Loading...
HomeMy WebLinkAboutContract 48512 0 CITY SECRET CONTRACT NO. .7 Z Developer and Project Information Cover Sheet: per Company Name: Wilbow-Llano Springs Development Corporation Address, State,Zip Code: 4131 N. Central Expy, Suite 990, Dallas,TX 75204 Phone&Email: 972-865-1343,jrabon@wilbowusa.com Authorized Signatory, Title: Jennifer Rabon,VP of Development Project Name and Brief Primrose Crossing Phase 1D Description: Project Location: Northeast of Intersection of W.Risinger Rd. and Brewer Blvd Plat Case Number: FP-16-068 Plat Name: Primrose Crossing Mapsco: 102Q Council District: 6 City Project Number: 100547 CFA Number: 2006-113 DOE Number: None To be completed b staff.• �y Received by: J /G L � Date: OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 FT.WORTH,TX Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Wilbow Llano Springs Development Corporation , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Primrose Crossing Phase 1D ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Proj ect. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section 11, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractors) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ❑X, Sewer (A-1) r Paving (B) ❑X', Storm Drain (B-1) ❑X,, Street Lights & Signs (C) ❑Z. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infiastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years fiom the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the tern of the City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 5 of 11 construct the improvements in a good and worlananlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period)the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 7 of 11 Cost Summary Sheet Project Name: Primrose Crossing Phase 1D CFA No.: 2016-113 CP No.: 100547 An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 225,068.80 2.Sewer Construction $ 214,083.00 Water and Sewer Construction Total $ 439,151.80 B. TPW Construction 1.Street $ 645,683.09 2.Storm Drain $ 98,391.10 3.Street Lights Installed by Developer $ 51,140.75 4. Signals $ - TPW Construction Cost Total $ 795,214.94 Total Construction Cost(excluding the fees): $ 1,234,366.74 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 8,783.04 D. Water/Sewer Material Testing Fee(2%) $ 8,783.04 Sub-Total for Water Construction Fees $ 17,566.07 E. TPW Inspection Fee(4%) $ 29,762.97 F. TPW Material Testing(2%) $ 14,881.48 G. Street Light Inspsection Cost $ 2,045.63 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 46,690.08 Total Construction Fees: $ 64,256.15 Choice Financia/Guarantee Options,choose one Amount Mark one Bond=100% $ 1,234,366.74 Completion Agreement=100%/Holds Plat $ 1,234,366.74 x Cash Escrow Water/Sanitary Sewer=125% $ 548,939.75 Cash Escrow Paving/Storm Drain=125% $ 994,018.68 Letter of Credit=125%w/2yr expiration period $ 1,542,958.43 City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOER: Wilbow Llano Springs Development Corp Jesus J. Chapa Assistant City Manager Name: Jennifer Rabon Date: Title: VP of Development �� -d 3/lo Date: Recommended by: ATTEST: (Only if required by Developer) Wendy Chi43abulal, EMBA, P.E. Development Engineering Manager Signature Water Department Name: Dougla . Wiersig, P.E. Director Transportation &Public Works Department Approved as to Form &Legality: ATTEST: Gf• xl-a. -7 Richard A. McCracken dy J. Kayser Assistant City Attorney City Secretary M&C No. tj 16 F RTS Date: I i 123 like ®� Foci It95 � !��A- *'•. City of Fort Worth,Texas �XAS OFFICIAL RECORD Standard Community Facilities Agreement CITY SECRETARY CFA Official Release Date: 10.07.2015 FT. WORTH,TX Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 - Changes to Standard Community Facilities Agreement 2 Location Map n Exhibit A: Water Improvments 0 Water Cost Estimate Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate ❑X Exhibit B: Paving Improvements n Paving Cost Estimate n Exhibit B-1: Storm Drain Improvements ❑XStorm Drain Cost Estimate 0 Exhibit C: Street Lights and Signs Improvements D Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100547 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 11 of 11 Pecan Voll Gaif Cour FOkpy �� A - R MiuOT Golf Cour Pecan Valley FC ��� hA 9 VALL M H ASHFORD Golf CRursc y AVN➢A Rr44 L s k a VPC yam, a H LVM J�4� 9�H ery�,` .l���tV� Southwest � PARK KF 4 FIESTA Park ALTA MESA Va Perk rth ,Or J VA ` PN 5 g(AC Nq y .f^ � H CP➢IZ q ICAN a Cppl➢ VN RfN S pl � � A➢ ✓ 4 rDg § X3$8' 9 4 xNeAm� LRUI Parks �. NNPMOA N Par � 2' d J•,,tPt , IT aTx crtr uMn ➢IRKSI, cOY g q r O i YF GREEN L+Nft �f t FO F PY y SOUTH ALTP MESA O� BRAN lNGSHIR F L R V �SA`V] SOUTH MEA' Lanpharn Park $ Lqk yCff Y NfA iplaldaY $ p o SYCAMORE \ y VOD➢qQ SCALE:1" = 4000' J LONGS LEN q a BENBROOK �m PROJECT a A➢OVTR CRF Y N LAKE . c Mus srgaai couxaus f `> FAR y N g aLOCATION Ar E Q ROOKVAY �0. w cc HU SPRIN SRFRg&4q «CAL Sip o ^ Q FRANCIS VILLAGE W � NORTH ROV EY CL RURNE UI 0.E V) R CKY O u d R d d Park x / L X W ao a AT_` T VICINITY MAP o PRIMROSE CROSSING PHASE 1D 0 0 Ln Y JACOBS X LOCATION MAP 777 MAIN STREET FORT WORTH, TX 76102 .� »_4000' PHONE 817-735-6000 In J PRIMROSE CROSSING TI3 - PHASE 10 FP# 05-073 00 DOE 4982 CONNECT TO ~ EXIST 8" WL w m DOE NO. 982 52 51 50 49 48 47 46 a 45 44 ® ¢ 43 EXIST 8 WL FIR TREE LANE 8 WL-2 42 SCALE:1" = 200' 8 9 10 11 12 13 14 15 16 Ln 41 3 40 a LEGEND LEY 32 39 E AL CONNECT TO 3e PROPOSED WATER LINE 39 s EXIST 8" WL to DOE NO. 4982 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 37 PROPOSED GATE VALVE g 36 PROPOSED FIRE HYDRANT [V WAKE ROBIN DRIVE 8 WL-4 A 98 Y ° m 35 a EXISTING WATER LINE J EXISTING GATE VALVE 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 34 — CONNECT TO Ln w 33 o EXISTING FIRE HYDRANT EXIST 8" WL ALLEY 33 0 32 �^ 3 DOE N0, 4982W LIMITS OF PROJECT tai I 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 m 31 o PRIMROSE CROSSING 30 - PHASE 1C 29 FP# 05-053 8 WL-3 DOE 4951 JAPONICA STREET AILLEY 29C 28 t 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 27® WAT E R w CONNECT TO Ln 26 EXHIBIT 'A' EXIST 8" WL ALLEY 4 DOE NO. 4982 3. 25 o _ co U 31 30 29 28 27 26 25 24 23 22 21 20 19 '& 17 24 PRIMROSE CROSSING 23 PHASE ID M EXIST 8" WL 8" WL-1 22 o DEW PLANT WAY jY 210 JACOBS 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 0 o ® a v x 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 Ln Project Item Information Bidder's Proposal Bidlist Item No. Description Unit of Specification Section No. Sheet 5 Bid Quantity Unit Price Bid Value Measure F WATER 3305.0003 8"Waterline Lowering EA 33 05 12 1 1 $5,500.00 $5,500.00 3305.0109 Trench Safety for Water LF 3305 10 3,207 3,207 $1.00 $3,207.00 3311.0001 Ductile Iron Water Fittings w/Res TON 3311 11 1.14 1.14 $5,500.00 $6,270.00 3311.0241 8"Water Pie LF 33 11 10, 33 11 12 3,207 3,207 $27.40 $87,871.80 3312.0001 Fire Hydra t EA 33 12 40 4 4 $3,500.00 $14,000.00 3312.0117 Connection to Existing 4"-12"Water Main EA 33 12 25 4 4 $50.00 $200.00 3312.2003 1"Water Service EA 33 12 10 1281 128 $790.00 $101,120.00 3312.3003 8"Gate Valve EA 33 12 20 6 6 1 $1,150.00 $6,900.00 Total Street Water Bid $225,068.80 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120 11 PRIMROSET C 0 SING CONNECT TO - PHASE 1C EXISTING FP# 05-073 8" STUB OUT DOE 4982 XIST m 52 51 50 49 48 47 46N a 45 44 ® °0 43 FIR TREE LANE 8" S3-7 42 11 L8 9 10 11 12 13 14 15 16 41 V 0 a 40 XT"' B ," A L N 39 SCALE:1" = 200' •E 38 LEGEND 31 30 29 28 27 26 25 24 23 22 21 20 19 ,8 17 37 PROPOSED SANITARY SEWER 94 d 36 WAKE ROBIN DRIVE 8" SS-6 ALLEY PROPOSED MANHOLE 29 35 EXISTING SANITARY SEWER o CONNECT TO 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1634 < EXISTING MANHOLE e EXISTING 8" Y STUB OUT " SS-8 N� 33 LIMITS OF PROJECT ALLEY 33 a ss- 31 30 29 28 32 PROPOSED SEWER LINES ARE 8" 3 31 UNLESS OTHERWISE INDICATED 27 26 25 24 23 22 21 20 19 18 i7 0 v PRIMROSE CROSSING � 30 o - PHASE 1C I FP# 05-053 JAPONICA STREET 8" SS-5 n 29 DOE 4951 o AL C CONNECTTO 0 ® m za y EXISTING 8" 2 3 4 5 6 7 8 9 10 „ 12 13 14 15 16 27 WASTEWATER s STUB OUT Wn 26 1\1a„ ss " ss—" AL Y 4 N EXHIBIT 'A1' 00 25 pN 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 24 a 23 PRIMROSE CROSSING 0 � 4 a 0 x DEW PLANT WAY 8" SS-4 22 PHASE 11) M � o N 21 w Y 5 6 7 8 9 10 ii 12 13 74 15 16 17 X18 19 20 ® JACOBS j 0 Ss-9 x 777 MAIN STREET CONNECT TO FORT WORTH, TX 76102 o EXISTING 8" PHONE 817-735-6000 STUB OUT Project Item Information Bidder's Proposal Bidlist Item No. Description UmtofNleas.TSpecificationSectionNo. Sheet 6 Sheet 7 Sheet 3 Sheet 9 1 Bid Quantity Unit PriceBid Value SANITARY SEWER 0241.2014 Remove 8"Sewer Line LF 0241 14 10 10 $5.00 $50.00 3301.0002 Post-CCTV Inspection LF 3301 31 3117 3,117 $2.75 $8,571.75 3301.0101 Manhole Vacuum Testing EA 3301 30 15 15 $150.00 $2,250.00 3305.0109 Trench Safety LF 3305 10 3117 3,117 $1.00 $3,117.00 3305.0113 Trench Water Stops EA 3305 15 5 1 3 9 $250.00 $2,250.00 3305.0116 Concrete Encasement for Utility Pipes CY 3305 10 18.6 2.4 21 $125.00 $2,625.001 3331.3101 4"Sewer Service EA 3331 50 1151 115 $275.00 $31,625.001 3331.4115 8"Sewer Pipe-SDR 26 LF 3311 10 33 31 12 33 31 20 3117 3,117 $29.25 $91,172.25 3339.0001 Epoxy Manhole Liner VF 33 39 60 19.1 26 45.26 $250.00 $11,315.00 3339.1003 4'Extra Depth Manhole VF 33 39 10,33 39 20 22.3 0.6 10.1 33.38 $150.00 $5,007.00 3339.1001 4'Manhole EA 333910,33 39 20 12 12 $3,300.00 $39,600.00 9999.0004 147 Drop Manhole JEA 1333910,33 39 20 3 3 $5,500.00 $16,500.00 Total Sanitary Sewer Bid $214,083.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Fonn R-scd 20120120 PRIMROSE CROSSING - PHASE 1C FP# 05-073 DOE ZE 4982 L I I I x 52 51 50 49 48 47 46 45 44 ® N ® Iry 43 1 FIR T7 EE LANE az SCALE:1" = 200' a 9 10 11 12 13 14 15 16 41 Q ® 40 LEGEND IL 39 N ALL 3 PROPOSED 29'B—B E / 3a U) n 31 30 29 za z7 2s 2s 2a z3 2z 21 20 19 1a R O AD WA Y�5 0'R O W / 37 36 PROPOSED SIDEWALK W4KE408fN,WE' (BY BUILDER) ® 35 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 34 3 PROPOSED 10' ALLEY ' ' 33 a WITH 15' ROW 32 PROPOSED ADA RAMPS ALL 3 ?, 3 (BY DEVELOPER) O 31 30 29 28 27 26 25 24 23 22 21 20 19 18 170 m N a PRIMROSE CROSSING ® 30 LIMITS OF PROJECT PHASE 1C 29 m FP# 05-053 JAPONICA STREET- o DOE 4951 j ® 28 w PAVING � 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 27 L X 26 EXHIBIT H 04 -3.. ALLY 3 25 U31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 24 CD ® 23 N PRIMROSE CROSSING O o -'DEW,'PLdN7"WAY i 22 < PHASE ID N Y 21 JACOBS 5 6 7 8 9 10 11 12 13 14 15 16 17 L 18 19 20 Ln ® J¢ v Y Ln 777 MAIN STREET 3 FORT WORTH, TX 76102 o PHONE 817-735-6000 In Biaaer,PmnF+m eidliat Item No. Uexcnpti.n Unit of Spceifieulinn Sheet'-4 llcd 21 Sheet 26 Sheet 21 A-12S Shcct'_1 .11,-111 Sheet 11 Shccl 32 --Il Shcct 34 Sheet 35 Shec138 Bid Quantity Unit Price Bid Value Mcudure Sechnn Nn. PAVING 3211.0400 lHvd.tedLime 3016s/s TN 3211 29 41 36 23 32 32 164 146,20 $23 976.80 3211.0501 6"Lime Treatment SY 321129 2704 2.389 1 561 2128 2,143 10,925 $2.39 $26 110.75 3213.0101 6"Cone Pvmt SY 321313 2530 2,240 1 463 1,993 2,001 10,22 33.21 $339.638.671 9999.0007 6"Conc Pvmt(AlleySection SY 321313 1.05 667 576 368 473 691 688 4,51 $37.52 $1694 77.84 3211.0111 4"Flexlble Base T e A CR-1 BY 32 11 23 1,184 720 590 410 554 747 744 4.949 $10.75 $53.201!z§ 3213.0501 Bartier Frae Ram Type R-1 EA 321320 2 2 $1'505-80 $3 011.60 3213.0504 Barrier Free Ram T a M•2 EA 321320 2 2 $1 473.45 $2'946-90 3213.0506 Barrier Free Ram Type PA EA 32 13 20 12 2 2 16 $1385.98 $22175.68 9999.0003 Remove Barricade and Connect to Existing EA 00 00 00 14 1 1 1 2 1 1 1 10 Pavement 263.61 $2,636.1 9999.0004 Sto Sin EA 00 00 00 2 2 $163.50 327.00 9999,OOtl5 Street Name Blade EA 32 1320 16 16 54,50 $872.00 9999.0006 Street Sign Pole EA 3213 20 4 4 327A0 $1 308.00 7oml Pnvin Bid $645 683.09 CITY ctF FeRT WnHt11 FTANnAkll CONilltn<TION YPEI'ffICAItnN neNAffNTS Fom�Ro�ieeJ 201:01.0 PRIMROSE CROSSING N - PHASE 1C x FP# 05-073 w DOE 4982 4" I a 52 51 50 49 48 47 46V 45 44 ® ¢ 43 N FIR TREE LANE 42 2` 41 8 9 10 11 12 13 14 15 16 Y 40 T A 39 0 ~ 38 �T < 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 1 O 37 N N m 36 WAKE ROBIN DRIVE A 0 9 SCALE:1 = 200 ® 35 } \ 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 .� 34 '� LEGEND I_I—V I�l A o 32 PROPOSED STORM DRAIN LINE Q31 30 29 28 27 26 2s 24 23 22 21 20 19 18 17 m 31 = PROPOSED INLET PRIMROSE CROSSING 30 PROPOSED MANHOLE - PHASE 1C 29 m PDOE 49053 JAPONICA STREET ALL EXISTING STORM DRAIN LINE 0 i 28 LIMITS OF PROJECT s 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 27 w 26 STORM oo A 4 2511 EXHIBIT 'B1' a 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 24 ® 23 PRIMROSE CROSSING r18 PHASEID DEW PLANT WAY o L Y O ���0�� 3 5 6 7 8 9 10 11 12 13 14 15 16 17 MO ®O X SD-2 777 MAIN STREET EXIST FORT WORTH, TX 76102 0 4'X3' RCB PHONE 817-735-6000 N Project Item Information Bidder's Proposal Bidlist Item No. Description Unit of Specification Section Bid p Measure No. Sheet 36 Sheet 37 Quantity Unit Price Bid Value STORM DRAIN 0241.4201 Remove 4' Drop Inlet EA 0241 14 1 1 $250.00 $250.00 3137.0102 Large Stone Ri ra , dry Sy 31 3700 20 20 $140.00 $2,800.00 3305.0109 Trench Safety LF 33 05 10 268 516 784 $1.00 $784.00 3339.1001 4'Storm Manhole EA 3920 1 2 3 $3,900.00 $11,700.00 3341.0201 21"RCP, Class III LF 3341 10 25 31 56 $54.40 $3,046.40 3341.0205 24"RCP, Class III LF 3341 10 243 54 297 $61.40 $18,235.80 3341.0302 30" RCP, Class III LF 3341 10 387 387 $82.70 $32,004.90 3349.0001 36"RCP, Class III LF 3341 10 44 44 $140.00 $6,160.00 3349.5001 10' Curb Inlet EA .334920 2 3 5 $4,100.00 $20,500.00 9999.0007 Connect to Existing 24"RCP lEA 00 00 00 1 1 $10.00 $10.00 9999.0008 1-CH-FW-0 3:1 Headwall) JEA 00 00 00 11 1 $2,900.00 $2,900.00 Total Storm Sewer Bid $98,391.10 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120 T PRIMROSE CROSSING - PHASE 1C FP# 05-073 DOE 4982 rn 52 51 50 49 48 47 46 45 44 43 E-- FIR TREE LANE 42 x 8 9 10 11 12 13 14 15 16 41 6 40 SCALE:1" = 200' Q ALLEY 32 39 5 N 38 L31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 37 n J Q g 36 a WAKE ROBIN DRIVE A 9 N LEGEND 35 � J N z 3 4 5 6 7 8 9 10 11 12 13 14 15 16 m 34 3 PROPOSED SINGLE STREET LIGHT Y vii 33 ALL 32 a EXISTING SINGLE STREET LIGHT 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 31 o LIMITS OF PROJECT PRIMROSE CROSSING 30 - PHASE 1C FP# 05-053 JAPONICA STREET 29 DOE 4951 AL - ® 28 NE 27® STREET LIGHTS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 L 26 x ALL 34 25 EXHIBIT 'C' E31 30 29 28 27 26 25 24 23 22 21 2C 19 18 17 24 23 PRIMROSE CROSSING jDEW PLANT WAY 22 -' Q PHASE ID 0 0 N 21 Y 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ® JACOBS 0 Ln c 777 MAIN STREET 3 FORT WORTH, TX 76102 PHONE 817-735-6000 I I PRIMROSE CROSSING PHASE 1C CZL I L — I FP# 05-073 DOE 4982 m 52 51 50 49 48 47 46 45 44 43 FIR TREE LANE - 42 (1 DDN 10 11 12 13 14 15 1641 a40 Y Al39 SCALE:1" = 200' s a 38 E31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 37 �36WAKE ROBIN DRIVE A LEGEND PROPOSED STREET SIGN N ` fO 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 34(3 33 EXISTING STREET SIGN ALLEY 33 0 32 LIMITS OF PROJECT w 31 3 31 3029 28 27 26 25 24 23 22 21 20 19 18 17 m o 30 PRIMROSE CROSSING -U PHASE 1C 053 29 FPDO O 4951 JAPONICA STREET A 0 ® 28 L EE2 6 7 8 9 10 11 12 13 14151627 26 STREET SIGNS AL4 w 25 EXHIBIT 'C1' j 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 24 D u E- 4 N 4 DEW PLANT WAY 22 PRIMROSE CROSSING a PHASE 1D O N � 21 5 6 7 8 9 10 11 12 13 14 15 16 17 �j, 18 19 20 iw Y JACOBS 3 0 777 MAIN STREET FORT WORTH, TX 76102 J PHONE 817-735-6000 Project Item Information Bidder's Proposal Bidlist Item No. Description Unit of Measure Specification Section No. Sheet 38 Bid Quantity Unit Price Bid Value STREET LIGHTS 2605.3015 2"CONDT PVC SCH 80 T LF 26 05 33 870 870 $6.87 $5,976.90 3441.3201 LED Lighting Fixture(70W) EA 3441 20 15 15 $315.00 $4,725.00 3441.3345 Rdwy Illum TY D-25-6 Pole EA 3441 20 15 15 $1,217.47 $18,262.05 3441.3301 Rdwy Ilium Foundation TY 4 EA 3441 20 15 15 $862.46 $12,936.90 3441.3401 6-6-6 Triplex Alum Elec Conductor w/#10 Copper Ground LF 34 41 20 870 in Pole Only 8701 $2.19 $1,905.30 3441.1502 lGround Box Type B w/A ron EA 34 41 10 20 20 $366.73 $7,334.60 Total Street Lights Bid $51,140.75 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Farm Revised 20120120