Project Namel 2014 CIP STREET RECONSTRUCTION CONTRACT 2 City Sec# 1 46474
Client Project#(s)l 02420
Contractor ADVANCED PAVING PM KRISTIAN SUGRIM Inspector WILLIAM"BILL" MASON
Change Order Submittal# 0 Date 11/15/2016
Contract Time
Dept. TIPW Totals CD
Original Contract Amount $2,661,496.90 $2,661,496.90 150
Extras to Date 268
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $2,661,496.90 $2,661,496.90 418
Amount of Proposed Change Order $0.00
Revised Contract Amount $2,661,496.90 $2,661,496.90 418
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.00%
MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $3,326,871.13
JUSTIFICATION (REASONS) FOR CHANGE ORDER
This Change Order is to request additional time to the contract for the following reasons: 90 days delay on 16th Street due to gas lines that had
to be lowered; 60 days for delays on streets that had utility work in progress; 30 days for time lost due to conflict with water services on 16th
street; 30 days due to water line conflict on Western Street; 14 days for additional work on retaining wall and steps on Lincoln Avenue; 30 days
due to gas line conflict on 20th Street and 14 days for the addition of 200 LF. of sub drain on 16th Street.
A by.
a
J.
�4000u000 �
0
NO0 0
0
0 / o�
O J O q
O
O
%. 00000000
� p
AS
OFFICIAL RECORD
CITY SECRETARY
FT. WORTI�i, TX
FORT WoRTH City of Fort Worth
Change Order Additions
Project Name 1 2014 CIP STREET RECONSTRUCTION CONTRACT 2 City Sec# 46474
Client Project# F 02420
ConVactor ADVANCED PAVING PM KRISTIAN SUGRIM Inspector®
Change Order Submittal# Date 11/15/2016
ADDITIONS
ITEM DESCRIPTION DEPT City Unit Unit CostTotal
T/PW $0.00
Sub Total Additions 0.00
Change Order Additions Page 1 of 1
►ORT WORTH City of Fort Worth
Change Order Deletions
Project Name 1 2014 CIP STREET RECONSTRUCTION CONTRACT 2 City Sec# 46474
Client Project# 1 02420
Contractor ADVANCED PAVING PM KRISTIAN SUGRIM Inspector®
Change Order Submittal# � Date 11115/2016
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
TIPW $0.00
Sub Total Deletions
Change Order Deletions Page 1 of 1
M/SBE Breakdown for this Change Order
M/SBE'Sub Type of S,eruice : Amount for fh�s
Total
Previous Change Orders
Co# : TE:: `:�,, AII4UNT �
Total $0.00
CFW Change Order Approval St-COApp02 Pagel of 3
Routing
Assigned To: Due Date:
Assigned By: Due Time:
Links 1
fortworthgov/Infrastructure Proiects/02420 - 2014 CIP Street Reconstruction Contract 2/Contractor/Change
Orders/Change Order Breakdown 02420 #1.xls
Attachments(0)
No Attachments have been added to this form.
https://projeetpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&Proces... 12/20/2016
CFW Change Order Approval St-COApp02 Page 2 of 3
FORT WORTH, City of Fort Worth
Change Order Request Approval
(Change Order Breakdown Available in Links)
For Change Order Submittal No.: 1
Change Order No.: St-COApp02 Date Started: 2016-12-19
City Sec. No.: 46474 Date Due: 2017-02-07
Project Name: 2014 CIP Yr. 1 - Conrtact 2
02420 DOE Numbers:
Project Numbers:
7374
Project Removal and replacement of non-functional and broken curb &
Description: gutter, driveways and sidewalks; pulverize and stabilize the
existing street pavement and overlay with virgin HMAC.
Project Manager: Kristian Sugrim City Inspector: William Mason
Contractor: Advanced Paving Co.
COUNCIL ACTION (If Required):
M&C Log Name:
M&C Number: M&C Date:
COST AND DAYS SUMMARY:
Requested
Department: Cost($) Fund Account Center: Days:
TPW $ 0.00
Total Cost: $_0.00 Total Requested Days: 268
Approval Status:
https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?SiteId=51500&Proces... 12/20/2016
CFW Change Order Approval St-COApp02 Page 3 of 3
Approved: Yes
Comments:
User: Tara Fishback
Date: 2016-12-19 2:06 PM
`Approved: Yes
Comments:
(User: Becky Garrett
.Date: 2016-12-19 2:15 PM
Approved: Yes
Comments:
User: Kristian Sugrim
Date: 2016-12-19 2:22 PM
Approved: Yes
Comments:
User: Najib Fares
Date: 2016-12-19 3:06 PM
;Approved: Yes
!Comments:
User: Todd Blomstrom
"Date: 2016-12-20 5:16 PM
'Approved: Yes
Comments:
User: Doug Wiersig
Date: 2016-12-20 11:43 AM
Approved: Yes
Comments:
User: Doug Black
Date: 2016-12-20 12:50 PM
;Approved: Yes
Comments:
User: Jay Chapa
Date: 2016-12-20 2:44 PM
Action Required: