Loading...
HomeMy WebLinkAboutOrdinance 8229 iv ORDINANCE NO. ~ ~a2q ._ AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE- MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF ALTAMESJDI~LEVARD SOIITH LANE AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS FIXING TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING, AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE CITY AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im- proved by raising grading and filling same and by constructing thereon the following to-wit ALTAMESA BOULEVARD SOUTH LANE From 120' east of McCart Street to Landview Drive., known and designated as Project No 029-23129 Unit III a seven-inch thick re- inforced concrete pavement on a six-inch thick lime stabilized. subgrade with seven-inch high superimposed concrete curb on a thirty- three foot traffic lane ~~ together with concrete curbs, gutters driveways and incidentals to such improvements on proper grade and line where same are not already so constructed together with storm sewers and drains and other necessary incidentals and appurtenances all of said im- provements to be cb nstructed as and where shown on the Plans and in strict accordance with the Plans and Specifications therefor contract therefore has been made and entered into with J. L. Bertram Eonstruction & Engineering. Inc. , and WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public Works Director to prepare and file estimates of the cost of such improvements and estimates of the amount per front foot proposed to be assessed against abutting property and the owners thereof and such estimates have been examined NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS THAT I Such estimates be and they are hereby adopted and approved.. II It is hereby found and determined that the cost of improvements on each portion of streets avenues and public places hereinafter described with the amount or amounts per front foot proposed to be assessed for sueh improvements against abutting pro- perty and the owners thereof are as follows to-wit ALTAMESA BOULEVARD SOUTH LANE From 120' east of McCart Street to Landview Drive known 'and designated as Project No 029-23129 Unit III The estimated cost of improvements is $ 31$,809 35 , the estimated amount per front foot to be assessed against abutting property and the owners thereof for superimpose concrete curb ~{ is $ 2.25 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 50.1Q , the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- the estimated amount per square foot to be assessed against abutting property and the owners thereof for six-inch thick concrete driveway is $ -(1- per square foot the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 52.35 plus the cost incurred for concrete driveway construction where specified l,. ~- III A hearing be given and held by and before the City Council of the City of Fort Worth Texas to all owning or claiming any property abutting upon said portions of highways streets avenues and public places as well as to all owning or claiming any interest in any such property Such hearing shall be given and held on the 30th day of December 19 80 at 9 30 A M , in the Council Chamber in the City Hall in the City of Fort Worth Texas and the City Secretary is hereby directed to give or cause to be given notice ,of the time and place of such hearing and of other matters and facts in accordance with the terms and provisions of an Act passed at the First Called Session of the Fortieth Legislature of the State of Texas and known as Chapter 106 of the Acts of said Seasion now being known as Article 1105b of Vernon's Texas Civil Statutes as amended by Acts 1967 60th Legislature Page 365 Chapter 176 Section 1 emergency effective May 12 1967 Such notice shall be by advertisement inserted at least three (3) times in a newspaper published in the City of Fort Worth Texas, the first publication to be made at least twenty one (21) days before the date of said hearing Said notice shall comply with and be in accordance with the terms and provisions of said Act as amended The City Secretary is further directed to give or cause to be given personal notice of the time and place of such hearing to all owning or claiming any property abutting on said portions of highways streets avenues and public places as well as to all owning or claiming any interest in any such property Such personal notice shall be in writing and shall be given or caused to be given by the City Secretary by depositing such written notice in the United. States Mail at least fourteen (14) days before the date of the hearing postage prepaid itt envelopes addressed to all persons owning or claiming any interest in the respective properties abutting the high- ways streets avenues and public places or portions thereof to be improved as the names bf such persons are shown on the current rendered tax rolls of the City of Fort Worth and at the addresses so shown or if the name of such respective owners do not appear on such rendered tax rolls then address to such owners as their names are shown on the current unrendered tax r611s of the City of Fort Worth at the addresses shown thereon In those cases in which an owner of property abutting a highway, street avenue or public place or portion or portions there- of which is to be improved is listed as '°unknown11 on the then current City of Fort Worth tax rolls or the name of an owner is shown on the Gity of Fort Worth tax m11s but no address for such owner is shown no notice need be mailed In those cases where the owner is shown to be an estate the mailed notice may be addressed to such estate In this connection the City Secretary shall prepare and file or cause to be prepared and filed with these proceedings a list of the properties to be assessed the names of those persons owning or claiming any interest in said properties to whom the notice was mailed together with the last known addresses determined as aforesaid of the respective owners and those per= sons owning or claiming any interest in said property The City Secretary shall certify that each of the parties in said list whose address is shown on the then current rendered or. unrendered tax rolls of the City ®f Fort Worth was mailed a copy of the notice of hearing and shall further certify the date or dates on which said notice was mailed A copy of each notice shall be attached to such certificate The certificate of the City Secretary will be con elusive evidence of the facts therein recited _: ,-:-- IV The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance Records of this City V This ordinance shall take effect and be in full force and effect from and after the date of its passage Passed and approved this ~ ~ day of ~G~~tiG~'Z- 19 ~® APPROVED AS TO FORM AND LEGALITY ,ty ttorney ~e ~' " Mayor and Coun~al Comm.u~,~.cat~on DATE REFERENCE SUBJECT Award of Contract - Altamesa PAGE NUMBER Boulevard Unit III South Lane - ].2~3~'80 '~'~C-54]l6 Paving Improvements i of 3 City Council action is reque ted on Project No 029--023-129•-00 as described below Roadway R 0 W Street Limits. Width-Feet Width-Feet Altamesa Blvd 120 east of McCart 2nd of 2 Varies 47 5 Unit 1"TI. Street east. to 33 Lanes to 54 5 (South ]:.anej Landview Drive Origin of Project The Regional Transportation Study and the City of Fort Worth Major Thoroughfare Plan provided for Altamesa Boulevard to be developed as the first major east-"west. thoraughfare loc:at:ed south of and parallel to South Loop 820 Altamesa Boulevard from- Hulen Street to McCart Street. was constructed in 1973, and completion of that section west from Hulen Street to Granbury Road has been provided f"or in the Wedgwood X-II develo~iment The City and County jointly designed and c°.ornstruc.ted a rural type roadway section that would serve on an interim basis until further development warranted extending Altamesa Boulevard from M Cart Street east as a fully designed thoroughfare On December 27 1977 (M&C C-4038} the City Council authorized Community Facilities Contract. No 9660 with R N Horton Lnc for the development of Woodmont Addition Phase I whi h included the assessment paving of the north half of Altamesa Boulevard adjacent to this development in late 1979 Included in the contract was the construction of 120 of the south lane at Mc.Cart Street in order to completely signalize the intersection As a .result of continuing development on the. south side of this segment of Altamesa Boulevard a contract was awarded on July 27 1980 ~MfxC C-5172) f"or the construction of the south la ~: bridge over. the Edgecliff Branch of Sycamore Creek grading of the TESCO easement and street excavation from just east of McCart Street east to .Landview Drivr-. just west of the Santa Fe Railroad Also included was the installation of required storm drainage facilities and appurtenances The contras-tor has progressed on the above improvements to a point where a paving contract is now feasible lmprovements 'T'he paving contract, will include the construction of major thoroughfare concrete pavement with concrete curb a cross-over and left-turn lanes at Westc.reek Drive a cross-over and a left-turn lane at Brookhaven Terrace and a left-turn lane at L.ar~dview Drive Receipt of Bids The paving project was advertised for bids on October 9 and 16 1980 and the following bids were received on November 6 1980 with 120 working days allocated to complete the project DATE REFERENCE SUBJECT Award Of Cpntract - AltameSa PAGE NUMBER ~~ Boulevard Unit L1T South Lane - 2 of 3 12/'3'80 C-5416_.. Paving Improvements Bidder Amount 7 L Bertram Constr & Engr Inc $300 763 54 L H Lacy Company 326 646 80 Southwestern Contracting Company 338 523 50 APAC-Texas Inc 354 374 60 R T Montgomery Inc 359 923 60 Uvalde Construction Company 383 329 S5 Austin Road Company 400 223 80 Project. C;~st and Financing Based on the low bid area standard policy appx:oximat.ely $1.28 286 35 is proposed tc be assessed against. abutting properties which will be provided for by a bond fund transfer from the Revolving Fund Unspecified Cost to the City for pavement construction is approximately $1'72 47'7 1.9 plus $18 045 81 for engineering Bond fund transfers are req~xired from the Streets in New Additions Unspecified A~:count f~~r the City s construction costs and from the Engineering Unspecified Account for the City s engineering costs Recommendatior-~ It is recommended that 1 The following bond fund t.r-°ansfers be approved From fio Amount Reason 029-036-90 -00 029-021-101..-00 $1.28 500 00 Contribution to Revolving Street in New Revolving Fund Fund Unspecified Additions Unsp Urtspe if ied 094--009 901.-00 094-02.3-129-00 $1.28 286 35 To provide funds for the Revolving Fund Altamesa Blvd property owner s share Unspecified Unit LII of costruction cost 029-036-901.-00 029 02.x-119-00 $1.'72 500 00 T'o provide funds for the Streets in New Alta Mesa Blvd City s share of construc- Additions Unsp Unit T1=I tion cost 029-095-901.-00 029-023 129-00 $ 1.8 500 00 To pr°ovide funds for the Engineering Altamesa Blvd City s survey inspec- Unspecified Unit II1 Lion administration and testing cost Z An ordinance be adopted aj Declaring the necessity for and ordering the improvements bj Making provisions for levying assessment s c) Direti:ting the Putlic. Works Department to prepare estimates of co is and amounts to be assessed dj Awarding the contr-act to J L• Bertram Construction & Engineer- ing ~lnc in the amount of $300 763 54 based on their low bid r~ DATE REFERENCE SUBJECT AWdrd Of Contract - Altamesa PAGE NUMBER $OUlev ard Unlt 111 South Lane - 3 3 12 3f 80 ~~C- PaVin lm x.°ovements or e) Making apprap iations to cover the indebtedness thereby incurred for impr.ovenlents of t he; project named above and 3 An ordinance be adopted a~ Appr:oving the estimates of costs and amounts proposed to be rise sed and b} Setting December 30 1980 as the date for the Benefit Hearing GG c. g P,:t.ta.c:hmen.t. APPROVED BY CITY COUNCIL ~ ~~ ~~~ ~~ Ci ecretary of the C of Fort Worth, TexaQ SUBMITTED FOR CITY MANAGER'S THE DISPOSITION BY COUNCIL: PROCESSED BY OFFICE BY ^ APPROVED ORIGINATING ^ OTHER (DESCRIBE) DEPARTMENT HEAD: Gar C~v~Tx ~ 8ec3arin CITY SECRETARY FOR ADDITIONAL INFORMATION Necessity ~ 6t^ er~ng Improvements, CONTACT 5 ) 'I ,~ r = ~°v q 80~ ~ ~~ DATE Setting Dec 3Q, 1380 as Bate .~ enef~t Hearing