WHEREAS, the City of Fort Worth (City) and Teague Nall and
Perkins, (Engineer) made and entered into City Secretary Contract
No. 27966, (the Contract) which was authorized by the City Council
by M&C C-19206 on the 27th day of August, 2002; and
WHEREAS, the Contract involves engineering services for the
following project:
Sanitary Sewer Rehabilitation Contract LII (52)
WHEREAS, it has become necessary to execute Amendment No. 1
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated November 21, 2003 a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer total $21,750 .00
2 .
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $312, 050 . 00
3 .
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
t r
EXECUTED on this the �' �� day of W / ,
2003, in Fort Worth, Tarrant County, Texas.
ATTEST:
Contract Authorization
Glo is Pearson, City Secretary -�-� --- - - • Q as �.
APPROVED: APPROVED:
A ?A0W)A46 W-
A. Douglas Rademaker, P.E. Marc Ott
Director, Department of Assistant City Manager
Engineering
Teague Nall and Perkins, Inc.
ENGINEE
By:_
Name: Ty Hilton, P.E.
Principal
1100 Macon St. ,
Fort Worth, TX 76102
APPROVED AS TO FORM AND LEGALITY:
Gary Steinberger
Assistant City Attorney
ENGI.FRM(NO M&C)
-2-
�. TEA G(�'E NA f L AND PERKINS
,vc. ENGINEERS A SURVEYORS s CONSULTANTS
November 21, 2003
Mr. Rakesh Chaubey, P.E.
Project Manager
Department of Engineering
City of Fort Worth
900 Monroe Street, Suite 201
Fort Worth, TX 76102
RE: Sanitary Sewer Rehabilitation Contract LII (52)
Sewer Project No. PS58-070580175070
D.O.E. Project No. 3763
Fee Proposal for Contract Amendment No. 1
Dear Mr. Chaubey:
Teague Nall and Perkins, Inc. is submitting this fee proposal for Amendment No. 1 to the contract
for the above referenced project based on additional services requested. The following is a brief
description and cost for the additional services provided on this project:
1. Additional Services to prepare Right-of-Entry and Easement Documents
The engineering services contract does not include the preparation of right-of-entry or
easement documents. These services were not included in the original contract because
the required number of each was not known until the Conceptual Design Plan could be
completed. The concept plan and preliminary construction plans have now been completed
and the number of right-of-entry agreements and easements are known and are
summarized below:
• Right-of-Entry Agreements 37 each @ $ 50 per each = $ 1,850
• Permanent Utility Easements 11 each @ $700 per each = $ 7,700
• Temporary Construction Esmts. 11 each @ $350 per each = $3,850
Subtotal Preparation of Right-of-Entry and Easement Documents: $13,400.00
2. Additional Services for Hydrologic and Hydraulic Study of Marine Creek
The conceptual design process led to the decision to construct an aerial crossing of Marine
Creek for sewer main M-BR instead of replacing the existing siphon. The City subsequently
required that TNP prepare a hydraulic study to evaluate the impact of the proposed aerial
crossing. TNP prepared the hydraulic study and submitted it to the City's staff hydrologist
for review. The study was recently approved.
Subtotal Hydrologic and Hydraulic Study of Marine Creek: $6,350.00
1100 MACON STREET
FORT WORTH, TEXAS 76102
(817)336-5773
FAX(817)336-2813
1
3. Additional Services for Structural Design of Marine Creek Aerial Crossing
As noted above, the conceptual design process led to the decision to construct an aerial
crossing of Marine Creek for sewer main M-BR instead of replacing the existing siphon.
The design of the aerial crossing includes the structural design of the piers which was not
included in the original contract.
Subtotal Structural Design of Marine Creek Aerial Crossing: $2,000.00
Total Contract Amendment No. 1: $21,750.00
For additional services provided pursuant to this Amendment No. 1,we request compensation in an
amount not to exceed $21,750.00. Such payment shall be made in accordance with the payment
terms specified in the Contract.
Summary.of Contract Fee:
Original Contract Amount: $290,300
Amendment No. 1 (Not-to-Exceed): 21,750
Revised Contract Amount (Not-to-Exceed): $312,050
Thank you for consideration of this contract amendment request. If you have any questions, please
do not hesitate to call me.
Sincerely,
TEAGUE NALL AND PERKINS, INC.
Ty Hilton, P.E.
2
FORTWORTH
MEM NDUM
TO: A. Douglas Rademaker, Director, DOE; and
Mike Groomer, Assistant City Manager
FROM: Rakesh Chaubey, DOE
DATE: December 10, 2003
RE: DESIGN FEE AMENDMENT NO. 1 TO SANITARY SEWER REHABILITAION
CONTRACT LII (52)
DOE 3763
SEWER PROJECT NO. PS58-070580175070
The proposed amendment will allow Teague Nall and Perkins, Inc. to provide additional services to the
project as requested by the City.
This amendment is necessary to pay for preparation of right-of-entry and easement documents. The
original scope of the contract did not cover easements because the number of easements was unknown
and only became clear later on during the course of design when the alignments of the lines were
established. Additionally, during the course of design, the City asked the consultant to provide for an
Aerial crossing over Marine Creek. Hydrologic Study and Structural design of the aerial crossing, were
needed as a consequence to this decision. This amendment covers those items as well.
Teague Nall and Perkins, Inc., has submitted a fee in the amount of$21,750.00 for the additional work
as described above, thereby increasing the contract fee from $290,300.00 to $312,050.00. I believe this
fee is fair and reasonable for the additional length of sewer lines to be designed. It is recommended that
the request be approved.
Please authorize additional fee by your signatures on the attached contract amendment forms.
Rakesh Chaubey
Attachment
Cc: Berdena Hamilton, Water Department
Dan Pepon, Water Department.
ENGINEERING DEPARTMENT
THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102-6311
(817) 871-7941 * FAX (817) 871-7854
Printed on recycled paper