HomeMy WebLinkAboutContract 46469-CO3 C11-'SECRETARY FORT WORTH. City of Fort Worth GUNTRACT W,IU 1 _10 Change Order Request Breakdown Project Namel Chisholm Trail Community Park-Ph 1 I City Sec# 46469 Client Project#(s)l 02439 Contractor Fain Group PM Tom Alves Inspector Thomas Miller Change Order Submittal# 0 Date 10/4/2016 Dept. PACS Contract Time Totals CD Original Contract Amount $3,400,000.00 $3,400,000.00 Extras to Date $230,338.18 $230,338.18 Credits to Date $111,219.36 $111,219.36 Pending Change Orders(in M&C Process) Contract Cost to Date $3,519,118.82 $3,519,118.82 Amount of Proposed Change Order $29,276.97 $29,276.97 Revised Contract Amount $3,548,395.79 $3,548,395.79 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $29,276.97 $29,276.97 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1 4.36% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $4,250,000.00 JUSTIFICATION(REASONS) FOR CHANGE ORDER The following Change Order#3 costs are associated with the addition of one 12'x 105'of NDS grass paver system. The work shall include excavation of the existing rock to insure a flush finish to the existing grade so as not to interrupt the drainage from the soccer field.The NDS grass paver system will be installed,filled with topsoil and Bermuda sod will be placed on top of the paver system.There is also approximately 58,000 sf of topsoil and curlex to be placed in areas around the large pavilion and down toward the back of the soccer fields.Additional curlex will be placed along the west side of the trail just to the south of the small pavilion. , O .a p / %w O J} O O c D o OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX I'4nzrWoR Ili City of Fort Worth Change Order Additions Project Name Chisholm Trail Community Park-Ph 1 City Sec# 46469 Client Project# 02439 Convactorl Fain Group PM Tom Alves Inspector Thomas Miller Change Order Submittal# 03 Date 10/4/2016 ADDITIONS ty Unit Unit Cost Total Maintenance Road,Topsoil and Curlex UTUGUM 0.00 0. 0000 0 $0.00 0.00000000 0.00 0.00000000 $0.00 77 0.00000000 $0. 0.00000000 0.00000000 0.00000000 som o. 00-0000 o.00-0070 000 00 0.00000000 $0.00 0-guawo o.00 PACS $29,276.97 Sub Total Additions $29,276'797 Change Order Additions Page 2 of 4 For.r _H City of Fort Worth Change Order Deletions Project Name Chisholm Trail Community Park-Ph 1 City Sec# 46469 Client Project# 02439 Contractor Fain Group PM Tom Alves InspectorF Thomas Miller Change Order Submittal# 0 Date 10/412016 JELE I TUNS ITEM UESGRIPTION UEP I- ty Unit Unit Cost Total PACS $0.00 Sub ota Deletions Change Order Deletions Page 3 of 4 M/SBE Breakdown for this Change Order M/SBE Sub Type of Service Amount for this CO N/A Total $0.00 Previous Change Orders Co# DATE AMOUNT C0#1 2/1/2016 $23,138.40 CO#2 7/19/2016 $12,610.00 Total $35,748.40 FORTWORTH, City of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: COsub03 Change Order No.: Pa - COApp03 Date Started: 11/8/2016 City Sec. No.: Date Due: 11/10/2016 Project Name: 02439 - Chisholm Trail Community Park - Phase I Project Numbers: 02439 DOE Numbers: DOE No. Project phase I park improvements that include an in-ground concrete skate park Description: two competition level soccer fields, over two miles of 8' wide concrete trail, one large pavilion, two small pavilions, one playground, entry roads, parking lots, windmill, and associated site amenties, benches, picnic tables, trash recepticles. Change order 3 improves maintenance access to soccer fields and installs more topsoil and seeding at bare ground locations City Project Mgr.: Thomas Alves City Inspector: Thomas Miller Contractor: The Fain Group, Inc. COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Department: Cost($) Fund Account Center: Requested Day! PARD $ 29,276.97 34014-0800450-5740010-CO24 30 Total: $ 29,276.97 Total Requested Days: 30 Approval Status: Approved: Yes Comments: Funding verified User: Debra Rose Date: 2016-11-10 1:17 PM Approved: Yes Comments: User: Larry Frazier Date: 2016-11-10 1:21 PM Approved: Yes Comments: User: Thomas Alves Date: 2016-11-14 8:15 AM Approved: Yes Comments: User: Joel McElhany Date: 2016-11-16 7:13 AM Approved: Yes Comments: User: Richard Zavala Date: 2016-11-16 9:44 AM Approved: Yes Comments: User: Doug Black Date: 2016-11-23 2:18 PM Approved: Yes Comments: User: Susan Alanis Date: 2016-11-28 11:59 AM Action Required: Please review and approve