HomeMy WebLinkAboutContract 48059 �'11py SECRETAN i_/19
Z p 'ONTRACT NO,
c0r-� CITY OF FORT WORTH, TEXAS
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES
This AGREEMENT is between the City of Fort Worth, a Texas home-rule municipality
(the "CITY'), and Kleinfelder, Inc., authorized to do business in Texas, an independent
contractor ("Consultant"), for a PROJECT generally described as: Holly Water Treatment
Plant Vehicle Maintenance Facility.
Article I
Scope of Services
(1) Consultant hereby agrees to perform as an independent contractor the services set
forth in the Scope of Services attached hereto as Attachment "A". These services
shall be performed in connection with Proposal to Provide Soils and Construction
Material Observation and Testing Services, Holly Water Treatment Plant Vehicle
Maintenance Facility, Fort Worth, Texas.
(2) Additional services, if any, will be requested in writing by the City. City shall not pay
for any work performed by Consultant or its subconsultants, subcontractors and/or
suppliers that has not been ordered in writing. It is specifically agreed that
Consultant shall not be compensated for any alleged additional work resulting from
oral orders of any person.
Article Il
Compensation
Consultant shall be compensated in accordance with the Fee Schedule shown in
Attachment "A". Payment shall be considered full compensation for all labor, materials,
supplies, and equipment necessary to complete the services described in Attachment uA".
However the total fee paid by the City shall not exceed a total of Not to Exceed $69,889.60
unless the City and the Consultant mutually agree upon a fee amount for additional
services and amend this Agreement accordingly.
The Consultant shall provide monthly invoices to the City. Payment for services rendered
shall be due within thirty (30) days of the uncontested performance of the particular
services so ordered and receipt by City of Consultant's invoice for payment of same.
Acceptance by Consultant of said payment shall operate as and shall release the City from
all claims or liabilities under this Agreement for anything related to, done, or furnished in
connection with the services for which payment is made, including any act or omission of
the City in connection with such services.
Cily of Fari Worth,Texas OFFICIAL RECORD
Standard Agreement ror Professional Services CITY SECRETARY
Reviskon pale:912412014
Page 9 of 8 FT.WORTH,TX
Article III
Term
Unless terminated pursuant to the terms herein, this Agreement shall be for a term of the
length of construction, beginning upon the date of its execution, or until the completion of the
subject matter contemplated herein, whichever occurs first.
Article 1V
Independent Contractor
Consultant shall operate hereunder as an independent contractor, and not as an officer,
agent, servant, or employee of the City. Consultant shall have exclusive control of and the
exclusive right to control the details of its work to be performed hereunder and all persons
performing same, and shall be solely responsible for the acts and omissions of its officers,
agents, employees, contractors and subcontractors. The doctrine of respondent superior
shall not apply as between City and Consultant, its officers, agents, employees, contractors,
and subcontractors, and nothing herein shall be construed as creating a partnership or joint
venture between City and Consultant.
Article V
Professional Competence and Indemnification
(1) Work performed by Consultant shall comply in ail aspects with all applicable local,
state and federal laws and with all applicable rules and regulations promulgated by
the local, state and national boards, bureaus and agencies. Approval by the City
shall not constitute or be deemed to be a release of the responsibility and liability of
Consultant or its officers, agents, employees, contractors and subcontractors for the
accuracy and competency of its services performed hereunder.
(2) In accordance with Texas Local Government Code Section 271.904, the
Consultant shall indemnify, hold harmless, and defend the City against
liability for any damage caused by or resulting from an act of negligence,
intentional tort, intellectual property infringement, or failure to pay a
subcontractor or supplier committed by the Consultant or Consultant's agent,
consultant under contract, or another entity over which the Consultant's
exercises control.
City of Fort Worth,Texas
Standard Agreement far Professional Services
Revision Dale:W24/2014
Page 2 of 8
Article Vi
Insurance
(1) Consultant shall not commence work under this Agreement until it has obtained all
insurance required under this Article and the City has approved such insurance, nor
shall Consultant allow any subcontractor to commence work on its subcontract until
all similar insurance of the subcontractor has been so obtained and approval given
by the City; provided, however, Consultant may elect to add any subconsultant as
an additional insured under its liability policies.
Commercial General Liability
$1,000,000 each occurrence
$2,000,000 aggregate
Automobile Liability
$1,000,000 each accident (or reasonably equivalent limits of
coverage if written on a split limits basis). Coverage shall be
on any vehicle used in the course of the Project.
Worker's Compensation
Coverage A: statutory limits
Coverage B: $100,000 each accident
$500,000 disease -policy limit
$100;000 disease -each employee
(2) Additional Insurance Requirements
a. Except for employer's liability insurance coverage under Consultant's worker's
compensation insurance policy, the City, its officers, employees and servants shall
be endorsed as an additional insured on Consultants insurance policies.
b. Certificates of insurance shall be delivered to the Property Management
Department, Attention: Brian Glass, 401 w 13"' Street, Fort Worth, TX 76102, prior
to commencement of work.
c. Any failure on part of the City to request required insurance documentation shall
not constitute a waiver of the insurance requirements specified herein.
d. Each insurance policy shall be endorsed to provide the City a minimum thirty days
notice of cancellation, non-renewal, and/or material change in policy terms or
coverage. A ten days notice shall be acceptable in the event of non-payment of
premium.
City of Fort Words Texas
Standard Agreement far Professional Senares
Revision Date.9124/2014
Page 3 of 0
e. Insurers must be authorized to do business in the State of Texas and have a
current A.M. Best rating of A: Vil or equivalent measure of financial strength and
solvency.
f. {other than worker's compensation insurance, in lieu of traditional insurance, City
may consider aitemative coverage or risk treatment measures through insurance
pools or risk retention groups. The City must approve in writing any alternative
coverage.
g. Workers' compensation insurance policy(s) covering employees employed on the
Project shall be endorsed with a waiver of subrogation providing rights of recovery
in favor of the City.
h. City shall not be responsible for the direct payment of insurance premium costs
for Consultant's insurance.
i. Consultant's insurance policies shall each be endorsed to provide that such
insurance is primary protection and any self-funded or commercial coverage
maintained by City shall not be called upon to contribute to loss recovery.
j. In the course of the Agreement, Consultant shall report, in a timely manner, to
City's officially designated contract administrator any Known loss occurrence which
could give rise to a liability claim or lawsuit or which could result in a property loss.
k, Consultant's liability shall not be limited to the specified amounts of insurance
required herein.
I. Upon the request of City, Consultant shall provide complete copies of all
insurance policies required by these Agreement documents.
Article VII
Transfer or Assignment
City and Consultant each bind themselves, and their lawful successors and assigns, to this
Agreement. Consultant, its lawful successors and assigns, shall not assign, sublet or transfer
any interest in this Agreement without prior written consent of the City.
Article VIII
Termination of Contract
(1) City may terminate this Agreement for its convenience on 30 days' written notice.
City of Fort worth,Texas
Standard Agreement for Professional Services
Revision Date:912412D14
Page 4 of 8
Either the City or the Consultant for cause may terminate this Agreement if either
Party fails substantially to perform through no fault of the other and does not
commence correction of such nonperformance with 5 days of written notice and
diligently complete the correction thereafter
(2) If City chooses to terminate this Agreement under Article 8, upon receipt of notice of
termination, Consultant shall discontinue services rendered up to the date of such
termination and City shall compensate Consultant based upon calculations in Article
II of this Agreement.
(3)All reports, whether partial or complete, prepared under this Agreement, including
any original drawings or documents, whether furnished by the City, its officers,
agents, employees, consultants, or contractors, or prepared by Consultant, shall be
or become the property of the City, and shall be furnished to the City prior to or at
the time such services are completed, or upon termination or expiration of this
Agreement.
Article IX
Right to Audit
(1) Consultant agrees that the City shall, until the expiration of three (3) years after final
payment under this Agreement, have access to and the right to examine any directly
pertinent books, documents, papers and records of Consultant involving transactions
relating to this Agreement. Consultant agrees that the City shall have access during
normal working hours to all necessary facilities and shall be provided adequate and
appropriate workspace in order to conduct audits in compliance with the provisions of
this section. City shall give Consultant reasonable advance notice of intended audits.
(2) Consultant further agrees to include in all its subcontracts hereunder, a provision to
the effect that the subcontracting consultant agrees that the City shall, until the
expiration of three (3) years after final payment under the subcontract, have access
to and the right to examine any directly pertinent books, documents, papers and
records of such sub-consultant, involving transactions to the subcontract, and
further, that City shall have access during normal working hours to all sub-
consultant facilities, and shall be provided adequate and appropriate work space in
order to conduct audits in compliance with the provisions of this article. City shall
give Consultant and any sub-consultant reasonable advance notice of intended
audit_
(3) Consultant and suis-consultants agree to photocopy such documents as may be
requested by the City. The City agrees to reimburse Consultant for the cost of copies
at the rate published in the Texas Administrative Code in effect as of the time copying
is performed.
City of Fort worth,Texas
Standard Agreement for Professional Services
Revisfvn Date.8124/21714
Page 5 of 8
Article X
Minority Business and Small Business Enterprise (MBE)(SBE) Participation
In accordance with the City's Business Diversity Enterprise Ordinance No. 20020-12-2011,
as amended, the City has goals for the participation of minority business enterprises and/or
small business enterprises in City contracts. Consultant acknowledges the MBE and SBE
goals established for this Agreement and its accepted written commitment to MBE and SBE
participation. Any misrepresentation of facts (other than a negligent misrepresentation)
and/or the commission of fraud by the Consultant may result in the termination of this
Agreement and debarment from participating in City contracts for a period of time of not less
than three(3) years.
Article XI
Observe and Comply
Consultant shall at all times observe and comply with all federal, state, and local laws and
regulations and with all City ordinances and regulations which in any way affect this
Agreement and the work hereunder, and shall observe and comply with all orders, taws
ordinances and regulations which may exist or may be enacted tater by governing bodies
having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance
thereof shall be considered. Consultant agrees to defend, indemnify and hold harmless City
and all of its officers, agents and employees from and against all claims or liability arising out
of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its
employees.
Article XIl
Venue and Jurisdiction
If any action, whether real or asserted, at law or in equity, arises on the basis of any
provision of this Agreement, venue for such action shall. lie in state courts located in
Tarrant County, Texas or the United States District Court for the Northern District of Texas
— Fort Worth Division. This Agreement shall be construed in accordance with the laws of
the State of Texas.
Article Xlll
Contract Construction
The Parties acknowledge that each ,party and, if it so chooses, its counsel have reviewed
City of Fort Worth,Texas
Standard Agreement for Professional Services
Revislorr hate.8/2462014
Page 6 of a
and revised this Agreement and that the normal rule of construction to the effect that any
ambiguities are to be resolved against the drafting party must not be employed in the
interpretation of this Agreement or any amendments or exhibits hereto.
Article XIV
Severability
The provisions of this Agreement are severable, and if any word, ;phrase, clause,
sentence, paragraph, section or other part of this Agreement or the application thereof to
any person or circumstance shall ever be held by any court of competent jurisdiction to be
invalid or unconstitutional for any reason, the remainder of this Agreement and the
application of such word, phrase, clause, sentence, paragraph, section, or other part of this
Agreement to other persons or circumstances shall not be affected thereby and this
Agreement shall be construed as if such invalid or unconstitutional portion had never been
contained therein.
Article XV
Notices
Notices to be provided hereunder shall be sufficient if forwarded to the other Party by
hand-delivery or via U.S_ Postal Service certified mail return receipt requested, postage
prepaid, to the address of the other Party shown below:
City of Fort Worth
Attn: Brian R. Glass,AIA
Architectural Services Manager
401 West 13"' Street
Fort Worth, Texas 76102
Consultant:
Kleinfelder, Inc.
,Attn: David Boes
7805 Mesquite Bend Dr. #100
Irving, Texas 75063
Article XVI
Headings
The headings contained herein are for the convenience in reference and are not intended
to define or limit the scope of any provision of this Agreement.
City of Fart Worth,Texas
Standard Agreement for ProWslonal Services
Revision pate.-9/2412014
Page 7 of 0
Article XVII
Counterparts
This Agreement may be executed in one or more counterparts and each counterpart shall,
for all purposes, be deemed an original, but all such counterparts shall together constitute
but one and the same instrument.
Executed and effective this the day a J ,2016.
BY: BY:
CITY OF FORT WORTH CONSULTANT
Kleinfelder, Inc,
Jesus J. Chapa David Boes
Assistant City Manager Operations Manager
Date: 9^I� Date: 2_ =-
APPROVAL RECOMMENDED:
�By
d to e Coo e
Director, Property Management
APPROVED AS TO FORM AND LEGALITY M&C No.: C-27820
By: M&C Date: 28 June 2016
zfA -
Assistant City Attorney
V:0 _Form 1295 Certification: l+!' $Ss;Z
ATTEST: D �y
D
70
Ma ,Kay r
City ecret �
FOFFICSIAL RECORD
City of Fort Worth,Texas TECRETARY
Standard Agreement for Professlnnal Services FT. WORTH, TJ(
Revision Date:9124/2014
Page 0 of 0
AI-T^Q-i rAff\1 T
(�KL EINFEL DEf,?
aright People Right Soluhom
March 10, 2016
Proposal No.: LOCALMKT.WEOH
Mr. Ronald Clements, AIA
City of Fort Worth
Transportation and Public Works Department
401 West 1311 Street
Fort Worth, Texas 76102
Subject: Proposal to Provide Soils and Construction Material Observation and
Testing Services
Holly Water Treatment Plant Vehicle Maintenance Facility
Fort Worth, Texas
Dear Mr. Clements:
Thank you for the opportunity to submit this proposal for construction observation and materials
testing services (Special Inspections) for the project referenced at the City of Fort Worth Holly
Water Treatment Plant Compound. The following sections provide our understanding of the
project and scope of services.
PROJECT UNDERSTANDING
The City of Fort Worth (the City) plans to construct a vehicle maintenance facility building and
associated parking area at 2222 Daggett Avenue in Fort Worth, Texas, The project site is
located within the existing Holly Water Treatment Plant Compound and is currently used as a
material stack yard for the City. The proposed building will be a 1"/2 story building with a footprint
area of approximately 30,801 square feet.
The following scope of services is based on Kleinfelder's knowledge of the project through our
geotechnical study along with discussions with City personnel and is expected to be performed
on a part-time basis. Our services will be performed as scheduled by the owner or their
designated representative and as such, the number of hours and tests required that we have
based our proposal on should be considered approximate.
We agree to provide a qualified technicians) to perform the construction materials services as
identified in the following sections. To most effectively serve the client and facilitate the
construction process, our services should be scheduled .24 hours in advance. We understand
that the construction process incorporates a large degree of variability and as such, we will do
our best to accommodate scheduling calls made on the same day as our services are needed
however, we cannot guarantee that we can satisfy service requests made on the same day as
the services are needed to be performed.
LOCALM KT.WEOH 1 DFW16P36448 Page 1 of 4 March 10, 2016
0 2016 Klelnfelder
78D5 Mesquite Bend Drive, Suite 100, Irving,TX 75063 p l 972.858.5900 f 1 972AD9,0008
The following documents were used to develop our scope of services:
• Construction drawings by O'Connor Architecture 8 Interior Design LTD Dated
November 10, 2015
■ Report of Geotechnical Study by Kleinfelder, inc. dated May 11, 2015
Our anticipated scope of services includes the following:
Earthwork
Perform earthwork(soils) observation and testing services including:
• Observation and testing of excavations, backfills and grading activities for the building
pad,
• Observation and testing of compacted pavement subgrade and base materials_
• Obtain field samples and perform laboratory moisture/density relations tests (standard
Proctor-ASTM 0698) and soil classification tests (liquid limit, plastic limit and percent
finer that No. 200 sieve analysis) for each soil type encountered during the construction
process(native soils) as required by the project geotechnical recommendations.
i Perform in-place nuclear moisture/density tests on building pad, utility backfill, paving
and sidewalk areas unless otherwise directed by the client.
■ Observation and documentation of drilled pier construction and other structural
foundation elements.
Observation and testing of utility backfill.
Observation and testing of HMAC paving.
Cast-In-Place Concrete
Perform concrete placement observation services during the concrete placement events as well
as perform field testing and sampling of the placed concrete including:
• Observation of concrete placement and sampling/testing fresh concrete (slump, air
content,temperature)for floor slabs, grade beams, pre-cast concrete panels.
• Cast concrete compressive strength specimens at a frequency of one set for every
100 cubic yards of concrete or fraction thereof placed per day for each type of concrete
placed, A concrete sample set will consist of five sample cylinders measuring
approximately 4 inches in diameter by 8 inched high (though additional samples can be
case if requested or approved by the client).
• All concrete sample cylinder pick-up events were estimated to be performed as separate
trips, independent of other services. These pick-up events consist of a technician picking
up and transporting sample cylinders to the Kleinfeider laboratory for subsequent
laboratory curing and compressive strength testing.
Concrete compressive strength tests will be performed on sample cylinders with one
tested at 7 days and three tested at 28 days. There will be one "hold" sample cylinder
cast with each typical set of samples.
t_OCALMKT.WLOH 1 DFW16P36448 Page 2 of 4 March 10,2016
V 2016 Kieinfelder
KLEINFELDER 7805 Mesquite Bend Drive,Suite 100,Irving,TX 75063 p 1972.868.5900 f l 972.409,0008
Masonry
Perform observation, documentation and testing during masonry operations, which will include:
• Sample CMU grout and cast grout compressive strength specimens at the proposed rate
of 1 set of 4 specimens per 2,000 square feet of wall
• Compressive strength determination of grout samples with 1 tested at 7 days, and
2 tested at 28 days and 1 retained as a "hold" specimen, for additional testing as needed
Structural Steel Services
• Observation of placement of reinforcing steel on a periodic basis.
• Observation and documentation of drilledlepoxled concrete anchors and structural steel
field welded and bolted connections.
ADDITIONAL SERVICES
The following services are not included in the Scope of Basic Services and will be considered as
Additional Services, if and when they are required or requested:
• The services of specialty sub-consultants or other special outside services other than
those described in the above Scope.
• Observation and documentation of CMU masonry and sampling/testing of CMU mortar.
• Any other services not specifically included in the above Scope,
COMPENSATION
It is anticipated that field services may begin approximately mid-May with the duration of the
project to run approximately 12 months. KleinfeIder proposes to perform the Scope of Basic
Services for a Not to Exceed Fee of $69,889. Kleinfelder proposes to perform the Scope of
Services presented above on a Time and Materials basis. Invoicing for this project will use the
attached Fee Schedule and the actual quantify of work performed. Invoices will be issued on a
periodic basis. The net cash amount of each invoice is payable on presentation of the invoice.
The City and Kleinfelder may subsequently agree in writing to provide for additional services to
be rendered under this agreement for additional, negotiated compensation.
LIMITATIONS
Our work will be performed in a manner consistent with that level of care and skill ordinarily
exercised by other members of Kleinfelder's profession practicing in the same locality, under
similar conditions and at the date the services are provided. Our observations and test results
will be based upon the frequency and magnitude of our scheduled services. Kleinfelder makes
no guarantee or warranty, express or implied, regarding the services, communication (oral or
written), report, opinion, or instrument of service provided.
This proposal is valid for a period of 60 days from the date of this proposal, unless a longer
period is specifically required for the RFP in which case that time frame will apply. This proposal
was prepared specifically for the client and its designated representatives and may not be
provided to others without Kleinfelder's express permission.
LOCAL MKT,WEOH 1 DFW16P36448 Page 3 of 4 March 10,2016
0 20f6 Kleinfelder
KLEINFELDER 7805 Mesquite Bend Drive, Suite 100,!ruing,TX 75063 p 1972-668-5900 f 1972.409.0008
TERMS OF ENGAGEMENT
Please indicate your approval of the proposal by signing the attached Master Services
Agreement and Work Order and returning the entire document to our office. A fully executed
copy will be returned to you. Any modifications of the attached language must be accepted by
both parties, and may result in an increase in scope and compensation. Acceptance of the
proposal indicates Client's review and understanding of the scope of services, budget and
terms.
We appreciate the opportunity to provide you with this proposal, and look forward to working
with you on this project. If you have any questions or wish to discuss, please contact us at
(972)888-5900.
Sincerely,
KLEINFELDER, INC.
Texas Registered Engineering Firm F-16438
A14
?elPeters, PE
Elizabeth MangProject Manager , FW COMET Services
Attachments:
Fee Estimate
Basis of Charges
Master Services Agreement
LOCALMKT_WEOH 1 DFW16P36448 Page 4 of 4 March 10,2015
0 2016 Kleinfelder
KLEINFELDER 7805 Mesquite Bend Chive,suite 100,Irving,TX 75063 p l 972.868.5900 f l 972.409.0[]08
KL EINF�L IJE10
Bright Peopk.Right Solutdons.
CITY OF FORT WORTH - HOLLY WATER TREATMENT PLANT COMPOUND
MUNICIPAL VEHICLE MAINTENANCE FACILITY
CONSTRUCTION MATERIALS TESTING SERVICES
SCHEDULE OF FEES
SERVICES QTY. RATE TOTAL
A. Earthwork
Field Technician(hourly) 320.00 $59.00 $18,880.00
Field Technician(OT)(hourly) 60.00 $88.50 $5,310.00.
Field Density Test(included in hourly rate) $0.00
Field Gradations(each) 3.00 $26.00 $78.00
Lime Depth Check(each) 3.00 $26.00 $78.00
Subtotal: $24,346.00
B. Cast-In-Place Concrete/Masonry
Field Technician(hourly) 128.00 $59.00 $7,552.00
Field Technician(OT) (hourly) 10.00 $88.50 $885.00
Subtotal: $8,437.00
C. Laboratory Testing
Sieve Analysis(-200) (each) 3.00 $81.00 $243.00
Moisture Density Analysis(ASTM D698) (each) 3.00 $235.00 $705.00
Atterberg Limit Test(each) 3.00 $110.00 $330.00
Lime Series(4 points) (each) 3.00 $135.00 $405.00
Concrete Cylinders(each) 164,00 $30.00 $4,920:00
Grout Compression (each) 80.00 $34.00 $2,400.00
AC Max Theo SPG(asphalt testing, each) 2.00 $147.00 $294.00
Subtotal: $9,297.00
D. Steel Inspection
Structural Steel Technician (hourly) 94.00 $70.00 $6,580.00
Subtotal- $6,580.00
D. Trip Charge
Within Tarrant County (per trip) 85,00 $40.00 $3,400.00
Subtotal: $3,400.00
E. project Management, Administration and Final Reporting
Project Manager(hourly) 62.00 $145.00 $8,990.00
Clerical(hourly) 62.00 $60.00 $3,720.00
Project Controls Specialist(hourly) 15.00 $85.00 $1,275,00
Dispatch (hourly) 62.00 $62.00 $3,844.00
Subtotal: $17,829.00
Budget Total:11 $69,889.00
LOCALMKT.WECH 1 DFW16P36448 Page 1 of 1 March 10, 2016
C 20161Ueinfelder
ACL Er1 rl'Fi `L DER
Bright People,Night Solutions.
February 18, 2015
Dalton Murayama, AIA
Architectural Services Manager
Transportation and Public Work Department
401 West 131' Street
Fort Worth, Texas 76102
SUBJECT: Contract Signatory Authority for City of Fort Worth, Texas
Dear Mr. Murayama:
The undersigned, acting in accordance with the laws of the State of Texas, do hereby consent
to the following--
David
ollowing=David Boes, Operations Manager for the Dallas/Fort Worth office of Kleinfelder, is authorized,
empowered and directed to take all actions and to execute, deliver, and perform for on behalf of
Kleinfelder, all instruments, documents, agreements, certificates, or writings, and any
amendments thereof, as such Authorized Person deems advisable in connection with work for
the City of Fort Worth, Texas.
David Boes is authorized, empowered, and directed to take all further actions and to execute
and deliver, for and on behalf of Kleinfelder, all other instruments, documents, agreements or
writings and to take such other action as he deems advisable to consummate the transactions
contemplated for the City of Fort Worth, Texas.
David Boes is authorized, empowered and directed to certify and attest to any documents,
including without limitation, resolutions of the Kleinfelder, that he may deem necessary or
appropriate to consummate the transactions.
Sincerely,
KLEINFELDER, INC.
Texas Registered Engineering Firm F-16438
William C Siegel, PE
Chairman, President and CEO
MG 151023.001 P Page 1 of 1 February 18, 2015
®2015 Kleinfelder
7805 Mesquite Bend, Suite 100, Irving,TX 75063 p 1972.868.5900 f 1972.409.(3008
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 6/28/2016 - Ordinance No. 22313-06-2016, 22314-06-2016
& Resolution No. 4653-06-2016
DATE: Tuesday, June 28, 2016 REFERENCE NO.: C-27820
LOG NAME: 21 MUNICIPAL VEHICLE MAINTENANCE FACILITY
SUBJECT:
Authorize Execution of a Construction Contract with Imperial Construction, Inc., in the Amount of
$6,530,625.00, Including an Owner's Construction Contingency Allowance of$455,625.00, 7.5 Percent, for
the Construction of a New Municipal Vehicle Maintenance Facility at the Holly Water Treatment Plant
Compound, Provide for Administrative Costs in the Amount of$532,304.00 and Authorize Execution of a
Contract with Kleinfelder, Inc., in the Amount of$69,889.00 for Materials Testing, for a Total Anticipated
Construction Cost of$7,132,818.00, Adopt Resolution Expressing Official Intent to Reimburse
Expenditures with Proceeds of Future Debt and Adopt Appropriation Ordinances (2014 BOND PROGRAM)
(COUNCIL DISTRICT 9)
RECOMMENDATION:
It is recommended that the City Council:
1. Adopt the attached resolution expressing official Intent to Reimburse expenditures with proceeds of
future debt for the Municipal Vehicle Maintenance Facility;
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Equipment Services Fund in the amount of$70,000.00 and decreasing the unassigned net position by the
same amount;
3. Authorize the transfer of$400,000.00 from the Sun Country Tank Project to supplement the funding to
the Municipal Vehicle Maintenance Facility Project;
4. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
amount of$400,000.00 in the Municipal Vehicle Maintenance Facility Project of the Water/Sewer DPN
Fund;
5. Authorize execution of a construction contract with Imperial Construction, Inc., in the amount of
$6,530,630.00 including an Owner's Construction Contingency allowance of$455,625.00, (7.5 percent of
the base bid), for the construction of a new Municipal Vehicle Maintenance Facility at the Holly Water
Treatment Plant Compound; and
6. Authorize execution of a contract with Kleinfelder, Inc., in the amount of$69,889.00 for materials
testing associated with the construction of a new Municipal Vehicle Maintenance Facility at the Holly
Water Treatment Plant Compound.
DISCUSSION:
A new Municipal Vehicle Maintenance Facility at the Holly Water Treatment Plant Compound was
recommended by three different fleet consultants over the past 15 years (2002 Transportation
Logname: 21MUNICIPAL VEHICLE MAINTENANCE FACILITY Page I of 4
Consultants, Inc., 2006 Scoping Study and 2010 Mercury Associates). These studies noted that 14-16
large heavy duty bays were needed to meet the maintenance needs of the existing Water Department
fleet of 750+ vehicles. The current facility has 11 small bays.
Design was funded by the 2014 Bond Program (Mayor and Council Communication (M&C) C-27081) and
construction is being funded using the Water/ Sewer DPN Fund and the Equipment Services Fund.
The City of Fort Worth issued a Request for Proposals (RFP) and received (11) proposals on January 28,
2016 for construction of the new Municipal Vehicle Maintenance Facility at the Holly Water Treatment
Plant Compound. Five of these firms provided the Post Proposal—Pre Award Submittals. These firms
were:
• Cooper General Contractors
• Haydon Building Corp
• Imperial Construction, Inc.
• Muckleroy & Falls
• Thos. S. Byrnes, Ltd.
On February 19, 2016, these five complete proposals were reviewed by members of the Water
Department, Property Management Department and the M/WBE Office. They were evaluated for best
value based on the selection criteria set forth in the Request for Proposals. The selection team
recommends that the City enter into negotiations for the construction of this new facility with Imperial
Construction, Inc.
Mucklero & Thos. S.
Selection Criteria Imperial Cooper Falls y Byrne Haydon
Proposed Price 55 60 55 53 53
M/WBE 1 5.5 2.05.5 5.0 2.0
Proposed Schedule 10 10 1 10 F 10 F 0
Reputation/Experience F 9 7 v1 8 F 8 F 8
Past Relationship with City of 10 5 6 F10 I 5
Fort Worth
-FTOTAL 89.5 84.0 1 84.5 F 86.0 F68.o
The overall project costs are expected to be as described in table below:
Municipal Vehicle Maintenance Facility r Totals
Architectural & Engineering Design $ 704,800.00
Project Management, Survey, Geotechnical, Bid Advertisement, etc. $$ 775,200.00
Design Phase Total $ 780,000.00
Construction Contract (Imperial Construction, Inc. including 7.5% of $6,530 625.00
the Base Bid as an Owner's Construction Contingency Allowance) '
Materials Testing (Kleinfelder, Inc.) 169,889.00
Project Administration Cost: Site Utilities, IT, Security, Project $ 532,304.00
Management, Contingency, FFE, Etc.
Construction Phase Total $7,132,818.00
Logname: 21MUNICIPAL VEHICLE MAINTENANCE FACILITY Page 2 of 4
Project Total 1$7,912,818.001
In accordance with the Chapter 7, Article III, Section 7-47, Section 109.2.1 of the City Code, Building
Permit Fees are waived for this project.
This project is anticipated to be included in a future revenue bond issue for the Water and Sewer
Fund. Available cash within the Water and Sewer portfolio and the City's portfolio along with the
appropriation authority authorized under the Direct Purchase Note (DPN) Program will be used to provide
interim financing for this project until debt is issued. To the extent resources other than the Water and
Sewer portfolio are used to provide interim financing, the Water and Sewer Fund will be charged interest
that is equivalent to the overall rate of return being earned by the City portfolio (currently approximately
one-percent annually). Should the City's portfolio not support the liquidity needed to provide an interim
short-term financing source, another funding source will be required, which could mean issuance of
securities under the DPN Program or earlier issuance of Water and Sewer revenue bonds than is currently
planned. Once debt associated with this project is sold, bond proceeds will be used to reimburse the
Water and Sewer portfolio and the City's portfolio in accordance with the attached Reimbursement
Resolution.
The City Council adopted the Water Department's Fiscal Year 2016 - 2020 Five-Year Capital Improvement
Plan on February 2, 2016 (M&C G-18662). This City Council adopted plan includes this specific project,
with funding identified through the DPN Program to be reimbursed with future revenue bonds. In
accordance with the provisions of the Financial Management Policy Statements, Staff anticipates
presenting revenue-supported debt issuances to the City Council for consideration within the next three
years. This debt must be issued within approximately three years to provide reimbursement for these
expenses. If that does not occur, the costs will no longer be reimbursable by issuing tax-exempt debt and
the funding source will have to be made whole through other budgetary methods. Adoption of the
attached Reimbursement Resolution does not obligate the City to sell bonds, but preserves the ability to
reimburse the City from tax-exempt bond proceeds
FUNDING SOURCES - Project Funding is coming from multiple sources. The design was paid for
through the 2014 Bond Program. The construction will be funded through the Water/Sewer DPN Fund
and the Equipment Services Fund.
M/WBE OFFICE - Imperial Construction, Inc., is in compliance with the City's Business Diversity
Enterprise (BDE) Ordinance by committing to 16 percent MBE participation on the base bid. The City's
MBE goal on the base bid contract is 11 percent.
The new Municipal Vehicle Maintenance Facility at the Holly Water Treatment Plant Compound is located
in COUNCIL DISTRICT 9.
FISCAL INFORMATION /CERTIFICATION:
The Director of Finance certifies that the appropriation for this project is available as directed by M&C G-
18375 in the Water/Sewer DPN Fund Programmable Project No. P00004 for the Municipal Vehicle
Maintenance Facility Project. Upon approval of the above recommendations and adoption of the attached
reimbursement resolution and appropriation ordinances, funds will be available in the current capital
budgets as appropriated, of the Water/Sewer DPN Fund and Equipment Services Fund.
Logname: 21 MUNICIPAL VEHICLE MAINTENANCE FACILITY Page 3 of 4
FUND IDENTIFIERS (FIDs):
TO
Fund Department Account Project Program Activity Budget Reference # Amount
ID ID Year Chartfield 2
q&�4A 56005 0600430 4905420 CO2422 C00780 2016 $200,000.00
56005 0600430 5740010 CO2422 C00780 2016 $200,000.00
3&4)56005 070043 4905420 CO2422 C00780 2016 $200,000.00
56005 0700430 5740010 CO2422 C00780 2016 $200,000.00
60101 0212030 5900011 $70,000.00
60201 0210420 4960101 CO2422 C00780 2016 $70,000.00
1602011 0210420 1 1 CO2422 I I C00780 2016 $70,000.00
FROM
Fund Department Account Project ProgramActivity Budget Reference # Amount
ID ID Year (Chartfield 2)
3 56005 0600430 5740010 CO2659 C01880 2016 $400,000.00
5 56005 0600430 5740010 CO2422 C00780 2016 $3,265,312.50
5 56005 0700430 5740010 CO2422 C00780 2016 3,265,312.50
56005 0600430 5330102 CO2422 C00780 2016 $34,944.00
56005 0700430 5330102 CO2422-T- C00780 2016 $34,945.00
CERTIFICATIONS:
Submitted for City Manager's Office by: Jay Chapa (5804)
Originating Department Head: Steve Cooke (5118)
Additional Information Contact: Brian Glass (8088)
Logname: 21MUNICIPAL VEHICLE MAINTENANCE FACILITY Page 4 of 4