Change Order Request Breakdown
Project Namel Chisholm Trail Community Park-Ph 1 City Sec# 46469
Client Project#(s)l 02439
Contractor Fain Group PM1 Tom Alves Inspectorl Thomas Miller
Change Order Submittal# 0 Date 2/1/2016
Contract Time
Dept. PACS Totals (CD)
Original Contract Amount $3,400,000.00 $3,400,000.00
Extras to Date $0.00
Credits to Date $0.00
Pending Change Orders(in M&C Process) $0.00
Contract Cost to Date $3,400,000.00 $3,400,000.00
Amount of Proposed Change Order $74,851.52 $74,851.52
Revised Contract Amount $3,474,851.52 $3,474,851.52
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO 1 $0.00
Additional Funding(if necessary) 1 $74,851.52 1 1 1 $74,851.52
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1 2.20%
MAXALL OWABLE CONTRA CTAMOUNT(ORIGINAL CONTRACT COST+25%) $4,250,000.00
JUSTIFICATION(REASONS) FOR CHANGE ORDER
Elements within the project that have been added or deducted from the project due to overall need of the City.
AtMAWb *�
City Secret
-�a®Fa� :
foo
,LAL RECORD
ECRETARY
O TH,TX
FO RT WORTH City of Fort Worth
�IV--- Change Order Additions
Project Name I Chisholm Trail Community Park-Ph 1 City Sec# 46469
Client Project# 1 02439
Contractor Fain Group PM Tom Alves Inspector Thomas Miller
Change Order Submiltal# Dale 21/2016
AQUI I IONS
ITEM DESCRIPTION UH,I Uty unit Unit Cost Total
Skate Park Ph 11 Design Cost
Drinking Fountain model revision ,7
Boulders-Playground AmenityAdd5
—77077—Additional ater Linellountain
ow tnp 7.
PCO#9R Tree Revision ,5
Irrigation Add from o Plans ACS 1.00000000 LS �8,wd.2b $6 908 2b
Phoenix Twist- aygroun menity $16,35T-57
Bleacher Revision 5,
Northside rainage
PACS $103,326.42
Sub otoAdditions
Change Order Additions Page 2 of 8
ruerWoRl_H City of Fort Worth
Change Order Deletions
Project Name Chisholm Trail Community Park-Ph 1 City Sec# 46469
Client Project# 02439
Contractor Fain Group PM Tom Alves nspector Thomas Miller
Charge Order Submittal# 0 Dale 2/1/2016
DLLLI IUNS
Unit unit os o a
aygroun enc evision
rash eceptace Credit
Supplier
mgahon Controllercr d
PACS $28,474.90
Sub oto Deletions
Change Order Deletions Page 3 of 8
M/SBE Breakdown for this Change Order
M/SBE Sub Type of Service Amount for this CO
EI Cala Concrete Sub $23,138.40
Total $23,138.40
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
DOE ✓ PROJECT BID NUMBER
(Please check ane)
F Q P,-r TV01R-'=� 7�Q�
Minority[Women Business Enterprise Office
LETTER OF INTENT TO PERFORM AS A MBE SUBCONTRACTOR/SUBCONSUL.TANT
FOR A CONTRACT ADMEN DME NTSICHANG E ORDERS OR EXTRA WORK
[NOTE: Pursuant to the City of Fort Worth Business Diversity Enterprise Ordinance,MBE firms participating under the Ordinance must be certified
prior to recommendation of award in order to he counted towards subccntracting participation.If the City of Fort Worth determines that a proposed
MBE Is not certified accordingly to the Ordinance requirements,the firm should immediately submit a completed certification application to the North
Central Texas Regional Certification Agency(NCTRCA),624 Six Flags Drive,Suite 100,Arlington,TX 76011.)
1. Name of Project Chisholm Trail Community Park
2. Name of OfferorlPrime contractor The Fain Groun in-
3. The undersigned is prepared to perform the following described work andlor supply the material fisted in connection with the
above project(where applicable specify"supply"or"install'or both): Go n(
ye
at an additional price of 5 4G added to the MBE fir's current subcontract amount.
EI Cala Construction.LLC t 1 Lo
(Name of MBE Firm) (Dale) 1 j
�G���ue
:Cifl, ne wne IAutherized Agent of MBE fir)Type or Print Name Signature f Owner or Authorized Agent of MBE firm)
t
I i,I r i, ,v"1 C 4IF
(Email Address to appear on`N'stings provided by the MY,BE Office) (Office Phone Number)
AFFIDAVIT OF Offeror/Prime CONTRACTOR
I HEREBY DECLARE AND AFFIRM that I, Lary Frazicr am the duly aufhodzed representa ive of
Circle one LOwnerlAuthofized.Agent)
The Fain Grout).Inc, and that I have personally reviewed the material and
Name of Prime Contractor
facts set forth in this Intent to Perform for. To the best of my knovdedge,information and belief the fac',s and representation
oontained In this for are true,and no material facts.have been omitted.
Pursuant to City of Fart Worth Business Diversity Enterprise Ordinance,any person(entity]who makes a false or fraudulent
statement in connection with participation of a SBE in any City of Fort Wo,th contract wilt be referred for debarment procedures
under the City of Fort Worth Business Diversity Enterprise Ordinance.
I de solemnly swear of affirm that the signatures contained herein and the information provided by the Prime Contractor are true
and correct,and that I an authorized on behalf of the Prime Contractor to make the affidavit.
Larry Frazier The Fain Group,Inc.
Circl e(f%yMfAuthorizedAgent)TypeorPrintName (Name fPrime Contractor-Print or Type)
�r r
tn, ofher crAuthorized Agent)27-4338 817.927-4389
(Office Phone Number) (Fax Number)
6/1/2012
12/13/2016 Page 1 of 4
Links 1
fortworthoov/PACS/02439 -Chisholm Trail Community Park- Phase I/Contractor/Change Orders/Change Order#1
Breakdown.xls
Attachments(0)
No Attachments have been added to this form.
https://projeetpoint.buzzsaw.com/ bz web/Forms/Fom-Print.aspx?Site1d=51500&ProcessId=1670&R...
12/13/2016 Page 2 of 4
FORT WORTH® City of Fort Worth
Change Order Request Approval
(Change Order Breakdown Available in Links)
For Change Order Submittal No.: COSub01
Change Order No.: Pa - COApp01 Date Started: 2/29/2016
City Sec. No.: 46469 Date Due: 4/8/2016
Project Name: C-02439 Chisholm Trail Community Park - Phase I
Project Numbers: C-02439 DOE Numbers:
DOE No.7509
Project Chisholm Trail Community Park Phase I - Design Build project
Description: Items that are part of the Change Order are as follows:
Skate Park Ph II Design Cost
Drinking Fountain model revision
Boulders - Playground Amenity Add
Additional Water Line/Fountain
Mow Strip at Soccer Fields
Tree Revision with 4 trees from Tree Farm
Irrigation Add from 100% Plans
Phoenix Twist - Playground Amenity Add
Bleacher Revision
Northside Drainage
Playground Bench Revision
Trash Receptacle Credit
SOD Supplier
Irrigation Controller credit
City Project Mgr.: Thomas Alves City Inspector: Thomas Miller
Contractor: The FAIN Group, Inc.
COUNCIL ACTION (If Required):
M&C Log Name:
M&C Number: M&C Date:
COST AND DAYS SUMMARY:
Department: Cost($) Fund Account Center: Requested Days:
PARD $ 74,851.52 34014-0800450-5740010-CO24 0
https:Hprojectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?Siteld=51500&ProcessId=1670&R...
12/13/2016 Page 3 of 4
Total: $ 74,851.52 Total Requested Days: 0
Approval Status:
https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?Siteld=51500&Processld=1670&R...
12/13/2016 Page 4 of 4
Approved: Yes
Comments:
User: Debra Rose
Date: 2016-04-07 7:38 PM
Approved: Yes
Comments:
User: Larry Frazier
Date: 2016-04-07 8:31 PM
Approved: Yes
Comments:
User: Thomas Alves
Date: 2016-04-11 1:36 PM
Approved: Yes
Comments:
User: Joel McElhany
Date: 2016-04-26 11:58 AM
Approved: Yes
Comments:
User: Richard Zavala
Date: 2016-04-26 3:53 PM
Approved: Yes
Comments:
User: Doug Black
Date: 2016-04-27 2:53 PM
Approved: Yes
Comments:
User: Susan Alanis
Date: 2016-04-27 5:08 PM
Approved: Yes
Comments:
User: Debra Rose
Date: 2016-07-01 11:25 AM
Approved: Yes