HomeMy WebLinkAboutContract 45582-A2 CITY SECRETARY SEC 2�2G': f AMENDMENT No . 2 (CONTRACT NO, GIt�SOR` TO CITY SECRETARY CONTRACT the City of Fort Worth (CITY) and HDR Engineering, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 45582, (the CONTRACT) which was authorized by M&C C-26731 on the 2517h day of March, 2014 in the amount of $512 ,532 . 00; and VVILEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in the amount of $38,420 . 00 which was Administratively approved on September 22,2014; and REAS, the CONTRACT involves engineering services for the following project: Marine Creek Drainage Basin Parallel Interceptor Improvements : VVIMUFAN, it has become necessary to execute Amendment No.2 to the CONTRACT to include an increased scope of work and revised fee. NOWTIM tEFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated November 21, 2016, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $317, 004 . 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be-- -- an amount of $857, 956. 00 . OFFICIAL RECORD 3 . CITY SECRETARY All other provisions of the Contract, which a3".WOffH,TA expressly amended herein, shall remain in full f rce a _ Page -1- effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED : ENGINEER City of Fort Worth HDR Engineering, Inc. Jesus J. Chapa Ramon F. Miguez, P. E . Assistant City Manager Vice President DATE : f o� l �� DATE: ht / APPROVAL RECOMMENDED: l-�e C. Christopher Harder, P.E. Acting Director, Water Department APPROVED AS TO FORM AND LEGALITY: M&C: C -28045 4?—e Date: 12/13/2016 Doug W. slack 17-f �(6' 833k6 Senior Assistant City Attorney ATTEST: OR a J. Kayser City Secretary �XAS OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX Page -�- November 21, 2016 Mr. Robert Sauceda City of Fort Worth, Water Department 1000 Throckmorton Fort Worth, Texas 76102 Reference: Marine Creek Sewer Interceptor Improvements Contract No. 45582 Amendment No. 2 for Additional Services Dear Mr. Sauceda: As requested by the City of Fort Worth Water Department, HDR Engineering, Inc. (HDR) offers to provide additional Professional Engineering Services for this project. These additional services are required due to the need to the decision to keep the Marine Creek Parallel Interceptor within the existing easement as much as possible to decrease construction costs. Installing the parallel interceptor in existing street right-of-way resulted in deep construction, tunneling and high construction costs. The estimated pipeline length is 10,850 L.F. This Engineering Services Contract Amendment includes a detailed Scope of Additional Services and a Task/Hour Breakdown, attached to this letter. HDR proposes to provide the attached scope of additional services for the lump sum total of$317,004. All additional services proposed will be performed in accordance with the March 25, 2014 Contract. This Amendment, consisting of one page; and the attached Additional Scope of Services and Task/Hour Breakdown, represent the entire amendment to the original agreement between the City of Fort Worth and HDR Engineering, Inc. If the terms of this Amendment are acceptable, please indicate by acknowledging acceptance of the terms of this document. Summary of Contract Authorization for Contract No. 45582: Original Contract Amount: $502,532 Amendment No. 1: $38,420 Current Contract Amount: $540,952 Proposed Amendment No. 2 $317,004 Revised Contract Amount $857,956 If you have any questions, or require additional information, please do not hesitate to contact me. Sincerely, HDR Engineering, Inc. f Douglas K. Biglen, P.E. Senior Project Manager hdrinc.com 600 West Sixth Street,Suite 100 Fort Worth,TX 76102-3684 (817)333-2800 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Amendment 2 Water and Sanitary Sewer Replacement Contract City Project No.02223 Labor hours Ex ans Task Description Project Project a Task No. QAJQC Manager Engineer EIT CADD Administrative Subconsultant Total Total Labor Cost Expense Task Sub Total Travel Reproduction Cost 1.1 Managing the Teeamam Biting Rate $236 $332 $108 $1D9 $137 $125 MWBE Non-MW BE 1.0 Desi Mana 4 18 10 14 0 4 $10,018 $0 $0 $0 SO $0 $10,D18 1.1.1 Intemal Team Meetings 1.1.2 QNQC 4 $9$0 $0 50 1.2 Communications and Reporting $0 $944 1.2.1 Pre-Design Coordination meeting 1.2,2 Design Submittal Review meetings 4 4 8$ 1, 097 $0 $0 $1,097 1.2,5 Pre are Months MWBE Re orfs 4 $2,632 $0 SO $2,632 1.2.6 Coordinate with permitting $3,520 agencies 8 4 4 4 $1,826 $0 $1,826 2.0 CoaC teal Design 30-Percent 4 12 24 12 12 2 $10,712 $12575 $0 $200 $150 $12,925 $23,637 2.1 Data Collection $215 2 $50 $150 $200 $415 2.2 H Subsurface Calculations 4 1 4 4 $2,254 $2,254 2.3 Subsurface UtilityEn Ineerin SUE 1 2 2 $796 $786 2.4 Geotechnlcal Investigation and Coordination 8 4 $3,082 $12,575 $3.082 $796 2.5 Environmental Assessment 2 12 12 8 $4,364 $150 $4,364 3.0 Preliminary Desion 90 Percent 3.1 Preliminary 10 79 178 162 364 32 $ 121 503.91 $ 3,600 $ - g $ $ 3,60D $125,104 Design Packa e 3.1.1 Cover $0 $0 3.1.2 Overall Layout 2 2 $493$548 $0 $493 3,1.3 Plan and Plan/Profile Sheets 4 50 150 150 350 $98,046 $0 $548 3.1.4 Specifications 4 16 16 18 $0 $96,046 24 $12,936 $0 $12,936 3.1.5 Construction Estimate 90% 4 4 4 $2,194 $0 $2194 3.2 Constructabilit Review $2228 3.3 Utllft Clearance 2 1 4 4 4 8 $2,747 $0 $2,228 3.4 Tral Control Plans 2 2 2 $1,156 $0 $2,747 3.5 SWPPP 2 2 2 $1,156 $1,156 $3,6$0 $1,156 4.0 Final Desi n 100% 6 30 60 60 150 8 $45,941 SO $0 $0 $D $0 $45,941 Final Draft(100%)Construction Plans and 4.1 S eciflcations 4.2 Final OTB Plans and S eclllcations 6 20 40 40 90 4 $29,562 $0 $29,562 $14,848 4.3 Construction Estimates 100% 2 14 14 60 4 $1,531 $0 $$1,848 5.0 Bid Phase 0 0 0 0 0 0 $ $0 $1,5$10 5.1 Bid S 1 ort $0 $0 $0 S $ 5.1.1 U load Documents to Buzzsaw $0 $O $0 Sell Contract Documents and Maintain Plan 5.1.2 Holders List 5.1.3 1 Issue Addenda $0 $0 $0 5.1.4 1 Attend Pre-Bld Meetin $0 $0 $00 5.1.5 Aherd Bid O enln $0 $0 $0 5.1.5 Tabulate Bids and Recommend Award $0 $0 $0 5.1.6 Incorporate Addenda into Bid Docs and Conform $0 $0 5.2 Mylar Drawings $0 $0 $0 City of Fort Worth,Texas Attachment B-Level of Effort Supplement PMO Official Release Date:5.19.2010 1 of 2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Amendment 2 Water and Sanitary Sewer Replacement Contract ity Project No.02223 Labor hours Ex ansa Task Description Project Project Task No. RA/OC Manager -Enclineer EIT CADD Administrative Subconsultant Total Labor Cost Total Expense Task Sub Total 6.0 Construction Phase Seryices Travel Reproduction Cost Billing Rate $236 $332 $106 $109 $137 $125 MWBE Non-MWBE 0 0 D 0 0 0 $ $0 $0 $0 0 0 $0 6.1 Construction Support 6.1.1 Attend Preconstruction Conference 6.1.2 Attend Public Meetin $0 $0 $0 6.1.3 Periodic Site visits $0 $D $0 6.1.4 Interpret Documents/issue RFls $0 $0 6.1.5 Final Walkthrouqh/Punchlist $0 .$0 6.2 Record Drawings $0 $0 $0 $0 7.0 ROperty Ownership Services D 0 4 0-0-0 $430 $22,200 $0 $0 $0 §22,200 §22,630 7.1 Easement t Pr a arra research u ROE documents 2 $215 $7,200 $215 7.2 Easement Pre aration 8 Monumentation 0 2 0 $215 $15,000 $15,000 $1$215 8.0 Survey 1 0 0 12 0 6 0 §2114 $70 650 $0 $0 $0 $70,650 §72,764 8.1 Desi n Surve 0 0 2 0 $215 $215 8.1. Establish horizontal and vertical control $6,400 8.1.2 Bore hole locations 8.1.3 Locate the existin M-365 2 $4,300 8.1.4 Io o ra hic Survey2 2 $4,400 8.1.5 Deliverables $32,500 8.1.6 Location of Wetlands 2 4 $9,800 8.1.7 Tree Locates 2---- M 9.0 Perm ittin $0 $100 $0 $100 $6,008 0 4 16 12 4 8 $5906 $0 9.1 SWPPP 4 16 12 4 8 $5,906 $0 $5,908 9.2 Environmental Services USACOE §D $0 $0 9.3 Floodplain Services $50 $50 $$0 9.4 I ROOT $0 �9.5 Railroad $0 $0 $0 TDLR $D $0 $City o ort orm Parks Conversion $0 $0 $p Totals $0 $50 $50 $50 24 143 304 280 536 54 $196,627 $109,025 $0 $3o0 $150 $109,475 $306,102 Project Sub Markup(10%) $10,903 Total Project cost w/Sub Markup $317,004 City of Fort Worth,Texas Attachment B-Level of Effort Supplement PMO Official Release Date:5.19.2010 2 of FID Table for M&C Log Name: 60MCM365VARA2—.HDR FIDs (Budget) Rec Fund Dept# Account Project I D Activity BudgetYear CF Program Amount Purpose 1)59607 0700430 4956001 CO2223 0017ZZ 2017 $558,424.00 1)59607 0700430 5110101 CO2223 C01730 2017 $87,500.00 1)59607 0700430 5330500 CO2223 C01733 2017 $355,424.00 1)59607 0700430 5710010 CO2223 C01741 2017 $65,500.00 1)59607 0700430 5310500 CO2223 C01742 2017 $25,000.00 1)59607 0700430 5310350 CO2223 C01773 2017 $1,000.00 1)59607 0700430 5540101 CO2223 001781 2017 $1,000.00 1)59607 0700430 5310350 CO2223 C01784 2017 $2,000.00 1)59607 0700430 5330500 CO2223 C01784 2017 $16,000.00 1)59607 0700430 5110101 CO2223 C01785 2017 $5,000.00 FIDs(Actuals) Rec Fund Dept# Account- Pr'oject I D Activity BudgetYear CF Program Amount u 772)59607 0700430 5330500 CO2223 C01733 2017 F 1 $317,004.00 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on-121-1- 3-1-2-01-6- DATE: 2/13/2016DATE: Tuesday, December 13, 2016 REFERENCE NO.: **C-28045 LOG NAME: 60MCM365VARA2-HDR SUBJECT: Authorize Execution of Amendment No. 2 to City Secretary Contract No. 45582, an Engineering Agreement with HDR Engineering, Inc., in the Amount of$317,004.00 for a Revised Contract Amount of$857,956.00 for Marine Creek Drainage Basin Parallel Interceptor Improvements at Various Locations Within the Marine Creek Drainage Basin, Provide for Project Management, Real Property Acquisition, Utility Coordination and Material Testing and Adopt Appropriation Ordinance (COUNCIL DISTRICT 2) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Sewer Capital Projects Fund in the amount of$558,424.00 from available funds; and 2. Authorize execution of Amendment No. 2 to City Secretary Contract No. 45582, an Engineering Agreement with HDR Engineering, Inc., in the amount of$317,004.00 for Syeainere Marine Creek Drainage Basin Parallel Interceptor Improvements at various locations thereby increasing the contract amount to $857,956.00 (City Project No. CO2223). DISCUSSION: On March 25, 2014 (M&C C-26731) the City Council authorized an Engineering Agreement with HDR Engineering, Inc., in the amount of$502,532.00 for the Marine Creek Drainage Basin Parallel Interceptor Improvements at various locations within the Marine Creek Drainage Basin. The agreement was subsequently revised by Amendment No.1 in the amount of$38,420.00 administratively authorized September 22, 2014. Amendment No. 2 will provide for the design of a 24 - inch sanitary sewer interceptor beginning at a sanitary sewer manhole at Huffines Blvd and Texas Shiner Drive and will follow the existing easement to the Boat Club Road/ Robertson Road intersection. The proposed scope of work includes design for junction structures and system interconnections of existing sanitary sewer mains, environmental assessment coordination with other agencies and geotechnical investigation. HDR Engineering, Inc. proposes to perform the necessary additional work for a lump sum fee of $317,004.00. Staff considers this fee to be fair and reasonable for the scope of services proposed. In addition to the amendment amount $203,000.00 is required for project management, real property acquisition, utility coordination and material testing. Engineering for the Marine Creek Drainage Basin Parallel Interceptor Improvement Project is one component of the overall project that includes project management, easement acquisition, utility coordination, material testing, inspection, construction and contingencies. The overall project budget is Logname: 60MCM365VARA2-HDR Page 1 of 2 $15,833,139.00. This project is part of the Water Department's Sanitary Sewer Overflow Initiative Program. This project will have no impact on the Water Department's operating budget when complete. Design for this project is expected to be completed by September 2017 with construction commencing in December 2017 and ending in November 2018. MWBE OFFICE: HDR Engineering, Inc. is in compliance with the City's BDE Ordinance by committing to an additional 37 percent SBE participation on this Amendment No.2. The project is located in COUNCIL DISTRICT 2, Mapsco 32Y, 46C, D, H, M and 47J. FISCAL INFORMATION /CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance funds will be available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. The Fiscal Year 2017 water operating budget includes appropriations of $31,636,073.00 for the purpose of providing pay-as-you-go funding for sewer capital projects. After this transfer for fiscal year 2017, the balance for sewer capital projects will.be $28,840,415.00. Appropriations for the Marine Creek Drainage Basin Parallel Interceptor Improvements Phase I project by fund will consist of the following: Current Proposed FUND ppropriations Appropriations[Project Total* Sewer Capital $512,532.00 $558,424.00 $1,070,956.00' Fund 59607 (Project Total ($512,532.00 F$558,424.00 [$1,070,956.00 *Numbers founded for presentation purposes. FUND IDENTIFIERS (FIDs): TO Fund Department ccoun Project Program ctivity Budget Reference # moun ID ID Year Chartfield 2 FROM Fund Department ccoun Project Program ctivity Budget Reference # moun ID ID Year Chartfield 2 CERTIFICATIONS: Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: John Carman (8246) Additional Information Contact: Robert Sauceda (2387) Logname: 60MCM365VARA2-HDR Page 2 of 2 C -ago Q5 CERTIFICATE OF INTERESTED PARTIES FORM 1295 10f1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2016-83346 HDR, Inc. 17111 Preston Road,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 07/12/2016 being filed. City of Fort Worth Date Acknowledg d: / kc( 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. 45582 Professional Engineering Services A, eAd- Nu L 4 Nature of interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling I Intermediary HDR Omaha, NE United States X O'Reilly, Charles Boston, MA United States X Felker, Brent Folsom, CA United States X Keen,eric Omaha, NE United States X Little, George Omaha, NE United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear,or affirm,under p Ity of p r' at the above disclosure is true and correct. TOM"Nir�tois '.scan'nt�ae. Stott or b%w Exp(ntu 049""" Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE Sworn to and subscribed before me,by the said Qrm0this the day of u.l 20 (p ,to certify which,witness my hand and seal of office. g'nuaa. 7' . sc, Anson QU-C-6�4 P4W$Jyl ftVAAW r Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.1021