HomeMy WebLinkAboutContract 46474-CO1 A` TY SECRETARY FORT WORTH,., City of Fort Worth CONTRACTNO. t- r L - Change Order Request Breakdown Project Namel 2014 CIP STREET RECONSTRUCTION CONTRACT 2 City Sec# 1 46474 Client Project#(s)l 02420 Contractor ADVANCED PAVING PM KRISTIAN SUGRIM Inspector WILLIAM"BILL" MASON Change Order Submittal# 0 Date 11/15/2016 Contract Time Dept. TIPW Totals CD Original Contract Amount $2,661,496.90 $2,661,496.90 150 Extras to Date 268 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $2,661,496.90 $2,661,496.90 418 Amount of Proposed Change Order $0.00 Revised Contract Amount $2,661,496.90 $2,661,496.90 418 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.00% MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $3,326,871.13 JUSTIFICATION (REASONS) FOR CHANGE ORDER This Change Order is to request additional time to the contract for the following reasons: 90 days delay on 16th Street due to gas lines that had to be lowered; 60 days for delays on streets that had utility work in progress; 30 days for time lost due to conflict with water services on 16th street; 30 days due to water line conflict on Western Street; 14 days for additional work on retaining wall and steps on Lincoln Avenue; 30 days due to gas line conflict on 20th Street and 14 days for the addition of 200 LF. of sub drain on 16th Street. A by. a J. �4000u000 � 0 NO0 0 0 0 / o� O J O q O O %. 00000000 � p AS OFFICIAL RECORD CITY SECRETARY FT. WORTI�i, TX FORT WoRTH City of Fort Worth Change Order Additions Project Name 1 2014 CIP STREET RECONSTRUCTION CONTRACT 2 City Sec# 46474 Client Project# F 02420 ConVactor ADVANCED PAVING PM KRISTIAN SUGRIM Inspector® Change Order Submittal# Date 11/15/2016 ADDITIONS ITEM DESCRIPTION DEPT City Unit Unit CostTotal T/PW $0.00 Sub Total Additions 0.00 Change Order Additions Page 1 of 1 ►ORT WORTH City of Fort Worth Change Order Deletions Project Name 1 2014 CIP STREET RECONSTRUCTION CONTRACT 2 City Sec# 46474 Client Project# 1 02420 Contractor ADVANCED PAVING PM KRISTIAN SUGRIM Inspector® Change Order Submittal# � Date 11115/2016 DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total TIPW $0.00 Sub Total Deletions Change Order Deletions Page 1 of 1 M/SBE Breakdown for this Change Order M/SBE'Sub Type of S,eruice : Amount for fh�s Total Previous Change Orders Co# : TE:: `:�,, AII4UNT � Total $0.00 CFW Change Order Approval St-COApp02 Pagel of 3 Routing Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthgov/Infrastructure Proiects/02420 - 2014 CIP Street Reconstruction Contract 2/Contractor/Change Orders/Change Order Breakdown 02420 #1.xls Attachments(0) No Attachments have been added to this form. https://projeetpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&Proces... 12/20/2016 CFW Change Order Approval St-COApp02 Page 2 of 3 FORT WORTH, City of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 1 Change Order No.: St-COApp02 Date Started: 2016-12-19 City Sec. No.: 46474 Date Due: 2017-02-07 Project Name: 2014 CIP Yr. 1 - Conrtact 2 02420 DOE Numbers: Project Numbers: 7374 Project Removal and replacement of non-functional and broken curb & Description: gutter, driveways and sidewalks; pulverize and stabilize the existing street pavement and overlay with virgin HMAC. Project Manager: Kristian Sugrim City Inspector: William Mason Contractor: Advanced Paving Co. COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 0.00 Total Cost: $_0.00 Total Requested Days: 268 Approval Status: https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?SiteId=51500&Proces... 12/20/2016 CFW Change Order Approval St-COApp02 Page 3 of 3 Approved: Yes Comments: User: Tara Fishback Date: 2016-12-19 2:06 PM `Approved: Yes Comments: (User: Becky Garrett .Date: 2016-12-19 2:15 PM Approved: Yes Comments: User: Kristian Sugrim Date: 2016-12-19 2:22 PM Approved: Yes Comments: User: Najib Fares Date: 2016-12-19 3:06 PM ;Approved: Yes !Comments: User: Todd Blomstrom "Date: 2016-12-20 5:16 PM 'Approved: Yes Comments: User: Doug Wiersig Date: 2016-12-20 11:43 AM Approved: Yes Comments: User: Doug Black Date: 2016-12-20 12:50 PM ;Approved: Yes Comments: User: Jay Chapa Date: 2016-12-20 2:44 PM Action Required: https://projeetpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&Proces... 12/20/2016