Loading...
HomeMy WebLinkAboutOrdinance 6257 ORDINANCE NO. _ .2 5 ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF FOREST PARK BOULEVARD AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH ERNEST LOYD FOR THE CONSTRUCTION OF SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPRO- PRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE, WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract with Ernest Loyd for the making and construction of certain street improvements on the hereinafter described portions of streets, avenues and public places in said City, to-wit: UNIT 1: FOREST PARK BOULEVARD From 484.4' north of the intersection of McCart Street and Park Hill Drive and the south property line of Lot B, Wilkes Subdivision to the north property lines of Lot 1, Block 1, Upland Addition and Lot 2, Block 2, Berkley Addition, known and designated as Unit 1, Project No. 104-22000-140. WHEREAS, by sundry proceedings heretofore passed by the City Council of the city of Fort Worth, Texas, including Ordinance No, 6122 , a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above described portions of streets, avenues and public places and against the real and true owners thereof; and, WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review, found and determined that, in some instances, in order to effect substantial justice and equality, it is desirable and necessary to grant and issue certain credits against some one or more of the assessments levied by Ordinance No. 6122 , and WHEREAS, the street improvements hereinabove mentioned have been completed upon each of the portions of streets, avenues and public places hereinabove described, and have been inspected and found to be in complete accordance with the contract therefor; NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: Io The improvements on each of the portions of streets, avenues and public places hereinabove described be, and they are hereby, accepted; and the contract with reference thereto be, and it is hereby, found and declared fully completed and performed. lie The Mayor, be, and he is hereby, directed to issue and execute in the name of the City, certificates in evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City Secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance with the proceedings relating to such improvements and assessments. The certificates shall be numbered, shall describe the property against which the assessment has been levied, shall, where known, state the name or names of the true owners of the respective parcels of pro- perty assessed and shall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon. The numbers of the certificates, with the property descriptions to be shown on the respective certificates, together with the names of the owners of said property, the principal amount of the assessment, the respective credits, if any which are hereby authorized, granted and allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after giving effect to such credit, if any, are hereby enumerated and itemized as follows: 11,10 When each of the certifiactes has been duly executed as hereinabove provided, same shall be delivered to the Tax Assessor-Collector as part payment of the contract price Iv The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete ordinance in the appropriate Ordinance Records of said City. Vo This ordinance shall take effect and be in full force and effect from and after the date of its passage. cit PASSED AND APPROVED THIS day of APPROVED AS TO FORM AND LEGALITY: 1 r re7.4t.it'. 44414P).# City Attorney UNIT NO, 1, PROJECT NO. 104-22000-140g FOREST PARK BOULEVARD FROM APPROXIMATELY 484.4 FEET NORTH OF THE INTERSECTION OF McCART STREET AND PARK HILL DRIVE AND THE SOUTH PROPERTY LINE OF LOT B, WILKES SUBDIVISION TO THE NORTH PROPERTY LINES OF LOT 1, BLOCK 1, UPLAND ADDITION AND LOT 2, BLOCK 2, BERKLEY ADDITION, to be improved by widening the roadway four-feet each side and construction a six-inch thick hot-mix asphaltic concrete surface course on a six-inch thick lime stabilizer hinder base course, with six-inch or seven- inch high concrete curbs (as specified in the plars) and two-foot wide concrete gutters, so that the finished street will consist of one fifty-foot wide roadway, and by con- structing five-inch thick concrete sidewalks where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING APPROXIMATELY 484.4 FEET NORTH OF INTERSECTION OF PARK HILL DRIVE AND McCART STREET WEST SIDE OF STREET M. J. AROCHA SURVEY (ABSTRACT 2) City of Fort Worth Tr. out 1208.5' No Assessment Park and Recreation Dept. of East $ -0- portion of survey Res. I. L. TURNER REVISION - UPLAND ADDITION Mrs. Joe Danciger So. 44' 2301 Medford Court West Strip 44' Pavement $2.43 $106.92 Comm. Widening $ 106.92 Fielding T. Chase S. 15' 1 15' Pavement $2.43 $ 36.45 c/o Geo. Beggs of Comm. Widening $ 36.45 621 Fort Worth Lot 20 Club Building Harwood Brown E. 60' 1 105' Pavement $2.43 $255.15 Fort Worth National of N. Comm. Widening $ 255. 15 Bank Trust No. 2272 105' of P.O. Box 2050 19 & 20 Fielding T. Chase 18 & 17 1 120' Pavement $2.43 $291.60 c/o Geo. Beggs Comm. Widening $ 291.60 621 Fort Worth Clut, Building UNIT NO. 1, PROJECT NO. 104-22000-140 - CONT. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BERKLEY ADDITION F. R. Bigelow 1 & 2 3 140' Existing Facilities 2115 Forest Res. No Assessment $ -0- Park Boulevard HUNTINGTON LANE INTERSECTS Sam Laves 2235 Huntington Lane D 7 140' Pavement $2.43 $340.20 Comm. Widening 140' Sidewalk 4.03 564.20 $ 904.40 Mrs. W. I. Myers A 7 140' Pavement $2.43 $340.20 2236 Hawthorne Ave. Comm. Widening 140' Sidewalk 4.-03 564.20 $ 904.40 HAWTHORNE AVENUE INTERSECTS Perle Convey 4 & N. 8 90' Existing Facilities Trust No. 11-768 10' of Res. No Assessment $ -0- c/o First National 3 Bank Victor M. Cano S. 50' 8 90' Existing Facilities 2209 Forest of 3 & Res. No Assessment $ -0- Park Boulevard N. 40' of 2 R. J. Marcuse, Jr. 1 & S. 8 100' Existing Facilities 2215 Forest Park 20 ' of Res. No Assessment $ -0- Boulevard 2 WILSHIRE BOULEVARD INTERSECTS Joseph E. Hawkins 4 15 80' Existing Facilities 2227 Forest Park Res. No Assessment $ -0- Boulevard UNIT NO. 1, PROJECT NO. 104-22000-140 - CONT.' BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT HUNTINGTON LANE INTERSECTS UPLAND ADDITION 2nd Church of 8, 7, & So. 1 150' Pavement $2.43 $364.50 Christ Scientist 20' of 6 Apt. Widening $ 364.50 2112 Forest Park Boulevard Beatrice P. 5,4, 1 160' Pavement $2.43 $388.80 Caldwell and & N. Apt. Widening $ 388.80 Eula P. Hardesty 40' of 2100 Forest Park 6 Boulevard Bill J. Hart 3,2, 1 180' Adjusted to 2910 Prevost & 1 Apt. 168' Pavement $2.43 $408.24 Widening $ 408.24 ARLINGTON AVENUE INTERSECTS EAST SIDE OF STREET BERKLEY ADDITION Phillip Dean 2 2 60' Existing Facilities Raymond Res. No Assessment $ -0- 2001 Forest Park Boulevard Robert S. Travis 1 2 60' Existing Facilities 2005 Forest Park Res. No Assessment $ -0- Boulevard WINDSOR PLACE INTERSECTS George J. Kahak 4 3 80' Existing Facilities 2101 Forest Park Res. No Assessment $ -0- Boulevard Will Wendeborn 3 3 60' Existing Facilities 2301 Medford Res. No Assessment $ -0- Court West UNIT NO. 1, PROJECT NO. 104-22000-140 - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BERKLEY ADDITION Harry W. Brian 3 & N. 15 90' Existing Facilities 2231 Forest Park 30' of Res. No Assessment Boulevard 2 $ -0- Henry C. McWhirter, Jr. 1 & So. 15 110' Adjusted to 2239 Forest Park 30' of Res. 30' Sidewalk $4.03 $120.90 Boulevard 2 $ 120.90 GLENCO TERRACE INTERSECTS Jessie Frankrich A 17 204.8' No Access 2300 Warner Road Res. No Assessment $ -0- Jessie Frankrich 14 17 146' No Access 2300 Warner Road Res. No Assessment $ -0- C. A. Seals A & B 100' Existing 2913 Merida Comm. Paving 60' Sidewalk $4.03 $241.80 $ 241.80 TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $ 4,023.16 TOTAL CITY OF FORT WORTH COST 95 975 43 TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO. 1 . . . $99,998.59 City of Fort Worth, Texas sidwirm Mayor and Council Communication Nerras DATE REFERENCE SUBJECT: Final Payment - Paving of Forest PAGE R.&B. NUMBER Park Boulevard from McCart Street to 3/2/70 FP-697 170 feet North of Windsor Place 1 of 1 cam► Final City Council action on the project described below is requested. Project Description Name: Paving of Forest Park Boulevard from McCart Street to 170 feet North of Windsor Place Contractor: Ernest Loyd Contract Awarded: May 26, 1969 (M&C C-1493) Work Order Issued: July 9, 1969 Work Order Effective: July 21, 1969 Date of Final Inspection and Approval: January 23, 1970 Working Time Bid: 60 Working Days Working Time Used: 56 Working Days Project Cost and Financing Original Bid Price: $88,814.40 Final Contract Cost: $90,907.81 Partial Payments Previously Made: 6 Amount: $79,723.22 Final Payment Due: $11,184.59 Final Payment To Be Made From Project Account Number 104-22000-140. Deviation From Bid Price: Minor variations between quantities estimated in the contract documents and quantities measured and used at the job site resulted in an over-run of $2,093.41. Compliance With Specifications Tests made during construction on this project show that materials used were in compliance with specifications. Recommendation It is recommended that the above described project be accepted as complete by the adoption of an ordinance and that final payment of $11,184.59 be authorized to the contractor, Ernest Loyd. HDM/mh SUBMITT D BY: DISPOSITION-BY COUNCIL: PROCESSED BY `^APPROVE`D,D ❑ OTHER (DESCRIBE) �i 421 4�i2� ." 4 ✓,?.oz c�OT Q— [/,c7 CITY SECRETARY DATE CITY MANAGER i i°