIGHTS"
INTERSECTIONS
CORNER BROOK LN & BUSH RIVER TRL 1
CHANGE OF DIRECTIONS
CORNER BROOK LN 2
RUSH RIVER CT 2
DOUBLE OAK LN 1
MALLOW OAK DR 1
SUMMER CREEK RANCH, SECTION XI
Page 3 of Exhibit C
fix.
IV
STREET NAME SIGNS
1 . The City of Fort Worth will install the street name signs upon
final approval of the street construction. The street name signs
will remain the property of, and will be maintained by, the City
of Fort Worth.
2 . The Developer will pay for the street name sign installations
required for this development to the extent of $100 . 00 per
intersection. This unit cost will be revised annually by the
Department of Transportation and Public Works to reflect
prevailing costs of materials and labor.
3 . This development creates the following four (4) intersections at
a cost to the Developer of $400.00 :
NOTE: Reported zero (0) on exhibit .
Rush River Tr & Corner Brook Lane
Rush River Tr & Rush River Ct
Double Oak Lane & Mallow Oak Dr
Double Oak Lane & Double Oak Tr
Summer Creek Ranch, Sec. X1
CFA code: 2003122 Date: June 30, 2004
Div
1�
1�SU ''`'Jl'V lv 5')N
N
Ff�
COLUMBUS
z z
w C
J �
S Ib
W
S J
S N
sumM R CRE R I S I N G E R
N
NORTH
N1GN z CROWLEY
CLEBURHE
CD
LLJ
PROJEC
L OCA TIO
0
J
0
VICINITY MAP
N.T.S.
LOCATION MAP
1 � �� �' J�1 � ��•" = SUMMER CREEK RANCH
�V�U� ;;���n��7p,�;• SECTION XI
UN rU�+"jj'IIGI D/ IIUW°I1 I{IL 1,u�:( CL TEXAS,L.P.,A TEXAS LIMITED PARTNERSHIP
�e U:� li U l c 5495 BELTLIKE SUITE 225
DALLAS,TEXAS 75254
N
" i
` r j
6
/ �� "•/ f i .;`i j!
,.
I
7 CHAPARRAL CREEK�-�D4-(�-V..E
E�1STj SECITIGNIx
23 se C`T/qy �� u e 6
.............
..
. I
24
�/- 25 ' 1
% 9 / 26
27
ze
29 30 EXIST. ECTi .. IX
' 10 60 61 �* I
/ \ I 62 63 6,
30 X4A 31 ' I
/ 32 _ —
/ 12 An= 34 35 32
28
13 / 33 '^ / 57 } S6 ( 55 54 5:
° 36 I I I-
r% R3 26 25 I I SECTION LIIIE
!t 14 4 27 24 I I
/i is t'7r 37
i 34 35 36 37 38 39 40 41
(/ 15
(� J b fFT -_ 38
23 _
—
�` 16 17 18 19
22
41 42 43 44 45 46 47
r / % SECTION LINE !
54 53 52 51 50 49 48
;r?
S5
If ,f% 1 I• - �UBL�-DAR-CAS°'' _�—
/ 7 56
10 9 8 7 6
i J
57 I I z
211(
O
58 11 12 13 14 15W
i
!;
NA611A
�" 60
61 62 63 64
� 65 66 67 SE TION L NT v
°
.. .._ ... .......... ..... — ... ..... .. _ ... ... .. ...._. _... _ ....__ ........................
.._. � .._......._
.. ... .. ..._ .......... ........... _ ____
......... _ McPHERS�N [Mil EVARJ ��` .._.� _............
_. _.._ ...... ------ _._.. `.
1
(�r
i
i
I
EXHIBIT
PAVING PLAN
AJ ]
5�,.'JAS s � RANCH
mER CREEK RAN
SECTION XI
IL5��e CL EXA5.5495 BELTLN S TE 225
L1 DALLAS,TEXAS 7524D
N
t ro _•'�� _ ........
II HALLPARRAI, CREEK�T E
ED(ISTJ SEGt IONI,X
t; 8 23 ,r t „ I ,a ! 9 t 7
24 I 1
27
26 z9 30 EXIST. E T[ N IX
10 ` 60 I 61 62 63 I 6,
1 � N f lT 30 ...,R.Y _..�
I
31 59
31 1
12 1 1 73 1' J
/1 k 34 35 32
26 yVj
1' 13 / 57 I 56 55 I 54 I 5:
j 36 I 33 N
t f 26 25 Ij I SEC ION LIME I I_
I
/T 14 If 27 24 I[ 1
it
35 36 37 38 39 40 41
I - 4:
5
38
I
—L N ROOK LANE
I 1 16 17 19 20 21 22 39
i� 40 41 42 43
T45-
46 47
#
SECTION L NE
Iff
t 1�
54 53 i
I52 51 50 49 48
!/ /J
i 1 _
56 j
71j 10 9 6 7 6
/ i,1, •� 57 I li
2 1 z
y " 1
j`i N 58 13 14 15N
/ 59
60
,✓ ��; 61 62 61 64 65 66 67
-. - --. E ONLN
.. ......-.
. .. .. .......` .......... .. ..........
_..- _ .... . ..... McPHERS, BOULEVARD , ... ..... /
.._ ....
/,..
......... ........ ..... _ .. .._ ..:.._. ......... ......... _ -...... _ .... ...
. 1
1`
r
r
t
r {
I
EXHIBIT "B°1"
STORM DRAINAGE PLAN
---_.� SUMMER CREEK RANCH
J� s5clok X1
A� REEL w� d�VLJ�:
�•°�Jf 10/01!i ' CL TEXAS,L.P.,A TEXAS LIMITED PARTNERSW
5495 BELTLNE SLATE 225
FY. :`�u �� U If{ DALLAS.TEXAS 75240
N
n _ _
23
25
2W
\ 26
977
cr1 1® C N 6qpWk 6,t 62 r
-
3311 \
- _. _........
311 W ;
L� 29 � 33 I .. .... __..._
19 32
/
W
3w
to
SECTION LINE
24
f 37 i
ai
kO5ffl2fVER-COOFt-r — 38 � _ —
1 �
�bfTNER 73ROT7KZ A7VE-- —
.....�\ 221
�r
� 41 41 44 65 46 4170
+ SECTION LINE -
f
t.
r
t
�- —pTypBCr-DAR LxFe— —
J 56
J 57 s
0
z
t
'� - !• 4
MALL BAR—ORTVE
6�0
bit 6§2 66 64 65
SE TION L NE 66
6
EXHIBIT "C"
STREET LIGHTING PLAN
n^�
SUMMER CREEK RANCH
�• 1:2i Il SECTION XI
CL TEXAS,l?.,A TEXAS LIMITED PARTNERSHIP
5495 BELTUNE SUITE 225
ntn
OALLAS,TEXAS 75240
N
-- ---------
............. . .........
p A Q
7
. ............
Al
R
Err 4
23
8 /pp L AIL-
24
2--
7 2W 9 3;
27
28 29 30
10 E2 wow
30 K L4
31
31 32
29
12 33 34 35 32
28
13 7
9 1 3
36 3
26 25 SECTION LINE
14 24
27
/M1 o 37 9
34 35 36 17 38 39 40
is 41
C U 38
_7,LCpIINQ_l BROOK LAN E_
_4
16 17 18 19 20 21 3
22 9
40 41 42 43 44 45 46 47
SECTION LINE
54 53 52 51 50 49 48
55 -DQ-UQLE OAK LAN
a on
Iw
54 5' 52
-DQ-U'ILE
56
10 9 8 7 6
57
SB 0
12 13 11 15�w
59
L MALLOW OAK
61 62 63 64 61 66 67
SE4TI ON ON L L NE
.............
EXHIBIT "ID"
SIDEWALK PLAN
SUMMER CREEK RANCH
SECTION XI
CL TEXAS,L.P..A TEXAS LIMITED PARTNERSHIP
NOTE:SIDEWALK TO BE BUILT BY INDIVIDUAL HOMEBUILOER 5495 BELTLINE SUITE 225
DALLAS,TEXAS 75240
EXHIBIT"A"
BID SCHEDULE
CL TEXAS,L.P.,A TEXAS LIMITED PARTNERSHIP
SUMMER CREEK RANCH,SECTION XI
PAVING CONTRACT
Item Estimated Total Total
No. Quantity Unit Description of Item with Total Unit Price Written in Words Unit Price Amount
1 11,081 SY Fumish&Install Six-Inch Reinforced 3,000 psi Concrete Paving
including 7-inch curb,complete in place,
for dollars
and cents per Square Yard $ 18.85 $ 208,876.85
2 . 11,781 SY Perform Initial Lime Stabilized Subgrade Preparation,
in locations specified per geotechnical recommendations,
complete in place,
for dollars
and cents per Square Yard $ 1.60 $ 18,849.60
3 . 177 TON Fumish Hydrated Lime(30 lbs/SY)for Subgrade Stabilization,
for dollars
and cents perTon $ 94.00 $ 16,638.00
4 . 116 LF Connect to Existing Pavement,complete in place,
for dollars
and cents per Linear Foot $ 20.00 $ 2,320.00
5 . 2 AC Seed and Fertilize Road Right-of-Way
for dollars
and cents per Acre $ 1200.00 $ 2,400.00
6 . 7 EA Fumish&Install Barrier Free Ramps,
as detailed on plans.Complete in place,
for dollars
and cents per Each $ 475.00 $ 3,325.00
"v�:UU4I U��y1.a
EXHIBIT"A"
BID SCHEDULE
CL TEXAS,L.P.,A TEXAS LIMITED PARTNERSHIP
SUMMER CREEK RANCH,SECTION XI
PAVING CONTRACT
Item Estimated Total Total
No. Quantity Unit Description of Item with Total Unit Price Written in Words Unit Price Amount
7 . 8 EA Adjust Manhole Rim in Pavement,complete in place,
for dollars
and cents per Each $ 200.00 $ 1,600.00
8 . 7 EA Furnish&Install Concrete Light Pole Base,including excavation,
PVC conduit,and backfill,complete in place,
for dollars
and cents per Each $ 600.00 $ 4,200.00
TOTAL FOR SUMMER CREEK RANCH,SECTION XI-PAVING CONTRACT $ 258,209.45
(Unit prices are to be shown in both words and figures. In case of discrepancy,the unit price in writing will prevail. Prices listed above are the only compensation to be
made.All items,if workis requited tocomplete the work as shown in the plans and as specified which are not listed as a pay item in this proposal,are considered
subsidiary to the item and the cost of the subsidiary work should be included.)
EXHIBIT"A"
BID SCHEDULE
CL TEXAS,L.P.,A TEXAS LIMITED PARTNERSHIP
SUMMER CREEK RANCH,SECTION XI
UTILITIES CONTRACT
Item Estimated Total Total
No. Quantity Unit Description of Item with Total Unit Price Written in Words Unit Price Amount
STORM SEWER ITEMS
7 . 21 LF Furnish&Install 21-inch Reinforced Concrete Pipe,including
excavation,embedment and backfill,complete in place,
for dollars
and cents per Linear Foot $ 33.00 $ 693.00
8 . 477 LF Furnish&Install 30-inch Reinforced Concrete Pipe,including
excavation,embedment and backfill,complete in place,
for dollars
and cents per Linear Foot $ 52.00 $ 24,804.00
9. 4 EA Furnish and Install 10-Foot Curb Inlet,including excavation,backfill
and materials,complete in place,
for dollars
and cents per Each $ 1,850.00 $ 7,400.00
10 . 30 CY Furnish and Install Rip Rap,including excavation,backfill
and materials,complete in place,
for dollars
and cents per Cubic Yard $ 60.00 $ 1,800.00
11 2 CY Furnish and Install Slope Paving Headwall,including excavation,backfill
and materials,complete in place,
for dollars
and cents per Cubic Yard $ 275.00 $ 550.00
12 , 498 LF Design and Implementation of Trench Safety system including sheeting,shoring,
and bracing,complete in place,
for dollars
and cents per Linear Foot $ 1.00 $ 498.00
SUBTOTAL STORM SEWER ITEMS $ �5,
rrUv—j a—cnm,5 lb i.Std
P.02/02
EXIJI T"A"
BID SCRED(1LE
CI,TEXAS,L.P.,A TEXAS LIMITED PARTNERSIIIP
SUMMER CREEK RANCH,SF..(:T1ON XI
SIDEWALK
Item Estimated Total Total
No. Quantity Unit rkwription of Item with Total Unit Price Written in Wordy Unit Price, Amount
1 6,335 LF Fumish&Install 4'Reinforced Concrete Sidewalk as detailed.
complete in place,
for dollars
and cents per Linear Foot 3 10.Q0 S u3,35tt.ElU
TOTAL FOR SUMMER CREEK RANCH,SECTION X1-SIDEWALK $ 6335GAO
(Unit prkw saw b 1e,shown In York words art fivA ,In am of diohep w.Ik udr prim is wihide will PrMil.Prim West aharc ate dM my can4oaallun to N
astde.AN hm ifwa"tgrUed weampkie tke work u al o..d io The prow and u sprwifrod.ahiek as not boors as a Pay here In this propaol.are considered
rAoidiay a dw iron vA dw oast aria arhaidiary work d weld Iss Indudal.)
I4CIAl ' EC 7�kc
IT ,
ti�