Loading...
HomeMy WebLinkAboutContract 30499 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No.� WHEREAS, Mercantile Partners, L.P. , hereinafter called "Developer", desires to make certain improvements to Block 3A,Lots 3 & 6 Mercantile Center Addition, an addition to the City of Fort Worth,Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: That said Developer, acting herein by and through Brian Randolph, its duly authorized Vice President, and the City, acting herein by and through Marc Ott, its duly authorized Assistant City Manager, for and in consideration of the covenants and conditions contained herein, do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II,paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. Mercantile Ctr-CFA REVISED FORMAT WITH 4% 08 20 04.doc CITY ���;����� Mercantile Center Addition August 20, 2004 1�T, `n �U H, T E I F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof- Mercantile Ctr-CFA REVISED FORMAT WITH 4% 08 20 04.doc t� '�.p Mercantile Center Addition 'w r,o August 20, 2004 vJI ���Q Water(A) None; Sewer(A-1)None; Paving (B) attached; Storm Drain (B- 1) attached; Street Lights and Signs (C) attached. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, 131, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $216,863.98. Item Developer City Cost Total Cost Cost A. Construction 1. Streets $40,427.75 $ - $ 40,427.75 2. Storm, Drainage $166,653.00 $ - $ 166,653.00 3. Street Lights $ 1,500.00 $ - $ 1,500.00 4. Street Name Signs -0- $ - $ - B. Engineering Design $ - $ - $ - C. Construction Engineering and Mana erne t by DOE 4% $8,283.231 $ 8,283.23 TOTALS 1$ 216,863.981$ -[$ 216,863.98 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. The developer is responsible for installation of sidewalk and a separate financial guarantee is required in the form of a bond or check for the cost of the sidewalk. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. Mercantile Ctr-CFA REVISED FORMAT WITH 4% 08 20 04.doc Mercantile Center Addition August 20, 2004 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Develo er has executed this instrument in triplicate, at Fort Worth,Texas this the�hday of , 2004. Approval Recommended: Transportation and Public Works Department 05 Robert Goode, P. E. Director f�'f Fo W ' Marc 6tt Assistant City Manager Approved as to Form: 4ssis�tant City Attorney ATTEST: DEVELOPER 1 By: Briatrikandolph, Vice President Mercantile Corporation General Partner: Mercantile Partners, L.P. Contract Authorization Date ORIG2-CFA REVISED FORMAT WITH 4 o-082004.doc f;�rf Mercantile Center Addition ]`; August 20, 2004 e Dunaway Associates, Inc. Page 1 Dale A.Apple, E.I.T. Unit II: Paving & Storm Drain Improvements to Serve LOTS 3 & 6; BLOCK 3A - MERCANTILE CENTER ADDITION Section A: Paving Improvements BID BID ITEM OU ANTITY I UNIT DESCRIPTION PRICE COST 1 146 SY 6-inch Reinf Concrete PVMT(complete&in lace) $ 25.00 $ 3,650.00 2 164 SY 6-inch Lime Stabilized Sub grade(Applied r 6%per weight) $ 2.25 $ 369.00 3 3 TON Lime(36#/SY) $ 125.00 $ 368.75 4 6,664 SF Standard 4-foot concrete sidewalk $ 3.25 $ 21,658.00 5 1 LS Pavement markings per City Requirements $ 3,000.00 $ 3,000.00 6 60 LF 4"PVC Pie w/ ullwire $ 10.00 $ 600.00 7 881 LF Standard 4-foot concrete sidewalk $ 12.00 $ 10,572.00 8 140 LF 6"Conc Curb&Gutter $ 1.50 $ 210.00 SUBTOTAL: $ 40,427.75 Section B: Storm Drain Improvements UNI ITEM QUANTITY ND TITY UNIT DESCRIPTION PRICE COST 1 174 LF 5-foot by 4-foot RCB $ 250.00 $ 43,500.00 2 565 LF Class III 54-inch RCP $ 175.00 $ 98,875.00 3 40 LF Class III 21-inch RCP $ 30.00 $ 1,200.00 4 1 EA Rework 20-foot Curb Inlet and Replace with Grate Inlet $ 2,500.00 $ 2,500.00 5 1 EA 10-foot Curb Inlet $ 2,000.00 $ 2,000.00 6 5 EA 6-footsquare SDMH $ 1,800.00 $ 9,000.00 7 22 VF Verticle MH Extension $ 250.00 $ 5,500.00 8 739 LF Trench Safety $ 2.00 $ 1,478.00 9 1 LS Trench Backfill and Densi Testing $ 2,500.00 $ 2,500.00 10 10 CY Concrete for misc placement $ 10.00 $ 100.00 SUBTOTAL: $ 166,653.00 UNIT SUBTOTAL: $ 207,080.75 H:\WP\Jobs\2000\2000098\03\CFA\SD_CFA—COST—RO2-04-0607—daa.xi a F9_ 77. -- r "I I. 1`iilT T, I HEODORE M. WHITLOCK VOLUME 15422, PAGE 22 + _ LOT 3, BLOCK 3A ! D.R.T.C.T. MERCANTILE CENTER , INSTALL 8J0.60 LF LS-WE-WALK: LL c - a fr J z w _ !_ k 1-r � '1 t I LOTS�i BLOCK[3A � MERC M77LE C NTER i j ; e o MERCANTILE PARTNERS p4 f a° VOLUME 11752, PAGE 190 a i 1*. C 1NST\41.�'3Z D.R. T.C.T. a 4' CdI�G EWALK f o Q �- 1 �, y � G o rn r F r JI-`i` _ CF INSTALL. 415.98 INSTALL: 35.23 LF CROSS DR .�r` (J 4 CONC. SIDEWALK } ® PROPOSED 6" CONCRETE DRIVE APPROACH PROPOSED 4' SIDEWALK PROPOSED HAW TRANSITION PAVEMENT PAVING IMPROVEMENTS o loo zoo 400 TO SERVE `Dunaway Pn^ire" LOTS 3&6, BLOCK 3A GRAPHIC SCALE IN FEET Associates,Inc. MERCANTILE CENTER ADDITION EXHIBIT a� PAGE 1 OF 2 LOT 6, BLOCK 3A 1. %IYSTALL/�lj: MERCANTILE CENTER ¢j coticl SIDEWA INSTALL 74 SY [. CIO 6' REINF. CONC. I _ DRIVE _ - j z INSTALL STU. 1.50' �r LV LET --_.1 ` ' SIDEWALK 4' CONC INSTALL: 73 sY 'S 1` .QjA ROS 6' R EINF ONO Z D LF Sw R._ INSTALL: 17 SY OF EX 1.50' HMAC 7RANS177ONV CURB & GUTTER PAVEMENT L 13 SY HMA TRAN9770M REMOVE 80 LF PAVEMENT OF EX. CONG CURB & GUT7FR ® PROPOSED 6'CONCRETE DRIVE APPROACH PROPOSED 4'SIDEWALK IMMUMM PROPOSED HMAC 7RANS177O1N PAVEMENT PAVING IMPROVEMENTS 0 50 100 200 TO SERVE Dunaway I Engi=, LOTS 3&6, BLOCK 3A GRAPHIC SCALE IN FEET MERCANTILE CENTER ADDITION Associates,Inc. ,, „ „ EXHIBIT 'B' PAGE 2 OF 2 Uri,rrU I';11 1 f!IC(I 11 t I ' 3111f U o iiq'i l - _ ��.: - LOT 3, BLOCK 3A ; THEODOl�E M. WH/TLOCK t '^- MERCANTILE CENTER ! VOLUME 15422, PAGE 22 I; —1 ; D.R.T. T. -----_ - I ; ---_--------------------------------- tt --- —� --- i 1 - u UT'T^ I Wrt Y z F k3' 1 ALL �E (�c,., � �� o M �171 - L . I- - �- I� EET - 1� K A :._ , 3 OF 3 M r:A Ei!G�EIJTER II, -- �. �� a� � MERCANTILE PARTNERS �y + VOLUME 11752, PAGE 190 D.R.T.C.T. EET co 4 z I --- - `._�LV -- ----- -- __ !ss 0 100 200 400 STORM DRAIN IMPROVEMENTS TO SERVE GRAPHIC SCALE IN FEET ' , D►unaway I Pl11 LOTS 3&6, BLOCK 3A Associates,Inc. sU 5,C"' Aa,,,A». MERCANTILE CENTER ADDITION EXHIBIT B-1' PAGE I OF 3 '4-! f 1 LOOT, , BLOCJC 3�} -. MtRCANTILE ,('TENTER f „ ODIFY.EX/S71NG 1 ET : -GRATE _ EXIST. 2 0' , ��' INLET (/V6ElyA4[ 4999--!!X. OR APPRQVED J SD!!NLET ; i 'EQUAL) AT 77ME�t�F jAR1.VEN!A_ r CON TRUCTION._ f 1 j4F�GlN P1BLlC IMPROVEMENTS TOP OF GRATE �y6Q9.7 j IPR/VATIE OP,ROVEMENTS -- ��`'`^•- , FL(21") = 606.28 END & PSG - . : IN,STALL 0'i CURB !NLET - 610.72 �'`"--- FOP QF RA Tt r 610.38 ) 606:88.E � EXIST. _� - rsT i 20' 24" RCP .,1_ !� ET SyLV41VIA CROSS EXIST 20' R' SD INLET EX/ST. -E'XIS.T. ' SOMH BEGIN PUBLIC �� `;. IMPROVEMENTS 5 24" RCP - BEGIN 21" RCP f CONNECT TO EXST. 20' CURB INLET EXIST, 36" RCP EXIST. 20' � ' F/L 21 610.64 f � DOE #.• 2566 5D INLET �. FILE NO.: K-1559 EXIST. 36" RCP I DOE #• 2566 FILE NO.: K-1559 0 25 50 100 STORM DRAIN IMPROVEMENTS TO,�Dunaway LOTS 3&6,BLOCK 3A GRAPHIC SCALE IN FEET Ergineen Planner Associates,Inc. g, ,a„r,ne<,a MERCANTILE CENTER ADDITION EXHIBIT "B-1" PAGE 2 OF 3 BEGIN 40 LF JACK & BORE F/L 54- 595.39 i ii END & PLUG 54-1 RCP.r CONST S7D. 6' SQAWH i ii F11- 54 5.95.80 A CONST -S7D. 6"-SQMH RIM 605.61 1 RIM 604.16 594.14 F17. 54' 59.3.76 F 54 L - -------- --------- ------ BEGIN PUBLIC I IMPRO WA4EN TS CONS77?UCT SID. --------- ----- 6' SQMH 1 , 11 PROP F11 5x4' 589.38 CONST--ST9--- PROP. 'x4l RLD\ I EX. 5X4' RCB 6' SO. MH DRAINAGE 54" RCP -w 'A-01 D.0-E 4129 -RIM 605:71, EASEMENT ------- -#%L 514- !'F695.57 END 40 LF FIL E W-1312 JACK & BORE CONST STD. 6' SOMH It END & PLUG 54- RCP- RIM 604.00- PROP. PERMANENT FA 54-11695.66 F/t 54' 595.55 1 HMA C PA VEWEN T F/t 54" 593.40 71 11 �4 REPAIR FA 5X4' 59340 CONST STD. 6' SOMH INSTALL: EXIST I - 0 1 1 - 30" PLUG 30" RCP I I Z 1:4 RIM 600.67 DOE 4129 F/I .30- 594.99 FILE #.- W-13121 �4>4 CQ 0 I Flt 5X4' 590.36 MERCANTILE PARTNERS I CO --I I VOLUME 11752, PAGE 190 D.R.TC.T 0 50 100 200 STORY DRAIN IMPROVEMENTS TO SERVE GRAPHIC SCALE IN FEET Engirmefs St�,Dunaway I man w, LOTS 3&6, BLOCK JA I Surveyom 4V Associates,Inc. I endsmpe Addaects MERCANTILE CENTER ADD177ON EXHIBIT "B-1" PAGE 3 OF 3 I. STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 0 EA $ 2, 000 $0, 000 . 00 MID-BLOCK RESIDENTIAL 0 EA $ 2, 000 $0, 000 . 00 CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2, 000 $0, 000 . 00 MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 . 00 MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2 , 500 $0, 000 . 00 MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2 , 500 $0, 000 . 00 RELOCATE EXISTING LIGHT 1 EA $ 1, 500 $1, 500 . 00 Subtotal $1, 500.00 City' s Cost $00, 000 . 00 Developer' s Subtotal $1, 500.00 10% Contingencies $0, 000 .00 Project Total $1, 500.00 Adjacent Developer' s Cost $0, 000 .00 Developer' s Cost $1, 500. 00 2% Inspection Fee $0, 00.00 (CFA CODE 2004091) DEVELOPER' S COST: $1, 500 .00 MERCANTILE CENTER, LOTS 3&6, BLK III-A July 12, 2004 Fort Worth, Texas July 26, 2004 PAGE I OF Exhibit C II. STREET LIGHTS WORK DESCRIPTION: 1 . The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C" , immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department . 2 . Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works . 3 . The City will install all the streetlights that use overhead or underground conductors on residential, and collector streets. the developer agrees to pay the city the amount shown below prior to the City starting it' s design efforts. 4 . Streetlights on arterial streets shall be installed with underground conduit and conductors . 5 . The Developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operation of the street lights 6 . The estimated cost of this street light installation is detailed on page 1 of exhibit C and is summarized below, the street lights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPER'S COST: $1,500.00 MERCANTILE CENTER, LOTS 3&6, BLK III-A July 12, 2004 FORT WORTH, TEXAS (CFA CODE 2004091) Page II of Exhibit C III. "STREETLIIGHTS" RELOCATION SYLVANIA CROSS DR 1 MERCANTILE CENTER, LOTS 3 & 6, BLK III-A Page III of Exhibit C LOT 6, BLOCK 3A q RELD TE EXISTING MERCANTILE CENTER; d STR ! 0 56 L.F. CONDUIT ? a d �PROPOSED PULL BO PROPOSED pa STREET LIGHT RELOCA77ON r SYLVANIA CROS S DR. - PROPOSED STREET LIGHT ❑ - PROPOSED PULL BOX L • - EXISTING STREET LIGHT — — — - PROPOSED CONDUIT TO BE REMOVED 0 10 20 40 STREET LIGHT IMPROVEMENTS 717 SERVE GRAPHIC SCALE IN FEET Dunaway Pi,'�° LOTS 3&6, BLOCK 3A 4V Associates,Inc. s,;,, peArc,,,ec,, MERCANTILE CENTER ADDITION EXHIBIT "c" .. .. ... ..,�.,,r .,,4..... �,a.,.o PAGE 1 OF 1 IV STREET NAME SIGNS 1 . The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2 . The Developer will pay for the street name sign installations required for this development to the extent of $100 . 00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3 . This development creates the following zero (0) intersections at a cost to the Developer of $0.00 : (Private, commercial, office parking lot . ) Mercantile Center, Lots 3 & 6, Block 3A CFA code: 2004091 Date: June 28 , 2004