Loading...
HomeMy WebLinkAboutContract 47767-FP1 uepariment otof�anager'M�K- ►r &W const. Services CPN# -ENDat /` ' `�Y SECRETARY�I�,�� ' Project f I 1 �,� C�. Risk Managemen Canady LT WO RT HO R D.O.E. Brotherton CFA Westerman/Scanned Esteban Perez/Scanned The Proceeding people ha e e n ont cted concerning the request for final payment& have ,TION AND PUBLIC WORKS released this project for such payment. ;PROJECT COMPLETION 59(41- 10d 10 I)eveloper Projects) Clearance Conducted By I City Project Ns: 100010 Regarding contract for THE CONSTRUCTION OF CHAMPIONS CENTER RETAIL DEVELOPEMENT as required by the WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. D E SE 0 V E Original Contract Price: DEC 2 0 Z016 $289,688.00 Amount of Approved Change Orders: ($45,924.00) Ns 1 By Revised Contract Amount: S243,764.00 Total Cost Work Completed: $243,764.00 IZI�. l4 Recommend d for cceptance Date Asst. Directo , TPW - Infrastructure Design and Construction 6 Accepted Date Asst. Director, WATER DEPARTMENT Asst. City Manager Date Comments: FUND: 59601-5310350-0600430-100010-001580 /SEVVER 59607-5310350-0700430-100010-001380 - - --- SMA 1fLEI� OFFICIAL RECORD DEC 2'2 2016 CITY SECRETARY ^`^ Rev.9/22/16wtw: 4;L� T. o` I9 T3( U Uzi \y1Su v Lq DEC 2 0 2016 By J�q b 1 06w o City Project Numbers 100010 DOE Number 1075 Contract Name THE CONSTRUCTION OF CHAMPIONS CENTER RETAIL DEVELOPM Estimate Number I Contract Limits Payment Number 1 Project Type WATER&SANITARY SEWER For Period Ending 10/18/2016 Project Funding Project Manager NA City Secretary Contract Number Inspectors RODGERS / TAEZAZ Contract Date 11/18/2015 Contractor GM.I CORPORATION Contract Time 300 CD 5525 N.MACARTHUR BLVD..#400 Days Charged to Date 212 CD IRVING, TX 75038-2604 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $243,764.00 Less %Retained $0.00 Net Earned $243,764.00 Earned This Period $243,764.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day 50.00 LessPavement Deficiency $0.00 Less Penalty 50.00 Less Previous Payment 50.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment 5243.764.00 Thursday,November 3,2016 Page 4 of 4 FoRTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name THE CONSTRUCTION OF CHAMPIONS CENTER RETAIL DEVELOPMEN Contract Limits Project Type WATER&SANITARY SEWER City Project Numbers 100010 DOE Number 1075 Estimate Number 1 Payment Number 1 For Period Ending 10/18/2016 CD City Secretary Contract Number Contract Time 30IED Contract Date 11/18/2015 Days Charged to Date 212 Project Manager NA Contract is 100.00 Complete Contractor EMJ CORPORATION 5525 N.MACARTHUR BLVD.,#400 IRVING, TX 75038-2604 Inspectors RODGERS / TAEZAZ Thursday,November 3,2016 Page 1 of 4 City Project Numbers 100010 DOE Number 1075 Contract Name THE CONSTRUCTION OF CHAMPIONS CENTER RETAIL DEVELOPM Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER&SANITARY SEWER For Period Ending 10/18/2016 Project Funding UNIT I:WATER IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 FITTINGS,TEES,AND CROSSING(CO#1) 4.706 TN $2,000.00 $9,412.00 4.706 $9,412.00 2 2"WATER SERVICE 8 EA $950.00 $7,600.00 8 $7,600.00 3 6"PVC WATERLINE(CO#1) 155 LF $30.00 $4,650.00 155 $4,650.00 4 8"PVC WATERLINE(CO#1) 25 LF $40.00 $1,000.00 25 $1,000.00 5 12"PVC WATERLINE(CO#1) 1668 LF $50.00 $83,400.00 1668 $83,400.00 6 6"GATE VALVE&BOX(CO#1) 9 EA $1,000.00 $9,000.00 9 $9,000.00 7 8"GATE VALVE&BOX(CO#1) 1 EA $1,500.00 $1,500.00 1 $1,500.00 8 12"GATE VALVE&BOX(CO#1) 5 EA $2,000.00 $10,000.00 5 $10,000.00 9 12"WATER PIPE,CSS BACKFILL 160 LF $40.00 $6,400.00 160 $6,400.00 11 CONNECT TO EX 12"WATER LINE(CO#1) 1 EA $2,000.00 $2,000.00 1 $2,000.00 12 FIRE HYDRANT ASSEMBLY(CO#1) 1 EA $2,500.00 $2,500.00 1 $2,500.00 13 TRENCH SAFETY 2279 LF $1.00 $2,279.00 2279 $2,279.00 14 2"AUTOMATIC FLUSH VALVE W/SOLAR I LS $21,866.00 $21,866.00 1 $2L866.00 POWER(CO#1) 15 IRRIGATION SERVICE 2 INCH COPPER(CO#1) 16 LF $28.00 $448.00 16 $448.00 Sub-Total of Previous Unit $162,055.00 $162,055.00 UNIT H:WASTEWATER IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 6"PVC PIPE(0'-IO'DEEP) 160 LF $17.00 $2,720.00 160 $2,720.00 2 8"PVC PIPE(0'-IO'DEEP) 1647 LF $20.00 $32,940.00 1647 $32,940.00 3 4'EXTRA DEPTH MH(>8') 13 VF $250.00 $3,250.00 13 $3,250.00 4 4'MANHOLE(CO#1) 6 EA $4,250.00 $25,500.00 6 $25,500.00 5 WASTEWATER ACCESS CHAMBER 8 EA $350.00 $2,800.00 8 $2,800.00 6 CONNECT TO EXIST S.S.MH I EA $3,710.00 $3,710.00 1 $3,710.00 7 8"PVC SEWER PIPE CSS BACKFILL 160 LF $40.00 $6,400.00 160 $6,400.00 8 TRENCH SAFETY 1807 LF $1.00 $1,807.00 1807 $1,807.00 9 MANHOLE VACUUM TESTING 5 EA $155.00 $775.00 5 $775.00 10 POST-CCTV INSPECTION 1807 LF $1.00 $1,807.00 1807 $1,807.00 Sub-Total of Previous Unit $81,709.00 $81,709.00 Thursday,November 3,2016 Page 2 of 4 City Project Numbers 100010 DOE Number 1075 Contract Name THE CONSTRUCTION OF CHAMPIONS CENTER RETAIL DEVELOPM Estimate Number I Contract Limits Payment Number 1 Project Type WATER&SANITARY SEWER For Period Ending 10/18/2016 Project Funding Contract Information Summary Original Contract Amount $289,688.00 Change Orders Change Order Number 1 ($45,924.00) Total Contract Price $243,764.00 Date — (v Total Cost of Work Completed $243,764.00 Co act r - Less %Retained $0.00 Date Net Earned $243,764.00 Inspection Supervisor Earned This Period $243,764.00 Retainage This Period $0.00 Date �Z—� — Less Liquidated Damages Project Manager Days @ /Day $0.00 Date LessPavement Deficiency $0.00 Asst.Dire for//TP/W-Infrastructure Design and Construction Less Penalty $0.00 Date 17-70-16 Less Previous Payment $0.00 Director/Contracting Department Plus Material on Hand Less 15% $0.00 Balance Due This Payment $243,764.00 Thursday,November 3,2016 Page 3 of 4 cc w ] \ \ z 2 g g $2 F m * c) 9 k 0 2 CD R q = e m / m ; \ j § \ ® \ m \ ^ 2 /. f \ § ` ° e ° 2 R /5 2 § ® \ z o > z o : m r ) � k � 9 ) m / / 2 § z § ) /d / / . g / / q $ _. £ w H § 2 § 2§ � # # § ■ moo ) ( (31� < f \ ) 0 § 7 \ ƒ \ k � � \ ; f & \ 2 CO � * q - \ « E .< \a $/ ] [ CD E( _ 0 ® �m \ \ I - C, g $ 46 6 » ¥ > Lo \ G = k -u o m . �ƒ Z0 Q O \ o 22 \ \ ƒƒ $ 0 }% | C— m � e 3 O i 6 Q % m .. $ m }} k% \ a ^ 2§ (R � 10 §} � \ ƒ k \ | ^ 0 {� � S m m o < c N p G Z m to _ Q \ * m -U a n D m � z w 6 m m 3 m y O wwwwwwwwwww w � 7. Cf O !2(gO m �N wW ID N y -� OOOw W W OOpN O 'y r O ..i o OOOO NPN O Zm O wa�aoriwcoi�rnrnrnw o m c m j X D w rm V' a Z O Z OOps NN 00a,(A' Z O PD m A c o D n A 2 2 m O O -{ m T"immm m�n',.-n ITT:= OZDDDDY N -ji -0 T 2 m c nz m DaD m m m O T m m o O V n o w o D c oc N Sl N q,OZT pOp �� m OZ7.l�o0� coZmmh m m*C7=�G7 G�FZo z-n ���m r m -i .�,� DAwmmC?mg m m -{-<DD <fl ��Opmm =gyp '0 ��XZ>r<DD>m<Zu> Dmm r- _0 K Gz7z_y>mm mN �W�,mda iv toz 0Sb 21 o m m' � c, cmmm z� o mm oopc<ic<<=o z m �MMmo a < m m o C, rt 0 Z � as ds Fn 65 65 l!1[if ifl Efl d9 fA Efl efl C 0000000000000m OoO0000000000 u+rfl en even 69 civ a &v Env rn en w N CAn v Z;N N r A 0 m C]1 O O O CT O tT m W A Oo N N O m CD 00000000 A CA LTD y A 00�00 0000 000 CAOr (p 0 0 0 0 O O 0 C]0 0 o O o o O O ry O O O O O O O O O O O O MAIA Document G707TM - 1994 Consent Of Surety to Final Payment PROJECT:(Name andaddress) ARCHITECT'S PROJECT NUMBER: OWNER: Champions Center Retail Development Water Distribution System and Sanitary CONTRACT FOR:General Construction ARCHITECT:❑ Sewer System City Project#100010:CFA Number 201611 CONTRACTOR: TO OWNER:(Name and address) CONTRACT DATED:November 18,2015 SURETY: City of Fort Worth and LRIC Champions OTHER:❑ Center,LP In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (Insert name and address of Sures}) Continental Casualty Company 5565 Glenridge Connector NE.6th Floor,Atlanta GA 30342 on bond of SURETY, (Insert name and address of Contractor) F,MJ Corporation TX 5525 N.MacArthur Blvd.,Suite 400,Irving.TX 75038 CONTRACTOR. hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety of any of its obligations to (Insert name and address of Owner) City of Fort Worth and LRIC Champions Center.LP as set forth in said Surety's bond. OWNER, IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date:November 8,2016 (Insert in writing the month followed by the numeric date and year.) Continental Casualty Company (Sure ) (Signature of author-ed rep esentative) Attest: Patricia S.Kleehammer,Attorney-in-fact (`Seal): (Panted name and title) AIA Document G7071"-1994.Copyright 0 1982 and 1994 byThe American Institute of Architects.Ail rights reserved.VVARNING:This AIA,'Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribu tion of this AIAS Document,or any portion of it,may � result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the lav",This document was produced by AIA software at 11:20:33 on 11/08/2016 under Order No,9952527211 1 which expires on 0410712017,and is not for resale. User Notes: — (1515284023) a�r rr a✓a�v es x azrutlx:x t5t t e3tl�t LNki INDI VI ILIAL A'I"1'URNEY-IN-FACT Know All Men By These Presents,That Continental Casualty Company,an Illinois insurance company,National Fire Insurance Company of Hartford,an Illinois insurance company,and American Casualty Company of Reading,Pennsylvania,a Pennsylvania insurance company(herein called "the CNA Companies"),are duly organized and existing insurance companies having their principal offices in the City of Chicago,and State of Illinois, and that they do by virtue of the signatures and seals herein affixed hereby make,constitute and appoint Mark R Brock,Dana F Davis,Patricia fi Kleeharn er, T Michael Langley,Dana Keith Davis,Cecil Ray Vaughan III, Individually of Rossville,GA,their true and lawful Attomey(s)-in-Fact with full power and authority hereby conferred to sign,seal and execute for and on their behalf bonds,undertakings and other obligatory instruments of similar nature -In Unlimited Amounts and to bind them thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of their insurance companies and all the acts of said Attorney,pursuant to the authority hereby given is hereby ratified and confirmed. This Power of Attorney is made and executed pursuant to and by authority of the By-Law and Resolutions,printed on the reverse hereof,duly adopted,as indicated,by the Boards of Directors of the insurance companies. In Witness Whereof,the CNA Companies have caused these presents to be signed by their Vice President and their corporate seals to be hereto affixed on this 7th day of November,2013. {� wU , nro,. Continental Casualty Company fit+ cowoRft ,�S` National Fire Insurance Company of Hartford `'"�°�0tlt°rrc American Cas alty Company of Reading,Pennsylvania Sv SEAL gut t, e sm Paul T.Bruflat Vice President State of South Dakota,County of Minnehaha,ss: On this 7th day of November,2013,before me personally came Paul T.Bruflat to me known,who,being by me duly sworn,did depose and say: hat he resides in the City of Sioux Falls,State of South Dakota;that he is a Vice President of Continental Casualty Company,an Illinois insurance :ompany,National Fre Insurance Company of Hartford,an Illinois insurance company,and American Casualty Company of Reading,Pennsylvania,a ?ennsylvania insurance company described in and which executed the above instrument;that he knows the seals of said insurance companies;that the ;eals affixed to the said instrument are such corporate seals;that they were so affixed pursuant to authority given by the Boards of Directors of said nsurance companies and that he signed his name thereto pursuant to like authority,and acknowledges same to be the act and deed of said insurance .ompames. wvvrrr} J.MOHR sour"° =AQW My Commission Expires June 23,2015 J.Mohr Notary Public CERTIFICATE I,D.Bult,Assistant Secretary of Continental Casualty Company,an Illinois insurance company,National Fire Insurance Company of Hartford,an linois insurance company,and American Casualty Company of Reading,Pennsylvania,a Pennsylvania insurance company do hereby certify that the ewer of Attorney herein above set forth is still in force,and further certify that the By-Law and Resolution of the Board of Directors of the insurance )mpanies printed on the reverse eof is stillin force. I/n>�tes�tim_ ony whereof I have hereunto subscribed my name and affixed the seal of the said surance companies this J day of� lAekl- ,�C�„� —�_. Continental Casualty Company National Fire Insurance Company of Hartford . ' a ` aar`o American Casualty Company of Reading,Pennsylvania SERI NAY rl, as ,r 102 D.Bult rm F5853-4/2012 Assistant Secretary EMJ CONSTRUCTION AFFIDAVIT STATE OF Texas COUNTY OF Dallas .Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared George Heath,Vice President of Construction of EMJ Corporation, known to me to be a credible person,who being by me duly sworn, upon his oath deposed and said; That all persons, firms,associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property. mages; On Contract described as; 40012-01 Champions Center Retail A, BY George Heath Subscribed and sworn before me on this date 14th of November,2016. t,,:.".Look SH NoEILA M. NAZARIO-THOMAS tary Public -_ Notary Pudic,state of Texas Dallas,Texas 7� s My Commission Expires �.„,;; November 12, 2017 5525 N. MacArthur Blvd • Suite 400 . Irving,TX 75038 V%IM.EMJCORP.COM FORTWORTH, TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Champion Center Retail Developments PROJECT NUMBER: 100010 DOE NUMBER: WATER PIPE LAID SIZE TYPE OF PIPE LF Water 6 PVC 155 Water 8 PVC 25 Water 12 PVC 1668 Water FIRE HYDRANTS: 1 VALVES(16"OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: Yes NEW SERVICES: 2" Copper(Domestic) 120 2" Copper(Irrigation) 16 SEWER PIPE LAID SIZE TYPE OF PIPE LF Sanitary Sewer 8" PVC 1647 6" PVC 160 PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: Yes NEW SERVICES: TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 a (817) 392-7941 •Fax: (817)392-7845 FORTWORTHREV:02'22'07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY PROJECT INFORMATION Date: 11/1/2016 Name of Contractor Project Name EMJ Construction Cham ios Center Retail Development DOE Inspector Project Manager Habte Taezaz Fred Ehia DOE Number Project Dculty Type of Contract 100010 Q Simple Q Routine Q Complex E]Water 0 Wastewater ❑ Storm Drainage ❑ Pavement Initial Contract Amount Final Contract Amount $289,688.00 $243,764.00 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent ELEMENT RATING iELEMENT RATING (0-4) (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS 1 Availability of Ins ector 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Ins ector 2 Clarity&Sufficiency of Details 3 3 Accuracy of Measured Quantities 3 Applicability.of Specifications 4 Display Of Professionalism 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution v PROJECT MANAGER EVALUATION 6 Performance-Settin up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 _Availability of Project Mana er 1 Change Order Processing Time 3 Communication y 2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe IIl)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector �� Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax: (817)392-7845 FoRTWORTHREV:02/20/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR I) CONTRACTOR&PROJECT DATA Name of Contractor Project Name EMJ Construction Champion Center Retail Development DOE Inspector DOE Number Habte Taezaz 1000100 DOE Inspector Project Manager Water [21 Waste Water ❑ Storm Drainage ❑ Pavement Fred Ehia Initial Contract Amount Project Difficulty $289,688.00 Q Simple QQ Routine Q Complex Final Contract Amount Date $243,764.00 .11/1/2016 Il)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE I Submission of Documents 2 Y 3 8 6 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 3 60 45 9 Daily Clean Up 5 Y 3 20 15 10 Citizen's Complaint Resolution 5 Y 4 20 20 11 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 426 BONUS POINTS(25 Maximum)(B) III)CONTRACTOR'S RATING TOTAL SCORE(TS) 426 Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating(ITS/MS] *100%) 426 / 448 = 95% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector _L y� .� - Signature Contractor Signature DOE Inspector's Supervisor CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817) 392-7941 •Fax: (817)392-7845 FORTWORTH rev 03/05/07 TRANSPORTATION & PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:1 NAME OF PROJECT: Champions Center Retail Developments PROJECT NO.: 100010 CONTRACTOR: EMJ Construction DOE NO.; PERIOD FROM:06/20/16 TO: 10/18/16 FINAL INSPECTION DATE: 18-Oct-16 WORK ORDER EFFECTIVE:6/20/2016 CONTRACT TIME: 120 0 WD* CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL &HOLIDAYS & TOO COLD RELOCATIONS CHARGED DAYS THIS PERIOD 121 121 PREVIOUS PERIOD TOTALS TO DATE 212 121 *REMARKS: >� - 11 � d1 � 16 CONTRACTOR DATE INSPECTOR DATE _ ENGINEERING DEP ARTIyIENT The City of Fort'Worth• 1000 Throckmorton Street•Fort North,TY 76012-6311 (817) 392- 794; •Fax: (817)392-7845