HomeMy WebLinkAboutOrdinance 8051~„
ORDINANCE NO 8 O S' /
ORDINANCE ACCEPTING IMPROVEMENTS ON A PoRTI®N of BAST 12TH STREET
AND PORTIONS OF SUNDRY OTt~R STREETSa AVENUES AND PUBLIC PLACES
IN 7.°HE CITE OP FORT WORTHg TEXASg DECLARING T~ CONTRACT WITH
FOR TYIE CONSTRUCTION OP
SAYD IMPROVEMENTS FULY~Y COMPIoETED AND PERFORMEDg DIRECTING TIDE
ISSUANCES EXECUTION AND DELI~iERY OF CERTIFICATES IN EVIDENCE OF
SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS
1~REIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS;
DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE
BY COPYING THE CAPTION OF SAME IN T~tE MINUTE BOOK OF THE CITY
COUNCIL OF FORT WORTH, TEXASs AND BY FILING THE COMPLETE.. ORDINANCE
IN APPROPRIATE ORDINANCE RECORDS OF SAID CITYg AND PROVIDING AN
EFFECTIVE DATE
WHEREASs the City of Fort Worth9 Texans has heretofore entered into a contract
with texas 6itulithi~ ('~tq~an~v s for the making €~xad construction of
certain street improvements on tkee hereinafter described portions of atreetas avenues and
public places in said Citjas tom~it
EAST 12TH STREET ':From Sylvania Avenue to Baurline Street, known and de-
signated as Project No 104=24000-267, afive-inch thick
hot-mix asphaltic concrete pavement on a six-inch thick
lime stabilized subgrade with seven-inch high concrete
curb and eighteen-inch wide concrete gutter on a twenty-
eight foot roadway Six-inch thick concrete driveways
~; will be constructed where specified
,~
I"
tivHEREAS, by sundry proceedings heretofore pa3sed by the City Council of the
City of Fort YJorth, Texas, including Ordinance No _7854 , a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues acid public places and against
the real and true owners thereof; and,
wHEF~k;AS, the City council of the pity of Fort ~'~orth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No 7~r4 , and
F~HFNEAa, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NU~u, TFiEFtHFORE,
BE IN ORDAINED BY THE CITY COUNCIL OF THE CITY OF FLIRT WORTH,
TEXA:i, THAT
I
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed
II
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such i.tnprovements and assessments The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed and shall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon The
nurrlbers of the certificates, with the property descriptions to be shown on the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after ~'iving
effect to such credit, if any, are hereby enumerated and itemized as follows
III
When each of the certificates has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price
IV
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute. Book of the City Council of Fort Worths T~xass
and by filing the complete ordinance in the appropriate prdinance Records of said City
V
This ordinance sha11 take effect and be in fu11 force and effect from and after
the date of its passage
PASSBD AND APPROVED THIS /~j '~' day of ~..~,..~.c.a.r.•.y es lg ~ o
APPROVED AS TO FORM AND LE(aAI,ITY
City Attorney
PROJECT NO 1~4-24000-267, EAST 12TH STREET FROM SYLVANIA AVENUE TO BAURLINE STREET, to be
improved by constructing a five-inch thick hot-mix asphaltic concrete pavement on a six-inch
thick. lime stabilized subgrade with seven-inch, high concrete curb and eighteen-inch wide con-
crete gutter on a twenty-eight foot roadway Six-inch thick concrete driveways will be con-
structed where specified
BLOCK
OWNER LOT 7.ONING FRONTAGE RATF AMOUNT ASSESSMENT
NORTH SIDE MARTINDALE ADDITION
Claude F Guyden 29 & 2 75' Pavement ~1 34 $100 50
2605 E 12th Street EL/2-30 Res 75' Curb & gutter 7 16 537 ~~
Fort Worth Texas 76111 41 S F Driveway 2 65 1~8 65
$ 746 15
Jessie D Guyden 27 & 2 100' Pavement $1 34 5134 00
2611 E 12th Street 2$ Res 100' Curb & gutter 7 16 716 00
Fort Worth Texas 76111 82 S F Driveway ?_ 65 217 30
$i,n67 3n
Willie A Wooldridge 26 2 50' Pavement $1 34 $ 67 M
2619 E 12th Street Res 50' Curb & gutter 7 16 358 00
Fort Worth Texas 76111 41 S F Driveway 2 65 108 h5
S 533 65
Theo R Guyden 25 2 5C' Pavement Sl 34 $ h7 00
4?_65 Balboa Drive Res 50' Curb & gutter 7 lh 358 00
Fort `~?orth Texas 76133 $ 425 00
E L Battles 24 2 50' Pavement $1 34 $ 67 ~~
26?_5 F. 12th Street :Res 50' Curb & gutter 7 16 358 n~
Fort Worth Texas 76111 41 S F Driveway 2 65 1~8 65
S 533 65
Mrs Thelma Patricks 22 & 2 100' Pavement $1 34 $134 GO
5524 Shiloh Drive ?_3 Res 50' Curb & gutter 7 16 358 00
Fort Worth Texas 76107 50' Gutter only 3 58 179 09
$ 779 65
Clay Stef 21 2 50' Pavement $1 34 S 67 00
4804 E Rosedale Res 50' Curb & gutter 7 16 35~i nn
Fort Worth Texas 76107 41 S F Driveway 2 h5 108 65
$ 533 h5
1
PROJECT NO 104-24000-267, EAST 12TH STREET F~ROT~ SYLVANIA AVENUETO BAiJRLINE STREET continued
BLOCK
OWNER LOT ZONING FRONTAGE RATE AT30UNT AS5FSSMENI'
NORTH SIDE MARTINDALE ADDITION
Letha Tucker 20 2 50' Pavement $1 34 ~ 67 n0
2705E 12th Street Res 50' Gutter only 3 58 17~ 00
Fort Worth Texas 76111 $ 246 0~
Frank Jefferson 19 2 5Q' Pavement
2713E 12th Street Res 50' Cirb & gutter
Fort Worth Texas 76111 41 S F Driveway
$1 34 $ 67 ~ln
7 16 358 nn
2 65 1n8 65
$ 533 65
Floyd Bolden 18 2 50' Pavement
C/0 James T Williams Res 50' Curb & gutter
3014E 4th Street 41 S F Driveway
Fort Worth Texas 76111
Robert Willis 16 & 2 105' Pavement
2723E 12th Street 17 Res 105' Curb & gutter
Fort Worth Texas 7h111 41 S F Driveway
$1 34 $ h7 ~~
7 16 358 On
2 65 108 65
$1 34 $140 70
7 16 751 8n
2 65 108 65
$ 533 65
$1 n01 15
BAURLINE intersects
SOiJTH SIDE
H Bolden
2724E 12th Street
Fort Worth Texas 76111
Floyd Bolden
C/0 James T Williams
3014E 4th Street
Fort Worth Texas 76111
15 3 55' Pavement
Res 55' Curb & gutter
13 & 3 100' Pavement
14 Ras 100' Curb & gutter
82 S F Driveway
$~ 34 $ 73 70
7 16 393 80
$1 34 $134 00
7 16 716 00
2 65 217 30
$ 467 5n
$1,067 30
2
PROJECT NO 104-240007267, FAST 12TI~ STREET FROM SYLVANIA AVENUE TO BAURLINE STREF_,T continued
BLOCK
OWNER LOT ZONING FRONT~IGE RATE AMOUNT ASSESSMENT
SOUTH SIDE MARTINDA~.E ADDITION
A L Koontz 12 3 50' Pavement S1 34 $ h7 00
2810 Sutton Street Res 50' Curb & gutter 7 lh 358 ~0
Dallas Texas 75210 $ 425 0~
James T Williams 10 & 3 100' Pavement
3014E 4th Street 11 Res 100' Curb & gutter
Fort Worth Texas 76111 41 S F Driveway
$1 34 $134 00
7 16 716 On
2 65 108 65
$ 958 65
Josh Clayborn 9 3 Sn' Pavement
2700E 12th Street R.es 5~' Curb & gutter
Fort Worth Texas 76111 41 S F Driveway
$1 34 S 67 00
7 16 358 00
2 65 108 h5
S 533 65
Edgar Conerway 7 & 8 3 100' Pavement
30Q0 E 4th Street. Res 100' Curb & gutter
Fort Worth Texas 76111 123 S F Driveway
$1 34 $134 nn
7 16 716 00
2 65 325 q5
$1 175 95
H H Nelson 6
2316 Magnolia
Fort Worth, Texas 76110
3 50' Pavement
Res 50' Curb & gutter
41 S F Driveway
$1 34 $ 67 00
7 16 358 0~
2. 65 108 65
$ 533 65
Lucille 0 Smith 5
2616E 12th Street
Fort Worth Texas 76111
3 50' Pavement
Res 50' Curb & gutter
41 S F Driveway
$1 34 $ h7 00
7 i6 358 nn
2 65 108 65
$ 533 65
H H Nelson 4
2316 Magnolia
Fort Worth Texas 76110
3 50' Pavement
Res 50' Curb & gutter
41 S F Driveway
$1 34 $ 67 On
7 16 358 !10
2 65 108 65
$ 533 65
3
PROJECT NO 104-24000-267, EAST 12TH STREET FROM SYLVANIA AVENUE TO BAl1RLINE STREET, cont
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENTS
SOUTH SIDE MARTINDALE ADDITION
Curtis Sessions 3 3 50' Pavement $1 34 $ 67 00
2723 Finley Res 50' Curb & gutter 7 16 358 00
Fort Worth, TX 76111 41 S F Driveway 2 65~, 108 65
$ 533 '65
Mrs John H Johnson
1124E Hattie
Fort Worth, TX 76104
2 3 50' Pavement
Res 50' Curb & gutter
:~:~ 41 S F Driveway
$1 34 $ 67 00
7 16 358 00
2 65 108 '65
$ 533 '65
City of Fort Worth E 2-1 3 25' -0-
TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS)
TOTAL COST TO CITY OF FORT WORTH
TOTAL CONSTRUCTION COST
$14,229 80
$47,433 83
$61,663 63
~~
•
•
City of Fort Worth, `Texas
.I~fayor ct9a.tl Co7ancal Cornr-~„unacatZOn
DATE REFERENCE SUBJECT Final Payment Assessment PAGE
NUMBER paving of East 12th (Sylvania to
2/19/80 ~*FP-1421 Baurline) Project No 104-24267 iot.~_
Final Council action is requested on the project described below
Project Description
Name Assessment Paving of E 12th (Sylvania to Baurline) Project No 104-24267.
- Contract No 10211 dated November 7 1978
Contractor Texas Bitulithic Company
Contract Awarded November 7 1978 (M&C C-4409)
Work Order Issued March 27 1979
Work Order Effective April 9 1979
I
Work Began October 17 1979 (The contractor was delayed until October 17, 1979
for utility interference that was unknown at the
time the work order was issued )
Project Substantially Complete and Final Inspection Made December 14 1979
Final Construction Approval January 28 1980
Working Time Bid 20 Days
Working Time Used 19 Days
Project Cost
Original Bid Price $59 476 45
Final Contract Cost $54 090 90
Partial Payments Previously Made 3 Amount $48 033 81
Final Payment Due $6 057 09
Deviation from Bid Price
The final contract cost of this project is $5 385 55 under the bid price The
underrun is the result of differences between quantities estimated for the
contract documents and .quantities actually used to complete the work
•
oy
~,a
•
•
DATE REFERENCE SUBJECT Final Payment Assessment PAGE
NUMBER Paving of East 12 (Sylvania to
2/19/80 **FP-1421 Baurli ne) Project No 104-24267 ~-°f-~
Financing
Sufficient funds are available for the final payment in Project Number 104-24267
account
Compliance with Specifications
The project has been completed in accordance with the requ irements of the
contract
Recommendations
It is recommended that the project described above be accepted by the adoption
of an ordinance and final paymen t of $6 057 09 be made to Texas Bitulithic
Company
VS dx
SUBMITTED FOR THE
CITY MANAGER'S
-
DISPOSITION BY COUNCIL.
PROCESSED BY
OFFICE BY• 'APPROVED
ORIGINATING
D ^ BOTHER (DESCRIBE)
~
'
EPARTMENT HEAD: Kelth A Smith ~ ~ • ,,qq QS
~
~ ~~ ~ ~r~!
U ITY SECRETARY
FOR ADDITIONAL INFORMATION __
~ ~ ~ 9 ~d
CONTACT John L Jones ext 7901 DATE