Loading...
HomeMy WebLinkAboutContract 46440 0TY SECR-HANI � enr Developer and Project Information Cover Sheet: Developer Company Name: INDUSTRIAL DEVELOPMENTS INTERNATIONAL(TEXAS), LP Address, State,Zip Code: 5420 LBJ FRWY., STE. 1275,DALLAS,TX 75240 Phone,E-Mail: 972.560.7010 KEVIN.GREENgBROOKFIELDLOGISTICS.COM Authorized Signatory/Title: KEVIN GREEN/DIRECTOR OF CONSTRUCTION Project Name and Brief Description: WATER, SEWER,PAVING, STORM DRAIN, STREET LIGHTS &NAME SIGNS TO SERVE SPEEDWAY DISTRIBUTION CENTER BLDG. C Project Location: NORTH OF SH 114&EAST OF THREE WIDE DR. Plat Case No.: FP-14-017 Plat Name: SPEEDWAY DISTRIBUTION CENTER Mapsco: 642Q&R Council District: 7 City Project No: 02286 CFA: 2014-080 DOE: 7247 To be complet iby ,taff.�({• Received by: `� �C/�""V" � Date: F� C� r Pte, EOFFICI�AL RECORD I CRETARYRTH,TX COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary 400 COUNTY OF TARRANT § Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as SPEEDWAY DISTRIBUTION CENTER BLDG. C ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Project. NOW,THEREFORE,For and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that the said acceptance process requires the Developer's contractor(s) to submit an 2 affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub-contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City- approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X , Sewer (A-1) X, Paving (B) X, Storm Drain (B-1) X Street Lights & Signs (C) X E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section 11, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. 3 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. 4 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in_part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said 5 contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. 6 iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) 7 Cost Summary Sheet Project Name: SPEEDWAY DISTRIBUTION CENTER BLDG. C CFA No.: 2014-080 DOE No.: 7247 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $73,298 2.Sewer Construction $60,957.20 Water and Sewer Construction Total $ 134,254.70 B. TPW Construction 1.Street $ 461,242.96 2.Storm Drain $ 437,460.44 3.Street Lights Installed by Developer $ 42,722.75 TPW Construction Cost Total $ 941,426.15 Total Construction Cost(excluding the fees): $ 1,075,680.85 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 2,685.09 D. Water/Sewer Material Testing Fee(2%) $ 2,685.09 Sub-Total for Water Construction Fees $ 5,370.18 E. TPW Inspection Fee(4%) $ 35,948.14 F. TPW Material Testing(2%) $ 17,974.07 G. Street Light Inspsection Cost $ 1,708.91 H. Street Signs Installation Cost $ 490.00 Sub-Total for TPW Construction Fees $ 56,121.12 Total Construction Fees: $ 61,491.30 Financial Guarantee Options Choose one Amount Mark choice Bond=100% $ 1,075,680,85 X Completion Agreement=100%/Holds Plat $ 1,075 680.85 Cash Escrow Water/Sanitary Sewer=125% $ 167 818.38 Cash Escrow Paving/Storm Drain=125% $ 1,176,782.69 Letter of Credit=125%w/2yr expiration peri2d $ 1,344,601.06 8 IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary,with the corporate seal of the City affixed,and said Developer has executed this instrument in quadruplicate, at Fort Worth,Texas this day of F mar 20 1,5 . CITY OF FORT WORTH-Recommended by: Water Department Transportation&Public Works Department /",),k Z4. 1).-"4 W' Lj Wendy i-Babulal,EMBA,P.E. Douglasp.Wiersig,P.E. Development Engineering Manager Director Approved as to Form &Legality: Approved by City Manager's Office Douglas W. Black Fernando Costa Assistant City Attorney Assistant City Manager M&C No. Date: ATTEST: Q °°®R� X ®� o:0 Mary J.Kayser IT U City Secretary AS ATTEST: DEVELOPER: 4gnature S' afore (Print)Name/ C,Lrlr Print Name:KEVIN GREEN Title:DIRECTOR OF CONSTRUCTION OFFICIAL RECORD 9 CITY SECRETARY FT,WORTH,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map ® Exhibit A: Water Improvements ® Water Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Estimate ® Exhibit B: Paving Improvements ® Paving Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 10 B N S F Cathe'1ne 'j��Jl R®d ECT PETTY LOCA 7r N S H 114 ^�P� w 3 W ,—-- Uj ECc XAS MOTOR � S Y CSP cn LO ti E�'Zape� C"P P� I35W m N Fear LO o �3 S j -� --- CITY LZtAP 1 N 0 a IT VICINITY MAP N d N U) N.T S C O elfN SPEEDWAY V AY DHS==®N C ENTER9 m BUILDING "C" o DOUBLE EAGLE BOULEVARD LOCATED HN C NTY OF FORT V V ®RTH9 TEXAS z OVIN ED/D EVE LOPED]BY: M Atlanta•Chicago•Cincinnati ' BY, Dallas•Ft.Lauderdale•Memphis I Los Angeles•Philadelphia ���,{���1�� �1�pp�1�g Two Lincoln Centre, Suite 1275 }�� �/�(� 1\YiltlllLSs�II]1&L L 8 N 5420 L X Freeway NOVE 1S ER CIVILENGINEERS—PLANNERS—SURVEYORS N DaAos, TX 75240 9 O David Seaman ®.n 2405 Mustang Drive,Grapevine,Texas 76051 Phone (972))560-7003 Fox (972 560-7007 Ill. Metro(617)329-0373 W o r m U 0 o J r 2 N w N w m F�2 LO Q (oa m �? N Ld Sm W W O z W Q J; MY W O N O J Z Q J Z am o Z*EO Lu x L, N i-- w W = I > w i z on U = o Q lL Q N a N 0 3 ww w ® z Yn n m z z z �t� ate. I- a E= nom. F- M z O O N O O N J O o D- W d W d W V N y of o II + LLJ z 1 x 0 U U — — z o J i El co 0 N —� _---'-- O W 12� "U I OI �i kl - -- -- �- t i ♦ Z. i �t I �€ Ka a w i 0 111111111110 11111 aAMa 9 MU �r �rv1m mmir Y�rvTt �y �+�\7 LEGEND N SPEEDWAY D11S u1l�uun�uJ 1 (I) CE=R,Rs5-- PROPOSED SANITARY SEWER LINE IBUI i' 1T' HNG "C" —DOUBLE,EAGLE BOULEVARD s EXISTING SANITARY SEWER LINE W*E LJlL11e1LJ�tA� �L. DOUBLE t`110�t11r • PROPOSED SANITARY SEWER MANHOLE S ��II7Cl��t�]E6�ll� lEMB17oA—V QS EXISTING SANITARY SEWER MANHOLE GRAPHIC SCALE 1"®200' - 0 200 400 600 t m m � i � i I I I CD ..._............._........ ..................;.........._-_._ ........ ....... _. I .... _ j.. � -OT I A �..._......._...— _.. _ C _-- ..... -_........._ .......i...............i.. —....1.........—. ................:..__ ..............._.._. _....I...... .. � I : .;........ Ex. lo' S.S. j I LOT8. BLOCK 8' S.S. EX. 8' S.S. IID6DUB]LEFAGLF B®ULLIVAR D LOT 9, EX. loS.S. BLOCKA LOT/0, BLOCK A / PREPARED BY: G GGDV�qN! SHALL 9 CIVIL ENGINEERS—PLANNERS_SURVEYORS 2405 Mustang Drive,Grapevine,Texas 7eo51 Metro(817)329.4373 E:\10276\Plans\BUILDING C\Plans\Building C Revisions Sept 2014.pro 25 Jan 2015 LEGEND N SPEEDWAY DEcSTREBUTH®N CENTER, PROPOSED 49' B—B ROADWAY W E w/ 68' R.O.W. BU.�DHNG "C" —DOUBLE EAGLE BOULEVARD77771 w/ CONCRETE PAVING s PROPOSED TEMPORARY TURN .. GRAPHIC SCALE 1"-200' snzms AROUND ASPHALT PAVEMENT .=rr 4SIDEWALK PER BUILDING PLANS o zoo 400 aoo 4' SIDEWALK PER THIS CONTRACT mm I II _ ._. ................._........�_............_�_... _............I......_.._ ..... ..... . _ - : : : 'OT,�.... ..ice _�_T................_.._..-.. _......_._._ _ OCK p� : _ .................:----..--�....................._.. ......... i -......- - I- I DOUBLE EAGLE BOULEVARD LOT 9, BLOCK A LOT/0, BLOCK A ]PREPARED BY: ®®DVnN 1 MARSHAiLLr, CML ENGINEERS—PLANNERS—SURVEYORS 7� 2405 Mustang Drive,Grapevine,Texas 76051 Metro(317)32&4373 E:\10276\P1ans\BUI1-DING C\Plans\Building C Revisions Sept 2014 pro 25 Jon 2015 LEGEND N SPEEDWAY DISTM=ON CENTER, PROPOSED STORM DRAIN LINE w E BUILDHNG "C" -DOUBLE EAGLE BOULEVARD EXISTING STORM DRAIN LINE S STORM DRAW FJ=rr"B-1" GRAPHIC SCALE 1"=200* PROPOSED STORM DRAIN INLET 0 200 400 600 x .A—R� mm------ ------ .................................. LOT lI 0 C­ .................................... ............. ..............CKi.........._._................. ........ . ....... ...... ..... ............. ...... .............. ............. ... , R R.Q.B. I I TIT- I I I Lm I I I I I J I I I I I I I I I I I U I I I I I I •• J I 11,1111111 U I I I I I I I I I I I ZZ 21' R.C.P O' INLET ..LLLLI I I I I I I I I 10' INLET fits -ZL DOUBLE EAGLE BOULEVARD firs LOT 9 BLOCK PRIVATE as DETENTION PRIVATE POND 'D' DETENTION EXISTING POND 'D' LOT/0, PRIVATE BLOCK A DETENTION 24' POND R.C.IP EX. 24' PREPARM BY: R.C.P .� GOODWW! ILEX. 48 R.C.P. X. 41'11 R.IC 11 i,P A 1 1111111 Ill hLARSHALL 9, 6la 1 CML ENGINEERS ivPLANNERS—SURVEYORS Grapevine,—TeXaS 76051 -7--�T7 Metro(817)329-4373 EX. 9' x 5' R.C.B. FF 2405 Mustang Drive,G E:\10276\Plons\BUILDING C\Plons\Building C Revisions Sept 2014.pro 25 Jon 2015 LEGEND N SPEEDWAY DlSTRHB=GN CENTER, PVC Condbil w E BUIILDHNG "C" -DOUBLE EAGLE BOULEVARD Pole Assembly S STREET LIGHTS /00w 14ps GRAPHIC SCALE 1"=200' F=IT"C" 0 200 400 600 f3l m m ------------------ ID ....... ............. ......................................................... ....................... .....................— ....................................... . ............ ........... ......... ................ CROSSING 1-MICH.H.1 U-111.1 I I I I I I I I U I I I I I I I I I 11.0.1.121.91111 coNvor CROSSOV6 ExlsrwG DOUBLE EAGLE BOULEVARD 9 TRW OCATIarORAER ORAERLCON Lor 9 BLOGtA LOT/0. BLOCK A PREPARED BY: GOODV4NI SHALL CIVIL ENGINEERS-PLANNERS-SURVEYORS 2405 Mustang Drive,Grapevine,Texas 760 51 9 n77 Metro(817)3294373 E:\10276\Plons\6UlLDlNG C\Plons\Building C Revisions Sept 2014.pro 25 Jon 2015 N SPEEDWAY DHS==GN CP=R, W*E BUHLDENG "C" -DOUBLE EAGLE BOULEVARD S STREET SIGNS GRAPHIC SCALE 1"-200' Ell=11c 0 200 400 600 LEGEND S TREE T NAME SIGN m ------- --- .................... ............ ........... ...................... ............................ ROCK 2 ............... ........... ....... ....................... .......................... .......................— .................. .......... DOUBLE EAGI.E BOULEVARD GOf 9, &=A LOT/0, BLOCK A PREPARED BY. GOODVEN1 MARSHAIL rlLLLLLLLLLLLLUiF-----ll\ CIVIL ENGINEERS—PLANNERS—SURVEYORS 2405 MustangDrive,Grapevine,Texas 76051 T�7 I Metro(817)329-4373 E:\10276\Plans\BUlLDlNG C\Plcns\Building C Revisions Sept 2014,pro 25 Jon 2015 no 4243 pIDPROIX}SAL Page i ort SECTION 00 42 43 CFA Quantity and Cost Matrix Spcedway Dristribution Center,Building*C*-Double Eagle Boulevard DOE 47247 UNIT PRICE BID Project Item W.-tum Bidder's Proposal Sheet Number&Quantity Bidlist item Specification unhof No. Description Section No- Measure Bid Quantity Unit Price Bid Vatue 3 4 6 UNIT I:WATER AIPROVEMENTS 1. 3311.0461 12'PVC Water Pie 3311 12 LF 1,120 $35.00 $39,200.00 744 376 2. 3312.3005 12'Gate Valve&Vault 33 12 20 EA 1 $2,352.00 $2,352.0 1 3. 3312.0117 Connect to Existing 12"Water Main 33 12 25 EA 1 $1,004.00 $1,004.001 1 4. 3312.0001 Std.Fire Hydrant Assembly w/61 Gate Valve&Box 33 12 40 EA 4 54 420.00 $17,680.001 2 2 S. 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 0.7 $4,315.0 $3 020.50 0.5 0.2 6. 0241.1118 End&Plu 12"WL 12"Pressure Plu 0241 14 EA 2 $1 004.00 $2 008.00 1 1 7. 3312.2204 2"Im ation Meter Private Water Service 33 12 10 EA 2 $1,901.0 $3 802.00 1 1 8. 3312.2203 2"Domestic Meter ater Service 33 12 10 EA 1 $1,901.00 $i 901.00 1 9. 9999.000212"Cleanin a 000000 EA 1 $650.00 $650.00 1 10. 3305.0109 Trench Safe 33 05 10 LF 1,120 $1.00 $1 120.00 744 376 11. 3304.0101 Water System Testing(Temporary Water Services) 33 04 30 LF 1,120 $0.50 5560.00 744 376 TOTAL UNIT I:WATER IMPROVMENTS $73,297.50 Bidlist Item Specification Unitof Sheet Number& No Dc-iluimw section No. Measurs ➢id Quantity Unit Price Bid Value Quantity UNIT 11:SANITARY SEWER IMPROVEMENTS 7 12. 3331.4115 8'Sewer P-a SDR-26 PVC 3311 10 LF 780 $52.00 $40,560.00 780 13. 3339.1001 4'Dia.Std.S.S.Manhole 33 39 10 EA 3 $4,414.0 $13,242.0 3 14. 3339.1003 Extra Depth for 4'Dia.Manhole 3339 10 VF 20 20 15. 0241.1118 End&Plu 8"S.S.8"Pressure Plu 0241 14 EA 1 $1,334.00 $1.33400 1 16. 3331.4116 8'Sewer Pipe,SDR-26 PVC w/CSS Backfill 3311 10 LF 40 $42.53 $1,701-20 40 17. 3305.0113 Trench Water Stops 330515 EA 2 $886.00 $1772.00 2 18. 3305.0109 Trench Safety 33 05 10 LF 780 $0.80 $624.00 780 19. 3301.0002 T- -WS Sanita Sewer Une 33 01 31 LF 780 $0.501 $390.00 780 20. 3331.3316 Conn.to Ex.S.S.S.out(II S.S.Se".Reinstatement) 3331 50 EA 7 $1,334.00 $1,334.00 1 TOTAL UNIT II:SANITARY SEWER IMPROVMENTS $60,957.20 Bidlist Item Specification Unitof No. Description Section No. Measu Bid Quantity Unit Price Bid Value Sheet Number&Quantit UNIT IU:DRAINAGE IhIPROVEMENTS 23 24 21. 3349.500110'Cmb Inlet 334920 EA 2 $3159.00 $6318.00 2 22. 3341.0201 21'R.C.P.,Class III 3341 10 LF 99 $47.00 54,653.00 99 23. 3341.020524'R.C.P.Class 111 334110 LF 63 $53.00 $3339.00 63 24. 3341.040242'R.C.P.Class 111 334110 LF 95 $112.00 $10640.00 95 25. 3341.1303 6x4'R.C.B.BoxCulvert Pdvate 3341 10 LF 332 $260.00 586 320.00 332 26. 3341.1402 7x4'R.C.B.(Be.Culvert Private 3341 10 LF 771 $366.00 S282,186.001 771 27. 3349.4104 21"Sloped End Headwall SET 1 Pia 33 49 40 EA 1 $1,701.00 $1,701.0 1 28. 3349.4105 24"$lo ed End Headwall SET 1 Pie 33 49 40 EA 2 $1,757.00 $3,514.00 2 29. 3349.411142"Slo ed End Headwall SET,1Pi a 334940 EA 1 $2,965.00 $2965.00 1 30. 3349.10006x4'Headwall Boz Culvert Private 334940 EAK19 $17046.00 $11046.00 1 31. 3349.10007X4'Headwall Box Culvert(private) 334940 EA $11,623.00 $11,623.00 1 32. 3349.0102 4X4'S.D.M.H.Riser 4'Manhole Riser(Private) 33 49 10 EA $4,573.00 $4,573.00 1 33. 3305.0112 Concrete Collar 33 05 17 EA 51 176.00 $1,176. 1 34. -0241.3501 Remove Ex.24"Sto ed End HdvA.SO Junction Str 0241 14 EA $538.00 $1,076.00 2 35. 0241.3015 Remove Ex.24'R.C.P.Storm Line 0241 14 LF $9.12 $538.00 59 36. 0241.3501 Remove Ex.42'SIo ed End Hdwl.SO Junction Str 021114 EA 51 037.00 $1,037.0 1 37. 0241.3501 Remove E. 42'45'Bend SD Junction Structure 02 41 14 EA $63.00 $63.00 f 38. 0241.3021 Remove Ex.42"R.C.P.Storm Line 0241 14 LF 52 $9.13 $475.00 52 39. 3137.010412'-Thick Rip-Rap 6x9 Medium Stone D Private 313700 SF 216 $7.56 $1632.96 108 108 40. 3137.0102 18"-Thfck Rip-Rap 12X12'(Large Stone DPrivate 31 37 00 SF 288 $8.26 $2,378.88 144 144 41, 3305.0109 Trench Safety 33 05 1077TF77F7797 7, $0.80 $205.60 99 158 TOTAL UNIT III:DRAINAGE IMPROVMENTS $437,460.44 Bidlist Item SpecifitiUnitof No Ascription Section callo.on Measure Bid Quantity Unit Price Hid Value Sheet Number&Quantity UNIT IV:PAVING]A ROVEMENTS 13 14 42 3213.0104 9"Reinforced Concrete Pvmt 32 13 13 SY 6,306 $56.51 $356,345.7 4,729 1,577 43. 3212.03022" 212.03022"Asphalt Pvmt T e D 32 12 16 SY 671 $37.00 $24,814.6 671 44. 3211.0502 8"Lime Stabilized Sub rade Treatment 3211 29 SY 7,256 $0.08 $580.45 4,918 2,338 45. 3211.0400 Hydrated Lime 38#/8 32 11 29 TON 138 $195.00 S26,882.0 94 44 46. 9999.0001 Connect to Concrete Header 00 00 00 LF 49 $10.00 $490.00 49 47. 3217.0101 Pavement Markings,6"SLD Pvmt Markin HAS 32 17 23 LS 1 $14,544,0 $14,544.00 1 48. 3441.4006 St.Si ns Install Alum Silm Ground Mount 34 41 30 EA 1 $330.00 $330.00 1 49. 13471.0001 Traffic Control 34 71 13 LS 1 $500.00 $500.00 1 50. 3213.0301 4"Concrete Sidewalk 32 13 20 SF 4 043 $4.50 $18,193.50 2,786 1,257 51. 3213.0508 4'Barrier Free Ram T e G7 32 13 20 $350.00 $2,100.O 5 1 52. 3123.0101 Unclassified Excavation by Plan 31 2316 1 CY 1 6,585 1 $2.501 $16,462.50 3,622 2,963 TOTAL UNIT IV:PAVING IMPROVMENTS $461,242.96 Bidlist hem Specification Unitof Sheet Number& No. Ascription Section No. Measure Bid Quantity Unit Price Bid Velue Quantity Ctrl'OFFORT t\'OATH STAIR-e CO1-20 CTi0Y5PFFiFIGTiOV DOLTJ\(INIS Fam Rc,'uN20120120 SPFID\VAI'C CFA pIDPROPOSAL S}IFETx1ATRL\ 00 J2 J3 am PROPOSAL Pa 2M2 SECTION 0042 43 CFA Quantity and Cost Matrix Speedway Dristribution Center,Building'C'-Double Eagle 13 u1-urd DOE#7247 UNIT PRICE BID Pr ject Item Information Bidder's Proposal Sheet Number&Quantity BidlNhem Description Specification Unit oC Bid On unit Price Bid Value No. Section No. Aieasure 3 4 6 UNIT V:STREET LIGHT IMPROVEMENTS 35 53. 2605.30112"CONDUIT PVC SCH 40 26 05 33 LF 976 $2.50 $2.4400 976 54. 3441.3301 RoadwayIlium Foundation TY 1 2 and 4 34 41 20 1 EA 1 4 1 $800.001 $3,200.00 4 55. 3441.1501 Ground Box T e B 34 41 10 EA 2 $200.00 $400.00 2 56. 3441.1410 NO t0lnsulated Elec Condr 34 41 20 LF 2 928 $3.00 84.00 2,928 57. 3441.3003 R Ilium Assmbl TY 18.1 8A 19 and D-40 34 41 20 EA 5 $2 998.75 93.75 5 58. 3441.3201 LED Ughting Fixture 344120 EA 5 $2,581.00rE;05.00 5 TOTAL UNIT V:STREET LIGHT IMPROVMENTS $42,722.75 Payment/Performance/Maintenance Bonds $1,200.00 Bid Summary TOTAL UNIT I:WATER IMPROVMENTS $73.297.50 TOTAL UNIT II:SANITARY SEWER IMPROVMENTS $60.957.26 TOTAL UNIT 111:DRAINAGE IMPROVMENTS $437.460.44 TOTAL UNIT IV:PAVING IMPROVMENTS $461.242.96 TOTAL UNIT V:STREET LIGHT IMPROVMENTS $42,722.75 Total Construction Bi(I $1,075,680.85 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 180 calendar days after the date when the mce CONTRACT comens to run as provided in the General Conditions. END OF SECTION CR5'OF FORT WORTH STA�D,llUJ C0.5IAUCRO^I SPECIFICATIOUDOCUx1ENF5 Farm Rca'uN 20120120 $FEED\\'Al"C CFA a1DPR0}pSAL SfMET\UTRL\