HomeMy WebLinkAboutContract 48509 CITY SECRETARYGG
CONTRACT NO.., D
Developer and Project Information Cover Sheet:
Developer Company Name: Lennar Homes of Texas Land and Construction,Ltd.
Address, State,Zip Code: 1707 Marketplace Blvd,Irving,TX 75063
Phone&Email: 469-587-5206, david.aughinbaugh@lennar.com
Authorized Signatory,Title: Stewart Parker,Vice President
Project Name and Brief Sendera Ranch East Phase 13A
Description:
Project Location: North and west of intersection of Rocky Face Lane and Skytop Dr
Plat Case Number: None Plat Name: None
Mapsco: 06E Council District: 2 City Project Number: 100445
CFA Number: 2016-094 DOE Number: None
To be comp t d by staff
Received b : a e
OFFICIAL RECORD
CITY SECRETARY
FT.WO X
6
ti !a
a 3
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015 q
Page 1 of 11
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, Lennar Homes of Texas Land and Construction , Ltd, ("Developer"),
desires to make certain specific improvements as described below and on the exhibits attached
hereto ("Improvements") related to a project generally described as Sendera Ranch East Phase
13A ("Project') within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City");
and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of
City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement') in connection with the collective Improvements for the
Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply
with all provisions of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 2 of 11
further acknowledges that said acceptance process requires the Developer's contractor(s)
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by
Developer for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City-approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) ®, Sewer (A-1) ®, Paving (B) ®, Storm Drain (B-1) ®, Street Lights &
Signs (C) M.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section Il, paragraph 7 of the Policy and the contracts shall be
administered in conformance with paragraph 8, Section 1I, of the Policy. Developer shall
ensure its contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the infrastructure for
a period of two (2) years from the date of final acceptance insuring the
maintenance and repair of the constructed infrastructure during the term of the
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 3 of 11
maintenance bond. All bonds to be furnished before work is commenced and to
meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the amounts
required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City shall be
named as additional insured on all insurance required by said documents and
same will be evidenced on the Certificate of Insurance (ACORD or other state-
approved form) supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to
be subject to inspection at any and all times by City inspection forces, to not
install or relocate any sanitary sewer, storm drain, or water pipe unless a
responsible City inspector is present and gives his consent to proceed, and to
make such laboratory tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 4 of 11
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or asserted, brought
for or on account of any injuries or damages sustained by any persons (including
death) or to any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by said Developer,
its contractors, subcontractors, officers, agents or employees, or in consequence of
any failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City,its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure
contemplated herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its officers,
servants, or employees. Further, Developer will require its contractors to indemnify,
and hold harmless the City for any losses, damages, costs or expenses suffered by the
City or caused as a result of said contractor's failure to complete the work and
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 5 of 11
construct the improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce such
contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional
year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 6 of 11
the end of two (2) years from the date of this Agreement (and any extension
period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 7 of 11
Cost Summary Sheet
Project Name: Sendera Ranch East Phase 13A
CFA No.: 2016-094 DOE No.: 100445
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 181,061.60
2.Sewer Construction $ 562,391.65
Water and Sewer Construction Total $ 743,453.25
B. TPW Construction
1.Street $ 419,190.50
2.Storm Drain $ 177,572.70
3.Street Lights Installed by Developer $ 81,781.00
4. Signals $ -
TPW Construction Cost Total $ 678,544.20
Total Construction Cost(excluding the fees): $ 1,421,997.45
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 14,869.06
D. Water/Sewer Material Testing Fee(2%) $ 14,869.06
Sub-Total for Water Construction Fees $ 29,738.12
E. TPW Inspection Fee(4%) $ 23,870.53
F. TPW Material Testing(2%) $ 11,935.26
G. Street Light Inspsection Cost $ 3,271.24
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 39,077.03
Total Construction Fees: $ 68,815.15
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond=100% $ 1,421,997.45 X
Completion Agreement=100%/Holds Plat $ 1,421,997.45
Cash Escrow Water/Sanitary Sewer=125% $ 929,316.56
Cash Escrow Paving/Storm Drain= 125% $ 848,180.25
Letter of Credit=125%w/2yr expiration period $ 1,777,496.81
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
Lennar Homes of Texas Land and Construction,
Ltd.
Jesus J. Chapa 1
Assistant y g Cit Manager
2 / Name: Stewart Parker
Date: � 3 �`/� Title: Vice President
Recommended by: Date: 1 1 1 (1 I I S
ATTEST: (Only if required by Developer)
, 6�, �9
Wendy Chi%'Babulal, EMBA, P.E.
Development Engineering Manager
Water Department Signature
Name:
Dough W. Wiersig, P.E.
Director
Transportation & Public Works Department
Approved as to Form &Legality:
ATTEST:
Richard A. McCracken
Assistant City Attorney ary J. Kayser
City Secretary
M&C No. FORT
Date: 12l"kg �LQ
o cr. t795 :2
* * OFFICIAL RECORD
CITY SECRETARY
City of Fort Worth,Texas p'S FT.WORTHS TX
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 9 of 11
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
Attachment 1 - Changes to Standard Community Facilities Agreement
Location Map
Exhibit A: Water Improvments
Water Cost Estimate
Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
Exhibit B: Paving Improvements
Paving Cost Estimate
"! Exhibit B-1: Storm Drain Improvements
Storm Drain Cost Estimate
C' Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 10 of 11
ATTACHMENT "1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 100445
None
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 11 of 11
SH 114
��F o
t
SH 114
a
d
x
LOCATION MAP
/ FM 156 1.,_5000'
3 JOHN DAY RD.
N PROJECT
LOCATION00
00
h�
3 � O
a
v oa
SENDERA
OD
RANCH
BLVD
cn0
a.
w 00
D
�o
x WESTPORT
x
OPKWYOf
a ��
W
5 �
00
04
FJ� m
ILo
s, to SENDERA RANCH EAST
(97� PHASE 13A
N
BLUE MOUND E
0 J ,� COB
N
O7
M
777 MAIN STREET
APSCO NO. 06—EFORT
0
WORTH,
76102
COUNCIL DISTRICT 2 HONE 8117i--735 6000
—16-038
FP
�� \ / y_I_L1—I_L1—I_L1_
= I I I �\ ���/ ��Fk�3s••� <�/ / / \ I I I I I I I I N
�� \��yL� ,' ���� �\ / FUTURE SCALE:1" = 300'
y \`� �, \\� \ SENDERA
\ FUTURE ^ \
SENDERA '�� may' / ,��\,�/,�\\\ \��' RANCH EAST —
\ RANCH EASTPH 13B
cq
<k
LEGEND
24 PROPOSED WATER LINE
25 \ /��
Y` \ \ \ \ s. \ C \\ r''�� I`— \ PROPOSED GATE VALVE
xa
7 1827 PROPOSED FIRE HYDRANT
,a 15 6 3 e w, 26 �\ \ —,�;\ ;— —— EXISTING WATER LINE
x3 1 2 13 18 4' -\
10 11 ZRP�� 17 z9 '—1 _ 11 I I — EXISTING FIRE HYDRANT
16 30
v I \ xs SpN a 15 r— \ — r— EXISTING GATE VALVE -04
1 T—T 7 -7 F � Ix 13
\ \ 10 z — LIMITS OF PROJECT
-F— FUTURE \\ \ ' \ N3 a 33 NZ
Ld
N SENDERA \ i O87 f 9 xe ' 6 5 w�- a ; 34
rn
N RANCH EAST \\ 1 6 �' wP� 17 16 35
30 15 16 1
a 1 1 12 314 \ ` —
--�— ___
I � \ \�� N3 2 w N7 6 5
\ I 9 8 w`- —-I
w I
J,—L— oR�JE 12\ —
_ _L_i_��J— yWL-1 12 SK�pP 5 14 13 ;_ WATER
j -T—
T- -"T—T--r I ��i'� 16 18 17 'sh � r- - '.,.,..
p 9
20 - EXHIBIT 'A'
1s
SENDERA RANCH EAST
T� ��L-�_� _ I U7 14 w 1 PHASE 13A
o —
CD
_
PHASE 10
--� --� \
FP# 15-027
N
X __ 777 MAIN STREET
3 FORT WORTH, TX 76102
1n
PHONE 817-735-6000
l—
FT
FUTURE SCALE:1" = 300'
SENDERA '
FUTURE RANCH EAST
SENDERA
RANCH EAST
PH 13B
24 -�� � � LEGEND
25
83 19 26 \ C ,�\\ r ,� 1 ,— PROPOSED SAN SEWER
16 t7 18 27 a �'— \1 \�_ �' PROPOSED MANHOLE
I 1 83 13 14 ,s s- ze \ \ —,�� 1 1 1 EXISTING SAN SEWER
z R e 17 18 �N 29 , 1 1'�
s 16 Se °0 30 _—'1 \ _11 ; '1 Ir, EXISTING MANHOLE e
--��—T—r--1 / \ 2 13 14x 31 _-1 r� a1 —� LIMITS OF PROJECTix 1
- -
9 10 " T 32
3 2 m 33 82
'''
- FUTURE \ \ 83 N
� I`� 87 w Sa 7 6 s 4 �o m 34
SENDERA 9 S" Y
CL RANCH EAST 6 , °` w 6 17 t8 35
5
4 „ 13 14 15 85
2
tj I I I I \ , 10 2
j - --
\1 \` '
8 6 N5
- -T 2 8 7
9
J � 12\
4 13W SS-1 1
SKYTOP DRIVE 16 15 N
WASTEWATER
16 1786N - - _ 18
1 Ni 1 ) 15 20 'g �. EXHIBIT 'A-1'
-T L-�_-L L-�_ _- 8714 SENDERA RANCH EAST
PHASE 1PHASE 13A
C) � . 0
--_� -- N FP# 15-027 �,
J COBS
N MATCHLINE
X 777 MAIN STREET
i FORT WORTH, TX 76102
C3 PHONE 817-735-6000
N
MATCHLINE r'
I _ /---
3 FUTURE \
_-1 SENDERA SCALE:1" = 300'
RANCH EAST �\
N PHASE 14 /X ` \ �� PHASE
04 ` \` �x` \`,� `` y / 0 10
/' �` 15-027
LEGEND
PROPOSED SAN SEWER
PROPOSED MANHOLE
X\ /� FUTURE EXISTING SAN SEWER
SENDERA �� �' / T '� I--- \�� EXISTING MANHOLE - e
/ �y RANCH EAST LIMITS OF PROJECT — —
/ \ /
/ %\ <�/
a
w
W WASTEWATER
N f ��
\ EXHIBIT 'A-1'
SENDERA RANCH EAST
PHASE 13A
C-4 X4-
x
3 4,
W --T--E_X 2
4"---
------EX 24-"--------
JACOBS
T--1TFTia
rn
x 777 MAIN STREET
FORT WORTH, TX 76102
o PHONE 817-735-6000
FUTURE �yy i� i�� �� �\
\ PHASE 13B./ xX �� \� �` ��\�\ \1/ �A
\ \ —A SENDERA
r \ \ RANCH
EAST �\ \ i / �� \\ �'' \ SCALE:1" = 250'
24
CL A
83 19 \ 26
117 18 27FUTURE \ _
6
s 28 PHASE 13B
I I 8s ,3 4 — SENDERA 1
� 1 � „ 12 ' '.'CRP\L.''� 18 ��\\ 29
° J I 10 'pR�O 17 <\
1s 16 8a ` 30 _— RANCH \_—
\ 83 14 m\
13 I 3, EAST \
\ 1x 12 \�� LEGEND
a° \ \ 9 \: \ 10 3 2 32 I I \I
s 4 33 82 1 I —11 I PROPOSED 29'8—B
i 7 7 — 34 ,1 ROADWAY/501ROW
J e — ,s 35 - PROPOSED 4'SIDEWALK ---------__-
4 is as 7 \ (BY HOMEBUILDER)
---------
12 t3 \ �� PROPOSED ADA RAMPS O
N I \ \ 4 0 10 11 z (BY DEVELOPER)
3
—� 85 6 s 4 ,, LIMITS OF PROJECT — —
x
.c I ' .� g ,,,� :ap:
W FUTURE _ _ _ 12\
—SENDERA SKYTOP DRIVE /'/// is 14 13
—T RANCH �---- s.. 18 17 86
x
ST 9
w EA__ � s i
04 s 20
PAVING
04
14 i
EXHIBIT 'B'
SENDERA RANCH EAST
——� —— PHASE 13A
—� 10
FPHASE1 -027
3 _� - .J/�CO�
cq
_ �_
—' / �� 777 MAIN STREET
3 FORT WORTH, TX 76102
cn
PHONE 817-735-6000
L1-1—L1-1
FUTURE /7-� N
SENDERA '
J �; j �✓ ,j \y ��\��\\ `y� // f;�\ ` RANCH EAST
\\ SCALE:1" = 300'
FUTURE
SENDERA
RANCH EAST \\ /' c
T—T—I—T, PH 13B >\
04
--r—T--,— —� � \ `\ ` �0 2425 � � 1 LEGEND
838 s � z6 \ <� ��11 � PROPOSED STORM
V I
t617 11
9� zz i� �,- 1 1__� DRAIN LINE
0 1 1 1 ( 1 1 \ 83 13 14 �RPQ. za _— 1` \ PROPOSED INLET T
i z 18 ry 29
—
MPpR s 16 17
PROPOSED MANHOLE
m 30 1 1 ' '11 1 1
,O 12 1s t4 3, _— 1 �� �\ �� EXISTING STORM
10 11 z 32 _— 1� L_— DRAIN LINE
+— FUTURE 1� ' 83 8 8 s
6 4 3 33 N1 EXISTING INLET
SENDERA ( ' s 8 wP� 34 --1 �— EXISTING MANHOLE
—_ RANCH EAST 6 �QPQ��� e 17 is 35 — LIMITS OF PROJECT — —
i 5 14 15 85 `�
C —I--1- T r---1 �� \ ' I 4 ii 12 13
.N. I 10 2
t3 85 6
x T 2 5 4
Lu
— -- — T \ \ \ N3 = 7 �6
i 1n n 9 6 QP t
3 121
14
w -
-7-7 I—T T r —— 16 t9 ,8 17 86
03 4 5 20 STORM
04I I I I I I �--� I H,
o _ L- I I -L L--J -1 x7 14 �pNE
EXHIBIT B-1
SENDERA RANCH EAST
EX„
T—— —— 1 PHASE 10 PHASE 13A
cn
N -- ---_i ---� --� 1 FP# 15-027 ,>w
N
X 777 MAIN STREET
FORT WORTH, TX 76102
o PHONE 817-735-6000
i
F-T F-
FUTURE ,7-� N
SENDERA
RANCH EAST
FUTURE �'� SCALE:1" = 300'
a �\�\ � \ �\ ' i�\�\ ����
\ ' SENDERA
N \ RANCH EAST
PH 13B
04
��'� �
24 \ -\\ _� LEGEND
25
Nia i9 ��� LIGHT
z27 /�\\ _._�
6 ,- \\ PROPOSED STREET
\ Nd12 14 15 L � 28
13 �1`
7
J 1 ) o1 1
NMPpR\0 n y29
5 '6 m 30 — 1 1 —11 EXISTING STREET 0-4=1`a` T- F- 7- F-- N�
� 1 xs 3 14 31 .-1 r 1\
U
I I I I I � � 'x 10 „ 1z , 32
LIGHT
9 3 2
— FUTURE 1 N3 a 6 5 4 33 Nz LIMITS OF PROJECT - -
SENDERA ( ' 9 xe 7 34
wP� C—
__ RANCH EAST 65 g)NQ 5 t6 171a 35
j -7 T—F-1—r \ ' I 4 11 '2 13 14 85 1
L (( I( _ 1L \ 3 NS 5 4 3 \-
l l — —— I — T /\ \ \ N3 2 7 6 \�
I I I I I I 1 1 p � 9 a �pP pRNE It
U 1I J 12\
t4 13
x —
T- - —T�—r — ,6 i8 17 N6
Go ,5 20 19 STREET LIGHTS
_1 i�J_1r��_� 14 EXHIBIT 'C'
SENDERA RANCH EAST
�----� --� \ PHASE 1 PHASE 13A
o
�___ --� ✓ \ FPS 15-027
JACOBS
N
O>
X 777 MAIN STREET
3 FORT WORTH, TX 76102
PHONE 817-735-6000
FUTUREI
r---I
SENDERA N
RANCH EAST
FUTURE SCALE:1" = 300'
IL
SENDERA
RANCH EAST �� �� c
<o l--7 —1—T-I PH 138
v x \ \ \ \
CE;
LEGEND24
\ \ "� \
�1 1 \r— \ \\ \ \ 83 1g °°� 2526 �\ \<' , \\ - 1, STOP SIGN ONLY
17 y 27
16 \ \ STOP SIGN & STREET NAME SIGN -
\ 14 15 P�� �� 28
N I IN3 2 13 — Ria �R 18 29
o _,-II - �I STREET NAME SIGN ONLY �G
SPN MPa 16 1, m 30
r—TT—T—�1 1 8a 13 ,4 15 3, .-1 r� �\ •
"i X 11 t2 1 —' II STREET LIGHT TO INCLUDE
v \ 1 a ° 3 z ' 32 STOP SIGN & STREET NAME
FUTURE '\\ \ ' 838 84 7 6 5 4 33 81 -I \ -II ;," SIGNS
SENDERA 7 9 8 wP� 34 1 C LIMITS OF PROJECT
W I__ RANCH EAST \ 6 �pPaV`N 17 ,e 35 _ — — — —
2 i� 5 14 t5 16
85
—T1—T—��—r \ \ I I 4 11 12 3 \ pRNE I
I \ \ 10 z SK�pP r
3 85 5 4 3 I..
27 6 \-
,< 1f P 1 9 e RAVE �t
13 1 2\
+� 6 15 14
a
X T-
-7-7 6 8 17 86 STREET SIGNS
00 ` I 20 ,s
N --� / 15
oT��_� ��_�_ x714 EXHIBIT 'C-1 '
— cE �N
SENDERA RANCH EAST
PHASE 13A
n -
N PHASE 10
FP# 15-027
N
1 44 owl W,ACOO
N
J 777 MAIN STREET
3 FORT WORTH, TX 76102
o PHONE 817-735-6000
JACOBS ENGINEERING GROUP INC.
777 MAIN STREET, FORT WORTH, TEXAS 76102
PHONE NO. (817) 735»6000
SENDERA RANCH EAST
PHASE 13A
SECTION 00 42 43
SENDERA RANCH EAST, PHASE 13A
PROPOSAL FORM
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120120
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Unit of Specification Section BID QTY BID QTY
Bidlist Item No. Description Measure No. PG.S PG.6 Bid Quantity Unit Price Bid Value
3305.0109 Trench Safety for Water LF 33 05 10 3,078 3,078 $0.30 $923.40
3311.0001 Ductile Iron Water Fittings w/Res TON 3311 11 1.55 1.55 $5,930.13 $9,191.70
3311.0241 8"Water Pipe LF 3311 12 2,376 2,376 $25.20 $59,875.20
3311.0251 8"DIP Water LF 3311 10 77 77 $74.00 $5,698.00
3311.0441 12"Water Pipe LF 3311 12 5991 599
$34.48 $20,653.52
3311.0451 12'D I P Water LF 3311 10 261 26 $114.00 $2,964.00
3312.0001 Fire Hydrant EA 33 12 40 3 3 $3,600.00 $10,800.00
3312.0117 Connection to Existing 4"-12"Water Main EA 33 12 25 3 3 $500.00 $1,500.00
3312.2003 1"Water Service EA 33 12 10 78 78 $711.24 $55,476.72
3312.3003 8"Gate Valve EA 33 12 20 1 7 7 $1,134.08 $7,938.56
3312.3005 12"Gate Valve EA 33 12 20 1 1 $2,040.50 $2,040.50
9999.0001 Remove&Relocate Fire Hydrant EA 00 00 00 1 1 $2,500.00 $2,500.00
9999.0002 Remove&Relocate 8"Gate Valve EA 00 00 00 1 1 $1,500.00 $1,500.00
Total Street Water Bid $181,061.60
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120120
Project Item Information Bidder's Proposal
—7
Bidlist Item No. Description Unit of Specification Section No. BID QTY BID QTY BID QTY BID QTY BID QTY Bid Quantity Unit Price Bid Value
Measure PG.7 PG.10 PG.I1 PG.12 PG.15
3301.0002 Post-CCN Inspection LF 3301 31 2,902 2,902 $1.25 $3,627.50
3301.0101 Manhole Vacuum Testing EA 3301 30 14 14 $100.00 $1,400.00
3305.0109 Trench Safety LF 33 05 10 2,902 2,902 $0.50 $1,451.00
3305.0113 Trench Water Stops EA 33 05 15 1 2 2 5 $350.00 $1,750.00
3331.3101 4"Sewer Service EA 3331 50 791 79 $627.59 $49,579.61
3331.4115 8"Sewer Pipe LF 3311 10 2,902 2,902
$48.38 $140,398.76
3331.4116 8"Sewer Pipe,CSS Backfill LF 33 11 10,33 31 12,33 31 20 44 64 64 172 $45.00 $7,740.00
3339.1001 4'Manhole EA 33 39 10,33 39 20 14 14 $3,377.30 $47,282.20
3339.1003 4'Extra Depth Manhole VF 1 33 39 10,33 39 20 2.50 4.00 1.71 8.21 $25.00 $205.25
Total Residential Sanitary Sewer Bid $253,434.32
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120120
Project Item Information Bidder's Proposal
Bidlist Item No. Description Unit of Specification Section No. BID QTY BID QTY BID QTY BID QTY Bid Quantity Unit Price Bid Value
Measure PG.7 PG.8 PG.9 PG.10
. w g
a al t.z t
3301.0002 Post-CCTV Inspection LF 3301 31 220 2,610 2,830 $1.25 $3,537.50
3301.0101 Manhole Vacuum TestingEA 3301 30 2 15 17 $100.00 $1,700.00
3305.0109 Trench Safe LF 33 05 10 220 2,610 2,830 $0.50 $1,415.00
3305.0113 Trench Water Stops EA 33 05 15 7 2 9
$350.00 $3150.00
3305.0116 Concrete Encasment for Utility Pipes CY 33 05 10 16.8 9.3 26.11 $45.00 $1,174.50
3331.3101 4"Sewer Service EA 3331 50 2 30 32 $627.59 $20,082.88
3331.4115 8"Sewer Pipe LF 3311 10 220 10 230 $48.38 $11,127.40
3331.4215 15"Sewer Pipe LF 3311 10 2,600 2,600
$76.52 $198,952.00
3339.1001 4'Manhole EA 33 39 10,33 39 20 2 14 16 $3,377.30 $54,036.80
3339.1003 4'Extra Depth Manhole VF 33 39 10,33 39 20 18.14 14.0 32.09 $25.00 $802.25
9999.0003 5'Manhole over Existing EA 00 00 00 1 1 $6,635.00 $6635.00
9999.0004 Sanitary Sewer Manhole Vent EA 00 00 00 2 2 $850.00 $1 700.00
9999.0005 Water Tight Hinged Manhole Frame Cover& EA 00 00 00 1 56
Grade Rings $774.00 $4 644.00
Total Master Sanitary Sewer Bid $308,957.33
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120120
Project Item Information Bidder's Proposal
Bidlist Item No. Description Unitof Specification Section BID QTY BID QTY BID QTY BID QTY BID QTY BID QTY Bid
Measure No. PG.9 PG.18 PG.24 PG.25 PG.26 PG.27 Quantity Unit Price Bid Value
0241.4401 Remove 36"Headwall/SET EA 02 41 14 1 0 . � .
3137.0102 Large Stone Riprap,d SY 31 37 00 100 17 117 $$66.00 $750.00
$66.00 $7,722.00
3305.0109 Trench Safe LF 33 05 10 705 33 354 93 1185 $0.40 $474.00
3341.0201 21"RCP,Class III LF 33 41 10 33 46 73 152 $55.55 $8,443.60
3341.0205 24"RCP,Class III LF 3341 10 40 20 60 $63.30 $3,798.00
3341.0208 27"RCP,Class III LF 3341 10 239 239 $69.50 $16,610.50
3341.0302 30"RCP,Class III LF 3341 10 29 29 $77.90 $2,259.10
3341.0309 36"RCP,Class III LF 3341 10 475 475 $101.60 $48,260.00
3341.0402 42"RCP,Class III LF 3341 10 230 230 $129.85 $29,865.50
3349.0001 4'Storm Junction Box EA 33 49 10 1 1 1 2 1 $5,595.00 $11,190.00
3349.0002 5'Storm Junction Box EA 33 49 10 1 1 $5,850.00 $5,850.00
3349.5001 10'Curb Inlet EA 33 49 20 2 2 4 $4,300.00 $17,200.00
3349.5002 15'Curb Inlet EA 34 49 20 2 2 4 $4,700.00 $18,800.00
9999.0006 42"Sloped End Headwall EA 00 00 00 1 1 $2,950.00 $2,950.00
9999.0007 Inlet Protection EA 00 00 00 10 10 $190.00 $1,900-00
9999.0008 Rock Check Dam EA 00 00 00 2 1 2 $750.00 $1,500.00
Total Storm Sewer Bid $177,572.70
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Forth Revised 20120120
Bidder's Proposal
Bidlist Item No. Descri tion Unit of Specification BID QTY BID QTY BID QTY BID QTY BID QTY BID QTY
p Measure Section No. PG.33 PG.34 PG.35 PG.36 PG.37 PG.38 Bid Quantity Unit Price Bid Value
3211.0400 Hydrated Lime(30 lbs/sy) TNA 321129 34.87 34.5 29.7 24.4 31.4 155 $155.00 $24,025.00
3211.0501 6"Lime Treatment SY 3211 29 2324.5 2303 1980.5 1627 2096 10,331 $2.70 $27,893.70
3213.0101 6"Conc Pvmt SY 32 13 13 2186.7 2159.4 1858.3 1522.1 1959.2 9,686 $34.30 $332,229.80
3213.0301 4"Conc Sidewalk SF 32 13 20 152 152 $6.00 $912.00
3213.0501 Barrier Free Ramp,Type R-1 EA 32 13 20 2 5 7 $1,950.00 $13,650.00
3213.0504 Barrier Free Ramp,Type M-2 EA 32 13 20 2 1 3 $1,900.00 $5,700.00
3213.0506 Barrier Free Ramp,Type P-1 EA 32 13 20 2 1
3 $1,600.00 $4,800.00
9999.0009 Remove&Dispose Street Barricade EA 00 00 00 1 1 $500.00 $500.00
9999.0010 Remove&Relocate Standard EOR Barricade EA 00 00 00 1 1 2 $1,850.00 $3,700.00
9999.0011 Concrete Pavement Header LF 00 00 00 29 29 58 $10.00 $580.00
9999.0012 Stop Signs EA 00 00 00 51 5 $90.00 $450.00
9999.0013 Street Name Blade EA 00 00 00 161 16 $250.00 $4,000.00
9999.0014 Street Sign Pole EA 00 00 00 31 3 $250.00 $750.00
Total Paving Bid $419,190.50
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Forth R-ixed 20120120
Project Item Information Bidder's Proposal
Bidlist Item No. Description BID QTY
p Unit of Measure Specification Section No. PG 38 Bid Quantity Unit Price Bid Value
2605.3015 2"CONDT PVC SCH 80(T) LF 26 05 33 1470 1,470 $9.05 $13,303.5 1 0
3441.3201 LED Lighting Fixture(70W) EA 34 41 20 13 13 $725.00 $9,425.00
3441.3345 Rdwy
III
TY D-25-6 Pole EA 34 41 20 13 13 $2,370.00 $30,810.00
3441.3404 6-6-6 Triplex Alum Elec Conductor w/#10 Copper LF 34 41 20 1470 1,470
Ground in Pole Onl $3.25 $4,777.50
3441.3301 Rdwy Ilium Foundation TY 4 EA 34 41 20 13 13 $1 805.001 $23,465.00
Total Street Lights Sid $81,781.00
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120120
WRITTEN CONSENT TO CORPORATE ACTION
BY BOARD OF DIRECTORS OF
LENNAR TEXAS HOLDING COMPANY
NOVEMBER /S , 2011
The undersigned, constituting all of the members of the Board of Directors of LENNAR
TEXAS HOLDING COMPANY, a Texas corporation (the "Corporation"), pursuant to the
provisions of the Texas Business Corporation Act, do hereby unanimously agree and consent to
the adoption of, and do hereby adopt,the following resolution:
RESOLVED, that Stewart Parker be, and hereby is, elected to the office
of Vice President of the Corporation, to serve the Corporation in such capacity
until the next annual meeting of the Board of Directors of the Corporation, or until
a successor is duly elected and qualified or until his earlier resignation or removal
from office.
This Written Consent may be executed in counterparts, and all counterparts executed
shall constitute one Written Consent. A facsimile or PDF of a signature to this Written Consent
shall be deemed as valid as an original signature thereto.
IN WITNESS WHEREOF, the undersigned have executed this Written Consent effective
as of the date first written above.
DIRECTORS:
ark Sustana