HomeMy WebLinkAboutContract 47385-CO1 FORT WORTH City of Fort Worth CITY SECRETARY
Change Order Request CONTRACT NO. ��S �r)
Project Name: 2014 CIP Year 2-Contract 2 CitySec No.: 1 47385
Project No.(s): 59601/59607-0600430/0700430-5740010/CO2433/C01783 I DOE No. 7377 CityProj.No.:l 02433
Project Description: 2014 CIP Year 2-Contract 2 Water, Sewer and Paving replacement Whitman Ave, Carlyle Dr&Walton Ave.
Contractor: Stabile&Winn, Inc. Change Order# 0 Date: 1 5/3/2016
City Project Mgr.1 Robert Sauceda City Inspector: I Edward D'avila
Phone Number: (682)432-5478 Phone Number: (817)217-9078
Dept, Water Sewer Paving Totals Contract Time
(Calender days)
Original Contract Amount $570,605.25 $436,740.00 $975,759.95 $1,983,105.20 260
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $570,605.25 $436,740.00 $975,759.95 $1,983,105.20 260
Amount of Proposed Change Order $57,800.00 $15,840.00 $0.00 $73,640.00 030
Revised Contract Amount $628,405.25 $452,580.00 $975,759.95 $2,056,745.20 290
Original Funds Available for Change Orders $0.00 $0.00 $0.00
Remaining Funds Available for this CO $0.00 $0.00 $0.00
Additional Funding(if necessary) $57,800.00 $15,840.00 $73,640.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 3.71%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,478,881.50
JUSTIFICATION(REASONS)FOR CHANGE ORDER
he change order will provide for increased pay item quantities of permanent and temporary asphalt
avement repair, imported backfill, and water gate valves, connections to existing water mains and
emoval and salvaging of water valves that were necessary on the project due to actual field
onditions that were encountered during construction.
Staff concurs with the contractor's request for 30 additional calendar days on the change order.
FOR 3& y6789'
AA-.4—
d
tmd P. Co /males,Ant"*
�XAS �o ti
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfactio nd repfasdnt§payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Contractor Name I 9b'Itritir Sigqure Date
Stabile&Winn, Inc. Jerry Henderson / 2/ ol.b
Loo
Inspector Date Project Ma ger - — Date
Assistant Di eqo Water Dept Date onstructio upervisor JPW Dept) Dat
(O-n S 10ki 1 z 12 ZZ ZD
As itant fit ,4 or Date. Assistant City Manager Date
Council Action(If Required)
M&C Number 28002 M&C Date Approved 2 2 1T—]
City of Fort Worth
Change Order Additions
Project Name 2014 CIP Year 2-Contract 2 City Sec No.: 47385
Project No.(s): 59601/59607-0600430/0700430-5740010/CO2433/C01783 DOE No.= City Proj. No.: 02433
Project 2014 CIP Year 2-Contract 2 Water,Sewer and Paving replacement Whitman Ave,Carlyle Dr&Walton Ave.
Description
Contractor Stabile&Winn, Inc. Change Order: Date: 5/3/2016
City Project Mgr. Robert Sauceda City Inspector F Edward Davila
ADDITIONS
IFT
;[ EP Unif1nit'Cost
UNIT I WATER IMPROVEMENTS
6 REOMVE 8"WATER VALVE&SALVAGE Water 7.00 EA $160.00 $1,120.00
8 TEMP ASPHALT PVMT REPAIR(2"HMAC/6"CTB) Water 700.00 LF $18.00 $12,600.00
19 CONNECT TO EXISTING 6"TO 12"WATER MAIN Water 6.00 EA $1,600.00 $9,600.00
20 12"GATE VALVE Water 1.00 EA $2,800.00 $2,800.00
21 8"GATE VALVE Water 5.00 EA $1,600.00 $8,000.00
25 5'WIDE RESIDENTIAL HMAC REPAIR Water 114.00 LF $105.00 $11,970.00
26 EXTRA WIDTH RESIDENTIAL HMAC REPAIR Water 38.00 SY $95.00 $3,610.00
27 IMPORTED ACCEPTABLE BACKFILL Water 150.00 CY $25.00 $3,750.00
28 WATER SAMPLE STATION(D-122) Water 1.00 EA $4,350.00 $4,350.00
UNIT II SANITARY SEWER
4 TEMP ASPHALT PVMT REPAIR(2"HMAC/6"CTB) Sewer 720.00 LF $22.00 $15,840.00
Water $57,800.00
Sewer $15,840.00
Paving
Page 2 of 4 Additions Sub Total 1$73,640.00
F_O R T ��VO RT H City of Fort Worth
Change Order Deletions
Project Name 2014 CIP Year 2-Contract 2 City Sec No.: 47385
Project No.(s): 59601/59607-0600430/0700430-5740010/CO2433/C01783 DOE No. 7377 City Proj. No.: 02433
Project Description 2014 CIP Year 2-Contract 2 Water, Sewer and Paving replacement Whitman Ave, Carlyle Dr&Walton Ave.
Contractor Stabile&Winn, Inc. Change Order: IE Date 5/3/2016
City Project Mgr. Robert Sauceda City Inspector: FEdward D'avila
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
Water
Sewer
Paving
Page 3 of 4 Deletions Sub Total
MMBE Breakdown for this Change Order
M1NBE Sub Type of Service Amount°for this C`0
Total
Previous Change Orders
co# TATE , + IOUNT
Total $OflO'
Page 4 of 4