HomeMy WebLinkAboutContract 31189 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.ss� IaO
WHEREAS, The Estates of Eagle Mountain, Ltd., hereinafter called
"Developer", desires to make certain improvements to The Ranch at Eagle Mountain
Nine, an addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Desoto Wild Wood
Development, Inc., its duly authorized General Partner, and the City, acting herein by
and through Marc Ott, its duly authorized Assistant City Manager, for and in
consideration of the covenants and conditions contained herein, do hereby agree as
follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of th N
n_CFA with Revised 4% 1 Eagle Ranch 9 °�'November 18, 2004L -',':
r
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused,
in whole or in part, by the alleged negligence of the City of Fort Worth,
its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof.
CFA with Revised 4% 2
Eagle Ranch 9 vJ�w�'
November 18, 2004
Water (A) None; Sewer (A-1) None; Paving (B) attached; Storm Drain (B-
1) attached; Street Lights and Signs (C) attached.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B 1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, 131,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
...........................
construction and inspection is estimated to $..:
Item Developer City Cost Total Cost
Cost
A. Construction
1. Streets $ 242,746.00 $ 242,746.00
2. Storm Drainage $ 91,045.00 $ 91,045.00
3. Street Lights $ 30,800.00 $ 30,800.00
4. Street Name Signs $ 600.00 $ 600.00
B. Engineering Design
C. Construction Engineering
and Management by DOE (4%) $ 14,147.00 $ 14,147.00
TOTALS $ 223,302.00 1 $ -Is 223,302.00
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
The developer is responsible for installation of sidewalk and a separate financial
guarantee is required in the form of a bond or check for the cost of the sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
CFA with Revised 4% 3 t
Eagle Ranch 9
November 18, 2004' v
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Developer
has executed this instrument in triplicate, at Fort Worth, Texas this the 18 day of November,
2004.
Approval Recommended:
ATTEST: Transportation and Public Works
Department
�L7
Mariy i-iendrixu Robert Goode, P. E.
City Secretary Director
y
�s f Fo W o
Contract Authorizatioa
°m arc Ott
Date
Assistant City Manager
Approved as to Form:
Assistant ity Attorney
ATTEST: The Estates of Eagle Mountain Ltd.
By: Desoto Wildwood Development. Inc.
Corporate Secretary
By:
Ga
President
TV
RECEIVED
CFA with Revised 4% 4 NOV 18 2004
Eagle Ranch 9
November 18, 2004
4
• PROP 4' I,
PROP 4' I —i SIDEWALK
SIDEWALK PROP 4'
II 1 I SIDEWALK I ( i I°...........
.. .. ..... `,
' I ® PROP 4' q �,
PROP 4' ! £3 i SIDEWALK +I I Ili
SIDEWALK ' f { *?: . PROP 4'
. , ice , ' j , ® , SIDEWALK j
PROP 4' O
p) I I I JII I SIDEWALK j 1\
t.
PROP 4` : f..:...... _.
SIDEWALK
LEGFNn
PROPOSED
BLOCK 16
ND.�4'
-���
t. Sidewalk Location is Approx.
cricrete 5idewalks Along Eagle Ranch Blvd. _
C,10P4 Dolhart Drive to be Constructed by
�`?) ,Fa hg Contractor.
'1. 4' w crete Sidewalks Along Tin Star, Silver City. EAGLE ONE SNGINEEELS INC.
{lo do, and Fools Gold Drive to be Constructed EXHIBIT tB"
- `-H ebudder.
PAVING FACILITIES r. suBwTEn: Bcc xowR� DEN wm Br uo
THE RANCH AT EAGLE MOUNTAIN NINE a.,,. - ORAYN BT: 0V
TARRANT COUNTY °"R E,Ra
�" Zoa.
aR�c r eT: J
PBra
Ex. 24'
RCP
tPROP 36-1
T. ,
i P ; 7. 1! , 1
PROP ;f fl-RCP Pkop
142' RCP
24' RCP P24' RCP
TINS TAR DRIVE PROP
R PROP - 1, W , 1 4' RC.P
PROP 2
42' RCP F il�
% 24-, RCP
PROP 42'-
RCP @
PROP
30' RCP
SILVERCITYORIVE �Y
7---------a I
.. .... .... . ......
-------------- ----- .... ......
: I �� .13--.., 1 :.......... ...
iii: L-PROP 30'
RCP
............... .................................................... ..... ............... .... ...................
..........
.. ........ ................. .. .........
......... ... ...... ........... .. ........
........
LEMW
PROPOSED
STORM SEWER W/ !NL1--
STORM SEWER W/MANHOLE
KEE, ID
CM3
cn,
EAGLE ONE ENGINEER. INC.
EXHIBIT"B-1"
STORM DRAINAGE SYSTEM
SUBMITTED'.OM 2004 DM .0
THE RANCH AT EAGLE MOUNTAIN NINE
goo DRAWN DSP
TARRANT COUNTY DATE.UMCM.20D+ SHEET NO
fl
ur,
1
...
�\ AlIN STAR DRIVE
T F
j,Ell
I V Ii
Q I ii i i i j I I y
i '
- - w
ILVER CITY DRIVE
�" � I I �.I • I � � � � I i � � , i � j
_..«
^;„....,
......
0
P
v: ................... ....... ................... .....
• RaP�O$Ep
r.....=.......... ....
........ ..... .. _ .s PRO 0 EJ FE LIGHT
,
EAGLE ONE ENGINM, INC.
N
i EXHIBIT"C"
STREET LIGHTS/STREET SIGNS sijw-,m:DEC,2004 DES ED BY:""
THE RANCH AT EAGLE MOUNTAIN NINE �"" ''°° °"""B,
N DAIS:MARCY,2OD4 SHR7 NO
TARRANT COUNTY S+�Br.
iBND
Summary of Costs
The Ranch at Eagle Mountain Nine
29-Mar-04
Revised 11-5-04
ITEM DEVELOPER COST CITY COST TOTAL COST
A. Construction
1. Water $ 102,566 $ - $ 102,566
2. Sanitary Sewer $ 107,660 $ - $ 107,660
3. Streets $ 242,746 $ - $ 242,746
4. Storm Drainage $ 91,045 $ - $ 91,045
5. Sidewalks $ 19,883
5. Street Lights $ 30,800 $ - $ 30,800
6. Street Name Signs $ 600 $ 600
B. Engineering Design $ - $ - $ -
C. Construction Engineering (*) $ 4,205
and Management by DOE
(2%Water/Sewer Inspection Fee) $ 4,205
(4%Storm/Pav Inspection Fee) $ 14,147
TOTALS $ 613,652 $ - $ 579,622
Notes:
1. All Preliminary Plats filed after July 11,2000 will require sidewalks on all streets.
Forty-two(42)feet and wider streets include sidewalk cost.
2. Construction items(1-6)are based on contracts let by developer
3. Developer's and City's column for Item C represents two percent(2%)costs for construction inspection
and materials testing.
(*) Represents City participation for construction fees.
4. City not preparing plans and specifications.
CFA CODE:
RECEIVED
7�a L 1
EXHIBIT"B"
The Ranch at Eagle Mountain Nine
Paving and Grading
Developer's Cost Breakdown
29-Mar-04
ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST
I G .
1 6-inch Concrete Pvmt. SY 10617 19.95 $ 211,809.15
2 Hydrated Lime(30 lbs/SY) Ton 187 81.00 $ 15,147.00
3 Subgrade Manipulation SY 10974 1.40 $ 15,363.60
4 Connect to existing pavement LF 58 7.35 $ 426.30
TOTAL ON-SITE PAVING $ 242,746.05
EXHIBIT"B-1"
The Ranch at Eagle Mountain Nine
Drainage Facilities
Developer's Cost Breakdown
29-Mar-04
ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST
I. tan-Site Drama
1 24"RCP Storm Sewer LF 156 46.00 $ 7,176.00
2 30"RCP Storm Sewer LF 311 61.20 $ 19,033.20
3 36"RCP Storm Sewer LF 17 80.60 $ 1,370.20
4 42"RCP Storm Sewer LF 280 107.00 $ 29,960.00
5 48"RCP Storm Sewer LF 98 127.10 $ 12,455.80
6 10'Curb Inlet EA 5 2310.00 $ 11,550.00
7 15'Curb Inlet EA 1 3080.00 $ 3,080.00
8 4-ft Diameter Storm Manhole EA 1 2200.00 $ 2,200.00
9 5-ft Diameter Storm Manhole EA 1 3300.00 $ 3,300.00
10 Connect to Existing Sewer EA 1 661.20 $ 661.20
11 Trench Safety LF 862 0.30 $ 258.60
TOTAL DRAINAGE $ 91,045.00
/
'
EXHIBIT"C"
The Ranch at Eagle Mountain Seven
Street Light Facilities
Developer's Cost Breakdown
2o'xxur'o4
ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST
(See Note No. 1) EA 14 2200.00 F7 30,800.00
TOTAL STREET LIGHT FACILITIES $ 30,800.00
Sidewalk Facilities
Developer's Cost Breakdown
29-Mar-04
ITEM DESCRIPTION UNIT QUANTITY FMT COST TOTAL COST
I Handicap Rarrip(See Note No.2) EA 6 350.00 2,100.00
2 4'Sidewalks(See Note No.2) SF 5932 2.90 17,202.90
3 6'Sidewalks(See Note No.2) SF 200 2.90 $ 580.00
TOTAL SIDEWALK FACILITIES $ 19,882.8
Street Signs
Developer's Cost Breakdown
29-Mar-04
ITEM DESCRIPTION UNIT QUANTITY UNTIT COST TOTAL COST
TOTAL STREET SIGNS $ 600.00
Notes:
1 Unit cost for street lights include cost and installation of underground conduit and pole bases.
City io responsible for cost and installation of all wiring and street|kJhtfidueo.
2 Sidewalks and ramps to be constructed by individual homebui|dero. Financial guarantee to be provided
by individual homebui|densot time of home construction.
3 City will be responsible for all cost and installation of standard street name signs on public streets.
I. STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 4 EA $ 2, 000 $8, 000 . 00
MID-BLOCK RESIDENTIAL 8 EA $ 2, 000 $16, 000 . 00
CHANGE OF DIRECTION RESIDENTIAL 2 EA $ 2, 000 $4, 000 . 00
MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 .00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000 . 00
RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 . 00
Subtotal $28,000 .00
City' s Cost $00, 000 . 00
Developer' s Subtotal $28,000 .00
10% Contingencies $2, 800 .00
Project Total $30,800 .00
Adjacent Developer' s Cost $0,000 .00
Developer' s Cost $30,800 .00
2% Inspection Fee $0,00 .00
DEVELOPER' S COST. $30, 800.00
THE RANCH AT EAGLE MOUNTAIN NINE
June 16, 2004
Fort Worth, Texas
November 5, 2004
PAGE I OF Exhibit C
II. STREET LIGHTS WORK DESCRIPTION:
1 . The Developer shall provide for the installation of streetlights
at the approximate locations shown in Exhibit "C", immediately
after final acceptance of the street construction, in accordance
with engineering plans and specifications approved by the
Transportation and Public Works Department .
2 . Streetlights on residential and /or collector streets can be
installed using overhead or underground conductors with the
approval of the Director of Transportation and Public Works .
3 . The City will install all the streetlights that use overhead or
underground conductors on residential, and collector streets. the
developer agrees to pay the city the amount shown below prior to
the City starting it' s design efforts.
4 . Streetlights on arterial streets shall be installed with
underground conduit and conductors .
5 . The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide
for the installation of any electrical transformers required for
the proper operation of the street lights
6. The estimated cost of this street light installation is detailed
on page 1 of exhibit C and is summarized below, the street lights
will remain the property of, and will be maintained by the City of
Fort Worth.
DEVELOPER' S COST: $30,800.00
THE RANCH AT EAGLE MOUNTAIN NINE
June 16, 2004
FORT WORTH, TEXAS
Page II of Exhibit C
tilt
v � . . 1. iv 1.J
III.
"STREETLIGHTS"
INTERSECTIONS
EAGLE RANCH BLVD & TIN STAR DR 1 j
SILVER CITY DR & HONDO ST 1
FOOLS GOLD DR & TIN STAR DR 1 �r
SILVER CITY DR & DALHART DR 1
MID - BLOCK
SILVER CITY DR 3
TIN STAR DR 5
CHANGE OF DIRECTIONS
FOOLS GOLD DR 1�
HONDO ST 1
THE RANCH AT EAGLE MOUNTAIN NINE
Page III of Exhibit C
IV
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon
final approval of the street construction. The street name signs
will remain the property of, and will be maintained by, the City
of Fort Worth.
2 . The Developer will pay for the street name sign installations
required for this development to the extent of $100 . 00 per
intersection. This unit cost will be revised annually by the
Department of Transportation and Public Works to reflect
prevailing costs of materials and labor.
3 . This development creates the following six (6) intersections at a
cost to the Developer of $600. 00 :
Tin Star Dr & Eagle Ranch Blvd
Tin Star Dr & Fools Gold Dr
Tin Star Dr & Hondo St
Silver City Dr & Fools Gold Dr
Silver City Dr & Hondo St
Silver City Dr & Dalhart Dr
The Ranch at Eagle Mountain Nine
CFA code: 2004069 Date: June 18, 2004